DE3337994A1 - INSTALLING POLES - Google Patents

INSTALLING POLES

Info

Publication number
DE3337994A1
DE3337994A1 DE3337994A DE3337994A DE3337994A1 DE 3337994 A1 DE3337994 A1 DE 3337994A1 DE 3337994 A DE3337994 A DE 3337994A DE 3337994 A DE3337994 A DE 3337994A DE 3337994 A1 DE3337994 A1 DE 3337994A1
Authority
DE
Germany
Prior art keywords
pile
ground
driven
section
housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE3337994A
Other languages
German (de)
Inventor
John Peter Natal Everett
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Frankignoul Pieux Armes
Original Assignee
Frankignoul Pieux Armes
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Frankignoul Pieux Armes filed Critical Frankignoul Pieux Armes
Publication of DE3337994A1 publication Critical patent/DE3337994A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/62Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/26Placing by using several means simultaneously

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Description

S.A. Compagnie Internationale £" 18. Oktober 1983S.A. Compagnie Internationale £ "October 18, 1983

des Pieux Armes Frankignoul -Jr P 4947of the Pieux arm Frankignoul -Jr P 4947

Rue Gretry, 196
B-4020 LIEGE
Rue Gretry, 196
B-4020 Lounger

Beschreibungdescription

Installieren von PfählenInstalling piles

Die Erfindung betrifft das Installieren von Pfählen oder ähnlichen Gegenständen in dem Boden, die temporäre oder permanente Pfahlgehäuse einschließen. Alle derartigen Gegenstände werden nachfolgend als Pfähle bezeichnet, wenn nicht anders besonders erläutert, und der Ausdruck Pfahl soll alle derartigen Gegenstände umfassen.The invention relates to installing piles or similar items in the ground including temporary or permanent pile housings. All such Objects are hereinafter referred to as piles, unless otherwise specifically explained, and the term pile is intended to include all such items.

Das Installieren von Pfählen wird zweckmäßig durchgeführt, indem Axialstöße eines Schlaghammers auf den Pfahl ausgeübt werden, oder daß der Pfahl gedreht wird und gleichzeitig eine Axialkraft auf ihn wirkt, um ihn in den Boden zu treiben. Ein beiden Installierungsverfahren anhaftender Nachteil besteht darin, daß sich Reibungskräfte zwischen den Seiten des Pfahles und dem Boden entwickeln, welche die erforderliche Energie erhöhen, um den Pfahl in den Boden zu treiben, wobei auch die Energie erhöht wird, die gefordert wird, um die Pfahlgehäuse oder Dorne zurückzuziehen .The installation of piles is conveniently carried out by axial thrusts of a percussion hammer on the pile be exerted, or that the pile is rotated and at the same time an axial force acts on it to move it into the Drifting soil. A disadvantage inherent in either method of installation is that frictional forces develop between the sides of the pile and the ground, which increase the energy required to power the pile drift into the ground, also increasing the energy required to withdraw the pile housings or mandrels .

Ein Gegenstand der Erfindung besteht darin, diesen obenerwähnten Nachteil zu beseitigen.It is an object of the invention to provide the aforesaid To eliminate disadvantage.

Ein Verfahren zum Installieren eines Pfahles gemäß Erfindung umfaßt das Ausrichten des Pfahls in Bezug auf den Boden, in welchem er zu installieren ist, das Eintreiben oder Drücken des Pfahles in den Boden und zu gleicher Zeit das Zugeben einer abbindbaren flüssigen Substanz zwischenA method of installing a pile according to the invention comprises aligning the pile with respect to the Soil in which it is to be installed, driving or pressing the stake into the ground at the same time adding a settable liquid substance between

der Seite des Pfahles und dem Boden, in welchen er getrieben wird.the side of the stake and the ground into which it is driven.

