DE3017353A1 - Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear - Google Patents

Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear

Info

Publication number
DE3017353A1
DE3017353A1 DE19803017353 DE3017353A DE3017353A1 DE 3017353 A1 DE3017353 A1 DE 3017353A1 DE 19803017353 DE19803017353 DE 19803017353 DE 3017353 A DE3017353 A DE 3017353A DE 3017353 A1 DE3017353 A1 DE 3017353A1
Authority
DE
Germany
Prior art keywords
chain
extraction device
bearing block
run
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19803017353
Other languages
German (de)
Other versions
DE3017353C2 (en
Inventor
Norbert 4670 Lünen Hesse
Horst 4712 Werne Schlüsener
Erfried 4670 Lünen Simon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gewerkschaft Eisenhutte Westfalia GmbH
Original Assignee
Gewerkschaft Eisenhutte Westfalia GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerkschaft Eisenhutte Westfalia GmbH filed Critical Gewerkschaft Eisenhutte Westfalia GmbH
Priority to DE19803017353 priority Critical patent/DE3017353A1/en
Publication of DE3017353A1 publication Critical patent/DE3017353A1/en
Application granted granted Critical
Publication of DE3017353C2 publication Critical patent/DE3017353C2/de
Granted legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C29/00Propulsion of machines for slitting or completely freeing the mineral from the seam
    • E21C29/04Propulsion of machines for slitting or completely freeing the mineral from the seam by cable or chains
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C27/00Machines which completely free the mineral from the seam
    • E21C27/20Mineral freed by means not involving slitting
    • E21C27/32Mineral freed by means not involving slitting by adjustable or non-adjustable planing means with or without loading arrangements
    • E21C27/34Machine propelled along the working face by cable or chain

Abstract

The chain-drawn plane, is guided on a rail on a conveyor, and the double length chain runs in channels one above the other, extending through the rail or its attachments. One length is vertically deflected in the area of the machine frame and/or connecting gutter, in a mineral-extracting assembly in a mine. The deflected section (11,12) of the draw chain (n) is supported on a roller guideway (16,17) in the deflection area. This may replace the walling of the chain channel (8,9). It can be made up from a series of rollers (19) lying one behind the other along the line of the chain.

Description

Mineral- Gewinnungseinrichtung für den untertägigen BergbauMineral extraction facility for underground mining

Die Erfindung bezieht sich auf eine Gewinnungseinrichtung nach dem Oberbegriff des Anspruchs 1.The invention relates to a recovery device according to the Preamble of claim 1.

Bei Gewinnungsmaschinen -mit einer abbau-stoßseitig vom Förderer verlaufenden doppeltrumigen Zugkette erstreckt sich diese bekanntlich in Kettenkanälen, die innerhalb der Führungsschiene für die Gewinnungsmaschine-oder in Anbauteilen der Führungsschiene verlaufen. Da die Gewinnungsmaschine das aus dem Abbaustoß gelöste Mineral über die Führungsschiene in den Förderer laden muß, ergibt sich naturgemäß die Forderung, die Führungsschiene möglichst niedrig auszubilden. Da der Durchmesser eines von der Zugkette umschlungenen Antriebsrades durch die Größe der Kettenglieder vorbestimmt und deshalb in der Regel größer bemessen ist als der Mittenabstand zwischen den Kettenkanälen, ist wenigstens ein Trum der Zugkette im Bereich des Antriebs aus ihrer Soll-Flucht abgewinkelt, um den Trum auf das Antriebsrad führen zu können.In the case of mining machines with a mining joint running from the conveyor double-stranded pull chain, this is known to extend in chain channels that are within the guide rail for the mining machine or in add-on parts of the guide rail get lost. Since the mining machine over the mineral loosened from the mining face the guide rail has to load into the conveyor, the requirement naturally arises, to train the guide rail as low as possible. Since the diameter is one of the traction chain wrapped drive wheel predetermined by the size of the chain links and is therefore usually larger than the center-to-center distance between the Chain channels, at least one strand of the pull chain is off in the area of the drive their intended alignment angled in order to be able to lead the strand onto the drive wheel.

Eine weitere Notwendigkeit, die Zugkette schräg zum Hangenden abzuwinkeln, besteht dann, wenn der Antriebsrahmen einer Gewinnungseinrichtung mit dem Zweck schräg vom Liegenden abhebt, um in einen söhlig angeordneten Streckenförderer laden zu können. In einem solchen Fall ist es sogar notwendig, beide Trume der Zugkette abzuwinkeln, weil das von der Zugkette umschlungene Antriebsrad höher angeordnet ist als die in der Führungsschiene verlaufenden Kettenkanäle.Another need to bend the pull chain diagonally to the hanging wall, exists when the drive frame is an extraction device with the purpose lifts diagonally from the lying position in order to load into a conveyor belt arranged on the floor to be able to. In such a case it is even necessary to use both strands of the pull chain to bend, because the drive wheel wrapped by the pull chain is arranged higher than the chain channels running in the guide rail.

Eine abgewinkelte Zugkette drückt unter Spannung naturgemäß gegen die Wandung des Kettenkanals, wodurch nicht nur die Antriebskraft vermindert wird, sondern auch die Wandung des Kettenkanals und die Zugkette vorzeitig verschleißen.An angled pull chain naturally pushes against it under tension the wall of the chain channel, which not only reduces the driving force, but also the wall of the chain channel and the pull chain wear out prematurely.

Der Erfindung liegt die Aufgabe zugrunde, bei einer Gewinnungseinrichtung der eingangs bezeichneten Bauart die Reibung und den Verschleiß zu vermindern, die bzw. der entsteht, wenn die Zugkette den Bereich der Abwinkelung durchläuft. Diese Aufgabe wird nach der Lehre aus dem Anspruch 1 gelöst. Bei einer nach dieser Lehre ausgestalteten Gewinnungseinrichtung ist die Reibung und der daraus folgernde Verschleiß auf ein Minimum begrenzt, weil die Zugkette radial an einer Rollenführung abgestützt ist, deren der Zugkette bzw. dem betreffenden Trum zugewandte Seite mitläuft. Der reibungs- und verschleißarme Durchlauf im Bereich der Abwinkelung ist selbst dann gewährleistet, wenn der betreffende Trum der Zugkette stark abgewinkelt ist, wodurch eine möglichst nahe Anordnung des Antriebsrades an der Führungsschiene ermöglicht wird, was angesichts der Forderung nach einem möglichst kurzen Antriebsrahmen erwünscht ist.The invention is based on the object of an extraction device the type described above to reduce the friction and wear, the or that arises when the pull chain runs through the area of the bend. These The problem is solved according to the teaching of claim 1. With one according to this teaching designed extraction device is the friction and the consequent wear limited to a minimum because the pull chain is supported radially on a roller guide is whose side facing the tension chain or the relevant strand runs along. Of the Even then, the passage in the area of the bend is low in friction and wear guaranteed when the relevant strand of the pull chain is strongly angled, whereby enables the drive wheel to be arranged as close as possible to the guide rail becomes what is desired in view of the demand for the shortest possible drive frame is.

Dabei ist gemäß Anspruch 2 die Geschlossenheit des betreffenden Kettenkanals gewährleistet, wodurch nicht nur eine Verschmutzung oder Verstopfung durch eindringendes Material verhindert, sondern auch ein Ausschlagen der Zugkette auf ein Minimum begrenzt wird.Here, according to claim 2, the closeness of the chain channel in question guaranteed, which not only prevents contamination or clogging by penetrating Prevents material, but also limits the pulling chain to a minimum will.

