DE3124957A1 - METHOD FOR PRODUCING IN PARTICULAR MULTIPLE-CURVED PIPELINE PARTS AND PIPELINE PART MANUFACTURED BY THE METHOD - Google Patents
METHOD FOR PRODUCING IN PARTICULAR MULTIPLE-CURVED PIPELINE PARTS AND PIPELINE PART MANUFACTURED BY THE METHODInfo
- Publication number
- DE3124957A1 DE3124957A1 DE19813124957 DE3124957A DE3124957A1 DE 3124957 A1 DE3124957 A1 DE 3124957A1 DE 19813124957 DE19813124957 DE 19813124957 DE 3124957 A DE3124957 A DE 3124957A DE 3124957 A1 DE3124957 A1 DE 3124957A1
- Authority
- DE
- Germany
- Prior art keywords
- pipeline
- curved
- legs
- straight
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D—WORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21D7/00—Bending rods, profiles, or tubes
- B21D7/06—Bending rods, profiles, or tubes in press brakes or between rams and anvils or abutments; Pliers with forming dies
Description
Verfahren zum Herstellen von insbesondere mehrfach gekrümmten Rohrleitungsteilen und ·β*·πι nach dem Verfahren hergestellte« Rohrleitungsteil.Method for the production of pipe parts with multiple bends, in particular and · β * · πι produced according to the method « Pipeline part.
Die Erfindung bezieht sich auf ein Verfahren zum Herstellen von insbesondere mehrfach gekrümmten Rohrleitungsteilen als Fertigteil aus geraden Rohrteilen durch Bieaen und einen nach dem Verfahren hergestellten Rohrleitungsteil. The invention relates to a method for the production of pipeline parts, in particular multiply curved as a prefabricated part made of straight pipe parts by Bieaen and a pipe part produced according to the process.
Besonders im Kraftwerksbau sind Rohrleitungsbiegungen mit verlängerten Schenkeln notwendig. Die herkömmliche Herstellungsart von Rohrleitungsbiegungen läßt es bei der Herstellung zwar zu, diese mit verlängerten Schenkeln herzustellen/ indem ein beilieges bzw. ein gefordertes Zwischenmaß zwischen zwei Krümmungen in der verlangten Länge vorgesehen wird, das überbrückt werden muß. Dieses Verfahren ist aber bereits wegen der infolge des Einschaltens des Zwischenmaßes zu erbringenden'bzw. vorzusehenden Schweißnähte schwierig sowie aufwendig und verhältnismässig unwirtschaftlich. Pipe bends with extended legs are particularly necessary in power plant construction. The conventional one Production method of pipe bends allows it to be produced with lengthened Manufacture legs / by adding an enclosed or a required intermediate dimension between two curves is provided in the required length that must be bridged. But this procedure is already because of the 'or. weld seams to be provided difficult as well as expensive and relatively uneconomical.
Die bekannten Verfahren sind mit Rücksicht auf die Auslegung des Rohrbogens von den, Schenkellängen abhängig und verlangen wegen der geraden Längen ein Berechnen und Ausmessen.The known methods are with regard to the design of the pipe bend of the leg lengths and require calculation and measurement because of the straight lengths.
Der Erfindung liegt im wesentlichen die Aufgabe zugrunde, ein Verfahren zum Herstellen von insbesondereThe invention is essentially based on the object of a method for producing in particular
mehrfach gekrümmten Rohrleitungsteilen als Fertigteil aus geraden Rohrteilen zu schaffen, bei welchem räumliche Winkelveränderungen durch fertig angepreßte Krümmer ermöglicht werden und eine Fertigungsvereinfachung sowie -verbilligung insbesondere durch das Einsparen von Schweißnähten erzielt wird.'multiply curved pipeline parts as a prefabricated part to create from straight pipe parts, in which spatial angle changes by finished pressed Elbows are made possible and a production simplification and cheaper, in particular through the Saving of weld seams is achieved. '
Vornehmlich zur Lösung dieser Aufgabe wird nach der Erfindung in einem im Ausgangszustand geraden Rohrleitungsteil zwischen zur Schaffung der Schenkel bzw. der Endschenkel dienenden Rohrleitunqsteilen die Wand des Rohrleitungsteils so verdickt, daß sie eine zum Bilden eines Krümmer durch entsprechendes Biegen zwischen den Endschenkeln geeignete Wanddicke erhält, wobei die Endschenkel in eine gewünschte Winkelstellung zur Längsachse gebracht werden können.According to the invention, a pipe part which is straight in the initial state is primarily used to achieve this object between the pipeline parts serving to create the legs or the end legs, the wall of the pipeline part so thickened that it is one for forming a bend by corresponding bending between the end legs are given a suitable wall thickness, the end legs in a desired angular position can be brought to the longitudinal axis.
Hierdurch ist erreicht, daß die Herstellung der Krümmer erheblich vereinfacht und verbilligt ist: denn die erfindungsqemäße Zusammenfassung des Krümmens und der Schenkelbildung machen die Vorsehung eines Zwischenstückes zur Schenkelbildung sowie die hiermit verbundenen Pass- und Schweißarbeiten überflüssig.This means that the manufacture of the manifold is considerably simplified and cheaper: because the summary of the curvature according to the invention and the leg formation make the provision of an intermediate piece for leg formation and the associated with it No need for fitting or welding.
Ein Vorteil der Erfindung ergibt sich auch dadurch, daß der das Ausgangsmaterial bildende gerade Rohrteil die gleiche Dimensionierung wie die gerade Rohrleitungsführung aufweisen kann; denn dies verringert im wesentlichen eine vorzunehmende Passarbeit bei dem Anschluß eines Schenkels an einen nächsten Rohrleitungsteil durch Schweißen.An advantage of the invention also results from the fact that the straight pipe part forming the starting material can have the same dimensions as the straight pipeline routing; because this essentially reduces a fitting work to be carried out when connecting a leg to a next part of the pipeline by welding.
Für die Herstellung von mehrfach gekrümmten Rohrleitungsstücken werden mehrere, so zwei oder drei, zum Biegen bzw. zum Krümmen bestimmte verdickte Wandabschnitte in dem zwischen den Schenkeln befindlichen Rohrleitungsteil einander benachbart in einem durch die zu bildenden Krümmer bzw. Krümmungsbogen be- ' stimmten Abstand vorgesehen, wobei entsprechendeFor the production of pipe sections with multiple bends, several, two or three, for bending or for curving certain thickened wall sections in the one between the legs Pipeline part adjacent to each other in a bend or bend to be formed ' correct spacing provided, with appropriate
Schenkellängen an den Enden eines jeden Krümmers möglich sind.Leg lengths possible at the ends of each elbow are.
Das Biegen einander folgender Krümmungen erfolgt in der Weise, daß bei geöffneter Pressvorrichtung anschließend an dieerste bzw. vorangehende Krümmung nach einer entsprechenden Weiterbewegung des Rohrleitungsteils die nächste Krümmung gepreßt wird.The bending of the following curvatures takes place in such a way that afterwards with the press device open to the first or previous bend after a corresponding further movement of the pipeline part the next one Curvature is pressed.
Das Bilden der zum Krümmer zu biegenden verdickten Abschnitte kann in der Weise erfolgen, daß der gerade Ausgangsrohrleitungsteil einem Stauchpressvorgang unterworfen wird, der sich in äußeren Verformungen zu einer Wandverdickung in den zu biegenden Abschnitten und deren Vorovalisierung äußert. Hierzu werden entsprechend geformte und geteilte Stauchhülsen verwandt, die das Ausgangsrohrstück umgeben.The formation of the thickened portions to be bent to the bend can be done in such a way that the straight Output pipeline part is subjected to an upsetting process, which results in external deformations to a Wall thickening in the sections to be bent and their pre-ovalization expresses itself. For this purpose, appropriately shaped and split compression sleeves that surround the output pipe section.
Im Anschluß an diesen Verfahrensschritt wird der ovalisierte zu krümmende Rohrteil unter Einbringung der für das Material geeigneten Temperatur mit Hilfe von Matrize und Patrize in die Form des zu fertigenden Spools gebracht.Following this process step, the ovalized pipe part to be curved is introduced with the temperature suitable for the material into the shape of the spool to be produced with the help of a die and male die brought.
Hierbei wird der vorovalisierte Querschnitt der Abschnitte durch Druck in Richtung der Hauptachse der Ovalform in die runde Querschnittsform gebracht.Here, the pre-ovalized cross-section is the Sections brought into the round cross-sectional shape by pressure in the direction of the main axis of the oval shape.
Die Zeichnung erläutert schematisch die Durchführung des Verfahrens nach der Erfindung.The drawing explains schematically the implementation of the method according to the invention.
Fig. 1 gibt einen mehrfach gekrümmten Spool in Längsansicht teilweise wieder.Fig. 1 partially reproduces a multi-curved spool in a longitudinal view.
Fig. 2 läßt die Herstellung der zu biegenden verdickten Abschnitte in dem in seiner Ausgangsform geraden Rohrleitungsteil für einen Mehrfachkrümmer erkennen.Fig. 2 allows the production of the thickened sections to be bent in the straight in its original shape Detect pipe part for a multiple elbow.
Fig. 3 verdeutlicht das Pressen eines vorbereiteten Rohrleitungsteils in die fertige Krümmerform.3 illustrates the pressing of a prepared pipe part into the finished elbow shape.
Fig. 1 zeigt schematisch einen mehrfach gekrümmten Rohrleitungsteil, der in seiner Gesamtheit mit 1 bezeichnetist. Die einzelnen Krümmungen weisen die Bezugszeichen a und b auf. Sie können von der zeichnerischen Wiedergabe abweichend gleiche Längen und gleiche Krümmungsradien aufweisen.Fig. 1 shows schematically a multi-curved pipe part, which is designated by 1 in its entirety. The individual curvatures have the reference symbols a and b. You can from the drawing Reproduction deviating have the same lengths and the same radii of curvature.
wandten Krümmungsenden sind mit c angedeutet.turned ends of curvature are indicated with c.
Bei der Herstellung eines mehrfach, vorliegendenfalls zweifach gekrümmten Rohrteils 1 wird so vorgegangen/ daß in einem geraden Rohrleitungsteil 2 verdickte Wandungsstellen 3 und 4 bzw. Abschnitte 3 und 4 an den Stellen gebildet werden, die einer Biegung unterworfen werden sollen. Hierbei ist der gerade Rohrleitungsteil 2 zwischen einem Festlager 5 und einem verschiebbaren Preßkopf 6 angeordnet, der unter hydraulischem Verschiebedruck steht. An durch die vorzunehmenden Biegungen bestimmten Stellen ist eine geteilte Stauchhülse 7 und 8 vorgesehen. Die Ausnehmungen 9 im Inneren der Stauchhülsen sind für den unter der Wirkung des Preßkopfes 6 ausgeübten Druckes verdrängten Werkstoff vorgesehen, so daß sich am Rohrleitungsteil 2 Verdikkungen 10 nach außen bilden. Zur Begünstigung dieses Vorganges kann im Rohrleitungsteil ein Kern bzw. ein Dorn vorgesehen sein. Auch lassen sich zwischen den Biegestellen lösbare Führungshülsen vorsehen, um unerwünschte Ausbauchungen des Rohrleitungsteiles zu verhindern. An den Biegestellen sind die Stauchhülsen zusätzlich im Inneren so ausgebildet, daß sich durch den StauchpreßVorgang ein vorovalisierter Querschnitt ergibt.When making a multiple, present case Double curved pipe part 1 is proceeded in such a way / that thickened in a straight pipe part 2 Wall points 3 and 4 or sections 3 and 4 are formed at the points that are subject to bending should be. Here, the straight pipeline part 2 is between a fixed bearing 5 and a displaceable one Arranged compression head 6, which is under hydraulic displacement pressure. On through the bends to be made A split compression sleeve 7 and 8 is provided at certain points. The recesses 9 inside the compression sleeves are for the displaced material under the action of the compression head 6 pressure provided so that on the pipeline part 2 thickenings 10 form to the outside. In favor of this Process can be provided in the pipeline part, a core or a mandrel. You can also choose between the Provide bending points detachable guide sleeves to prevent unwanted bulges in the pipeline part impede. At the bending points, the compression sleeves are also designed on the inside so that through the upsetting process results in a pre-ovalized cross-section.
Das Biegen eines jeden Krümmabschnittes wird in der in Fig. 3 angedeuteten Weise mit Hilfe von Patrize 11 und Matrize 12 vorgenommen, wobei der Preßdruck der Patrize hydraulisch ausgeübt wird. Der zu krümmende Rohrleitungsabschnitt wird entsprechend erhitzt in die Preßvorrichtung gebracht und zumEach curved section is bent in the manner indicated in FIG. 3 with the aid of a male mold 11 and die 12 made, the pressing pressure the male part is applied hydraulically. The pipe section to be bent is heated accordingly brought into the pressing device and for
runden Querschnitt gepreßt. Die Schenkel 13 und 14 des Krümmers können beliebig lang sein. Nach dem Biegen der ersten Krümmung wird der RohrIcitungsteil weiterbewegt, so daß die nächste Biegestelle bzw. der nächste Abschnitt in die Presse gelangt.pressed round cross-section. The legs 13 and 14 of the elbow can be of any length. After bending the first curvature of the pipe Ic is itungsteil moved further, so that the next bending point or the next section enters the press.
Die Schenkel des einen Krümmers können mit dem Schenkel eines Nachbarkrümmers durch Schweißen verbunden werden. Bei einem mehrfach gekrümmten Rohrleitungsteil setzt sich der eine Schenkel einer vorangehenden Krümmung in dem diesem zugewandten Schenkel der folgenden Krümmung fort* wobei der nächste Schenkel dieser Krümmung sich in dem zugewandten Schenkel einer dritten Krümmung fortsetzen kann.The legs of one elbow can be connected to the leg of an adjacent elbow by welding. In the case of a multi-curved pipeline part, one leg of a previous curvature continues in the leg of the following curvature facing it * whereby the next leg of this curvature can continue in the facing leg of a third curvature.
Wenn also ein Spool drei Biegungen beinhaltet, werden mindestens sechs Schweißnähte bei diesem Spool gegenüber vorbekannten Ausführungen eingespart. Dies ist auch bei der Anordnung bzw. Plazierung von notwendigen Unterstützungen (Aufhängungen) von Vorteil/ welche sich dann, wegen .der fehlenden Schweißnähte auf dem Fertigspool selbst geografisch flexibel anordnen lassen. Beim Erfindungsgegenstand belaufen sich die zu berücksichtigenden Kosten im wesentlichen auf die Vorfertigung, die anschließenden Prüfungen und die Enddokumentation. So if a spool has three bends, there will be at least six welds on that spool saved compared to previously known designs. This is also necessary when arranging or placing Supports (suspensions) are advantageous / which are then, because of the missing welds on the Have the prefabricated pool arranged flexibly in terms of geography. In the case of the subject matter of the invention, the amounts to be taken into account are The main costs are the prefabrication, the subsequent tests and the final documentation.
LeerseiteBlank page
Claims (8)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19813124957 DE3124957A1 (en) | 1981-06-25 | 1981-06-25 | METHOD FOR PRODUCING IN PARTICULAR MULTIPLE-CURVED PIPELINE PARTS AND PIPELINE PART MANUFACTURED BY THE METHOD |
EP82105537A EP0070406A3 (en) | 1981-06-25 | 1982-06-24 | Method of producing a pipework duct having at least one elbow between two straight lengths of pipe |
JP57109088A JPS5858935A (en) | 1981-06-25 | 1982-06-24 | Multi-bend and its manufacture |
ZA824546A ZA824546B (en) | 1981-06-25 | 1982-06-25 | Process and apparatus for the manufacture of bend pipe components and a pipe component manufactured according to the process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19813124957 DE3124957A1 (en) | 1981-06-25 | 1981-06-25 | METHOD FOR PRODUCING IN PARTICULAR MULTIPLE-CURVED PIPELINE PARTS AND PIPELINE PART MANUFACTURED BY THE METHOD |
Publications (2)
Publication Number | Publication Date |
---|---|
DE3124957A1 true DE3124957A1 (en) | 1983-01-13 |
DE3124957C2 DE3124957C2 (en) | 1987-08-13 |
Family
ID=6135343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19813124957 Granted DE3124957A1 (en) | 1981-06-25 | 1981-06-25 | METHOD FOR PRODUCING IN PARTICULAR MULTIPLE-CURVED PIPELINE PARTS AND PIPELINE PART MANUFACTURED BY THE METHOD |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0070406A3 (en) |
JP (1) | JPS5858935A (en) |
DE (1) | DE3124957A1 (en) |
ZA (1) | ZA824546B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5615481A (en) * | 1993-10-23 | 1997-04-01 | Witzig & Frank Turmatic Gmbh | Method and apparatus for the production of circumferentially compressible pipe fittings |
CN114558965A (en) * | 2022-03-11 | 2022-05-31 | 南通高新管件制造有限公司 | Forging, pressing and shaping equipment and machining process for marine pipe elbow |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3938388A1 (en) * | 1989-11-18 | 1991-05-23 | Behr Gmbh & Co | Mfg. U=shaped tube elbows for heat exchanger - forms solder venting ducts by milling cutters, with tube still straight |
US7987690B2 (en) | 2008-01-04 | 2011-08-02 | Cerro Flow Products Llc | Fluid conduits with integral end fittings and associated methods of manufacture and use |
US7942456B2 (en) | 2008-01-04 | 2011-05-17 | Cerro Flow Products, Inc. | Fluid conduits with integral end fittings and associated methods of manufacture and use |
CN113976663B (en) * | 2021-10-22 | 2023-05-23 | 中国原子能科学研究院 | Pressure pipe manufacturing method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE471645C (en) * | 1929-02-18 | Jakob Schmitz | Process for the production of pipe bends of wall thickness as uniform as possible | |
US2258242A (en) * | 1940-09-27 | 1941-10-07 | Phelps Dodge Copper Prod | Apparatus for drawing tubes of multiple wall thickness |
US2500813A (en) * | 1947-09-25 | 1950-03-14 | Rudolph E Fritsch | Method of making pipe fittings |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2241083A (en) * | 1938-11-07 | 1941-05-06 | Diescher Tube Mills Inc | Method of making upset seamless tubing |
US2228301A (en) * | 1939-08-22 | 1941-01-14 | Phelps Dodge Copper Prod | Tube drawing method and apparatus |
-
1981
- 1981-06-25 DE DE19813124957 patent/DE3124957A1/en active Granted
-
1982
- 1982-06-24 EP EP82105537A patent/EP0070406A3/en not_active Withdrawn
- 1982-06-24 JP JP57109088A patent/JPS5858935A/en active Pending
- 1982-06-25 ZA ZA824546A patent/ZA824546B/en unknown
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE471645C (en) * | 1929-02-18 | Jakob Schmitz | Process for the production of pipe bends of wall thickness as uniform as possible | |
US2258242A (en) * | 1940-09-27 | 1941-10-07 | Phelps Dodge Copper Prod | Apparatus for drawing tubes of multiple wall thickness |
US2500813A (en) * | 1947-09-25 | 1950-03-14 | Rudolph E Fritsch | Method of making pipe fittings |
Non-Patent Citations (1)
Title |
---|
Mitt. DFBO, 1968 Nr. 9, S. 121 bis 127, bes. Bild 3 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5615481A (en) * | 1993-10-23 | 1997-04-01 | Witzig & Frank Turmatic Gmbh | Method and apparatus for the production of circumferentially compressible pipe fittings |
CN114558965A (en) * | 2022-03-11 | 2022-05-31 | 南通高新管件制造有限公司 | Forging, pressing and shaping equipment and machining process for marine pipe elbow |
Also Published As
Publication number | Publication date |
---|---|
EP0070406A3 (en) | 1984-03-21 |
DE3124957C2 (en) | 1987-08-13 |
JPS5858935A (en) | 1983-04-07 |
ZA824546B (en) | 1983-08-31 |
EP0070406A2 (en) | 1983-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2739962C3 (en) | Method and device for manufacturing a metal pipe | |
DE19614656A1 (en) | Manufacture of increased wall thickness on hollow profile, for IC engine exhaust pipe | |
DE401476C (en) | Process for the production of whole-piece, metallic hollow bodies with ribs | |
DE102005007997B3 (en) | Construction unit manufacturing method, involves producing blank mold, which is then reformed into required form of construction unit by reforming tool in one of two reforming processes | |
DE3124957A1 (en) | METHOD FOR PRODUCING IN PARTICULAR MULTIPLE-CURVED PIPELINE PARTS AND PIPELINE PART MANUFACTURED BY THE METHOD | |
DE19944679C2 (en) | Process for producing a hollow metal body and a tool mold for carrying out the process | |
DE2548853C3 (en) | Device for the production of metal ring blanks | |
DE19529731A1 (en) | Prodn. of corrugated metal pipes - with use of an expandable mandrel and external, axially displaceable disk-shaped jaws | |
DE3142480A1 (en) | "METHOD FOR PRODUCING LOCAL COAT REINFORCEMENTS ON HOLLOW BODIES" | |
DE582238C (en) | Method for producing double walls from the wall of pipes by means of axial pressure on the pipe face | |
DE2536852A1 (en) | Form tool for producing curved duct sections - forces duct into ring gap between core and tool body | |
DE890013C (en) | Elbows, especially for large pipelines, and processes for their manufacture | |
DE4018365C2 (en) | Process for producing sheet metal parts from a tube | |
DE651101C (en) | Process for the production of pipe connectors with branch nozzles made of copper | |
DE740769C (en) | Process for the production of cooling pipes with a square cross-section | |
DE2032132B2 (en) | Method and device for the production of dome-shaped housing halves | |
DE521448C (en) | Process for the production of collar or flange pipes | |
DE961343C (en) | Process for the production of several connecting pieces on a pipe that are at the same height or the same cross-sectional plane | |
DE880884C (en) | Reversible cap with reinforcing bead and process for their manufacture | |
DE19740322C1 (en) | Method of manufacture of internal combustion engine camshaft | |
DE641745C (en) | Device for the production of sleepers on a press | |
DE102004039599B3 (en) | Process to produce sheet metal of varying thickness for subsequent use as pipe rolling material or profiled components | |
CH675472A5 (en) | Mfg. tubular heating radiator - bends tube ends for projection welding into header bores | |
DE863642C (en) | Process for the production of reversal pieces for pipe runs of heat exchangers | |
DE2517249A1 (en) | Heat exchanger tube with helical corrugations - with smaller corrugations superimposed to increase turbulence |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8127 | New person/name/address of the applicant |
Owner name: OELLOS GMBH FABRIK SELBSTSCHMIERENDER LAGER UND LA |
|
8127 | New person/name/address of the applicant |
Owner name: EMIL WOLFF, MASCHINENFABRIK UND EISENGIESSEREI GMB |
|
D2 | Grant after examination | ||
8364 | No opposition during term of opposition | ||
8339 | Ceased/non-payment of the annual fee |