Der Pfahl wird zweckmäßig in den Boden getrieben oder gedruckt, indem auf ihn eine Axialkraft ausgeübt und er um seine Achse gedreht wird. Die Axialkraft wird vorzugsweise mittels Schlaghammerstößen aufgebracht. Die Hammerschläge und das Drehen des Pfahles können gleichzeitig oder abwechselnd erfolgen. Die Drehung kann in einer Richtung oder oszillierend sein.The stake is expediently driven or pressed into the ground, by exerting an axial force on it and rotating it around its axis. The axial force is preferred applied by hammer blows. The hammer blows and the turning of the pile can be done simultaneously or alternately take place. The rotation can be unidirectional or oscillatory.

Die abbindbare flüssige Substanz, die beispielsweise flüssiger Mörtelschlamm oder Beton sein kann, wird zweckmäßig zugegeben, indem ein Behälter an dem Punkt geschaffen wird, an welchem der Pfahl in den Boden eintritt, wobei der Behälter erlaubt, daß der Mörtelschlamm oder der Beton zwischen der Seite des Pfahles und dem Boden unter· der Wirkung von Schwerkraft fließen kann.The settable liquid substance, for example liquid Mortar slurry or concrete is conveniently added by creating a container at the point at which the pile enters the ground, the container allowing the mortar slurry or concrete between the side of the pile and the ground under the action can flow by gravity.

Der Pfahl kann hohl sein. In diesem Fall kann die abbindbare flüssige Substanz zusätzlich oder alternativ in das Innere des Pfahles während seines Setzens eingeführt werden. Dies kann dadurch erreicht werden, daß Öffnungen in der Pfahlwand vorgesehen werden, durch welche der Mörtelschlamm oder Beton in das Innere des Pfahles strömt.The stake can be hollow. In this case, the settable liquid substance can additionally or alternatively into the interior of the stake while it is being set. This can be achieved by making openings in the pile wall be provided through which the mortar slurry or concrete flows into the interior of the pile.

Weiterhin umfaßt erfindungsgemäß ein Pfahl, der für die Verwendung in dem erwähnten Verfahren geeignet ist, ein längliches Hohlglied mit öffnungen in seiner Wand in Abständen längs seiner Länge.Furthermore, according to the invention comprises a pile for the Use in the mentioned method is suitable, an elongated hollow member with openings in its wall at intervals along its length.

Der Pfahl kann jeden geeigneten Querschnitt aufweisen, der geeignet ist, einen Spalt zwischen der Seite des PfahlesThe pile can be of any suitable cross-section suitable to include a gap between the side of the pile

und dem Boden zu schaffen, in welchen er getrieben oder bei Rotation des Pfahles um seine Achse gedrückt wird. So kann der Pfahl einen rechteckigen Querschnitt aufweisen. Alternativ kann der Pfahl kreisförmigen Querschnitt aufweisen, wobei an seinem Äußeren ein oder mehrere längliche Gebilde vorgesehen sind, die sich davon auswärts erstrecken .and to create the ground into which it is driven or pushed as the pole rotates about its axis. The post can thus have a rectangular cross-section. Alternatively, the pile can be circular in cross-section have, one or more elongated formations being provided on its exterior extending outwardly therefrom .

Die Erfindung wird nachfolgend an einem Ausführungsbeispiel anhand der beigefügten Zeichnung näher erläutert.The invention is explained in more detail below using an exemplary embodiment with reference to the accompanying drawing.

In der Zeichnung zeigen:In the drawing show:

Fig. 1 eine Schnittansicht einer AnordnungFig. 1 is a sectional view of an arrangement

eines Pfahles, der im Boden zu installieren ist,a pile to be installed in the ground,

Fig. 2 und 3 perspektivisch Pfahlausbildungen gemäß2 and 3 in perspective pole designs according to

Erfindung.Invention.