Bei einer in einem Ober- und Untertrum verlaufenden Zugkette ist gemäß Anspruch 3 die Rollenführung auf der zum Hangenden weisenden Seite des Kettenkanals angeordnet, um einen reibungs- und verschleißarmen Durchlauf zu gewährleisten. Diese Ausgestaltung ermöglicht es auch, den Antriebsrahmen stark anzuheben, was -z. B. dann erforderlich ist, wenn der Förderer in einen söhlig angeordneten Streckenförderer laden soll.In the case of a tension chain running in an upper and lower run, according to Claim 3 the roller guide on the side of the chain channel facing the hanging wall arranged to ensure a low-friction and low-wear run. These Design allows it is also possible to raise the drive frame strongly, what -z. B. is required when the conveyor is arranged in a sole Line conveyor should load.

Während des Betriebs einer Gewinnungseinrichtung-können z. B.-beim Antriebsbeginn erhebliche Lastspitzen auftreten, bei denen die Zugkette mit einer verhältnismäßig größen Kraft gegen die Rollenführung drückt. Dies ist insbesondere deshalb von Bedeutung, weil die Rollenführung angesichts der vorliegenden Größenverhältnisse ziemlich klein ausgebildet s,einmuß. Die Ausgestaltungen nach den Ansprüchen 4 und 5 dienen dazu, die Lebensdauer der Rollenführungslagerung zu verlängern. Dies wird gemäß Anspruch 4 dadurch erreicht, daß die Rollenführung aus mehreren in Kettenlängsrichtung hintereinanderliegenden Rollen besteht, auf die sich die Belastung verteilt. Dabei ist gemäß der Ausgestaltung nach Anspruch 5 gewährleistet, daß die Lastverteilung in etwa gleichmäßig ist.During the operation of an extraction facility-z. B.-at Start of drive significant load peaks occur in which the pull chain with a relatively large force presses against the roller guide. This is particular therefore of importance because the roller guide in view of the present proportions fairly small, a must. The embodiments according to claims 4 and 5 serve to extend the life of the roller guide bearing. this will according to claim 4 achieved in that the roller guide consists of several in the chain longitudinal direction there are consecutive roles on which the load is distributed. Included is ensured according to the embodiment of claim 5 that the load distribution is roughly uniform.

Durch die Ausbildung nach Anspruch 6 wird ein Schlagen oder werden seitliche Schwingungen des betreffenden Zugkettentrums auf ein Minimum begrenzt, weil wenigstens die bankrechten Kettenglieder der Zugkette immer an wenigstens einer Rolle anliegen.The training according to claim 6 will be a hitting or Lateral vibrations of the relevant tension chain center are limited to a minimum, because at least the right bank links of the pull chain are always attached to at least one Role.

In Fällen, in denen sowohl der Obertrum- als-auch der Untertrum der Zugkette abgewinkelt ist, z. B. bei einem angehobenen Antriebsrahmen, ist es gemäß Anspruch 7 vorteilhaft, in beiden Trumen eine-Rollenführung vorzusehen, um einen reibungs- und --verschleißarmen Durchlauf zu gewährleisten.In cases where both the upper run and the lower run of the Pull chain is angled, e.g. B. with a raised drive frame, it is according to Claim 7 advantageous to provide a roller guide in both strands to one to ensure low-friction and low-wear throughput.

Bei einem angehobenen Antriebsrahmen und- einem vorgegebenen Durchmesser des Antriebsrades kann es sich ergeben, daß der Obertrum der Zugkette stärker abgewinkelt ist, als der Untertrum. Eine stärkere Abwinkelung führt natürlich zwangsläufig zu einer größeren Belastung der Rollenführung. Die Ausgestaltunq nach Anspruch 8 verfolgt den Zweck, das Maß der Abwinkelung zu verringern und erreicht dies dadurch, daß die Rollenführung im Obertrum gegenuber der Rollenführung im Untertrum zur Strebmitte hin versetzt ist.With a raised drive frame and a given diameter of the drive wheel, it can happen that the upper run of the pull chain is more angled is than the lower run. Of course, a stronger deflection inevitably leads to a greater load on the roller guide. The Ausgestaltunq pursued according to claim 8 the purpose of reducing the amount of deflection and achieves this in that the roller guide in the upper run opposite the roller guide in the lower run to the center of the strut is offset.

Tatsächlich läßt sich hierdurch das Maß der Abwinkelung verringern.In fact, this can reduce the amount of deflection.

Die Ausbildungen nach den Ansprüchen 9 und 10 vereinfachen nicht nur die Herstellung der Rollenführung, sondern auch deren Montage bzw. Demontage vor Ort. Die Rollenführung kann zum einen als ein komplett vorgefertigtes Bauteil hergestellt werden. Zum anderen läßt sich dieses Bauteil schnell und einfach demontieren und montieren, um z. B. eine defekte Rollenführung auszutauschen.The training according to claims 9 and 10 not only simplify the manufacture of the roller guide, but also its assembly or disassembly Location. On the one hand, the roller guide can be manufactured as a completely prefabricated component will. On the other hand, this component can be dismantled quickly and easily and mount to z. B. replace a defective roller guide.

Hierzu ist es natürlich notwendig, den oder die Lagerböcke leicht und schnell montierbar bzw. demontierbar anzuordnen. Hierzu dienen die Ausgestaltungen nach den Ansprüchen 11 bis 14. Gemäß Anspruch 11 sind der oder die Lagerböcke der Rollenführung in einem der Führungsschiene stirnseitig vorgeordneten Gehäuse angeordnet. Das Gehäuse weist gemäß Anspruch 12 zwei in etwa bankrechte, sich in Kettenlängsrichtung erstreckende Seitenwände auf, zwischen denen der oder die Lagerböcke übereinander angeordnet und gehalten sind.For this it is of course necessary to light the bearing block or brackets and quick to assemble or dismantle. The refinements serve this purpose according to claims 11 to 14. According to claim 11, the bracket or brackets are the Roller guide arranged in a housing arranged upstream of the guide rail. According to claim 12, the housing has two approximately bank-right, extending in the longitudinal direction of the chain extending side walls, between which the one or more bearing blocks one above the other are arranged and held.

Dabei sind die Lagerböcke im Sinne von Anspruch 13 durch sowohl die Seitenwände des Gehäuses als auch die Lagerböcke in Abbaurichtung durchfassende Schrauben befestigt. Hierdurch ist nicht nur eine preiswerte, sondern auch eine schnell und leicht zu. mbntierende bzw. zu demontierende Befestigung gegeben. Bei der Ausgestaltung gemäß Anspruch 14 ist eine besonders einfache und leichte Montage bzw. Demontage-vom Abbaustoß her gewährleistet.The bearing blocks within the meaning of claim 13 by both the Side walls of the housing as well as the bearing blocks in the dismantling direction penetrating Screws fastened. This not only makes it an inexpensive one, but also one quick and easy to. Mounted or dismantled fastening given. at the embodiment according to claim 14 is a particularly simple and easy assembly or dismantling guaranteed from the working joint.

Die Ausbildungen nach den Ansprüchen 15 und 16 bezwecken eine preiswerte und günstige Lagerung der Rollen sowie deren einfache und schnelle Montage bzw. Demontage.The training according to claims 15 and 16 aim to be inexpensive and cheap storage of the rolls as well as their easy and quick assembly or Dismantling.

