DE2257758B2 - TENSIONING DEVICE FOR THE PRODUCTION OF PRE-TENSIONED PRECAST CONCRETE PARTS - Google Patents
TENSIONING DEVICE FOR THE PRODUCTION OF PRE-TENSIONED PRECAST CONCRETE PARTSInfo
- Publication number
- DE2257758B2 DE2257758B2 DE19722257758 DE2257758A DE2257758B2 DE 2257758 B2 DE2257758 B2 DE 2257758B2 DE 19722257758 DE19722257758 DE 19722257758 DE 2257758 A DE2257758 A DE 2257758A DE 2257758 B2 DE2257758 B2 DE 2257758B2
- Authority
- DE
- Germany
- Prior art keywords
- precast concrete
- clamping
- bearing supports
- production
- concrete parts
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
Die Erfindung betrifft eine Spannvorrichtung gemäß dem Oberbegriff des Anspruchs 1.The invention relates to a tensioning device according to the preamble of claim 1.
Bei einer bekannten Spannvorrichtung zur Herstellung von vorgespannten Fertigbetonteilen sind die Spannlagerstützen, welche zum Einspannen der Spanndrähte dienen, in einer Bodenplatte unverrückbar und lediglich zum Umrüsten abmontierbar eingespannt. Auf der Bodenplatte wird die Schalung für das herzustellende Fertigbetonteil aufgebaut. Nach dem Einfüllen des Betons in die Schalung und nach desser* Aushärten wird die Seitenschalung zwischen den beiden Spannlagerstützen entfernt, und die Spanndrähte werden durchgeschnitten. Normalerweise befinden sich solche Vorrichtungen in Hallen, die mit einem Hallenlaufkran versehen sind. Der Hallenlaufkran dient dann zum Abtransport des fertigen Spannbetonteils. Damit auch große Fertigbetonteile abtransportiert werden können, muß der Hallenkran so ausgelegt werden, daß er auch die schwersten Fertigbetonteile transportieren kann.In a known clamping device for the production of prestressed precast concrete parts are Insert bearing supports, which are used to clamp the tension wires, immovable in a base plate and can only be dismantled for retrofitting. The formwork for the to be produced is placed on the base plate Prefabricated concrete part built up. After the concrete has been poured into the formwork and after it has * hardened the side-formwork between the two radial tensioning bearings is removed and the tensioning wires are removed cut across. Usually such devices are located in halls with an overhead traveling crane are provided. The overhead traveling crane is then used to remove the finished prestressed concrete part. So too large precast concrete parts can be transported away, the hall crane must be designed so that it can transport the heaviest precast concrete parts.
Der Erfindung liegt die Aufgabe zugrunde, eine Spannvorrichtung zur Herstellung von vorgespannten Fertigbetonteilen so zu gestalten, daß der Hallenkran nicht mehr zum Anheben und Abtransportieren der fertigen Teile verwendet werden muß.The invention is based on the object of a clamping device for the production of prestressed To design precast concrete parts so that the hall crane no longer has to lift and transport the finished parts must be used.
Diese Aufgabe wird durch die im kennzeichnenden Teil des Anspruchs 1 angegebenen Merkmale gelöst.This object is achieved by the features specified in the characterizing part of claim 1.
Das fahrbare Untergestell ist in der Regel entsprechend dem herzustellenden Fertigbetonteil lang und schmal. Um eine ausreichende Stabilität beim Fahren zu gewährleisten, müssen die Räder des fahrbaren Untergestelles so ausgerichtet werden, daß das fahrbare Untergestell in Längsrichtung rollt. Dies ist jedoch bei den bekannten Spannvorrichtungen wegen der fest angeordneten Spannlagerstützen nicht möglich. Dadurch, daß jedoch nach der Erfindung eine der beiden Spannlagerstützen beweglich angeordnet ist, kann das fahrbare Untergestell mit der darauf befindlichen Schalung in den erwähnten Bereich eingefahren bzw. aus diesem herausgefahren werden.The mobile underframe is usually long and corresponding to the precast concrete part to be produced narrow. In order to ensure sufficient stability when driving, the wheels of the mobile undercarriage be aligned so that the mobile undercarriage rolls lengthways. However, this is at the known clamping devices are not possible because of the fixed clamping bearing supports. Through this, that, however, according to the invention, one of the two clamping bearing supports is movably arranged, the mobile one can Underframe with the formwork on it moved into or out of the area mentioned be driven out.
Bei der Spannvorrichtung nach der Erfindung braucht der Hallenkran nicht mehr so hoch belastbar ausgelegt zu sein, deß er auch schwerste Fertigbetonteile transportieren kann. Durch eine leichtere Bauweise des Hallenkranes wird der Hallenkran und die Hallenkonstruktion nebst Fundamenten billiger und außerdem wegen der weniger schweren zu bewegendenIn the jig according to the invention the hall crane no longer needs to be designed to withstand such high loads that it can handle even the heaviest precast concrete parts can transport. The hall crane and the hall structure are made possible by a lighter construction of the hall crane cheaper in addition to foundations and also because they are less difficult to move
ίο Massen schneller.ίο crowds faster.
Da das fahrbare Untergestell mit der Schalung in den Bereich zwischen den beiden Spannlagerstützen eingefahren wird, ist ein Aufbau an dieser Stelle nicht mehr erforderlich, so daß Zeit gespart wird. Nach dem Durchschneiden der Spanndrähte und dem Wegbewegen der einen Spannlagerstütze kann das fahrbare Untergestell mit dem fertigen Spannbetonteil und mit der Schalung auch wieder aus dem erwähnten Bereich herausgefahren werden. Der Abbau der Schalung braucht also ebenfalls nicht zwischen den Spannlagerstützen zu erfolgen. Es wird also auch hier wieder Zeit gespart. Die Spannvorrichtung und die Fläche des Hallenbodens steht nach dem Herausfahren des Untergestelles sofort zur Herstellung eines neuen SpannbetonteilesSince the mobile underframe with the formwork is retracted into the area between the two clamping bearing supports assembly is no longer necessary at this point, so that time is saved. After this The mobile undercarriage can cut through the tensioning wires and move away one of the tensioning bearing supports with the finished prestressed concrete part and with the formwork also moved out of the area mentioned will. The dismantling of the formwork does not need to be between the tension bearing supports either take place. Time is also saved here again. The tensioning device and the area of the hall floor is available for the production of a new prestressed concrete part immediately after the underframe has been moved out
J5 zur Verfügung.J5 available.
Eine besonders zweckmäßige Ausführungsform der Erfindung ist im Anspruch 2 gekennzeichnet.A particularly useful embodiment of the invention is characterized in claim 2.
Ein Ausführungsbeispiel der Erfindung wird nachfolgend an Hand der Zeichnungen beschrieben. Es zeigtAn embodiment of the invention is shown below described on the basis of the drawings. It shows
F i g. 1 eine Seitenansicht einer Spannvorrichtung,
F i g. 2 die Draufsicht der Spannvorrichtung nachF i g. 1 a side view of a clamping device,
F i g. 2 shows the top view of the clamping device according to
Fig. 1,Fig. 1,
Fig.3 eine stirnseitige Ansicht der Spannvorrichtung und3 shows an end view of the clamping device and
Fig.4 eine andere stirnseitige Ansicht der Spannvorrichtung. 4 shows another front view of the clamping device.
Die Spannvorrichtung weist Spannlagerstüizen 7 und 9 auf, die einen gegenseitigen Abstand haben. Die eine Spannlagerstütze 7 besteht aus zwei vertikalenThe clamping device has clamping bearing pieces 7 and 9 which are spaced from one another. the a clamping bearing support 7 consists of two vertical ones
<fl Trägern mit zwei horizontalen Querlochplatten 8. Diese Spannlagerstütze 7 ist fest im Boden verankert.<fl girders with two horizontal perforated plates 8. These Radial insert support 7 is firmly anchored in the ground.
Die andere Spannlagerstütze 9 besteht aus zwei vertikalen Trägern mit zwei horizontal verlaufenden Querlochplatten 8. Diese Spannlagerstütze 9 ist kippbar an- geordnet und im Boden 4 versenkbar.The other clamping bearing support 9 consists of two vertical beams with two horizontally extending cross-perforated plates 8. This clamping bearing support 9 is tiltable. tidy and retractable in the floor 4.
Wenn die Spannlagerstütze 9 versenkt ist, kann ein fahrbares Untergestell mit Rädern 3 in den Bereich zwischen den beiden Spannlagerstützen eingefahren werden. Das fahrbare Untergestell ist mit einer Schalung 2 versehen. In Längsrichtung der Schalung werden zwischen den beiden Spannlagerstützen 7 und 9 Spanndrähte 5 und 6 gezogen. Die Spanndrähte werden in den Querlochplatten 8 eingespannt, nachdem sie zuvor mit einer Vorspannung beaufschlagt wurden. Nach demWhen the clamping bearing support 9 is sunk, a mobile undercarriage with wheels 3 can be in the area be retracted between the two radial insert ball bearing supports. The mobile underframe is with a formwork 2 provided. In the longitudinal direction of the formwork 7 and 9 tension wires are placed between the two tension bearing supports 5 and 6 drawn. The tension wires are clamped in the transverse perforated plates 8 after they have previously were preloaded. After this
;.5 Einfüllen des Betons in die Schalung 2 und nach dem Aushärten werden die Spanndrähte 5 und 6 zwischen den Spannlagerstützen und der Schalung durchgeschnitten. Dann wird die Spannlagerstütze 9 wieder versenkt und das fahrbare Untergestell mit der Scha-; .5 pouring the concrete into the formwork 2 and after the When hardening, the tension wires 5 and 6 are cut through between the tension bearing supports and the formwork. Then the clamping bearing support 9 is sunk again and the mobile underframe with the shell
■>o lung und dem darin befindlichen Fertigbetonteil 1 herausgefahren. ■> o lung and the prefabricated concrete part 1 located in it.
In den F i g. 1 und 4 ist erkennbar, in welcher Weise die Spannlagerstütze 9 im Boden versenkbar ist.In the F i g. 1 and 4 it can be seen in which way the clamping bearing support 9 can be lowered into the ground.
Hierzu 1 Blait ZeichnungenIn addition 1 Blait drawings
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19722257758 DE2257758C3 (en) | 1972-11-24 | Clamping device for the production of prestressed precast concrete parts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19722257758 DE2257758C3 (en) | 1972-11-24 | Clamping device for the production of prestressed precast concrete parts |
Publications (3)
Publication Number | Publication Date |
---|---|
DE2257758A1 DE2257758A1 (en) | 1974-06-06 |
DE2257758B2 true DE2257758B2 (en) | 1976-02-26 |
DE2257758C3 DE2257758C3 (en) | 1976-10-07 |
Family
ID=
Also Published As
Publication number | Publication date |
---|---|
DE2257758A1 (en) | 1974-06-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1584412B1 (en) | Method and device for the production of elements consisting of concrete slabs and trusses embedded therein | |
DE2257768A1 (en) | PLANT FOR PRODUCING PRE-FABRICATED CONCRETE PARTS | |
DE2624083A1 (en) | DEVICE FOR POURING CONCRETE OBJECTS | |
DE2257758C3 (en) | Clamping device for the production of prestressed precast concrete parts | |
DE3203107A1 (en) | Apparatus and process for producing angle elements from concrete | |
DE2257758B2 (en) | TENSIONING DEVICE FOR THE PRODUCTION OF PRE-TENSIONED PRECAST CONCRETE PARTS | |
AT217082B (en) | Device for concreting long components | |
DE1134618B (en) | Method and device for the production of blocks from lightweight concrete | |
DE2805016C3 (en) | Process and battery formwork for the production of precast reinforced concrete parts on the construction site | |
DE1584651C3 (en) | Device for concreting a concrete slab on a support | |
DE1759041A1 (en) | Formwork element set with vertical cassette shapes | |
DE2417475A1 (en) | Upright mould for casting concrete slabs - two slabs cast between inner plate and travelling outer plates | |
AT227136B (en) | Device for making blocks from lightweight concrete | |
DE2302172C3 (en) | Device for the production of concrete elements, which consist of two spaced apart concrete slabs connected to one another by reinforcement | |
DE248034C (en) | ||
DE2338168C3 (en) | Formwork for the outside of a channel or the like | |
DE431740C (en) | Casting device for the production of tubular concrete objects, in particular hollow masts, using a core divided in the longitudinal direction | |
DE890472C (en) | Longitudinally divided Ruettelform for the production of long concrete bodies, such as beams, beams or the like. | |
DE1584412C (en) | Method and device for producing elements consisting of concrete slabs and trussed girders embedded therein | |
DE607664C (en) | Device for producing concrete ceilings consisting of individual slabs or blocks | |
DE1683762C3 (en) | Method and device for the continuous production of shell shapes or similar prefabricated components from compactable materials, preferably concrete, e.g. for channels | |
DE8118905U1 (en) | WORKING DEVICE FOR MOLDING AND DEFORMING CONCRETE ELEMENTS | |
AT252781B (en) | Mold and system for pouring and transporting large lightweight concrete bodies | |
DE2756596C2 (en) | Method for producing a prefabricated part from reinforced concrete, in particular a room cell, and device for carrying out the method | |
DE2147428A1 (en) | Method and device for manufacturing prestressed concrete beams |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C3 | Grant after two publication steps (3rd publication) | ||
E77 | Valid patent as to the heymanns-index 1977 | ||
EHJ | Ceased/non-payment of the annual fee |