In der Zeichnung ist ein Pfahl gezeigt, der in einen Boden einzutreiben bzw. dort zu installieren ist. Das Installieren wird mit Hilfe eines temporären Pfahlgehäuses 2 bewirkt, wie es beispielsweise in Fig. 2 und 3 gezeigt ist. Das in Fig. 2 gezeigte Pfahlgehäuse weist die Form eines hohlen Metallrohres rechteckigen Querschnittes auf, wobei Öffnungen 3 in jeder Seitenwand des Rohres in Abständen längs dessen Länge vorgesehen sind. Das in Fig. 3 gezeigte Pfahlgehäuse 2 weist die Form eines hohlen Metallrohres kreisförmigen Querschnittes auf, wobei in Abständen in dessen Seitenwand Öffnungen 3 vorgesehen sind. Zusätzlich weist das Pfahlgehäuse 2 nach Fig. 3 longitudinale Gebilde 4 an der Außenseite auf, die sich radial auswärts erstrecken. Jedes Gebilde 4 weist einen Führungsrand 4a und einen nacheilenden Rand 4b auf.In the drawing, a pile is shown, which is to be driven into a ground or to be installed there. The installing is effected with the aid of a temporary pile housing 2, as shown for example in Figs. That Pile housing shown in Fig. 2 has the shape of a hollow metal tube of rectangular cross-section, with openings 3 are provided in each side wall of the tube at intervals along its length. The pile housing shown in Fig. 3 2 has the shape of a hollow metal tube of circular cross-section, with intervals in its side wall Openings 3 are provided. In addition, the pile housing 2 according to FIG. 3 has longitudinal structures 4 on the outside that extend radially outward. Each structure 4 has a leading edge 4a and a trailing edge Edge 4b on.

Um einen Pfahl gemäß Erfindung zu installieren, wi-rd eine Bodenplatte 5 am Boden 1 angeordnet und ein Pfahlgehäuse 2 oberhalb vertikal ausgerichtet, wobei sich ein Ende des Pfahlgehäuses auf dem Fußteil 5 befindet. Ein Behälter 6, der einen Boden 6a und eine lösbare Wand 6b umfassen' kann, ist um das Fußstück 5 angeordnet und mit einer geeigneten abbindbaren flüssigen Substanz, wie beispielsweise flüssigem Mörtelschlamm oder Beton 7 gefüllt.In order to install a pile according to the invention, a floor plate 5 and a pile housing are arranged on the floor 1 2 vertically aligned above, with one end of the pile housing on the foot part 5. A container 6 comprising a bottom 6a and a detachable wall 6b ' can, is arranged around the foot piece 5 and with a suitable settable liquid substance, such as liquid mortar slurry or concrete 7 filled.

Das Pfahlgehäuse 2 erstreckt sich durch einen geeigneten Drehtisch 8, welcher das Pfahlgehäuse 2 um dessen Achse drehen kann. Das obere Ende des Pfahlgehäuses 2 nimmt eine zweckmäßige Kappe 9 auf, um es gegen Beschädigung durch die Schläge eines Hammers zu schützen, der schematisch bei 10 angedeutet ist.The pile housing 2 extends through a suitable turntable 8, which the pile housing 2 around its axis can turn. The upper end of the pile housing 2 receives a suitable cap 9 to protect it from damage to protect the blows of a hammer, which is indicated schematically at 10.

Zum Installieren des Pfahles wird das Pfahlgehäuse 2 zunächst in dem Boden 1 unter der kombinierten Wirkung intermittierender Schläge seitens des Hammers. 10 und Rotation des Pfahlgehäuses durch den Drehtisch 8 getrieben. Wenn das Pfahlgehäuse 2 so in den Boden getrieben wird, fließt der flüssige Mörtelschlamm oder Beton unter Wirkung der Schwerkraft in den Raum 11 zwischen der Seite des Pfahlgehäuses, und dem Boden. Es sei hervorgehoben, daß die Form des Pfahlgehäuses 2 gewährleistet, daß der Raum 11 bei Rotation des Pfahlgehäuses gebildet wird. Zur gleichen Zeit strömt Mörtelschlamm oder Beton durch die öffnungen 3 in das Innere des Pfahlgehäuses 2. ■ .To install the pile, the pile housing 2 is first in the ground 1 under the combined action of intermittent blows from the hammer. 10 and rotation of the Pile housing driven through the turntable 8. When the pile housing 2 is driven into the ground in this way, the liquid flows Mortar slurry or concrete under the action of gravity into space 11 between the side of the pile housing, and the ground. It should be emphasized that the shape of the pile housing 2 ensures that the space 11 upon rotation of the Pile housing is formed. At the same time, mortar slurry or concrete flows into the interior through the openings 3 of the pile housing 2. ■.