Bei der Ausgestaltung gemäß Anspruch 18 sind die Lagerbockschenkel in die Bildung der Kettenkanalwandung mit einbezogen und zur Vermeidung von Unebenheiten in der Wandung fluchtend mit der Rundung.In the embodiment according to claim 18, the bearing block legs are included in the formation of the chain channel wall and to avoid unevenness in the wall aligned with the curve.

des Kettenkanals ausgenommen.the chain channel excepted.

Den vorgenannten Zweck verfolgen auch die Ausgestaltungen nach den Ansprüchen 19 und 20. Hier bildet die Oberseite des Untertrum-Lagerbocks die untere Begrenzung des Obertrum-Kettenkanals.The above-mentioned purpose is also pursued by the configurations according to the Claims 19 and 20. Here the upper side of the lower run bearing block forms the lower one Limitation of the upper run chain channel.

Gemäß Anspruch 21 weisen der Untertrum-Lagerbock und der Obertrum-Lagerbock oberseitig bzw. unterseitig vorstehende Vorsprünge auf, von denen der eine den anderen hintergreift. Hiedruch wird eine zusätzliche, in seitlicher Richtung wirksame Arretierung für den einen Lagerbock geschaffen, so daß es z. B. möglich ist, zur Befestigung dieses Lagerbocks weniger Schrauben vorzusehen.According to claim 21, the lower run bearing block and the upper run bearing block on the top or bottom protruding projections, one of which is the other engages behind. This is an additional locking mechanism that is effective in the lateral direction created for a bearing block, so that it is z. B. is possible for attachment this bearing block to provide fewer screws.

Durch die Ausgestaltungen nach' den Ansprüchen 22 bis 25 wird' die Montage bzw. Demontage' der Zugkette erleichtert. Es ist durch die Ausgestaltung nach Anspruch 22 möglich, die Zugkette von, der Seite her in den Kettenkanal oder in die Kettenkanäle einzulegen bzw-.Through the configurations according to 'claims 22 to 25' the Assembly and disassembly 'of the pull chain facilitated. It's by design according to claim 22 possible, the pull chain from, the side in the chain channel or to be inserted into the chain channels or.

auszubauen, ohne das der oder die Lagerböcke demontiert werden müssen. Die Ausgestaltungen nach den Ansprüchen 23.und 24 ermöglichen in gleicher Weise ein Einlegen bzw. Ausbauen der Zug7 kette vom Abbaustoß her, wo ausreichend Platz zur Verfügung steht.to expand without having to dismantle the bearing block (s). The configurations according to claims 23 and 24 enable the same way inserting or removing the pulling chain from the working face where there is enough space is available.

Vom Versatz her ist ein Einbau bzw. Ausbau der Zugkette deshalb nur schwer durchführbar, weil an der Versatzseite der Rollenführung bzw. des die Rollenführung aufnehmenden Gehäuses der Förderer verläuft und somit äußerst wenig Platz vorhanden ist Gemäß Anspruch 25 sind der oder die Längsschlitze durch jeweils~eine auf der Innenseite der-lösbaren Seitenwand befestigte Leiste verschlossen.In terms of the offset, installation or removal of the pull chain is therefore only possible difficult to carry out because on the offset side of the roller guide or the roller guide receiving housing of the conveyor and therefore extremely little space available According to claim 25, the or each longitudinal slot through each ~ one on the Inside of the detachable side wall fastened bar closed.

Dabei reicht die Leiste soweit in den Längsschlitz hinein, daß ihre Längsseite in etwa mit der Wandung des Kettenkanals fluchtet und somit eine seitliche Begrenzung des Kettenkanals bildet.The bar extends so far into the longitudinal slot that its The long side is roughly aligned with the wall of the chain channel and thus a lateral one Forms limitation of the chain channel.

Durch die Ausbildung nach Anspruch 26 wird eine Zentrierung wenigstens des Untertrum-Lagerbocks- an wengistens der festen Seitenwand des Gehäuses erreicht. Hierzu sind wenigstens dem Untertrum-Lagerbock wenigstens ein seitlich vorspringender Zentrierungszapfen zugeordnet.By training according to claim 26, a centering is at least of the lower run bearing block- reached at least the fixed side wall of the housing. For this purpose, at least one laterally protruding bearing block is provided at least on the lower run bearing block Centering pin assigned.

Der Obertrum-Lagerbock wird gemäß Anspruch 27 dadurch im Gehäuse zentriert, daß er mit seiner Oberseite und mit seinen Stirnseiten an Querstreben des Gehäuses anliegt. Der Obertrum-Lagerbock ist somit in seiner, bank rechten Längsebene von drei Seiten her festgelegt.The upper run bearing block is centered in the housing according to claim 27, that he with his top and with his front sides on cross struts of the housing is present. The upper run bearing block is thus in its, bank right longitudinal plane of set three sides ago.

Die Ausgestaltung nach Anspruch 28 ermöglicht es, die Obertrum-Rollenführung gegenüber der Untertrum-Rollenführung zur Strebmittc hin zu versetzen, ohne daß der Abstand zwischen der Führungsschiene für die Gewinnungsmaschine und dem Antriebsrad für die Zugkette vergrößert wird. Dies wird dadurch ermöglicht, daß die Führungsschiene eine oberseitig bis in etwa zur Mitte des Obertrums reichende, stufenförmige Aussparung aufweist, in der die Führungsschiene von einem die Rollenführung aufnehmenden Vorsprung des Gehäuses übergriffen wird.The embodiment according to claim 28 enables the upper run roller guide to offset against the lower run roller guide to Strebmittc without the distance between the guide rail for the mining machine and the drive wheel for the pull chain is enlarged. This is made possible by the fact that the guide rail a step-shaped recess reaching up to approximately the middle of the upper run has, in which the guide rail from a projection receiving the roller guide the housing is encroached.

Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand einer vereinfachten Zeichnung näher beschrieben. Es zeigen Fig. 1 eine erfindungsgemäß ausgestaltete Gewinnungseinrichtung, -nämlich den Antriebsbereich-eines Strebförderers mit einer: abbaustoßseitig von-diesem verlaufenden Führungssch.iene für eine aus Vereinfachungsründen nicht dargestellte Gewinnungsmaschine in der Ansicht vom Abbaustoß her, Fig. 2 einen lotrechten Querschnitt durch die Führungsschiene nach der Linie' 11-11 in Fig. 1 und Fig 3 einen Schnitt-nach der- Linie III-I--II in Fig. -4-.An embodiment of the invention is based on a simplified drawing described in more detail. 1 shows a device according to the invention designed extraction device, namely the drive area of a face conveyor with a guide rail running from this on the excavation joint side for one For reasons of simplification, mining machine not shown in the view of the working face her, Fig. 2 is a vertical cross section through the guide rail along the line ' 11-11 in Fig. 1 and Fig. 3 a section-along the line III-I-II in Fig. -4-.

