DE2064997C3 - Loading bucket hanging on the hoist rope of an elevator. Elimination from: 2020165 - Google Patents

Loading bucket hanging on the hoist rope of an elevator. Elimination from: 2020165

Info

Publication number
DE2064997C3
DE2064997C3 DE2064997*A DE2064997A DE2064997C3 DE 2064997 C3 DE2064997 C3 DE 2064997C3 DE 2064997 A DE2064997 A DE 2064997A DE 2064997 C3 DE2064997 C3 DE 2064997C3
Authority
DE
Germany
Prior art keywords
chute
bucket
drilling
elevator
drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE2064997*A
Other languages
German (de)
Other versions
DE2064997B2 (en
DE2064997A1 (en
Inventor
Pierre Jean-Marie Theodore Le Havre Allard (Frankreich)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from FR6936287A external-priority patent/FR2064717A6/fr
Application filed by Individual filed Critical Individual
Publication of DE2064997A1 publication Critical patent/DE2064997A1/en
Publication of DE2064997B2 publication Critical patent/DE2064997B2/en
Application granted granted Critical
Publication of DE2064997C3 publication Critical patent/DE2064997C3/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B11/00Other drilling tools
    • E21B11/04Boring grabs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/28Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
    • E02F3/36Component parts
    • E02F3/40Dippers; Buckets ; Grab devices, e.g. manufacturing processes for buckets, form, geometry or material of buckets
    • E02F3/413Dippers; Buckets ; Grab devices, e.g. manufacturing processes for buckets, form, geometry or material of buckets with grabbing device
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Earth Drilling (AREA)

Description

Mm! bei Beschreibung des Ausfiihrungsbeispieles nach Fig. 4 bis 7 erläutert. Das gleiche gilt für den Kranz !9.Mm! when describing the exemplary embodiment 4 to 7 explained. The same goes for the Wreath! 9.

Gemäß Fig. 2 und 3 ist die Schurre 1 schwenkbar auf einer Achse 25 an einem fest mit dem Gestell der Hubvorrichtung 2 verbundenen Arm 3 (F i g. I) gelagert. Die Schurre 1 weist einen Hebel bildenden Arm 23 auf. Das Ende eines Seiles 22 sowie eine Rückstellfeder sind an dem Arm 23 befestigt. Die Rückstellfeder 29 ist bei 30 z. B. an einer Strebe der Hub- \orrichtung befestigt, während das Seil 22 bis 27 an einem bei 26 an der Hubvorrichtung 2 angelenkten Arm 21 befestigt ist. Ein Anschlag 28 beschränkt die Bewegung des Armes 21 unter der Wirkung des durch die Rückholfeder 29 ausgeübten Zuges. Das Steuerorgan bei der Ausführungsform nach F i g. 2 und 3 besteht aus einem Arm 21, der am Aufzugsgeste!! 3 über eine Achse 26 schwenkbar gelagert ist und der durch einen Anschlag 28 in der Bewegung nach unten begrenzt, ist. Die Schaufeln 6 werden durch den Ring 19 gesteuert, gegen den gemäß Darstellung in Fi g. 3 die Auslösungssiange 38 stößt, wobei die Schaufeln 6 geöffnet werden.2 and 3, the chute 1 is pivotable on an axis 25 on a fixed to the frame Lifting device 2 connected arm 3 (F i g. I) stored. The chute 1 has an arm forming a lever 23 on. The end of a rope 22 and a return spring are attached to the arm 23. The return spring 29 is at 30 z. B. attached to a strut of the lifting \ orrichtung, while the rope 22 to 27 on an arm 21 articulated at 26 on the lifting device 2 is attached. A stop 28 limits the Movement of the arm 21 under the action of the tension exerted by the return spring 29. The Control element in the embodiment according to FIG. 2 and 3 consists of an arm 21 which is attached to the elevator gesture !! 3 is pivotably mounted on an axis 26 and is in motion by a stop 28 is limited downwards. The blades 6 are controlled by the ring 19, against which as shown in Fig. 3 pushes the trigger string 38, with the blades 6 are opened.

Die Schurre 1 kann eine halbzylindrische Gestalt mit entsprechendem Hohlraum aufweisen, um den Bohrgreifer4 während seiner Abwärtsbewegung in das Bohrloch 7 durchfahren lassen zu können.The chute 1 can have a semi-cylindrical shape with a corresponding cavity around the To be able to pass Bohrgreifer4 into the borehole 7 during its downward movement.

Fig. 4 bis 7 stellen ein anderes Ausführungsbeispiel einer Schurre 1 dar, die eine Gestalt aufweist, welche besonders geeignet ist, um den von dem Bohrgreifer 4 kommenden Abtrag aus dem Bereich des Bohrloches 7 zu schleudern. Wie vorher sind ein Seil 22 und ein Rückholfeder 29 bei 20 an einem mit einer Schurre 1 verbundenen Arm 23 befestigt, welcher gelenkig bei 25 an einer nicht dargestellten Strebe8 des Bohrgerätes2 gelagert ist (siehe Fig. 1).Figs. 4 to 7 illustrate another embodiment a chute 1, which has a shape which is particularly suitable to the of the Drill gripper 4 to hurl the coming material from the area of the borehole 7. As before are a Cable 22 and a return spring 29 attached at 20 to an arm 23 connected to a chute 1, which is articulated at 25 on a strut 8, not shown, of the drill 2 (see FIG. 1).

Das Seil 22 ist mit einem Ring 40 verbunden, welchrr mittels Seilen od. dgl. 41 an einem anderen Ring 19 hängt, der zum Auslösen der öffnung:;bewegung der Schaufeln 6 des Bohrgreifert4 verwendet wird und an dem Ausleger3 (Fig. 1) des Hebegeriiles angehängt ist.The rope 22 is connected to a ring 40, which welchrr hangs by means of ropes or the like 41 on another ring 19, which is used to trigger the opening:; movement the shovels 6 of the drilling gripper 4 is used and on the boom 3 (Fig. 1) of the lifting device is attached.

Die Arbeitsweise der Schurre ist wie folgt: Wenn der Bohrgreifer 4 das Ende seines Aufwärtshubes erreicht hat, hebt der Oberteil des Bohrgreiters4 den Arm 21 bzw. den Ring 40 an, was die Spannung des Seiles 22 und damit das Umkippen der Schurre 1 unter den Bohrgreifer 4 bewirkt. Zu diesem Zeitpunkt öffnen sich die Schaufeln 6 des Bohrgreifers 4 unter der Wirkung des Ringes 19, welcher sich auf die Auslösungsstange 38 des Verriegelungsmechanismus dieser Schaufeln abstützt. Der Abtrag fällt dann in die Schurre 1, wie es die F i g. 3 und 6 zeigen. Wenn sich schließlich der Bohrgreifer 4 abwärts bewegt, nimmt er während seiner Abwärtsbewegung den Arm 21 bzw. den Kranz 40 mit ;ind bewirkt also das Erschlaffen des Seiles 22, so daß die Schurre 1 aus dem Weg unter dem Bohrgru.rcr 4 verschwindet, um ihn vorbei zu lassen. Wenn die Schurre aus dem Weg unter dem Bohrgreifer4 zurückgezogen wird, ist schon der Abraum neben dem Bohrloch 7 abgeladen worden, wie es aus dem Ausführungsbeispiel der F i g. 3 ersichtlich ist oder der Abtrag wird durch die Umkippbewegung der Schurre herausgeschleudert wie es besonders gut in F i g. 7 ersichtlich ist.The operation of the chute is as follows: When the drilling grab 4 reaches the end of its upward stroke has, the upper part of the Bohrgreiters4 lifts the arm 21 or the ring 40, which the tension of the Rope 22 and thus the overturning of the chute 1 under the drilling grab 4 causes. At this time open the blades 6 of the drill gripper 4 under the action of the ring 19, which is on the Release rod 38 of the locking mechanism of these blades is supported. The removal then falls into the chute 1, as shown in FIG. 3 and 6 show. Finally, when the drill gripper 4 moves downwards, he takes the arm 21 or the rim 40 with it during its downward movement; thus it causes the slackening of the rope 22 so that the chute 1 disappears out of the way under the Bohrgru.rcr 4 to him to let pass. If the chute is pulled back out of the way under the drill grab4, that's okay the overburden has been dumped next to the borehole 7, as shown in the embodiment of FIG. 3 can be seen or the removal is thrown out by the overturning movement of the chute like it particularly good in FIG. 7 can be seen.

Eine Schurre, gemäß dem durch die Fig.4 bis 7 dargestellten Ausführungsbeispiel wird bevorzugt, da sie das Zurückfallen des Abtrages in das .Bohrloch vermeidet und die Durchführung wiederholter Bohrungsvorgänge ohne jegliche Störung ermöglicht, wobei ein schneller und gleichmäßiger Bohrungsarbeitstakt erzielt wird.A chute, according to the embodiment illustrated by FIGS. 4 to 7, is preferred because it avoids the falling back of the cuttings in the .Bohrloch and the implementation of repeated drilling operations made possible without any disturbance, with a faster and more even drilling work cycle is achieved.

Die oben beschriebene Schu.re arbeitet unter Mitwirkung eines Bohrgreifers. Selbstverständlich könnte eine derartige Schurre mit Geräten einer anderen Bauart dieser Gattung zusammenarbeiten.The schu.re described above works with cooperation a drill grab. It goes without saying that such a chute could be connected to devices of another Type of construction of this type work together.

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (3)

1 2 eine iiberkopfbewegung austragenden Schurre ein Patentansprüche- Schwenkhebel angeordnet ist, an dem ein die Schurre ' in die Austragstcllung bewegender Seilzug sowie ein1 2 an overhead movement discharging chute a patent claims swivel lever is arranged on which a cable pulling the chute 'into the discharge stcllung as well as a 1. Am Hubseil eines Aufzuges hängender La- Rückstellorgan angreifen, und daß der Seilzug an dekübel, dessen Inhalt sich um Ende der Hubbc- 5 einen, in die Aufzugsbahn ragenden Meuerurgun anwcgung auf eine in die Aufzugsbahn des Kübels geschlossen ist. Bei einer Ausfuhrungsform de, Lrbcwegbare Schurre entleert, die am Gestell des findung besteht das Steuerorgan aus einem Arm. der Aufzuges, z. B. am Ausleger eines Erdbohrgerä- am Aufzug'gcstell durch einen Anschlag nach unten tes, um eine horizontale Achse kippbar gelagert begrenzt schwingbar gelagert ist. bei einer zweiten den Kübelinhalt seillich austrägt d ad u rc h ίο Ausführungsfoim besteht das Steuerorgan aus einem gekennzeichnet, daß an der durch ihre am Ausleger angehängten Ring, der seinerseits an Schräglage oder eine Überkopfbewegung austra- einem oberen Ring hangt, der den Bodenverschluß genden Schurre (1) ein Schwenkhebel (23) an- des Kübels öffnet.1. Attack on the hoist rope of an elevator hanging La-restoring member, and that the cable pull on the bucket, the content of which is closed at the end of the Hubbc- 5 a, protruding into the elevator track Meuerurgun on a in the elevator track of the bucket. In one embodiment de, Lrbcwegbare chute emptied, the control element consists of an arm on the frame of the invention. the elevator, e.g. B. is mounted on the boom of an Erdbohrgerä- on the elevator through a stop downward tes tiltable about a horizontal axis to a limited extent swingable. in a second the bucket contents roped out d ad u rc h ίο execution form, the control element consists of a characterized that on the ring attached to the boom, which in turn depends on an inclined position or an overhead movement, an upper ring, the chute that closes the bottom (1) A swivel lever (23) on the bucket opens. geordnet ist, an dem ein die Schurre (1) in die Der technische Fortschritt der Erfindung bestehtis arranged, on which the chute (1) in the The technical progress of the invention exists Austragstellung bewegender Seilzug (22) sowie 15 t.arin, daß die Arbeitsbewegungen aer Schurre ein Rückstcllorgan (29) angreifen, und daß der automatisch mit den Arbeitsbewegungen des Lade-Seilzug (22) an einem in die Aufzugsbahn ragen- kübels oder des Bohrgreifers abgestimmt sind, so daß den Steuerorgan angeschlossen ist. die Anforderungen an die Geschicklichkeit des Per-Discharge position moving cable (22) and 15 t.arin that the working movements of the chute attack a Rückstcllorgan (29), and that automatically with the working movements of the loading cable (22) are matched to a bucket protruding into the elevator track or the drill gripper, so that is connected to the control unit. the requirements for the skill of the person 2. Ladekübcl nach Anspruch I, dadurch ge- sonals erheblich geringer geworden sind. Die Koppkennzeichnel. daß das Steuerorgan aus einem ao lung bedingt, daß am Ende der Aufwärtsbewegung Arm (21) besteht, der am Aufzugsgestell (3) de/l.adekübels oder Bohrgreifers und beim öflnen durch einen Anschlag (28) nach unten begrenzt der Schaufeln die Schurre selbsttätig in eine Position schwenkbar gelagert ist. " unterhalb des Ladekübels oder Bohrgreifers gelangt2. Ladenkübcl according to claim I, which have become considerably lower overall. The coupling mark. that the control organ from an ao development conditions that at the end of the upward movement Arm (21) consists of the lift frame (3) de / l.adekübels or drill gripper and when opening by means of a stop (28) downward, the blades automatically limit the chute in one position is pivotably mounted. "reaches below the loading bucket or drill grab 3. Ladekübel nach Anspruch 1, dadurch ge- i>i. um den Bodenabtrag aufzunehmen. Wenn hingekennzeichnet, daß das Steuerorgan aus einem am 25 gen der Ladekübel b/w. der Bohrgreifer in Richtung Ausleger (3) angehängten Rins? (40) besteht, der auf das Bohrloch abgelassen wird, wird die Schurre seinerseits an einem oberen Ring (19) hängt, der automatisch durch cmc Rückstellfeder aus dem Weg den Bodenverschluß (6) des Kübels (4) öffnet. des Ladekübels oder Bohrgreifers zurückgezogen,3. Loading bucket according to claim 1, characterized in that i> i. to record the soil erosion. If indicated, that the controller from a on the 25 gene of the loading bucket b / w. the drill gripper in the direction Outrigger (3) attached rins? (40) that is lowered onto the borehole becomes the chute in turn hangs from an upper ring (19), which is automatically moved out of the way by the cmc return spring the bottom closure (6) of the bucket (4) opens. the loading bucket or drilling gripper withdrawn, wobei sie den Abtrag, den sie enthält, weit von dem 30 Bohrloch wcgschlei'.dcrt bzw. unmittelbar auf einenwhere it wcgschlei'.dcrt the erosion it contains far from the borehole or directly to one Lastkraftwagen.Trucks. Die Abstimmung der Arbeitsbewegungen bedingt außerdem eine sehr große Beschleunigung der Ar-The coordination of the work movements also requires a very large acceleration of the work Die Erfindung betrifft einen a.i Hubscil eines beitsvorgänge und verhindert eine übermäßige Ermü-Aufzuges hängenden Ladekübel, dessen Inhalt sich 35 dung des Personals, so daß die Aushubleistung pro am Ende der Hubbewegung auf eine in die Aufzugs- Zeiteinheit sich sehr steigert,
bahn des Kübels bewegbare Schurre entleert, die am Die Zeichnungen zeigen in
The invention relates to an ai Hubscil of a work process and prevents excessive fatigue-lift hanging loading bucket, the content of which is increased by the staff, so that the excavation performance per at the end of the lifting movement increases very much to one in the elevator time unit,
Movable chute emptied in the path of the bucket. The drawings show in
Gestell des Aufzugs, z.B. am Ausleger eines Erd- Fig. I eine Gesamtansicht im Aufriß, welche eineFrame of the elevator, e.g. on the boom of an earth bohrgcrätes, um eine horizontale Achse kippbar ge- Abfuhrschurre darstellt, die an einer Hubvorrichtung lagert den Kübelinhalt seitlich austrägt. Der be- 40 für einen Bohrgreifer angeordnet ist,
kannte Ladekübel weist den Nachteil auf, daß eine Fig. 2 und 3 schcmatksche Ansichten, welche bei
drilling device, tiltable about a horizontal axis, represents discharge chute, which is mounted on a lifting device and discharges the bucket contents to the side. The loading 40 is arranged for a drilling grab,
known loading bucket has the disadvantage that a Fig. 2 and 3 Schcmatksche views, which at
zwangläufige Steuerung der Schurre in Abhängigkeit einem ersten Ausführungsbeispiel der Erfindung das von der Hubbewegung des Ladekübels fehlt. Es be- Giundwesen der Arbeitsweise einer Schurre zur Absteht deshalb die Gefahr, daß bei nachlässiger Bedie- fuhr des Abraumes darstellen, und
nung Beschädigungen der Schurre durch den verhält- 45 Fig. 4 bis7 ein zweites Ausführungsbeispiel der nismäßig schweren Ladekübcl eintreten können, Erfindung mit Darstellung der aufeinanderfolgenden wenn die Schurre nicht rechtzeitig aus der Bewe- Arbeitsgänge einer Schurre, die besonders geeignet gungsbahn des I.adekiihels entfernt wird. ist, den Abtrag vom Bohrloch wegzuschleudcrn.
compulsory control of the chute as a function of a first embodiment of the invention that is missing from the lifting movement of the loading bucket. The basic principle of the way in which a chute works is therefore the risk of careless operation of the overburden, and
Damage to the chute caused by the behavior of a second embodiment of the heavily loaded loading bucket can occur, the invention showing the successive steps when the chute is not removed in time from the movement of a chute that removes the particularly suitable trajectory of the I.adekiihels will. is to hurl the cuttings away from the borehole.
Bei bekannten Bohrgreiferanlagen wurde der im Bei dem Ausführungsbeispiel nach Fig. I ist dieIn the case of known drilling grab systems, in the embodiment according to FIG Bohrgreifer gesammelte Abtrag neben das Bohrloch 50 Schurre 1 an einem Maschinengestell 2 angeordnet oder auf einen Lastkraftwagen abgeladen. Hierfür dargestellt, wobei diese Maschine ein Hebcgcrät ist, war es erforderlich, die Hubvorrichtung, an der der das mit einem Ausleger 3 versehen ist, an welchem Bohrgreifer angehängt war, zu drehen. Erst dann ein Bohrgreifer 4 mittels eines HubscilcsS aufgckonnlcn die Schaufeln des Bohrgreifers geöffnet wer- hängt ist. Der Bohrgrcifer4 weist an seinem Ende den, um den Abtrag außerhalb des Bohrloches abzu- 55 einen Satz den Bodenverschluß bildende Schaufeln 6 laden. Hierbei war nicht zu verhindern, daß öfters auf. welche das Abteufen bzw. Bohren eines Loder Abtrag ganz oder teilweise wieder in das Bohr- chcs7 in den Erdboden ermöglichen. Die Steuerung loch zurückfiel. Der Eiitlcerungsvorgang des Bohr- der Schurre 1 erfolgt durch ein Seil 22, das zwischen greifers verlangsamte auch erheblich den Arbeitstakt dem Bohrgreifer 4 und dem Arm 23 angeordnet ist. des Bohrens, weil die Arbeitsbewegungen von Hand 60 Die Schurre I mit dem Arm 23 ist um eine horizonaufeinander abgestimmt werden mußten. tale Achse kippbar gelagert, und zwar am Arm 8 derDrill grabber collected material next to the borehole 50, chute 1 on a machine frame 2 or dumped on a truck. Shown for this, where this machine is a lifting device, it was necessary, the lifting device on which the is provided with a boom 3, on which Drill grab was attached to rotate. Only then is a drilling gripper 4 opened by means of a HubscilcsS the blades of the drill grapple are open. The Bohrgrcifer4 points at its end a set of blades 6 forming the bottom seal in order to remove the material removed outside the borehole load. There was no way to prevent it from opening up frequently. which involves sinking or drilling a loder Allow all or part of the removal back into the drill chcs7 in the ground. The control hole fell back. The cooling process of the chute 1 is carried out by means of a rope 22 which is inserted between gripper also significantly slowed down the work cycle of the drilling gripper 4 and the arm 23 is arranged. of drilling, because the work movements by hand 60 The chute I with the arm 23 is one horizon on top of one another had to be voted on. tale axis mounted tiltable, on the arm 8 of the Die Aufgabe der Erfindung bestand darin, eine Hubvorrichtung 2. Zwischen dem Arm 23, nämlich Anlage zu entwickeln, bei der die Arbcitsbcwegun- dem Befestigungspunkt 20 und dem Bcfestigungsgcn der Schurre automatisch von den Bewegungen punkt 30 ist eine Rückstellfeder 29 vorgesehen, des Ladekübels bzw. eines Bohrgreifers gesteuert 65 Demgemäß ist die Schurre 1 durch das Seil 22 und werden. die Rückstellkraft der Feder 29 in zwei RichtungenThe object of the invention was to provide a lifting device 2. Between the arm 23, namely To develop a system in which the work paths and the attachment point 20 and the attachment point the chute automatically from the movements point 30, a return spring 29 is provided, of the loading bucket or a drilling gripper controlled 65 Accordingly, the chute 1 is through the rope 22 and will. the restoring force of the spring 29 in two directions Die Lösung dieser Aufgabe besteht gemäß der Er- steuerbar. Mit 40 ist ein Ring bezeichnet, an dem das findung darin, daß an der durch ihre Schräglage oder Seil 22 befestigt ist. Die Funktionen dieses Ringes 40The solution to this problem is according to the taxable. 40 is a ring on which the Finding that it is attached to the 22 by its incline or rope. The functions of this ring 40
DE2064997*A 1969-04-28 1970-04-24 Loading bucket hanging on the hoist rope of an elevator. Elimination from: 2020165 Expired DE2064997C3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR6913500A FR2040945A5 (en) 1969-04-28 1969-04-28
FR6936287A FR2064717A6 (en) 1969-10-22 1969-10-22

Publications (3)

Publication Number Publication Date
DE2064997A1 DE2064997A1 (en) 1972-01-05
DE2064997B2 DE2064997B2 (en) 1973-08-30
DE2064997C3 true DE2064997C3 (en) 1974-04-11

Family

ID=26214983

Family Applications (3)

Application Number Title Priority Date Filing Date
DE19702020165 Withdrawn DE2020165A1 (en) 1969-04-28 1970-04-24 Automatic sinking bucket for drilling purposes
DE2064997*A Expired DE2064997C3 (en) 1969-04-28 1970-04-24 Loading bucket hanging on the hoist rope of an elevator. Elimination from: 2020165
DE7015457U Expired DE7015457U (en) 1969-04-28 1970-04-24 INDEPENDENT BUCKET FOR DRILLING PURPOSES.

Family Applications Before (1)

Application Number Title Priority Date Filing Date
DE19702020165 Withdrawn DE2020165A1 (en) 1969-04-28 1970-04-24 Automatic sinking bucket for drilling purposes

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE7015457U Expired DE7015457U (en) 1969-04-28 1970-04-24 INDEPENDENT BUCKET FOR DRILLING PURPOSES.

Country Status (8)

Country Link
JP (1) JPS4936565B1 (en)
BE (1) BE749132A (en)
CH (1) CH498282A (en)
DE (3) DE2020165A1 (en)
FR (1) FR2040945A5 (en)
GB (1) GB1286914A (en)
LU (1) LU60811A1 (en)
NL (1) NL7006239A (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10351956B3 (en) * 2003-11-07 2005-07-14 Josef Möbius Bau-Aktiengesellschaft Device for extracting earth material from pipe driven into soil has flaps held by cable extending from one end of gripper pipe to other connected to actuator so this lowers cable and flaps drop to outlet position under pressure of soil
EP3725950B1 (en) * 2019-04-18 2022-09-14 BAUER Maschinen GmbH Slotted wall gripper and method for creating a slot in the ground
EP3798367B1 (en) * 2019-09-25 2022-03-09 BAUER Maschinen GmbH Slotted wall gripper, method for operating same, and civil engineering method
CN113287375B (en) * 2021-06-15 2023-12-22 河北建工集团生态环境有限公司 Weeding and fertilizing device for garden seedling cultivation
CN114753794B (en) * 2022-06-16 2022-09-02 陕西清腾畅建筑工程有限公司 Building construction drilling equipment

Also Published As

Publication number Publication date
DE2020165A1 (en) 1970-11-12
NL7006239A (en) 1970-10-30
GB1286914A (en) 1972-08-31
JPS4936565B1 (en) 1974-10-02
LU60811A1 (en) 1970-06-29
DE2064997B2 (en) 1973-08-30
DE2064997A1 (en) 1972-01-05
BE749132A (en) 1970-10-01
DE7015457U (en) 1972-02-24
FR2040945A5 (en) 1971-01-22
CH498282A (en) 1970-10-31

Similar Documents

Publication Publication Date Title
DE2064997C3 (en) Loading bucket hanging on the hoist rope of an elevator. Elimination from: 2020165
DE3512212C2 (en) Method and device for demolishing chimneys
DE601812C (en) Equipment for loosening, conveying and depositing overburden and, if necessary, for dismantling and conveying the usable masses in opencast mines
DE2430008C2 (en) Backhoe excavator
DE2502109A1 (en) PIT CEILING SUPPORT
DE3236572C2 (en)
DE1956215C3 (en) Loading arm arrangement
DE2556216C2 (en) Tower crane with self-supporting concrete distribution arm
DE828439C (en) Grapple suspended from the boom of a crane
DE2621704C3 (en) Method for automatically controlling the lowering movement of the scraper bucket of a scraper and scraper for carrying out the method
DE904880C (en) Cable excavator in which the lifting and lowering of the scraper bucket is done by changing the tension of the suspension cable
DE737928C (en) Bucket excavator
DE1167665B (en) Skip loader
DE928163C (en) Process and device for mechanical drainage
DE4238418A1 (en) Excavator for opencast working - has bucket on boom derricking on derricking jib by action of lifting mechanism and has slider to thrust bucket into earth
DE1905401A1 (en) Method and device for the production of sand-filled drainage shafts
DE2550414C3 (en) Hydraulic excavator
DE541444C (en) Hiking slide
DE1024696B (en) Crane, excavator or the like with a fly jib arranged on the main boom
DD158566A1 (en) DEVICE FOR CANCELING CONSTRUCTION WORKS
DE420069C (en) Fuse for blind shafts, brake shafts, etc. Like. With double funding
DE4140755C1 (en) Vertical shaft excavator for digging, loosening and/or loading - has holding bake with bracket with vertical main axis, round which swivels slewing arm
DE73425C (en) Locking device for chain-mounted rotary shovel excavators and hoists
DE868729C (en) Deep digging excavator with a spoon that can be swiveled on the fly jib
DE2020165C (en) Automatic drilling grab for drilling holes

Legal Events

Date Code Title Description
C3 Grant after two publication steps (3rd publication)
E77 Valid patent as to the heymanns-index 1977
EHJ Ceased/non-payment of the annual fee