Die Ecken des Pfahlgehäuses bei Fig. 2 und die Ausbildungen bzw. Gebilde 4 des Gehäuses nach Fig. 3 drücken den Mörtelschlamm oder Beton auswärts in den Boden ein. Dies dient dazu, um im geeigneten Boden zu gewährleisten, daß ein abschließender Pfahldurchmesser erhalten wird, der be-The corners of the pile housing in Fig. 2 and the training or structure 4 of the housing according to FIG. 3 press the mortar slurry or concrete outwards into the ground. This is to ensure that one in the appropriate soil final pile diameter is obtained, which is

33373943337394

trächtlich größer als der des Pfahlgehäuses 2 ist. Es wird ebenfalls gewährleistet, daß ein Mischen an der Zwischenfläche zwischen dem Boden und dem Mörtelschlamm oder Betonn eintritt, wodurch die abschließende Bindung zwischen Pfahl und Boden verbessert wird.is considerably larger than that of the pile housing 2. It it is also ensured that mixing occurs at the interface between the soil and the mortar slurry or concrete, which improves the final bond between the pile and the ground.

Das Einführen des flüssigen Mörtelschlammes oder Beton zwischen der Seite des Pfahlgehäuses 2 und dem Boden wird die Reibkräfte herabsetzen, die in diesem Bereich normalerweise entwickelt werden, so daß demzufolge die Energie verringert wird, die erforderlich ist, um das Pfahlgehäuse in den Boden'zu treiben.The introduction of the liquid mortar slurry or concrete between the side of the pile housing 2 and the ground is carried out reduce the frictional forces that are normally developed in this area, so that consequently the energy is reduced, which is required to drive the pile housing in the Boden'zu.

Wenn einmal das Pfahlgehäuse 2 in dem Boden auf geforderte Tiefe getrieben ist, wird ein zweckmäßiges Verstärkungsgehäuse aus Stahl (nicht gezeigt) längs der Innenseite des Pfahlgehäuses 2 abgesenkt, wenn dies erforderlich ist. Das Pfahlgehäuse kann dann in herkömmlicher Weise abgezogen werden, wobei das Fuß- bzw. Bodenteil 5 am Boden des Pfahles verbleibt. Das Abziehen wird wegen des Betons oder Mörtelschlamms, der das Gehäuse 2 umgibt, beträchtlich einfacher als bei herkömmlichen Pfählen. Alternativ kann ein zweckmäßiger Verstärkungskäfig (nicht gezeigt) längs der Innenseite des Pfahlgehäuses 2 abgesenkt werden, wenn dies erforderlich ist, und zwar vor oder während des Eintreibens des Gehäuses 2.Once the pile casing 2 has been driven into the ground to the required depth, a suitable steel reinforcement casing (not shown) is placed along the inside of the Pile housing 2 lowered if necessary. The pile housing can then be peeled off in a conventional manner be, the foot or bottom part 5 remains on the bottom of the pile. The peeling is because of the concrete or Mortar slurry surrounding the housing 2 is considerably easier than with conventional piles. Alternatively, a appropriate reinforcement cage (not shown) can be lowered along the inside of the pile housing 2 if so is required, namely before or during the driving of the housing 2.

Es lassen sich zweckmäßige Änderungen bei der beschriebenen Ausführungsform durchführen, ohne sich jedoch dabei vom Kern der Erfindung zu entfernen.Appropriate changes can be made to the embodiment described without, however, departing from Remove essence of the invention.

Beispielsweise können die öffnungen 3 von dem Pfahlgehäuse 2 fortgelassen werden, in welchem Fall das Gehäuseinnere mit Beton (high slump concrete) gefüllt werden kann, nachdem das Gehäuse in den Boden auf die geforderte Tiefe getrieben ist.For example, the openings 3 from the pile housing 2 can be omitted, in which case the interior of the housing can be filled with concrete (high slump concrete) afterwards the housing is driven into the ground to the required depth.

