DE289839C - - Google Patents
Info
- Publication number
- DE289839C DE289839C DENDAT289839D DE289839DA DE289839C DE 289839 C DE289839 C DE 289839C DE NDAT289839 D DENDAT289839 D DE NDAT289839D DE 289839D A DE289839D A DE 289839DA DE 289839 C DE289839 C DE 289839C
- Authority
- DE
- Germany
- Prior art keywords
- counterweight
- boom
- load
- inclination
- lever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000002965 rope Substances 0.000 claims description 5
- 238000003379 elimination reaction Methods 0.000 claims 1
- 230000000875 corresponding Effects 0.000 description 3
- 230000001105 regulatory Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 1
- 230000036633 rest Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/74—Counterweights or supports for balancing lifting couples separate from jib
- B66C23/76—Counterweights or supports for balancing lifting couples separate from jib and movable to take account of variations of load or of variations of length of jib
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/06—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements
- B66C23/08—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements and adapted to move the loads in predetermined paths
- B66C23/10—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs mounted for jibbing or luffing movements and adapted to move the loads in predetermined paths the paths being substantially horizontal; Level-luffing jib-cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/36—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes mounted on road or rail vehicles; Manually-movable jib-cranes for use in workshops; Floating cranes
- B66C23/52—Floating cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/03—Cranes with arms or jibs; Multiple cranes
- B66C2700/0307—Cranes in which it is essential that the load is moving horizontally during the luffing movement of the arm or jib
- B66C2700/0314—Cranes in which it is essential that the load is moving horizontally during the luffing movement of the arm or jib in combination with the movement of the counterweight
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Description
KAISERLICHESIMPERIAL
PATENTAMT.PATENT OFFICE.
Die Erfindung betrifft eine Vorrichtung zur gänzlichen oder teilweisen Aufhebung der Schiffsneigung bei Schwimmkranen mit einziehbarem Ausleger und durch die Last einstellbarem Gegengewicht.The invention relates to a device for the total or partial cancellation of the Ship inclination with floating cranes with retractable boom and adjustable by the load Counterweight.
Die Erfindung besteht im wesentlichen darin, daß das Gegengewicht entweder durch die im Lastseil auftretende Zugspannung und durch die Stellung des Auslegers oder durch die Stellung des Auslegers und durch die Neigung des Schiffskörpers beeinflußt wird. Hierbei kann das Gegengewicht durch die in der Auslegereinziehvorrichtung auftretende Zugspannung, die abhängig ist von der Lastgröße und der Lastausladung, beeinflußt werden.The invention consists essentially in the fact that the counterweight either by the im Load rope occurring tensile stress and by the position of the boom or by the position of the boom and is influenced by the inclination of the hull. Here, the counterweight can be used in the boom retraction device occurring tensile stress, which depends on the load size and the load radius, can be influenced.
Auf den Zeichnungen sind in Fig. 1 bis 3 Ausführungsbeispiele der Erfindung schematisch dargestellt.In the drawings, embodiments of the invention are shown schematically in FIGS. 1 to 3 shown.
Bei der Ausführungsform nach Fig. 1 besteht die Lösung der gestellten Aufgabe darin, daß die von der Last verursachte Spannung im Tragorgan einerseits und die Ausladung des Lastauslegers andererseits ihre Wirkung auf ein fahrbares Gegengewicht derart ausüben, daß dieses der jeweiligen Last und Lastausladung entsprechend von der Kranmitte entfernt wird. Das Windwerk g für das Tragorgan f steht ebenso wie das Traggerüst b auf dem Schwimmkörper a. Der einziehbare Ausleger c ist bei s an das Traggerüst b angelenkt, und das Lastseil f geht über eine bei s gelagerte feste Rolle y, von da über eine lose Rolle h, um dann über eine zweite Rolle y zum Auslegerkopf und zur Lastflasche zu laufen. Die lose Rolle h, welche in der Endlage sich in der punktiert gezeichneten Stellung befindet, ist durch Laschen r an das zum Gegengewicht m führende Zugorgan d angeschlossen, welches über mehrere an dem Gerüst e gelagerte Umleitrollen geführt ist. Das Gegengewicht läuft auf einer beweglichen, gekrümmten Bahn k, die einerseits auf dem Gerüst e aufliegt, andererseits durch eine bei w angreifende Zugstange q mit dem Ausleger c in dem Punkte ζ verbunden ist. Je nach der Lage des Auslegers wird durch die Zugstange q die Gegengewichtsbahn k verstellt, während die Stellung des Auslegers c durch das bei t angeordnete Windwerk 0 unter Vermittlung der bei χ angreifenden Spindel φ beeinflußt wird. Beim Einziehen des Kranauslegers c wird die Kurvenbahn k so viel gekippt, daß das Gegengewicht auf die entsprechende Entfernung von der Kranmitte sich bewegt und somit das Gegengewichtsmoment so viel verringert wird, wie es die durch das Einziehen des Auslegers hervorgerufene Verkleinerung des Gesamtmoments von Nutzlast und Auslegereigengewicht erfordert, während die infolge der Nutzlast in dem Tragorgan vornandene Spannung mittels des Zugorgans d die entsprechende Einstellung des Gegengewichts m für das Lastmoment der Nutzlast bewirkt. Es steht nichts im Wege, die zur Auslegerstellung passende Verstellung der Kurven- bahn k auch auf andere Weise wie dargestelltIn the embodiment according to Fig. 1, the solution to the problem is that the tension caused by the load in the support member on the one hand and the extension of the load boom on the other hand exert their effect on a mobile counterweight in such a way that it depends on the respective load and load extension Center of the crane is removed. The winch g for the supporting member f is just like the supporting frame b on the floating body a. The retractable boom c is hinged to the supporting structure b at s, and the load rope f goes over a fixed pulley y stored at s, from there over a loose pulley h, and then runs over a second pulley y to the boom head and the load block. The loose roller h, which is in the end position in the position shown in dotted lines, is connected by tabs r to the pulling element d leading to the counterweight m , which is guided over several deflecting rollers mounted on the frame e. The counterweight runs on a movable, curved path k, which on the one hand rests on the frame e , and on the other hand is connected to the boom c at point ζ by a tie rod q acting at w . Depending on the position of the boom, the counterweight path k is adjusted by the tie rod q , while the position of the boom c is influenced by the winch 0 arranged at t through the intermediary of the spindle φ acting at χ . When the crane boom c is drawn in, the curved path k is tilted so much that the counterweight moves to the appropriate distance from the center of the crane and thus the counterweight torque is reduced as much as the reduction in the total torque of the payload and the boom's own weight caused by the drawing in of the boom requires, while the tension in the front of the support element due to the payload by means of the tension element d causes the corresponding setting of the counterweight m for the load moment of the payload. Nothing stands in the way of the adjustment of the curved path k that matches the boom position in a different way as shown
zwangläufig durch das Windwerk ο zu bewerkstelligen. inevitably to be accomplished by the winch ο.
Bei der Ausführungsform nach Fig. 2 ist davon ausgegangen, die durch die Last eingeleitete Neigung des Schwimmkörpers sofort zur Verstellung eines entsprechenden Gegengewichts zu benutzen. Das Windwerk g wirkt auch hier auf das Hubwerk und ist ebenso wie das Traggerüst b für den Ausleger c auf dem Schwimmkörper α befestigt. Beginnt nun infolge irgendeiner Last der Schwimmkörper sich zu neigen, so wird sofort das als Winkelhebel ausgebildete Pendel d der Neigung folgen und mit der Stange e den Doppelhebel f bewegen, welcher seinerseits wieder mit einer Anlaß- und Reguliervorrichtung w1 für den Motor h in Verbindung steht. Der Motor h wirkt mittels Spindel i und Wandermutter ν auf die Schubstange k, die bei u an einem Arm I angreift, der um den Punkt t schwingbar ist und das Gegengewicht m trägt. Das Gegengewicht ist also bei unbelastetem Zustande des Kranes eingefahren und steht nicht über die Bordkante des Schwimmkörpers hinaus. Eine weitere, beim Verstellen des Auslegers erforderliche Beeinflussung der Gegengewichtsstellung, entsprechend dem durch das Eigengewicht des Auslegers und der Nutzlast hervorgerufenen Lastmoment, ist dadurch erreicht, daß der Ausleger, welcher wieder durch das Windwerk 0 und die Spindel p bewegt wird, durch die an dem Punkt ζ angeschlossene Zugstange q den Regulierhebel r der Anlaß- und Reguliervorrichtung w2 für den Motor h bewegt.In the embodiment according to FIG. 2, it is assumed that the inclination of the float introduced by the load can be used immediately to adjust a corresponding counterweight. The winch g also acts here on the hoist and, like the supporting frame b for the boom c, is attached to the floating body α. If the float begins to tilt as a result of any load, the pendulum d designed as an angle lever will immediately follow the tilt and move the double lever f with the rod e , which in turn is connected to a starting and regulating device w 1 for the motor h stands. The motor h acts by means of the spindle i and traveling nut ν on the push rod k, which at u acts on an arm I , which can swing around the point t and bears the counterweight m. The counterweight is therefore retracted when the crane is in an unloaded state and does not protrude beyond the beltline of the float. Another, when adjusting the boom required influencing the counterweight position, corresponding to the load torque caused by the dead weight of the boom and the payload, is achieved in that the boom, which is moved again by the winch 0 and the spindle p , by the Point ζ connected drawbar q moves the regulating lever r of the starting and regulating device w 2 for the motor h.
Bei der Ausführungsform nach Fig. 3 wird an Stelle der Zugspannung im Zugseil die in der Auslegereinziehvorrichtung auftretende Spannung zur -Verstellung des Gegengewichts benutzt. Der Ausleger wird wieder durch das Windwerk 0 bewegt, welches an dem Gelenkpunkt χ angeordnet" ist. Die Spindel p greift an dem Gegengewichtshebel I an, und zwar an einem außerhalb des Drehpunktes t gelegenen Punkt u, so daß eine Einstellung des Hebels I entsprechend dem Zug in der Spindel p erfolgt.In the embodiment according to FIG. 3, the tension occurring in the boom retraction device is used to adjust the counterweight instead of the tensile stress in the pulling rope. The boom is again moved by the winch 0 which is "disposed χ at the hinge point. The spindle p engages the counterweight lever I, namely at an outside of the pivot point t convenient point u, so that adjustment of lever I according to the Tension in the spindle p takes place.
Claims (5)
Publications (1)
Publication Number | Publication Date |
---|---|
DE289839C true DE289839C (en) |
Family
ID=544840
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DENDAT289839D Active DE289839C (en) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE289839C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2641773A1 (en) * | 1989-01-18 | 1990-07-20 | Potain Sa | LIFT BOOM CRANE WITH BOOM RETURN DEVICE |
EP1514832A1 (en) * | 2003-09-15 | 2005-03-16 | Jean-Marc Yerly | Lifting device |
-
0
- DE DENDAT289839D patent/DE289839C/de active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2641773A1 (en) * | 1989-01-18 | 1990-07-20 | Potain Sa | LIFT BOOM CRANE WITH BOOM RETURN DEVICE |
EP0379448A1 (en) * | 1989-01-18 | 1990-07-25 | Potain | Crane with a lifting jib and with a jib push-back device |
EP1514832A1 (en) * | 2003-09-15 | 2005-03-16 | Jean-Marc Yerly | Lifting device |
WO2005026036A1 (en) * | 2003-09-15 | 2005-03-24 | Jean-Marc Yerli | Lifting appliance |
US7331476B2 (en) | 2003-09-15 | 2008-02-19 | Jean-Marc Yerly | Lifting appliance |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0007554B1 (en) | Device for maintaining the tension in a tow cable | |
DE2414181A1 (en) | DEVICE FOR HOIST CABLE CONTROL IN KRAENEN | |
DE2814540A1 (en) | CRANE WITH HIGH PAYLOAD | |
DE289839C (en) | ||
DE19731049A1 (en) | Active levelling system for hinged jib of container loading crane | |
DE1007039C2 (en) | Device on slewing cranes for automatic adjustment of the counterweight | |
DE2336209A1 (en) | MOBILE CRANE WITH TELESCOPIC BOOM WITH CABLE SUSPENSION | |
DE844871C (en) | Folding davit | |
DE936859C (en) | Boom for bucket wheel excavators, loading belts or the like. | |
DE509736C (en) | Luffing crane | |
DE490037C (en) | Luffing crane | |
DE599401C (en) | Load rope compensation device for adjustable arms | |
DE942348C (en) | Jib crane | |
DE1073179B (en) | Portal luffing crane with horizontal load path | |
DE584843C (en) | Control device for the luffing mechanism of luffing cranes with a horizontal load path | |
DE1007040B (en) | Device for damping the pendulum and torsional vibrations of the gripper or load hook hanging on the boom of a crane | |
DE805439C (en) | Luffing crane with horizontal load path | |
DE843017C (en) | Device for determining the load weight on vehicles with suspension | |
DE2149732A1 (en) | LOADING CRANE | |
DE504641C (en) | Crane scale for luffing cranes | |
DE506825C (en) | Luffing crane | |
DE627649C (en) | Luffing crane | |
DE809042C (en) | Boat launching device with gravity-operated extension arm | |
AT360795B (en) | DEVICE FOR AUTOMATICALLY REGULATING THE LENGTH OF A SAFETY ROPE | |
DE583076C (en) | Luffing crane with almost horizontal load movement |