DE3067233D1 - Method and falsework for constructing bridges of prestressed concrete - Google Patents

Method and falsework for constructing bridges of prestressed concrete

Info

Publication number
DE3067233D1
DE3067233D1 DE8080100241T DE3067233T DE3067233D1 DE 3067233 D1 DE3067233 D1 DE 3067233D1 DE 8080100241 T DE8080100241 T DE 8080100241T DE 3067233 T DE3067233 T DE 3067233T DE 3067233 D1 DE3067233 D1 DE 3067233D1
Authority
DE
Germany
Prior art keywords
bridge
scaffold
section
shuttering
sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE8080100241T
Other languages
German (de)
Inventor
Rainer Dipl Ing Schweer
Manfred Dipl In Steidle-Sailer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Emil Steidle GmbH and Co KG
Original Assignee
Emil Steidle GmbH and Co KG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=8186574&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=DE3067233(D1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Emil Steidle GmbH and Co KG filed Critical Emil Steidle GmbH and Co KG
Application granted granted Critical
Publication of DE3067233D1 publication Critical patent/DE3067233D1/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

1. A method for the section-wise construction of reinforced concrete bridges wherein, starting from one end of the bridge, the bridge sections are manufactured one after the other using shuttering carried by an advanceable scaffold, wherein the individual bridge sections (18, 20) are reinforced and concreted in position on the shuttering (17) which rests on the scaffold (16) and, after completion of a section, the scaffold together with the shuttering supported thereon is lowered and advanced by the length of a bridge section on a displacement track (32) extending in the longitudinal direction of the bridge, wherein, in each case, the parts of the scaffold and/or shuttering, the path of travel of which would pass through the region of a support pier (12), are kept out of this region by moving them, and wherein the scaffold is raised to the level of the bridge superstructure on reaching the next bridge section, whereupon a section adjoining the last constructed bridge section is reinforced and concreted, characterised in that, in each case, bridge sections (18, 20) are constructed with a length which amounts to 1/2, 1/3 or 1/4 of the span of the bridge between two piers (12), wherein the bridge sections (20) present as a whole between two piers are supported directly by auxiliary supports (30) which remain standing until the pre-stressing from pier to pier is completed ; in that the scaffold is displaced stepwise over each section on a displacement track (32) assembled on the ground ; and in that the scaffold parts and/or shuttering parts, the path of travel of which would pass through a support pier (12) or an auxiliary support (30), are in each case removed only for the length of an advance step, by displacing them and/or pivoting them out of the way, and are reinserted after the next advance step, wherein the non-removed parts of the scaffold are always held together, together with its laterally extending projecting sections, as a displaceable constructional unit.
DE8080100241T 1980-01-18 1980-01-18 Method and falsework for constructing bridges of prestressed concrete Expired DE3067233D1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EP80100241A EP0032959B1 (en) 1980-01-18 1980-01-18 Method and falsework for constructing bridges of prestressed concrete

Publications (1)

Publication Number Publication Date
DE3067233D1 true DE3067233D1 (en) 1984-05-03

Family

ID=8186574

Family Applications (1)

Application Number Title Priority Date Filing Date
DE8080100241T Expired DE3067233D1 (en) 1980-01-18 1980-01-18 Method and falsework for constructing bridges of prestressed concrete

Country Status (3)

Country Link
EP (1) EP0032959B1 (en)
AT (1) ATE6878T1 (en)
DE (1) DE3067233D1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797657A (en) * 2019-01-29 2019-05-24 中铁九局集团第二工程有限公司 Cast-in-situ bridge falsework system device and bridge cast-in-situ construction method

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3247326C2 (en) * 1982-12-21 1984-11-22 Emil Steidle Gmbh & Co, 7480 Sigmaringen Process and falsework for the construction of reinforced concrete bridges in sections
DE3836568C2 (en) * 1988-10-27 1999-03-18 Reiner Dipl Ing Schweer Teaching scaffold for reinforced concrete bridges for universal use as a stationary and sliding scaffold
CN102108784B (en) * 2011-03-18 2012-05-30 北城致远集团有限公司 Special attached lifting scaffold
CN109457619B (en) * 2018-12-11 2023-12-19 中交第二航务工程局有限公司 A multi-functional movable support of complex for cast-in-situ construction of concrete girder
CN110670491A (en) * 2019-10-29 2020-01-10 中国铁建大桥工程局集团有限公司 Front anchor chamber roof cast-in-place construction device and construction method
US11479929B2 (en) 2020-08-07 2022-10-25 Peri Se Formwork system and method
CN111827126A (en) * 2020-08-07 2020-10-27 中铁大桥局集团第二工程有限公司 Method for lofting side line of railway slag wall during erection of steel beam of cable-stayed bridge
CN113430959A (en) * 2021-08-04 2021-09-24 刘澜涛 Construction method for prolonging radial width of expressway bridge
CN114606873B (en) * 2022-01-14 2024-06-18 浙江交工宏途交通建设有限公司 Cantilever concrete pouring bracket for steel box girder

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT230931B (en) * 1959-01-27 1964-01-10 Polensky & Zoellner Process for the production of a long-span bridge from prestressed concrete
DE1234759B (en) * 1962-12-10 1967-02-23 Polensky & Zoellner Method for shuttering the individual superstructure fields of a multi-span bridge
DE1201384B (en) * 1962-12-14 1965-09-23 Adolf Lupp K G Front structure for the construction of elevated roads and bridges
DE2436088C2 (en) * 1974-07-24 1984-09-27 Peiner Maschinen- Und Schraubenwerke Ag, 3150 Peine Movable space formwork
DE2533734A1 (en) * 1975-07-28 1977-02-10 Kunz Alfred & Co Concrete bridge construction using formwork support - has frame-like supports with transverse beams and intermediary hydraulic presses

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797657A (en) * 2019-01-29 2019-05-24 中铁九局集团第二工程有限公司 Cast-in-situ bridge falsework system device and bridge cast-in-situ construction method

Also Published As

Publication number Publication date
ATE6878T1 (en) 1984-04-15
EP0032959B1 (en) 1984-03-28
EP0032959A1 (en) 1981-08-05

Similar Documents

Publication Publication Date Title
NO148875B (en) DEVICE FOR MANUFACTURING STEEL FIBER-reinforced CONCRETE CONSTRUCTIONS USING A SPRAY SPRAY Nozzle
US4352220A (en) Method for the construction of a cable-stayed or rein-girth bridge
GB1117706A (en) Elevated traffic surface and method of building same
US4231977A (en) Method and apparatus for in-situ production of concrete slabs
GB1073831A (en) Method of and apparatus for erecting multi-span bridges and the like
DE3067233D1 (en) Method and falsework for constructing bridges of prestressed concrete
US3425076A (en) Concrete highway formed in the fashion of a bridge and method of constructing same
US20120036811A1 (en) Overhead form traveller and method
ZA846212B (en) A method for erecting a bridge superstructure of prestressed concrete and launching girder for performing the same
FR2344675A1 (en) METHOD AND DEVICE FOR MANUFACTURING REINFORCED CONCRETE BRIDGES
US3882564A (en) Process for construction of bridges, in particular motorway flyovers
US3416175A (en) Bridge assemblies
US4478773A (en) Scaffolding girder for constructing multiple-span bridge structures movable from one bridge to another
RU2205914C1 (en) Process widening bridge structure
GB1505145A (en) Apparatus and method for building a concrete bridge superstructure
CH437399A (en) Process for producing structures made of steel, for example prestressed concrete, which extend mainly in a longitudinal direction
DK0905319T3 (en) A method for producing a fixed carriageway for rail-bound traffic, and a solid carriageway made according to this method
KR910007423B1 (en) Method for construction p.c - beam on the bridge
JPH0730527B2 (en) Bridge and its construction method
JPS6135325B2 (en)
SU881262A1 (en) Form for concreting the slab of bridge span structure
SU619560A1 (en) Method of erecting monolithic reinforced concrete span of bridge by pushing
KR100904987B1 (en) Incremental launching method(i.l.m) for arch bridge structure using atemporary segment-supporter installed to substructureof bridge
SU897919A1 (en) Prefabricated ferroconcrete bridge pylon
SU863755A1 (en) Method of constructing an underpass in the embankment of operating railway

Legal Events

Date Code Title Description
8331 Complete revocation