Weiterhin kann das Installieren des Pfahles ausgeführt werden, indem eine nicht-stoßend wirkende Axialkraft an irgendeiner Stelle am Pfahl anstelle der Verwendung eines Hammers 10 aufgebracht wird.Furthermore, the installation of the pile can be carried out by applying a non-impacting axial force anywhere on the stake instead of using a hammer 10.

Die Erfindung kann auch bei dem Installieren von zusammengesetzten Pfählen Anwendung finden. In einem solchen FallThe invention can also be applied to the installation of composite Piles are used. In such a case

wird ein vorgeformter Pfahl, der beispielsweise rechteckigen Querschnitt aufweist, in den Boden in der obenbeschriebenen Weise getrieben, wobei an seinem unteren Ende ein geeigneter Schuh vorgesehen ist. Wenn einmal der vorgeformte Pfahl in den Boden getrieben ist, ist die installation vollständig, und der eingeflossene Mörtelschlamm oder das Vergußmaterial härtet, um einen zusammengesetzten Pfahl zu bilden.a preformed pile, for example rectangular in cross-section, is inserted into the ground in the above-described Wise driven with a suitable shoe provided at its lower end. Once the preformed The pile is driven into the ground, the installation is complete, and the poured mortar slurry or grout hardens to form a composite pile form.

Weiterhin können öffnungen 3 in dem Pfahlgehäuse 2 fortgelassen werden und Öffnungen in der Schwanzfläche 4b des Vorsprunges H ausgebildet sein. Das Innere des Gehäuses 2 kann dann für verschiedene Zwecke verwendet werden, wie dies unten erläutert ist.Furthermore, openings 3 in the pile housing 2 can be omitted and openings in the tail surface 4b of the projection H can be formed. The interior of the housing 2 can then be used for various purposes, as explained below.

Beispielsweise kann das Gehäuse 2 in den Boden mit Hilfe eines Hammers getrieben werden, der auf einen Betonstopfen oder ein anderes geeignetes Material am Boden des Gehäuses 2 fällt, begleitet mit einem Drehen des Gehäuses, bis die erforderliche Tiefe erreicht worden ist. Dann wird ein weiteres Eintreten des Gehäuses 2 verhindert, und es wird ein vergrößerter Boden unterhalb des Bodens des Gehäuses 2 gebildet, und zwar durch Austreiben des Stopfens und durch aufeinanderfolgende Chargen aus Beton oder aus einem anderen geeigneten Material, wobei direkte Stöße eines Hammers ausgeübt werden, der innerhalb des Gehäuses 2 fällt. Ein Verstärkungskäfig kann dann innerhalb des Gehäuses 2 abgesenktFor example, the housing 2 can be driven into the ground with the aid of a hammer that hits a concrete plug or Another suitable material falls at the bottom of the housing 2, accompanied by a turning of the housing until the required depth has been reached. Then the housing 2 is prevented from entering further, and it will an enlarged bottom formed below the bottom of the housing 2 by driving out the plug and through successive batches of concrete or of any other suitable material, the direct blows of a hammer being exerted falling within the housing 2. A reinforcement cage can then be lowered inside the housing 2

werden, wenn dies erforderlich ist, und das Gehäuseinnere wird dann mit einer Vergußmasse oder Betonn gefüllt.if necessary, and the interior of the housing is then filled with a casting compound or concrete.

Alternativ kann das Gehäuse 2 mit Hilfe eines Stopfens eingetrieben werden, wie dies oben erläutert ist, jedoch ohne die Ausbildung eines vergrößerten Bodens mit Hilfe dieses Stopfens.Alternatively, the housing 2 can be driven in with the aid of a plug are, as explained above, but without the formation of an enlarged floor with the help of this Plugging.

Als weitere Möglichkeit kann ein vergrößerter Boden ausgebildet werden, jedoch das Gehäuse 2 mit Hilfe des Hammers 10 eingetrieben werden.As a further possibility, an enlarged base can be formed, but the housing 2 with the aid of the hammer 10 are driven.

Weil ein Drehen des Pfahles bei dem erfindungsgemäßen Verfahren erfolgt, ist es ebenfalls möglich, geeignete Aufweitungselemente an dem Pfahl zu schaffen, wenn Bodenbedingungen es erfordern, daß der Durchmesser des Pfahles auf ein gefordertes Niveau ausgedehnt wird.Because the pile is rotated in the method according to the invention, it is also possible to use suitable expansion elements to create on the pile when soil conditions require that the diameter of the pile be up a required level is extended.

LeerseiteBlank page

Claims (1)

PatentansprücheClaims 1. Verfahren zum Installieren eines Pfahles in dem Boden, dadurch gekennzeichne,t , daß ein Pfahl in den Boden getrieben oder gedrückt und gleichzeitig eine abbindbare flüssige Substanz zwischen der Außenseite des Pfahles und dem Boden eingeführt wird, in welchen der Pfahl zu treiben ist.1. A method of installing a pile in the ground, characterized in that a Stake driven or pressed into the ground and at the same time a settable liquid substance between the Outside of the pile and the ground is inserted into which the pile is to be driven. 2. Verfahren nach Anspruch 1, dadurch g e k e η η zeichnet, daß der Pfahl in den Boden getrieben oder gedrückt wird, in_-dem eine axiale Kraft auf ihn ausgeübt und der Pfahl um seine Achse gedreht wird.2. The method according to claim 1, characterized in that the pile is driven into the ground or is pressed, in_-which an axial force on him exercised and the pile is rotated about its axis. 3.3. Verfahren nach Anspruch 2, dadurch gekennMethod according to Claim 2, characterized zeichnetdraws daß die Axialkraft in der Form vonthat the axial force is in the form of Schlaghammerstößen aufgebracht wird.Impact hammer blows is applied. 1J. Verfahren nach Anspruch 3, dadurch gekennzeichnet , daß die Hammerschläge und das Drehen des Pfahles gleichzeitig erfolgen. 1 J. Method according to claim 3, characterized in that the hammer blows and the turning of the pile take place simultaneously. 5. Verfahren nach Anspruch 3, dadurch gekennzeichnet , daß die Hammerschläge und das Drehen des Pfahles abwechselnd erfolgen.5. The method according to claim 3, characterized in that the hammer blows and the turning of the stake alternately. 6. Verfahren nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet, daß die Rotation in einer Richtung verläuft.6. The method according to any one of claims 2 to 5, characterized in that the rotation runs in one direction. 7. Verfahren nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet , daß die Rotation oszillierend erfolgt. ' . ■■ 7. The method according to any one of claims 2 to 5, characterized in that the rotation takes place in an oscillating manner. '. ■■ 8. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet , daß die abbindbare flüssige Substanz aus Mörtelschlamm oder flüssigem Beton ausgewählt wird.8. The method according to any one of the preceding claims, characterized in that the settable liquid substance made of mortar sludge or liquid Concrete is selected. 9. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet , daß die abbindbare flüssige Substanz durch Schaffen eines Behälters an dem Punkt eingeführt wird, an welchem der Pfahl in den Boden eintritt, wobei der Behälter ein Strömen der abbindbaren flüssigen Substanz zwischen der Außenseite des Pfahles und dem Boden unter dem Einfluß von Schwer- ' kraft erlaubt.9. The method according to any one of the preceding claims, characterized in that the settable liquid substance is formed by creating a container is inserted at the point at which the pile enters the ground, the container having a flow of the settable liquid substance between the outside of the pile and the ground under the influence of heavy ' force allowed. 10. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet , daß der Pfahl hohl ist.10. The method according to any one of the preceding claims, characterized in that the pile is hollow. 11. Verfahren nach Anspruch 10, dadurch gekennzeichnet , daß der Pfahl mit Öffnungen in der Pfahlwand versehen ist, durch welche die abbindbare flüssige Substanz in das Pfahlinnere fließen kann.11. The method according to claim 10, characterized in that the pile with openings in the The pile wall is provided through which the settable liquid substance can flow into the pile interior. 12. Verfahren nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet , daß der Pfahl einen Querschnitt aufweist, welcher einen Spalt zwischen seiner äußeren Seitenwand und dem Boden schaffen kann, in welchen er bei Rotation des Pfahles um seine Achse getrieben oder gedrückt wird.12. The method according to any one of the preceding claims, characterized in that the pile has a cross-section which can create a gap between its outer side wall and the bottom, in which it is driven or pressed when the pole rotates around its axis. 13- Verfahren nach Anspruch 12, dadurch gekennzeichnet , daß der Pfahl einen rechteckigen Querschnitt aufweist.13. Method according to claim 12, characterized in that the pile has a rectangular cross-section having. 14. Verfahren nach Anspruch 12* dadurch gekennzeichnet , daß der Pfahl einen kreisförmigen Querschnitt aufweist, wobei eine oder mehrere longitudinale Ausbildunger, an seinem Äußeren vorgesehen sind, die sich auswärts erstrecken.14. The method according to claim 12 *, characterized in that the pile has a circular cross-section has, with one or more longitudinal formations, being provided on its exterior, which extend extend outwards. 15- Pfahl, dadurch gekennzeichnet , daß er mit Hilfe des Verfahrens nach Anspruch 1 bis 15 installiert ist.15 post, characterized in that it is installed using the method according to claims 1-15 is. 16. Pfahl, dadurch gekennzeichnet , daß er einen länglichen hohlen Körper umfaßt, der in seiner Wand in Abständen längs seiner Länge Öffnungen aufweist.16. Post, characterized in that it comprises an elongated hollow body in his Wall has openings at intervals along its length. 17- Pfahl nach Anspruch 16, dadurch gekennzeichnet , daß er einen Querschnitt aufweist, welcher geeignet ist, einen Spalt zwischen der Seite des Pfahles und dem Boden zu schaffen, in welchen er bei Rotation des Pfahles um seine Achse getrieben oder gedrückt wird.17-post according to claim 16, characterized in that it has a cross-section which is suitable to create a gap between the side of the pile and the ground in which it is at Rotation of the pole about its axis is driven or pushed. 18. Pfahl nach Anspruch 17, dadurch gekennzeichnet, daß er rechteckigen Querschnitt aufweist. 18. Post according to claim 17, characterized in that it has a rectangular cross-section. 19. Pfahl nach Anspruch 18, dadurch gekennzeichnet , daß er einen kreisförmigen Querschnitt mit einem oder mehreren Gebilden an seinem Ä'ußseren aufweist, die sich davon auswärts erstrecken.19. Post according to claim 18, characterized in that it has a circular cross-section has one or more structures on its exterior, extending outward from it.
DE3337994A 1982-10-20 1983-10-19 INSTALLING POLES Withdrawn DE3337994A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB08230017A GB2129471A (en) 1982-10-20 1982-10-20 Installation of piles