Die Gewinnungseinrichtung umfaßt einen nur in der Fig-. 2-andeutungsweise dargestellten Strebförderer 1, an dessen zum nicht dargestellten Abbaustoß gerichteten Seite über ein Zwischenstück 2 eine Führungsschiene 3 für die nicht darges-te-l-lte -GewinnungsmaSchine befestigt ist. Endseitig ist-an-den Strebförderer 1 e-in nur in Fig. 1 dargestellter Antriebsrahmen 4 befestigt, an dem sowohl der vereinfacht dargestellte Fördererantrieb 5 als auch der nicht dargestellte Antrieb für die Gewinnungsmaschine angeordnpet sind. Vom Gewinnungsmaschinenantrieb ist lediglich das Antriebsrad 6 vereinfacht dargestellt, daß von einer ddppeltrumigen Zugkette 7- für die nicht dargestellte Gewinnungsmaschine umschlungen-ist. Die Zugkette verläuft in Kettenkanälen 8, 9, die sich übereinander längs durch, die Führungsschiene 3 erstrecken. Der Obertrum der Zugkette 7- ist mit 1-1 und der Untertrum mit 12 bezeichnet.The recovery device comprises one only shown in FIG. 2-hint face conveyor 1 shown, at its directed to the mining face, not shown Side via an intermediate piece 2 a guide rail 3 for the not shown-te-l-lte - Extraction machine is attached. At the end of the face conveyor 1 is only e-in In Fig. 1 shown drive frame 4 attached to which both the simplified conveyor drive 5 shown as well as the drive, not shown, for the mining machine are arranged. Only the drive wheel 6 is of the mining machine drive in simplified form, that of a ddppeltrumigen pull chain 7- for the not extraction machine shown is entwined. The pull chain runs in chain channels 8, 9, which extend longitudinally through the guide rail 3, one above the other. The upper run the pull chain 7- is denoted by 1-1 and the lower strand by 12.

Wie aus Fig. 1 zu entnehmen ist, ist der Strebförderer in der Lage, das Fördergut einem. sich quer erstreckenden, nur andeutungsweise dargestellten Streckenförderer 13 zu übergeben, der söhlig angeordnet ist. Der Antriebsrahmen 4 ist hierzu streckenseitig angel hoben. Aufgrund dieser Anordnung ist das Antriebsrad für die Gewinnungsmaschine höher angeordnet als die Führungsschiene 3. Es ist deshalb notwendig, sowohl den Obertrum 11 als auch den Untertrum 12 der Zugektte 7 zum Hangenden hin abzuwinkeln, um die Zugkette 7 um das Antriebsrad 6 legen zu können. Es ergibt somit sowohl im Obertrum 11 als auch im Untertrum 12 jeweils eine Abwinkelung der Zugkette 7, die mit 14 bzw. 15 bezeichnet ist. Da der Durchmesser d des Antriebsrades 6 größer bemessen ist, als der Mittenabstand zwischen Ober- und Untertrum 11, 12, fällt die Abwinkelung des Obertrums 11 größer aus (Winkel x) als die des Untertrums 12 (Winkel y).As can be seen from Fig. 1, the face conveyor is able to the goods to be conveyed. extending transversely, only hinted at To pass line conveyor 13, which is arranged in the sole. The drive frame 4 is for this purpose lifted on the track side. Because of this arrangement is the drive wheel for the mining machine arranged higher than the guide rail 3. It is therefore necessary, both the upper run 11 and the lower run 12 of the Zugektte 7 bend towards the hanging wall in order to put the pull chain 7 around the drive wheel 6 can. It thus results in one each in the upper run 11 as well as in the lower run 12 Bending of the pull chain 7, which is denoted by 14 and 15, respectively. Because the diameter d of the drive wheel 6 is larger than the center distance between the upper and lower run 11, 12, the angling of the upper run 11 is greater (angle x) than that of the lower run 12 (angle y).

Jedem Kettenkanal 8, 9 ist im Bereich der Abwinkelung 14, 15 auf der zum Hangenden gerichteten Seite eine Rollenführung zugeordnet, an der die Zugkette 7 sich abzustützen vermag. Die Rollenführung im Obertrum 11 ist mit 16 und die im Untertrum 12 mit 17 bezeichnet. Jede Rollenführung 16, 17 besteht aus mehreren, in Kettenlängsrichtung (Doppelpfeil 18) hintereinanderliegenden Rollen 19, die um parallel zum Liegenden 21 und quer zur Kettenlängsrichtung 18 gerichtete Drehachsen 22 drehbar gelagert sind. Die Abstände a der Rollen 19 voneinander sind so groß bemessen, daß wenigstens die bankrechten Kettenglieder 23 der Zugkette 7 immer an wenigstens einer Rolle 19 anliegen (siehe auszugsweise Darstellung in Fig. 1). Dabei werden die Rollen 19 jeder Rollenführung 16, 17 von einer gleichmäßig gekrümmten (gedachten) Linie 24 tangiert, wobei die Radien r dieser Linie 24 im Bereich der jeweils ersten und letzten Rolle 19 rechtwinkelig zum Ober- bzw. Untertrum 11, 12 gerichtet sind.Each chain channel 8, 9 is in the area of the bend 14, 15 on the the side facing the hanging wall is assigned a roller guide on which the pull chain 7 able to support itself. The roller guide in the upper run 11 is 16 and the one in The lower run 12 is designated by 17. Each roller guide 16, 17 consists of several in the chain longitudinal direction (double arrow 18) one behind the other rollers 19, which around Axes of rotation directed parallel to the horizontal plane 21 and transversely to the longitudinal direction 18 of the chain 22 are rotatably mounted. The distances a of the rollers 19 from one another are so great dimensioned that at least the right bank chain links 23 of the pull chain 7 always on at least one roller 19 abut (see excerpts from the illustration in FIG. 1). Included the rollers 19 of each roller guide 16, 17 of a uniformly curved Tangent (imaginary) line 24, the radii r of this line 24 in the area of first and last roller 19 at right angles to the upper and lower run 11, 12 are directed.

Die Rollen 19 sind in Lagerböcken gelagert, von denen der dem Obertrum 11 zugeordnete mit 25 und der dem Untertrum 12 zugeordnete mit 26 bezeichnet ist. Zu ihrer Lagerung weisen die Rollen 19 zu beiden Seiten Lagerzapfen 27 auf, die in quer zur Kettenlängsrichtung 18 in den Lagerböcken 25, 26 verlaufenden Bohrungen 28 einfassen und durch Wälzlager 29 darin gelagert sind. Dabei sind die Rollen 19 in bankrechten Längsnuten 31 angeordnet. Aufgrund des Vorhandenseins dieser Längsnuten 31 weist jeder Lagerbock 25, 26 einen abbaustoßseitigen und einen versatzseitigen Schenkel auf, die mit 32 bis 35 bezeichnet sind.The rollers 19 are mounted in bearing blocks, of which the upper run 11 associated with 25 and that associated with the lower strand 12 with 26. For their storage, the rollers 19 have bearing pins 27 on both sides, which in bores extending transversely to the longitudinal direction 18 of the chain in the bearing blocks 25, 26 28 enclose and are supported by roller bearings 29 therein. The roles are 19 arranged in longitudinal grooves 31 perpendicular to the bank. Due to the presence of these longitudinal grooves 31, each bearing block 25, 26 has one on the working face side and one on the offset side Legs, which are designated by 32 to 35.

Die beiden Rollenböcke 25, 26 sind übereinander in einem der Führungsschiene 3 stirnseitig vorgeordneten, allgemein mit 36 bezeichneten Gehäuse angeordnet, daß, wie die Führungsschiene 3, am Strebförderer 1 befestigt ist und im wesentlichen aus zwei bankrechten, sich parallel zur Zugkette 7 erstreckenden Seitenwänden 37, 38 und einer Deckplatte 39 besteht. Die abbaustoßseitige Seitenwand 37 ist lösbar angeordnet und nur in der Fig. 3 dargestellt. In der Fig. 1 ist die abbaustoßseitige Seitenwand 37 abgenommen, damit die Rollenführungen 16, 17 besser zu sehen sind.The two roller blocks 25, 26 are one above the other in one of the guide rails 3 frontal upstream, generally designated 36 housing arranged that, like the guide rail 3, is attached to the face conveyor 1 and essentially from two bank-right side walls 37 extending parallel to the pull chain 7, 38 and a cover plate 39 consists. The side wall 37 on the working face side is detachable arranged and shown only in FIG. In Fig. 1 is the working face side Side wall 37 removed so that the roller guides 16, 17 can be seen better.

Die Lagerböcke 25, 26 sind im Gehäuse 36 mit Hilfe von Schrauben 41 befestigt, die die Seitenwände 37, 38 und'die Lagerböcke 25, 26 durchfassen. Dabei sind auf der Versatzseite.des Untertrum-Lagerbocks 26 zwei Zentrierungszapfen 42 vorgesehen, die in die versatzseitige Seitenwand 38 einfassen.- Die,"Zentrierung-des, Obertrum-Lagerbocks 25 ist dadurch gegeben, daß dieser mit seiner Oberseite an der Deckplatte 39 und-mit seinen Stirnseiten 44, 45 an sich zwischen den Seitenwäden 37, 38 erstreckenden Distanzstücken 46, 47 anliegt. Weitere Distanzstücke sind mit 48, 49 bezeichnet.The bearing blocks 25, 26 are in the housing 36 with the aid of screws 41 attached, which the side walls 37, 38 und'die bearing blocks 25, 26 grasp. Included are on the Versatzseite.des lower run bearing block 26 two centering pins 42 provided, which enclose in the offset side wall 38.- The "centering-des, Upper run bearing blocks 25 is given that this with its top on the Cover plate 39 and with its end faces 44, 45 per se between the side walls 37, 38 extending spacers 46, 47 rests. More spacers are with 48, 49 designated.

Die Kettenkanäle 8, 9 verlaufen im Bereich der Rollenführungen 16, 17 unterhalb der Rollen 19, wobei hier die Rollenböcke 25, 26 und- die Distanzstücke 46, 48 und 49 sowie die Rollen 19 mit Eindrehungen 50 in die Bildung der Wandungen 51, 52 der Ke.ttenkanäle 8, 9 einbezogen sind. Hierzu sind die inneren Ecken- 53 der Schenkel 32, 33 und 34 fluchtend milder Rundung der betreffenden IRettenkanalwandung 51 bzw. 52 ausgenommen. Die untere Begrenzung des obertrumigen Kettenkanals 8 wird durch die Oberseite 54 des Untertrum-Lagerbocks 26 gebildet, wobei ein oberseitig vom Untertrum-Lagerbock 26 vorstehender Vorsprung -55 ebenfalls fluchtend mit der Kettenkanalwandung 51 geformt ist. Die untere Begrenzung des Untertrum-Kettenkanals 9 wird durch einen zum Abbaustoß hin abgewinkelten Fortsatz 56 gebildet, dessen Innenseite ebenfalls fluchtend mit der Rundung der Wandung 52 des. Kettenkanals 9 -formt ist.The chain channels 8, 9 run in the area of the roller guides 16, 17 below the rollers 19, the roller blocks 25, 26 and the spacers here 46, 48 and 49 and the rollers 19 with grooves 50 in the formation of the walls 51, 52 of the Ke.ttenkanäle 8, 9 are included. The inner corner 53 the legs 32, 33 and 34 are aligned with a mild rounding of the respective IRettenkanalwandung 51 or 52 excluded. The lower limit of the upper-strand chain channel 8 is formed by the upper side 54 of the lower run bearing block 26, with an upper side from the lower run bearing block 26 protruding projection -55 also in alignment with the Chain channel wall 51 is formed. The lower limit of the lower run chain channel 9 is formed by an angled to the working joint extension 56, the Inside also in alignment with the rounding of the wall 52 of the chain channel 9 -shaped.

Die Rollenböcke 25, 26 weisen abbaustoßseitig Längsschlitze 57 auf, die sich ihrer Tiefe nach bis zu den Kettenkanälen 8, 9 erstrecken und eine Breite c aufweisen, die in etwa der Breite e der Kettenglieder 23 entspricht. Durch diese Schlitze 57 kann die Zugkette 7 bei entfernter Seitenwand 37 eingelegt oder ausgebaut werden.The roller blocks 25, 26 have longitudinal slots 57 on the working face side, which extend their depth to the chain channels 8, 9 and a width c, which corresponds approximately to the width e of the chain links 23. Through this The pull chain 7 can insert or remove slots 57 with the side wall 37 removed will.

Auf der Innenseite der lösbaren Seitenwand 37 sind Leisten 58 befestigt, die so breit bemessen sind, daß sie mit ihren Längsseiten 59 mit den Wandungen 51, 52 der Kettenkanäle 8, 9 in etwa fluchten.On the inside of the detachable side wall 37 strips 58 are attached, which are dimensioned so wide that their long sides 59 with the walls 51, 52 of the chain channels 8, 9 are roughly aligned.

Die Leisten 58 bilden somit eine seitliche Begrenzung der Kettenkanäle 8, 9 im Bereich der pollenführungen 16, 17 bzw. der Lagerböcke 25, 26.The strips 58 thus form a lateral delimitation of the chain channels 8, 9 in the area of the pollen guides 16, 17 or the bearing blocks 25, 26.

Zum Zweck einer zusätzlichen seitlichen Festlegung des Obertrum-Lagerbocks 25 an der festen Seitenwand 38 des Gehäuses 36 ist ein von der Unterseite des Obertrum-Lagerbocks 25 vorspringender Vorsprung 61 vorgesehen, der vom Vorsprung 55 des Untertrum-Lagerbocks 26 auf seiner Abbaustoßseite hintergriffen wird.For the purpose of an additional lateral fixing of the upper run bearing block 25 on the fixed side wall 38 of the housing 36 is one of the underside of the upper run bearing block 25 protruding projection 61 is provided from the projection 55 of the lower run bearing block 26 is reached from behind on its mining face.

Die Führungsschiene 3 weis an ihrem dem Gehäuse 36 zugewandten Ende eine oberseitige Aussparung 62 auf, durch die sie in etwa bis zur Mitte des Obertrum-Kettenkanals 8 abgesetzt ist. In dieser Aussparung 62 wird die Führungsschiene 3 von einem Vorsprung 63 des Gehäuses 36 übergriffen, in dem ein Längenabschnitt der Obertrum-Rollenführung 16 aufgenommen ist. Diese Ausgestaltung ermöglicht es, die Obertrum-Rollenführung 16 gegenüber der- Untertrum-Rollenführung 17 zur Strebmitte hin zu versetze-n, ohne daß der Abstand f zwischen der Führungsschiene 3 und dem Antriebsrad 6 vergrößert wird.The guide rail 3 points at its end facing the housing 36 an upper-side recess 62 through which it is approximately to the middle of the upper run chain channel 8 is discontinued. In this recess 62, the guide rail 3 is supported by a projection 63 of the housing 36 overlapped, in which a length of the upper run roller guide 16 is included. This configuration enables the upper run roller guide 16 relative to the lower run roller guide 17 to the center of the strut to offset-n without that the distance f between the guide rail 3 and the drive wheel 6 increases will.

Zur Demontage der Rollenböcke 25-, 26 ist es lediglich notwendig, die abbaustoßseitige Seitenwand 37 des Gehäuses 36 zu entfernen und die Zugkette 7 durch die Längsschlitze 57 auszubauen. AnschließeJ(I können die Lagerböcke 25, 26 zum Abbaustoß hin aus ihrer Halterung herausgezogen werden.To dismantle the roller blocks 25-, 26 it is only necessary to remove the working face side wall 37 of the housing 36 and the pull chain 7 to be expanded through the longitudinal slots 57. Then the bearing blocks 25, 26 can be pulled out of their holder towards the working face.

Der Ein- bzw. Ausbau der Rollen 19 wird dadurch ermöglicht, daß der Durchmesser g der Bohrungen 28 in den Lagerböcken 25, 26 größer bemessen ist als der Durchmesser h der Rollen 19.The installation or removal of the rollers 19 is made possible in that the Diameter g of the bores 28 in the bearing blocks 25, 26 dimensioned larger is than the diameter h of the rollers 19.

Im Rahmen der Erfindung ist es auch möglich, nur im Obertrum-Kettenkanal 8 eine Rollenführung 16 vorzusehen. Dies ist z. B.In the context of the invention, it is also possible only in the upper run chain channel 8 to provide a roller guide 16. This is e.g. B.

dann möglich, wenn die Unterkante des Antriebsrades in gleicher Höhle mit der Mitte des Untertrum-Kettenkanals 9 liegt, so daß der Untertrum 12 der Zugkette 7 nicht abgewinkelt ist.then possible if the lower edge of the drive wheel is in the same cave with the center of the lower run chain channel 9, so that the lower run 12 of the pull chain 7 is not angled.

LeerseiteBlank page

Claims (28)

Patentan sprüche 1. Mineral-Gewinnungseinrichtung für den untertägigen Bergbau, mit einer kettengezogenen Gewinnungsmaschine, insbesondere Hobel, die an einer am Förderer angeordneten Führungsschiene geführt ist, wobei die doppeltrumige Zugkette in übereinanderliegenden Kettenkanälen verläuft, die sich längs durch die Führungsschiene oder Anbauteilen derselben erstrecken, und wenigstens ein Trum der Zugkette im Bereich des Maschinenrahmens und/oder der Anschlußrinne vertikal abgelenkt ist, dadurch gekennzeichnet, daß das abgelenkte Trum (11 bzw. 12) der Zugkette (n) im Bereich der Ablenkung (14 bzw. 15) an einer Rollenführung (16 bzw. 17) abgestützt ist.Claims 1. Mineral extraction facility for the underground Mining, with a chain-drawn mining machine, in particular planes, which at a guide rail arranged on the conveyor is guided, the double stranded Pull chain runs in superimposed chain channels that run lengthways through the Guide rail or attachments extend the same, and at least one strand of the Pull chain deflected vertically in the area of the machine frame and / or the connecting channel is, characterized in that the deflected strand (11 or 12) of the pull chain (s) supported in the area of the deflection (14 or 15) on a roller guide (16 or 17) is. 2. Gewinnungseinrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Rollenführung (16 bzw. 17) die Wandung (51 bzw. 52) des Kettenkanals (8 bzw. 9) ersetzt.2. Extraction device according to claim 1, characterized in that that the roller guide (16 or 17) the wall (51 or 52) of the chain channel (8 or 9) replaced. 3. Gewinnungseinrichtung nach Anspruch 1 oder 2, wobei der Trum der Zugkette schräg zum Hangenden hin abgewi,nkelt ist, dadurch gekennzeichnet, daß die Rollenführung (16 bzw. 17) auf der zum Hangenden weisenden Seite des Kettenkanals (8 bzw. 9) angeordnet ist.3. Extraction device according to claim 1 or 2, wherein the strand of Pull chain is angled obliquely towards the hanging wall, characterized in that the roller guide (16 or 17) on the side of the chain channel facing the hanging wall (8 or 9) is arranged. 4. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Rollenführung (16 bzw. 17) aus mehreren in Kettenlängsrichtung (18) hintereinanderliegenden Rollen (19) besteht.4. Extraction device according to one or more of the preceding Claims, characterized in that the roller guide (16 or 17) consists of several consists of rollers (19) lying one behind the other in the longitudinal direction (18) of the chain. 5. Gewinnungseinrichtung nach Anspruch 4, dadurch gekennzeichnet, daß die Rollen (19) von einer (gedachten) Linie (24) tangiert werden, die in etwa gleichmäßig gekrümmt ist, wobei der Radius (r) dieser Linie (24) im Bereich der ersten und letzten Rolle (19) rechtwinkelig zum Trum (Obertrum 11 bzw. Untertrum 12) der Zugkette (7) gerichtet ist.5. Extraction device according to claim 4, characterized in that that the rollers (19) are affected by an (imaginary) line (24), which is approximately is evenly curved, the radius (r) of this line (24) in the area of first and last roller (19) at right angles to the run (upper run 11 or lower run 12) of the pull chain (7) is directed. 6. Gewinnungseinrichtung nach Anspruch 4 oder 5, wobei die Zugkette eine Rundgliederkette ist, dadurch gekennzeichnet, daß die Abstände (a) der Rollen (19) voneinander so groß bemessen sind, daß wenigstens die bankrechten Kettenglieder (23) immer an wenigstens einer Rolle (19) anliegen.6. Extraction device according to claim 4 or 5, wherein the pull chain is a round link chain, characterized in that the distances (a) between the rollers (19) are dimensioned so large from each other that at least the right bank chain links (23) always rest on at least one roller (19). 7. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, das in beiden Trumen (11, 12) eine Rollenführung (16 bzw. 17) vorgesehen ist.7. Extraction device according to one or more of the preceding Claims, characterized in that a roller guide in both strands (11, 12) (16 or 17) is provided. 8. Gewinnungseinrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die Rollenführung- (16) im Obertrum (11) gegenüber der-Rollenführung (17) im Untertrum (12) zur Strebmitte hin versetzt ist.8. Extraction device according to claim 7, characterized in that that the roller guide (16) in the upper run (11) compared to the roller guide (17) in the The lower run (12) is offset towards the center of the strut. 9. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Rollenführung (16 bzw. 17) in einem auswechselbaren Lagerbock (25 bzw. 26) gelagert ist.9. Extraction device according to one or more of the preceding Claims, characterized in that the roller guide (16 or 17) in an exchangeable Bearing block (25 or 26) is mounted. 10. Gewinnungseinrichtung nach Anspruch 9, dadurch gekennzeichnet, daß für die Rollenführung (16) im Obertrum (11) und für dieim Untertrum (12) ein gemeinsamer Lagerbock vorgesehen ist.10. Extraction device according to claim 9, characterized in that that for the roller guide (16) in the upper run (11) and for those in the lower run (12) common bearing block is provided. 11. Gewinnungseinrichtung nach Anspruch 9 oder 10, dadurch gekennzeichnet, daß der oder die Lagerböcke (25, 26) in einem der Führungsschiene (3) stirnseitig vorgeordneten Gehäuse (36) angeordnet sind.11. Extraction device according to claim 9 or 10, characterized in that that the one or more bearing blocks (25, 26) in one of the guide rails (3) on the end face upstream housing (36) are arranged. 12. Gewinnungseinrichtung nach Anspruch 11, dadurch gekennzeichnt, daß das Gehäuse (36) zwei in etwa bankrechte, sich in Ketto-nlängsrichtung (18) erstreckende Seitenwände (37, 38) aufweist, zwischen denen der oder die Lagerböcke (25, 26) übereinander angeordnet und gehalten sind.12. Extraction device according to claim 11, characterized in that that the housing (36) two approximately bank-right, in the Ketto-nlängsrichtung (18) having extending side walls (37, 38), between which the one or more bearing blocks (25, 26) are arranged and held one above the other. 13. Gewinnungseinrichtung nach Anspruch 12, dadurch gekennzeichnot, daß der oder die Lagerböcke (25, 26) durch sowohl die Seitenwände (37, 38) des Gehäuses (36) als auch den oder die Lagerböcke (25, 26) durchfassende Schrauben (41) befestigt sind.13. Extraction device according to claim 12, characterized gekennzeichnot, that the one or more bearing blocks (25, 26) through both the side walls (37, 38) of the housing (36) as well as the bearing block (s) (25, 26) passing through screws (41) attached are. 14. Gewinnungseinrichtung nach Anspruch 13, dadurch gekennzeichnet, daß die abbaustoßseitige Seitenwand (37) lösbar ist und der oder die Lagerböcke (25, 26) vom Abbaustoß her auf die Schrauben aufsteckbar bzw. abnehmbar sind.14. Extraction device according to claim 13, characterized in that that the side wall (37) on the working face side is detachable and the one or more bearing blocks (25, 26) can be attached or removed from the working joint on the screws. 15. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Rolle oder die Rollen (19) jeweils in einer längs in die Unterseite des Lagerbocks (25, 26) eingearbeiteten Aussparung (Längsnut 31) angeordnet sind.15. Extraction device according to one or more of the preceding Claims, characterized in that the roller or rollers (19) each in a recess machined lengthwise into the underside of the bearing block (25, 26) (Longitudinal groove 31) are arranged. 16. Gewinnungseinrichtung nach Anspruch 15, dadurch gekennzei~lnet, daß die Rolle oder die Rollen (19) auf beiden Seiten Lagerzapfen (27) aufweisen, die mit Hilfe von Wälzlagern (29) in Bohrungen (28) des Lagerbocks (25, 26) gelagert sind, wobei die Bohrungen auf wenigstens einer Seite des Lagerbocks (25, 26) größer bemessen sind als der Außendurchmesser (h) der Rollen (19).16. Extraction device according to claim 15, characterized in that that the roller or rollers (19) have bearing journals (27) on both sides, which are mounted in bores (28) of the bearing block (25, 26) with the aid of roller bearings (29) are, wherein the bores on at least one side of the bearing block (25, 26) are larger are dimensioned as the outer diameter (h) of the rollers (19). 17. Gewinnungseinrichtung nach einem oder mehreren der vorherqehenden Ansprüche, dadurch gekennzeichnet, daß in die Rolle oder Rollen (19) eine der Wandung (51 bzw. 52) des Kettenkanals (8 bzw. 9) in etwa angepaßte Eindrehung (50) eingearbeitet ist.17. Extraction device according to one or more of the preceding Claims, characterized in that one of the walls in the roller or rollers (19) (51 or 52) of the chain channel (8 or 9) incorporated in an approximately adapted recess (50) is. 18. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Aussparung in der Unterseite des Lagerbocks (25, 26) durch eine zwei Schenkel (32, 33 bzw. 34, 35) schaffende Längsnut (31) gebildet ist und-die inneren unteren Ecken (53) der Schenkel fluchtend mit der Rundung der Wandung (51 bzw 52) des Kettenkanals (8 bzw. 9) ausgenommen sind.18. Extraction device according to one or more of the preceding Claims, characterized in that the recess in the underside of the bearing block (25, 26) through a longitudinal groove (31) creating two legs (32, 33 or 34, 35) is formed and-the inner lower corners (53) of the legs in alignment with the rounding the wall (51 or 52) of the chain channel (8 or 9) are excluded. 19. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Oberseite (54) des Untertrum-Lagerbocks (26) die untere -Begrenzung des Obertrum-Kettenkanals (8) bildet.19. Extraction device according to one or more of the preceding Claims, characterized in that the upper side (54) of the lower run bearing block (26) forms the lower limit of the upper run chain channel (8). 20 Gewinnungseinrichtung nach - Anspruch 19, dadurch gekennzeichnet, daß die Objerseite (54) des Untertrum-Lagerbocks (26) der Rundung der Wandung (51) des Obertrum-Kettenkanals (8-) entsprechend geformt ist.20 extraction device according to - claim 19, characterized in that that the upper side (54) of the lower run bearing block (26) of the curvature of the wall (51) of the upper run chain channel (8-) is shaped accordingly. 21. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß ein vom Untertrum-Lagerbock (26) oberseitig vorstehender Vorsprung (55) einen unterseitig vom Ober-trum-Lagerbock- (25) vorstehenden Vorsprung (61) abbaustoßseitig hintergreift.21. Extraction device according to one or more of the preceding Claims, characterized in that one of the lower run bearing block (26) on the top protruding projection (55) protruding from the upper run bearing block (25) on the underside Protrusion (61) engages behind on the working joint side. 22. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß si-ch an die Kettenkanäle (8, 9) im Lagerbock oder in den Lagerböcken (25, 26) seitlich jeweils ein seitlich aus dem betreffenden Lagerbock austretender verschließbarer Längsschlitz (57) anschließt, dessen Breite (b) in etwa der Kettengliedbreite (e) entspricht.22. Extraction device according to one or more of the preceding Claims, characterized in that they are attached to the chain channels (8, 9) in the bearing block or in the bearing blocks (25, 26) laterally one in each case from the relevant one Bearing block exiting closable longitudinal slot (57) is connected, the width of which (b) corresponds approximately to the chain link width (e). 23. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß zwischendem abbaustoßseitigen Schenkel (32) des Obertrum-Lagerbocks (25) und der Oberseite (54) des Untertrum-Lagerbocks (26)- ein Abstand (c) besteht, der in etwa der Kettengliedbreite (e)- entspricht.23. Extraction device according to one or more of the preceding Claims, characterized in that between the leg (32) on the working face side of the upper run bearing block (25) and the upper side (54) of the lower run bearing block (26) - there is a distance (c) which corresponds approximately to the chain link width (e). 24. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die untere Begrenzung des Kettenkanals (9) im Untertrum-Lagerbock (26) durch einen zum Abbaustoß hin abgewinkelten Fortsatz (56) des versatzseitigen Schenkels (35) gebildet ist, wobei zwischen dem Fortsatz (56) und dem abbaustoßseitigen Schenkel (34) ein Abstand (c) besteht, der in etwa der Kettengliedbreite (e) entspricht.24. Extraction device according to one or more of the preceding Claims, characterized in that the lower limit of the chain channel (9) in the lower run bearing block (26) by an extension angled towards the working joint (56) of the offset-side leg (35) is formed, with between the extension (56) and the leg (34) on the working face side there is a distance (c) which is approximately corresponds to the chain link width (e). 25. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß auf der Innenseite der lösbaren Seitenwand (37) wenigstens eine Leiste (58) befestigt ist, die in den ihr zugeordneten Längsschlitz (57) einfaßt und deren Längsseite (59) mit der Wandung des Kettenkanals (8 bzw. 9) in etwa fluchtet.25. Extraction device according to one or more of the preceding Claims, characterized in that on the inside of the detachable side wall (37) at least one strip (58) is attached, which is in the longitudinal slot assigned to it (57) and its long side (59) with the wall of the chain channel (8 or 9) is roughly aligned. 26. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß wenigstens dem Untertrum-Lagerbock (26) wenigstens ein auf einer Seite vorspringender und bevorzugt in die feste Seitenwand einfassender Zentrierungszapfen (42) zugeordnet ist.26. Extraction device according to one or more of the preceding Claims, characterized in that at least the lower run bearing block (26) at least one projecting on one side and preferably enclosing it in the fixed side wall Centering pin (42) is assigned. 27. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß der Obertrum-Lagerbock (25) mit seiner Oberseite (43) und seinen Stirnseiten (44, 45) an Anbauteilen (Deckplatte 39, Distanzstücke 46, 47) des Gehäuses (36) anliegt.27. Extraction device according to one or more of the preceding Claims, characterized in that the upper run bearing block (25) with its upper side (43) and its end faces (44, 45) on attachments (cover plate 39, spacers 46, 47) of the housing (36) rests. 28. Gewinnungseinrichtung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Führungsschiene (3) an ihrem dem Gehäuse (36) zugewandten Ende oberseitig bis in etwa zur Mitte des Obertrum-Kettenkanals (8) abgesetzt ist (Aussparung 62) und das Gehäuse (36) mit einem die Rollenführung (16) wenigstens zum Teil aufnehmenden Vorsprung (63) in diese Absetzung (Aussparung 62) einfaßt.28. Extraction device according to one or more of the preceding Claims, characterized in that the guide rail (3) on its housing (36) facing end on the top side to approximately the middle of the upper run chain channel (8) is offset (recess 62) and the housing (36) with a roller guide (16) at least partially receiving projection (63) in this deposition (recess 62).
DE19803017353 1980-05-07 1980-05-07 Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear Granted DE3017353A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19803017353 DE3017353A1 (en) 1980-05-07 1980-05-07 Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19803017353 DE3017353A1 (en) 1980-05-07 1980-05-07 Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear

Publications (2)

Publication Number Publication Date
DE3017353A1 true DE3017353A1 (en) 1981-11-12
DE3017353C2 DE3017353C2 (en) 1989-08-31

Family

ID=6101759

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19803017353 Granted DE3017353A1 (en) 1980-05-07 1980-05-07 Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear

Country Status (1)

Country Link
DE (1) DE3017353A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19537414B4 (en) * 1995-10-09 2004-03-11 Udo Adam Maschinenfabrik Planer drive with pressure roller scraper
WO2009130667A2 (en) 2008-04-22 2009-10-29 Bucyrus Dbt Europe Gmbh Chain guide for a driving chain of a mining machine
CN102900435A (en) * 2012-09-26 2013-01-30 三一重型装备有限公司 Coal plough
CN104196530A (en) * 2014-08-20 2014-12-10 天地科技股份有限公司 Double-chain ploughing and conveying machine

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104863586A (en) * 2015-05-14 2015-08-26 中煤张家口煤矿机械有限责任公司 Three-roller type chain pressing device for coal plough and chain pressing method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2835391A1 (en) * 1978-08-12 1980-02-21 Gewerk Eisenhuette Westfalia PLANER WITH ROLLING CURVE CONVEYOR

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2835391A1 (en) * 1978-08-12 1980-02-21 Gewerk Eisenhuette Westfalia PLANER WITH ROLLING CURVE CONVEYOR

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19537414B4 (en) * 1995-10-09 2004-03-11 Udo Adam Maschinenfabrik Planer drive with pressure roller scraper
WO2009130667A2 (en) 2008-04-22 2009-10-29 Bucyrus Dbt Europe Gmbh Chain guide for a driving chain of a mining machine
WO2009130667A3 (en) * 2008-04-22 2009-12-17 Bucyrus Dbt Europe Gmbh Chain guide for a driving chain of a mining machine
RU2461711C2 (en) * 2008-04-22 2012-09-20 Буцирус Ойропе Гмбх Guide for pulling chain of mining machine
CN102016229B (en) * 2008-04-22 2013-08-28 卡特彼勒全球矿场欧洲有限公司 Chain guide for a driving chain of a mining machine
US8544960B2 (en) 2008-04-22 2013-10-01 Caterpillar Global Mining Europe Gmbh Chain guide for a driving chain of a mining machine
CN102900435A (en) * 2012-09-26 2013-01-30 三一重型装备有限公司 Coal plough
CN102900435B (en) * 2012-09-26 2015-10-28 三一重型装备有限公司 Coal plough
CN104196530A (en) * 2014-08-20 2014-12-10 天地科技股份有限公司 Double-chain ploughing and conveying machine
CN104196530B (en) * 2014-08-20 2017-03-22 天地科技股份有限公司 Double-chain ploughing and conveying machine

Also Published As

Publication number Publication date
DE3017353C2 (en) 1989-08-31

Similar Documents

Publication Publication Date Title
DE69727455T3 (en) LINEAR GUIDE WITH SEVERAL BALL CHAIN ROWS
DE3148177C2 (en) Carrying chain conveyor with accumulating roller conveyor chains
DE3431351A1 (en) GUTTER SHOT FOR A CONVEYOR GUTTER
DE2829011B1 (en) Chain scraper conveyor, especially single chain scraper conveyor
DE3405986C2 (en)
DE3122035C2 (en)
DE2631083C2 (en) Planing system for underground operations
DE2123529C3 (en) Roller bearing for the longitudinally movable mounting of a part on a flat running surface, in particular a circulating roller shoe
DE3017353A1 (en) Mine mineral extracting plane machine - has roller guideway supporting deflected draw chain section, reducing wear
DE202008010791U1 (en) Drive and clamping station for a chain scraper conveyor
DE3913019A1 (en) CHIP FEEDER
DE102017011293B4 (en) Track, conveyor and method of assembling a track
DE3726693C2 (en)
AT520651B1 (en) vertical conveyor
DE102017004820B3 (en) Transport attachment, traction means, plate conveyor and method
CH631674A5 (en) ENDLESS LINK CHAIN FOR THE TRANSPORT OF OBJECTS AND USE OF THE LINK CHAIN.
DE2063060C3 (en) Chain conveyor
DE202019101949U1 (en) Energy chain for a trench cutter
DE2911705A1 (en) PITCHING MACHINE FOR DEEP OR UNDERGROUND MINING
DE2030437C3 (en) Guide track for an extraction device attached to the excavation face of a chain conveyor
DE2830513C2 (en) Scrapers for chain conveyors, especially those used in underground operations
DE202017102830U1 (en) Roll bar centering device for a continuous carpet roll carpet device, roll bar carpet and continuous press
DE3803987C2 (en) Drive station for a chain scraper conveyor, especially for use in mining companies
DE2656303A1 (en) Roller track for rod shaped material - has rollers alternatively inclined in opposite direction between two side members
DE4416742C1 (en) Transport deck for an inserting machine

Legal Events

Date Code Title Description
8127 New person/name/address of the applicant

Owner name: GEWERKSCHAFT EISENHUETTE WESTFALIA GMBH, 4670 LUEN

8110 Request for examination paragraph 44
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee