DE249226C - - Google Patents
Info
- Publication number
- DE249226C DE249226C DENDAT249226D DE249226DA DE249226C DE 249226 C DE249226 C DE 249226C DE NDAT249226 D DENDAT249226 D DE NDAT249226D DE 249226D A DE249226D A DE 249226DA DE 249226 C DE249226 C DE 249226C
- Authority
- DE
- Germany
- Prior art keywords
- stones
- closure
- ceiling
- closure body
- openings
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004575 stone Substances 0.000 claims description 33
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 8
- 210000001503 Joints Anatomy 0.000 claims description 6
- 229910052742 iron Inorganic materials 0.000 claims description 4
- 238000000034 method Methods 0.000 claims description 2
- 238000009415 formwork Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 238000005452 bending Methods 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 239000004927 clay Substances 0.000 description 1
- 229910052570 clay Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000875 corresponding Effects 0.000 description 1
- 230000002349 favourable Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
- E04B5/043—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement having elongated hollow cores
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/18—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members
- E04B5/21—Cross-ribbed floors
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
KAISERLICHESIMPERIAL
PATENTAMT.PATENT OFFICE.
PATENTSCHRIFTPATENT LETTERING
- JV* 249226 ^ KLASSE 37«. GRUPPE - JV * 249226 ^ CLASS 37 «. GROUP
RICHARD FABER in BERLIN.RICHARD FABER in BERLIN.
von Deckensteinen.of ceiling stones.
Patentiert im Deutschen Reiche vom 21. November 1908 ab.Patented in the German Empire on November 21, 1908.
Die Erfindung bezieht sich auf ein Verfahren zum möglichst dichten Abschließen der durchgehenden Hohlräume von Deckensteinen durch Verschlußkörper, um bei der Herstellung von Massivdecken das Eintreten des Zementmörtels in die Steinhohlräume beim Ausgießen oder Vollstampfen der Fugen der Decken zu verhüten.The invention relates to a method for closing the as tightly as possible continuous cavities of ceiling stones through closure body in order to manufacture of solid ceilings, the cement mortar entering the stone cavities when pouring or to prevent the joints of the ceilings from being rammed.
Das neue Verfahren besteht darin, daß dieThe new method is that the
ίο vor die Enden der Lochkanäle der Steine gesetzten Verschlußkörper während der Ausfüllung der Deckenfugen zwischen den Steinen durch Spannmittel gegen die Stirnseiten der Steine gepreßt werden. Hierdurch wird ein Einfließen von Mörtel in die Hohlräume der Steine, insbesondere bei der Verwendung federnder, sich den Unregelmäßigkeiten der Steine genau anpassender Verschlußkörper, völlig gehindert, während dieses bei den bekannten Verfahren, bei welchen sich die Verschlußkörper ohne besondere Anpressung gegen die Stirnseiten der Steine legen, nur schwer zu vermeiden ist.ίο placed in front of the ends of the perforated channels of the stones Closure body during the filling of the ceiling joints between the stones by clamping means against the front sides of the Stones are pressed. This prevents mortar from flowing into the cavities of the Stones, especially when using resilient ones, address the irregularities of the Stones precisely matching breech block, completely prevented, while this is with the known Process in which the closure body against each other without any particular pressure Laying the face of the stones is difficult to avoid.
Das neue Verfahren ist auf der Zeichnung in mehreren Ausführungsformen veranschaulicht. The new method is illustrated in several embodiments in the drawing.
Fig. ι der Zeichnung ist eine schaubildliche Darstellung einer Decke aus Hohlsteinen, deren Hohlräume auf verschiedene Weise geschlossen werden, während die Fig. ,2 und 3 eine besondere Ausführungsform des Verschlußkörpers zeigen.Fig. Ι of the drawing is a diagrammatic representation of a ceiling made of hollow stones, the cavities of which are closed in different ways, while Figs. 2 and 3 show a particular embodiment of the closure body.
Die Deckensteine sind mit 1, ihre durchgehenden Hohlräume mit 2 bezeichnet. Die Decke wird in bekannter Weise auf einer Schalung ausgeführt, welche von Brettern 3 auf Stützen 5 und Lagerhölzern 4 gebildet wird. Die Steine sind so nebeneinander angeordnet, daß die Hohlräume 2 benachbarter Steine sich gegenüberliegen. Die Decke ist in bekannter Weise durch Eiseneinlagen 6, 7 bewehrt.The ceiling stones are designated with 1, their continuous cavities with 2. the The ceiling is carried out in a known manner on formwork, which is made of boards 3 is formed on supports 5 and 4 wooden supports. The stones are arranged side by side that the cavities 2 of adjacent stones are opposite one another. The ceiling is Reinforced in a known manner by iron inlays 6, 7.
Nach der Erfindung können die durchgehenden Hohlräume 2 verschieden geschlossen werden. Mit 8 sind federnde, den Endöffnungen der Hohlräume entsprechend geformte Verschlußkörper bezeichnet, welche in die Fugen zwischen den Stirnseiten zweier Steine so eingesetzt werden, daß sie sich mit Federkraft gegen die einander gegenüberstehenden Stein-Stirnseiten legen und die Endöffnungen der Steine verschließen. In den Fig. 2 und 3 sind diese Verschlußkörper 8 besonders dargestellt. Die Fig. 2 zeigt den Verschlußkörper in der Form, in welcher er meist zur Baustelle geschafft wird, während die Fig. 3 ihn in der Form zeigt, die ihm vor dem Einschieben in die Deckenfuge gegeben wird. Der Verschlußkörper 8 besteht zweckmäßig aus einer Platte aus elastischem Stoff, beispielsweise aus Pappe oder Blech, und ist nach Fig. 2 mit Schlitzen 9,According to the invention, the through cavities 2 can be closed in different ways will. With 8 are resilient, the end openings of the cavities correspondingly shaped Closure body referred to, which in the joints between the faces of two stones so be used that they are spring-loaded against the facing stone end faces and close the end openings of the stones. In FIGS. 2 and 3, these closure bodies 8 are shown in particular. Fig. 2 shows the closure body in the form in which it was usually made to the construction site is, while Fig. 3 shows him in the form that is given to him before being pushed into the ceiling joint. The breech body 8 expediently consists of a plate made of elastic material, for example made of cardboard or sheet metal, and is according to Fig. 2 with slots 9,
10 versehen, während Fig. 3 auf der einen Seite des Verschlußkörpers Lappen oder Füße10 provided, while Fig. 3 on one side of the closure body flaps or feet
11 zeigt, welche aus der Ebene des Verschlußkörpers herausgebogen werden. Diese Lappen oder Füße 11 setzen sich beim Einschieben des Verschlußkörpers in eine Fuge auf die Schalung und sichern somit einen bestimmten11 shows which are taken from the plane of the closure body be bent out. These tabs or feet 11 are set when you insert them of the closure body in a joint on the formwork and thus secure a certain
Abstand des Verschlußkörpers und der darauf gelegten Eisenstäbe 7 von der Schalung. Die Öffnungen, welche durch Herausbiegen der Lappen 11 entstehen, sind gleichzeitig günstig für die Verteilung des Mörtels in der Fuge. Diese Ausführungsform des Verschlußkörpers bewirkt somit gleichzeitig den Abschluß der Lochkanäle und die Sicherung der Lage und der Umhüllung der Eisenstäbe mit Beton.Distance of the closure body and the iron bars 7 placed on it from the formwork. the Openings which are created by bending out the tabs 11 are at the same time favorable for the distribution of the mortar in the joint. This embodiment of the closure body thus simultaneously closes the perforated channels and secures the position and encasing the iron bars with concrete.
Der mit 12 bezeichnete Verschlußkörper besteht gleichfalls aus einem Bügel mit entsprechend verbreiterten Endteilen, die sich federnd gegen die Stirnöffnungen der Steinhohlräume legen. In diesem Falle werden aber nicht einander gegenüberstehende Öffnungen benachbarter Steine geschlossen, sondern jeder Bügel schließt die beiderseitigen Kanalenden eines Steines, indem er den Stein übergreift. Anstatt den Verschlußkörper selbst federnd auszubilden, kann er auch als einfache Verschlußplatte ausgeführt werden, welche durch besondere Spannmittel gegen die Stirnseiten der Steine gepreßt wird. Die Zeichnung veranschaulicht auch eine besondere Ausführungsform dieses Verschlusses, wobei die Verschlußplatten mit 13 und die Spannmittel mit 14 und 15 bezeichnet sind, und zwar zeigt 14 einen in eine Fuge zwischen zwei Steinen eingelegten federnden Bügel, während mit 15 eine ebenso wirkende Schraubenfeder bezeichnet ist. Diese Ausführungsform entspricht dem federnden Verschlußkörper 8. Man kann aber die Platten auch entsprechend dem Verschlußkörper 12 durch federnde, die Steine übergreifende Verschlußbügel oder durch den ganzen Stein umfassende elastische Bänder gegen die beiderseitigen Endöffnungen der Steinhohlräume pressen.The closure body designated by 12 also consists of a bracket with a corresponding widened end parts, which are resiliently against the front openings of the stone cavities place. In this case, however, openings that are not opposite to one another become adjacent Stones closed, but each bracket closes the channel ends on both sides of a stone by reaching over the stone. Instead of the closure body itself resilient train, it can also be designed as a simple closure plate, which by special clamping means is pressed against the face of the stones. The drawing illustrates also a special embodiment of this lock, the locking plates with 13 and the clamping means with 14 and 15 are designated, namely 14 shows one laid in a joint between two stones resilient bracket, while 15 denotes an equally acting coil spring is. This embodiment corresponds to the resilient closure body 8. One can but the plates also correspond to the closure body 12 by resilient, the stones overlapping locking brackets or elastic bands extending through the entire stone press against the end openings on both sides of the stone cavities.
Die federnden Verschlußkörper 8 können durch einfache Durchbiegung in die Fugen zwischen je zwei Steinreihen eingeschoben werden, während die Verschlußbügel 12 nach Auseinanderbiegen ihrer federnden, im Winkel angeordneten Verschlußplattenenden auf die Steine aufgesetzt werden. Die federnden Bügel oder die Schraubenfedern 15 werden zwischen die Verschlußplatten 13 aus Pappe, Blech, Ton oder Zement eingesetzt. Die federnden Teile 14 oder 15 können auch herausgenommen werden, wenn bereits so viel Mörtel in die Fugen eingebracht ist, daß die Verschlußscheiben auch ohne die federnden Bügel festgehalten werden.The resilient closure body 8 can be easily bent into the joints are inserted between two rows of stones, while the locking bracket 12 after Bending apart their resilient, angled closure plate ends on the Stones are put on. The resilient bracket or the coil springs 15 are between the closure plates 13 made of cardboard, sheet metal, clay or cement are used. the resilient parts 14 or 15 can also be removed when so much mortar has already been introduced into the joints that the sealing discs can also be held in place without the springy bracket.
Die Verschlußkörper können so gestaltet sein, daß sie gleichzeitig mehrere Öffnungen nebeneinander oder nur eine einzige Öffnung verschließen.The closure body can be designed so that they have several openings at the same time close next to each other or just one opening.
Claims (3)
Publications (1)
Publication Number | Publication Date |
---|---|
DE249226C true DE249226C (en) | 1900-01-01 |
Family
ID=507869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DENDAT249226D Expired DE249226C (en) |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE249226C (en) |
-
0
- DE DENDAT249226D patent/DE249226C/de not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0532908B2 (en) | Shutter element for joints | |
DE8129931U1 (en) | KIT FOR THE PRODUCTION OF NOISE AND VISUAL PROTECTION WALLS FROM PRE-FABRICATED COMPONENTS | |
DE249226C (en) | ||
WO2021047876A1 (en) | Anchoring element and method for mounting an anchor rail in a construction element made of concrete | |
DE19521262C2 (en) | Method of making a building board | |
AT397831B (en) | STEEL DOOR FRAME WITH THRESHOLD PROFILE | |
DE841501C (en) | Spacers for profile rods that serve as reinforcement of reinforced concrete ceilings | |
DE102018106675A1 (en) | An element | |
DE7526883U (en) | BRACKET FOR IN PARTICULAR DOUBLE-WALLED WITH ARMORING MADE OF INDIVIDUAL COMPONENTS OR FORMWORK TO BE BUILT. WALLS | |
DE2829941B2 (en) | Device for connecting steel reinforcement | |
DE2354706C2 (en) | Method for moving the superstructure of bridges in their longitudinal direction and sliding and tilting bearings for carrying out the method | |
EP0892127B1 (en) | Shuttering and method for inducing cracks | |
DE258397C (en) | ||
DE19720637C1 (en) | Process for producing a component from reinforced concrete and formwork for carrying out the process | |
DE2162202B2 (en) | Sealing strip for concrete formwork | |
DE2106218C3 (en) | Reinforcement element for concrete or the like | |
DE237526C (en) | ||
DE8530376U1 (en) | Rebar connection | |
DE3618674A1 (en) | Pipe closure | |
DE545803C (en) | Ceiling and roof construction made of concrete slabs between girders made of iron and reinforced concrete | |
DE29505603U1 (en) | Joint sheet | |
DE3432706A1 (en) | Method for the subsequent placement of an additional seal in trench walls and device for carrying out the method | |
AT400345B (en) | SPACERS | |
DE2541809C3 (en) | Reinforcement joint in concrete components in the area of a construction joint | |
DE29615053U1 (en) | formwork |