Publications (1)

Publication Number Publication Date
DE3337994A1 true DE3337994A1 (en) 1984-04-26

Family

ID=10533736

Family Applications (1)

Application Number Title Priority Date Filing Date
DE3337994A Withdrawn DE3337994A1 (en) 1982-10-20 1983-10-19 INSTALLING POLES

Country Status (10)

Country Link
BE (1) BE898026A (en)
BR (1) BR8305766A (en)
DE (1) DE3337994A1 (en)
FI (1) FI833758A (en)
FR (1) FR2534952A1 (en)
GB (1) GB2129471A (en)
GR (1) GR78698B (en)
LU (1) LU85052A1 (en)
NL (1) NL8303531A (en)
ZA (1) ZA837623B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323792B (en) * 2020-11-03 2022-07-15 北京顺义建筑企业集团公司 Internal-driving hammer pile pipe for holding-pressing type hammering pressure-grouting pile

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE656012A (en) * 1963-12-05
DE1634470A1 (en) * 1965-11-04 1970-10-29 Mueller Ludwig Foundation stake
US3404740A (en) * 1966-02-01 1968-10-08 Clemens B. Hoppe Apparatus for installing piling
US3638433A (en) * 1969-03-28 1972-02-01 James L Sherard Method and apparatus for forming structures in the ground
BE791062A (en) * 1971-12-14 1973-03-01 Taranto Rosanna PROCESS FOR CONSOLIDATION OF FURNISHED AND PILLAR FLOORS, PROVIDED WITH SEPARATE BALLS AND SPACES, CONSTRUCTED BY THIS PROCEDURE
US3851485A (en) * 1972-04-14 1974-12-03 J Steding Method and apparatus for installing concrete piles
GB1506388A (en) * 1975-05-23 1978-04-05 Lilley Waddington Ltd Excavation of bore holes
US4018056A (en) * 1975-07-18 1977-04-19 Interpile Usa, Inc. Apparatus for forming cast-in-place caseless concrete piles and the like
US4009582A (en) * 1975-10-29 1977-03-01 Interpile Usa, Inc. Method for forming deep cast-in-place caseless concrete piles
JPS5346109A (en) * 1976-10-08 1978-04-25 Wataru Nakanishi Method of forming underground pile
GB2064627B (en) * 1979-12-11 1983-09-21 Piling Tech Ltd Method of piling

Also Published As

Publication number Publication date
GB2129471A (en) 1984-05-16
FI833758A (en) 1984-04-21
NL8303531A (en) 1984-05-16
BE898026A (en) 1984-02-15
FR2534952A1 (en) 1984-04-27
FI833758A0 (en) 1983-10-17
LU85052A1 (en) 1984-03-22
BR8305766A (en) 1984-05-29
GR78698B (en) 1984-09-27
ZA837623B (en) 1984-07-25

Similar Documents

Publication Publication Date Title
DE69635549T2 (en) METHOD AND DEVICE FOR ESTABLISHING ENDLESS UNDERGROUND WALLS
DE10158524A1 (en) Pile device and method for the construction of concrete piles in soft ground
EP0080143A1 (en) Foundation for a pole, a pillar or the like
AT391506B (en) DEVICE FOR EXHAUSTING HEAT IN THE GROUND FLOOR OR TO RECOVER HEAT FROM THE GROUND FLOOR
DE69032252T2 (en) ANCHORING AND FASTENING METHOD BY SIDE SUPPORTS DRIVED IN THE FLOOR
EP0509385B1 (en) Method for creating concrete bodies and cement bodies in the ground
EP2925934A1 (en) Method for manufacturing a pile
DE68912648T2 (en) Construction method.
EP0109397B1 (en) Hollow foundation element and manufacturing method thereof
DE3337994A1 (en) INSTALLING POLES
DE3339965A1 (en) METHOD AND DEVICE FOR PRODUCING A CONCRETE PILE
DE69938438T2 (en) A CONCRETE ELEMENTS AND PILLAR METHOD EMBEDDED IN CONCRETE
AT393525B (en) METHOD FOR CUTTING A LOCAL CONCRETE PILE
DE1963852A1 (en) Method of erecting a structure that is at least partially submerged in a body of water
DE19803074C2 (en) Press shaft and method for creating one
DE3644399A1 (en) METHOD FOR INTERCEPTING SUPPORT WALLS
DE3626169A1 (en) Foundation with pile support
DE1910556A1 (en) Process for the production of foundation piles from in-situ concrete with extensions of the pile shaft and the pile base, as well as internal formwork for carrying out the process
DE3501252A1 (en) Method of producing a cast-in-situ concrete pile
DE3307392A1 (en) METHOD FOR CONSTRUCTION OF CONCRETE LINED UNDER CONCRETE
DE1944644C3 (en) Process for the production of a reinforced concrete pile from in-situ concrete used for the foundation of a corner post and steel pipe for the implementation of the process
DE2626762C2 (en) Method of making pile foundations using precast concrete piles
EP1553230B1 (en) Method for rehabilitating retaining walls
DE2942428A1 (en) New or existing harbour wall reinforcement - has submerged pile wall built from elements and intervening drilled tubes
DE2407874C3 (en) Device for explosively enlarging the pile base of an in-situ concrete pile

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee