DE202014101953U1 - Arrangement of an elevator in the staircase of an existing building - Google Patents
Arrangement of an elevator in the staircase of an existing building Download PDFInfo
- Publication number
- DE202014101953U1 DE202014101953U1 DE202014101953.7U DE202014101953U DE202014101953U1 DE 202014101953 U1 DE202014101953 U1 DE 202014101953U1 DE 202014101953 U DE202014101953 U DE 202014101953U DE 202014101953 U1 DE202014101953 U1 DE 202014101953U1
- Authority
- DE
- Germany
- Prior art keywords
- staircase
- elevator
- building
- stairwell
- height
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009434 installation Methods 0.000 description 8
- 241001310793 Podium Species 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 2
- BUHVIAUBTBOHAG-FOYDDCNASA-N (2r,3r,4s,5r)-2-[6-[[2-(3,5-dimethoxyphenyl)-2-(2-methylphenyl)ethyl]amino]purin-9-yl]-5-(hydroxymethyl)oxolane-3,4-diol Chemical compound COC1=CC(OC)=CC(C(CNC=2C=3N=CN(C=3N=CN=2)[C@H]2[C@@H]([C@H](O)[C@@H](CO)O2)O)C=2C(=CC=CC=2)C)=C1 BUHVIAUBTBOHAG-FOYDDCNASA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000010006 flight Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F11/00—Stairways, ramps, or like structures; Balustrades; Handrails
- E04F11/02—Stairways; Layouts thereof
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F17/00—Vertical ducts; Channels, e.g. for drainage
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Types And Forms Of Lifts (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes, bestehend aus einem von einem Keller (16) über mehrere Etagen (4) verlaufenden Treppenhaus (1) mit auf halber Etagenhöhe angeordneten Zwischenpodesten (3), wobei zwischen jeder Etage (4) jeweils eine Treppe (5) von einem Zwischenpodest (3) zur darüberliegenden Etage (4) angeordnet ist, dadurch gekennzeichnet, dass die Gebäudeaußenwand des Treppenhauses (1) eine Öffnung aufweist, wobei vor dieser Öffnung der Gebäudeauswand ein Treppenhaus (2) und in dem Treppenhaus (1) ein Fahrstuhl angeordnet ist, der an jeder Etage (4) einen Haltepunkt besitzt.Arrangement of an elevator in the staircase of an existing building, consisting of a staircase (1) running from a basement (16) over several floors (4) with intermediate platforms (3) halfway up the floor, with a staircase between each floor (4) (5) is arranged from an intermediate platform (3) to the floor (4) above, characterized in that the building outer wall of the staircase (1) has an opening, a staircase (2) in front of this opening of the building wall and in the staircase (1 ) an elevator is arranged, which has a stopping point on each floor (4).
Description
Die Erfindung bezieht sich auf eine Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes nach dem Oberbegriff des Anspruchs 1. Derartige Anordnungen werden zum werden zum nachträglichen Einbau von Fahrstühlen in bestehenden mehrgeschossigen Wohn- und Geschäftshäusern eingesetzt. The invention relates to an arrangement of an elevator in the stairwell of an existing building according to the preamble of
Allgemein ist es bekannt, beim nachträglichen Einbau von Fahrstühlen in einem zweiläufigen Treppenhaus, bedingt durch das beim zweiläufigen Treppenhaus vorhandene Zwischenpodest, den Halt des Fahrstuhles am Zwischenpodest anzuordnen. Dabei besteht aber der Nachteil, dass zum Erreichen und Betreten der Wohnungs- und/oder Geschäftseingänge vom Zwischenpodest aus noch eine halbe Etage über die Treppe überwunden werden müssen. Damit ist diese bislang angewendete Variante nicht barrierefrei. Generally, it is known to arrange for the subsequent installation of elevators in a two-lane staircase, due to the presence of the two-lane stairwell intermediate platform, the hold of the elevator on the intermediate platform. But there is the disadvantage that for reaching and entering the housing and / or business from the intermediate platform from half a floor on the stairs must be overcome. Thus, this previously applied variant is not barrier-free.
Deshalb ist aus der
Von Nachteil an dieser Lösung ist aber, dass während der Einbauphase des Fahrstuhles ein Erreichen und Betreten der Wohnungs- und/oder Geschäftseingänge über das Treppenhaus nicht möglich ist. Außerdem ist dieses Variante sehr teuer, da die bestehende zweiläufige Treppe komplett entfernt und durch eine einläufige Treppe ersetzt wird. The disadvantage of this solution, however, is that during the installation phase of the elevator, reaching and entering the apartment and / or business via the staircase is not possible. In addition, this variant is very expensive because the existing two-flight staircase is completely removed and replaced by a single-flight staircase.
In der
Von Nachteil ist hier aber auch, dass während der Einbauphase des Fahrstuhles ein Erreichen und Betreten der Wohnungs- und/ oder Geschäftseingänge über das Treppenhaus nicht möglich ist. Zudem gestaltet sich das Erweitern der nicht entfernten Treppenläufe schwierig, da die alten Zwischenpodeste und damit die oberen Auflageflächen der Treppenlaufe entfernt werden. The disadvantage here is also that during the installation phase of the elevator, reaching and entering the apartment and / or business via the staircase is not possible. In addition, the widening of the not distant staircases difficult, since the old intermediate platforms and thus the upper bearing surfaces of the staircase are removed.
Die Aufgabe der Erfindung besteht darin, ein bautechnisch effektive und kostengünstige Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes vorzuschlagen, welche einerseits den Halt des Aufzuges im Aufzugsschacht an jeder Etage ermöglicht und dabei kostengünstig ist und welche andererseits ein Erreichen und Betreten der Wohnungs- und/ oder Geschäftseingänge über das Treppenhaus auch während der Einbauphase des Fahrstuhles gewährleistet. The object of the invention is to propose a structurally effective and cost-effective arrangement of an elevator in the stairwell of an existing building, which on the one hand allows the maintenance of the elevator in the elevator shaft on each floor and is inexpensive and which on the other hand reaching and entering the housing and / or store entrances via the staircase even during the installation phase of the elevator.
Diese Aufgabe wird durch die Merkmale des Anspruchs 1 gelöst. Zweckdienliche Ausgestaltungen ergeben sich aus den Unteransprüchen 2 bis 9. This object is solved by the features of
Die neue Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes beseitigt die genannten Nachteile des Standes der Technik. The new arrangement of an elevator in the staircase of an existing building eliminates the disadvantages of the prior art.
Vorteilhaft bei der Anwendung der neuen Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes, bestehend aus einem von einem Keller über mehrere Etagen verlaufenden alten Treppenhaus mit auf halber Etagenhöhe angeordneten Zwischenpodesten, wobei zwischen jeder Etage jeweils eine Treppe von einem Zwischenpodest zur darüberliegenden Etage angeordnet ist, ist es, dass die Gebäudeaußenwand des alten Treppenhauses eine Öffnung aufweist, wobei vor dieser Öffnung der Gebäudeauswand ein neues Treppenhaus und in dem alten Treppenhaus ein Fahrstuhl angeordnet ist, der an jeder Etage einen Haltepunkt besitzt. Mit den Haltepunkten des Fahrstuhles an jeder Etage ein ebener und barrierefreier Zugang zu der Wohn- und/oder Geschäftsräumen der einzelnen Etagen gewährleistet. Advantageous in the application of the new arrangement of an elevator in the stairwell of an existing building, consisting of a running from a cellar over several floors old stairwell with halfway up the floor arranged intermediate platforms, between each floor in each case a staircase is arranged from an intermediate platform to the overlying floor It is that the exterior wall of the old staircase has an opening, in front of this opening of the building wall a new staircase and in the old stairwell an elevator is arranged, which has a breakpoint on each floor. With the breakpoints of the elevator on each floor a level and barrier-free access to the living and / or business premises of the individual floors guaranteed.
Von Vorteil beim Einbau des Fahrstuhles in das alte Treppenhaus ist es, dass nacheinander:
- – die Fensteraußenwand, einschließlich der Hauseingangstür komplett entfernt und vor der entstanden Öffnung der Gebäudeaußenwand das neue Treppenhaus mit einer neuen Gebäudeeingangstür und mit den Treppen angeordnet wird, wobei die einzelnen Treppen jeweils am unteren Zwischenpodest beginnen und am darüberliegenden Zwischenpodest enden,
- – vom Keller beginnend die alten Treppen zwischen dem Keller bzw. der jeweils unteren Etage zum darüberliegenden Zwischenpodest entfernt werden und in diesem entstandenen Freiraum wird der Fahrstuhlschacht mit der Fahrstuhlkabine derart eingebaut, dass die Fahrstuhlkabinentür und die Fahrstuhlschachttüren zu den Etagen ausgerichtet sind sowie diese Fahrstuhlkabine im Keller und an den Etagen jeweils einen Haltepunkt besitzt, und
- – ein barrierefreier Zugang zum Haltepunkt des Fahrstuhles im Keller des Gebäudes geschaffen, indem die Kellereingangstür in die Kellerauswand eingebraucht sowie ein Durchgang zwischen dieser Kellereingangstür und der Fahrstuhlschachttüren im Keller geschaffenen und außerhalb des Gebäudes vor der Kellereingangstür die Rampe zum Überwinden des Höhenunterschiedes zwischen dem Keller und dem Eingangsbereiches der Gebäudeeingangstür angeordnet werden.
- - The outer window wall, including the front door completely removed and in front of the resulting opening of the building exterior wall, the new staircase with a new building entrance door and with the stairs is arranged, said the individual stairs start at the lower intermediate platform and end at the intermediate intermediate platform,
- - Starting from the basement, the old stairs between the basement or the lower floor are removed to overlying intermediate platform and in this space created the elevator shaft with the elevator cabin is installed so that the elevator car door and the elevator shaft doors are aligned to the floors and this elevator cabin in the Basement and on the floors each has a breakpoint, and
- - created a barrier-free access to the breakpoint of the elevator in the basement of the building by the basement entrance door used in the basement wall and created a passage between this basement entrance door and the elevator shaft doors in the basement and outside the building in front of the basement entrance ramp to overcome the height difference between the basement and be arranged in the entrance area of the building entrance door.
Da die alte Treppe erst nach dem Anbau des neuen Treppenhauses erfolgt, ist auch während der Einbauphase des Fahrstuhles ein Erreichen der einzelnen Etagen und Betreten der Wohnungs- und/ oder Geschäftseingänge über das Treppenhaus gewährleistet. Since the old staircase takes place only after the installation of the new staircase, even during the installation phase of the elevator, reaching the individual floors and entering the apartment and / or shop entrances via the staircase is guaranteed.
Die neue Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes soll anhand eines Ausführungsbeispiels näher erläutert werden. The new arrangement of an elevator in the stairwell of an existing building will be explained in more detail using an exemplary embodiment.
Dazu zeigen: To show:
In dem Ausführungsbeispiel umfasst die neue Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes, gemäß der
Das alte Treppenhaus
Der Fahrstuhlschacht
Die Fahrstuhlkabine
Das neue Treppenhaus
Die Umsetzung der neuen Anordnung eines Fahrstuhles in das Treppenhaus eines bestehenden Gebäudes wird im Folgenden ausgehend von der Beschreibung des Treppenhauses vor dem Einbau des Fahrstuhles erläutert. The implementation of the new arrangement of an elevator in the stairwell of an existing building will be explained below, starting from the description of the stairwell before installing the elevator.
Das alte Treppenhaus
Zum Einbau des Fahrstuhles in dieses Treppenhaus
Anschließend werden vom Keller
Parallel zum Einbau des Fahrstuhles oder abschließend wird ein barrierefrei Zugang zum Haltepunkt des Fahrstuhles im Keller
Denkbar ist es auch, dass das neue Treppenhaus
Auch ist es denkbar, dass Treppenhaus
Alternativ ist es auch denkbar, gemäß der
BezugszeichenlisteLIST OF REFERENCE NUMBERS
- 1 1
- altes Treppenhaus old staircase
- 2 2
- neues Treppenhaus new staircase
- 3 3
- Zwischenpodest intermediate landing
- 4 4
- Etage floor
- 5 5
- Treppe stairway
- 6 6
- Hausinnenwand House interior wall
- 7 7
- Hausinnenwand House interior wall
- 8 8th
- Fahrstuhlschacht elevator shaft
- 9, 9‘ 9, 9 '
- Fahrstuhlschachtür Lift shaft door
- 10, 10‘10, 10 '
- Fahrstuhlkabine elevator car
- 11, 11‘11, 11 '
- Fahrstuhlkabinentür Elevator car door
- 12 12
- Treppe stairway
- 13 13
- Gebäudeeingangstür Building entrance door
- 14 14
- Fenster window
- 15 15
- Rampe ramp
- 16 16
- Keller basement, cellar
- 17 17
- Kellereingangstür Cellar door
- 18 18
- mittleres Treppenhauselement middle stairwell element
- 19 19
- unterstes Treppenhauselement lowest stairwell element
- 20 20
- oberstes Treppenhauselement top stairwell element
- 21 21
- Treppenhausdach Stairwell roof
- 22 22
- Kellertreppe basement stairs
ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- DE 102011115217 A1 [0003] DE 102011115217 A1 [0003]
- EP 1574470 A1 [0005] EP 1574470 A1 [0005]
Claims (9)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202014101953.7U DE202014101953U1 (en) | 2014-04-25 | 2014-04-25 | Arrangement of an elevator in the staircase of an existing building |
DE102014114904.1A DE102014114904A1 (en) | 2014-04-25 | 2014-10-14 | Arrangement of an elevator in the staircase of an existing building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE202014101953.7U DE202014101953U1 (en) | 2014-04-25 | 2014-04-25 | Arrangement of an elevator in the staircase of an existing building |
Publications (1)
Publication Number | Publication Date |
---|---|
DE202014101953U1 true DE202014101953U1 (en) | 2014-09-16 |
Family
ID=51629318
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE202014101953.7U Expired - Lifetime DE202014101953U1 (en) | 2014-04-25 | 2014-04-25 | Arrangement of an elevator in the staircase of an existing building |
DE102014114904.1A Pending DE102014114904A1 (en) | 2014-04-25 | 2014-10-14 | Arrangement of an elevator in the staircase of an existing building |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102014114904.1A Pending DE102014114904A1 (en) | 2014-04-25 | 2014-10-14 | Arrangement of an elevator in the staircase of an existing building |
Country Status (1)
Country | Link |
---|---|
DE (2) | DE202014101953U1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109415905A (en) * | 2016-06-21 | 2019-03-01 | 因温特奥股份公司 | For the method for building modernization rebuilding and with the structure for building lift facility between floors |
CN111042571A (en) * | 2020-01-07 | 2020-04-21 | 陈艳彬 | Flat-layer entrance added elevator and construction method thereof |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2681725B2 (en) * | 2017-02-28 | 2019-05-16 | Corsam Innova S L | Modular set for communication cores and procedure of implementation thereof in building renovations |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1574470A1 (en) | 2004-03-02 | 2005-09-14 | Rakennustoimisto Palmberg Oy | Method for mounting a lift in a building |
DE102011115217A1 (en) | 2011-09-28 | 2013-03-28 | BFS GmbH & Co. KG | Method for converting two-flight staircase without lift shaft into staircase with one-flight stairs, bridge, and lift shaft in e.g. multi-story residential building, involves providing entrance to staircase with new stairs into cellar |
-
2014
- 2014-04-25 DE DE202014101953.7U patent/DE202014101953U1/en not_active Expired - Lifetime
- 2014-10-14 DE DE102014114904.1A patent/DE102014114904A1/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1574470A1 (en) | 2004-03-02 | 2005-09-14 | Rakennustoimisto Palmberg Oy | Method for mounting a lift in a building |
DE102011115217A1 (en) | 2011-09-28 | 2013-03-28 | BFS GmbH & Co. KG | Method for converting two-flight staircase without lift shaft into staircase with one-flight stairs, bridge, and lift shaft in e.g. multi-story residential building, involves providing entrance to staircase with new stairs into cellar |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109415905A (en) * | 2016-06-21 | 2019-03-01 | 因温特奥股份公司 | For the method for building modernization rebuilding and with the structure for building lift facility between floors |
US20190323245A1 (en) * | 2016-06-21 | 2019-10-24 | Inventio Ag | Method for modernizing a building and structure with an elevator system constructed in a building |
US10577808B2 (en) * | 2016-06-21 | 2020-03-03 | Inventio Ag | Method for modernizing a building and structure with an elevator system constructed in a building |
CN111042571A (en) * | 2020-01-07 | 2020-04-21 | 陈艳彬 | Flat-layer entrance added elevator and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
DE102014114904A1 (en) | 2015-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3712355B1 (en) | Method for retrofitting a building with an elevator and set of components for carrying out the method | |
EP3898490B1 (en) | Method for operating a construction site device, and construction site device | |
DE102011052727A1 (en) | Lift for attachment to multi-storey building, has intermediate landings, and set of staircase run units, where each run unit extends from intermediate stair platform of building staircase to floor level of upper floors | |
WO2017220653A1 (en) | Method for modernizing a building and structure with a lift system constructed in a building | |
DE102014114904A1 (en) | Arrangement of an elevator in the staircase of an existing building | |
DE102018107807A1 (en) | PARK SYSTEM | |
DE202021004270U1 (en) | Prefabricated, transportable elevator tower | |
DE1271968B (en) | Multi-storey building made of prefabricated parts | |
DE102011115217A1 (en) | Method for converting two-flight staircase without lift shaft into staircase with one-flight stairs, bridge, and lift shaft in e.g. multi-story residential building, involves providing entrance to staircase with new stairs into cellar | |
WO2015139935A1 (en) | Multi-storey residential building | |
CH698910B1 (en) | Elevator car for reduced elevator shaft heads. | |
DE102005007475B3 (en) | Person e.g. handicapped person, elevator for use in building, has telescopic unit that is extensible from upper storey to underlying storey, and safety limit switches provided in platform, cover plate, cabine or door | |
EP0579024A1 (en) | Elevator shaft for prefabricated multi-storey buildings | |
DE102008058930B3 (en) | Method for erecting shaft scaffolding for lift system in building with two floors, involves mounting scaffold segment in lower floor which has static load-carrying capacity for carrying load to floor slab, where opening is cut in floor slab | |
DE202019102175U1 (en) | Mobility aid to make climbing stairs easier | |
DE2427113A1 (en) | Storeyed cell-unit multiple garage - has bounding uneven-armed angular concrete components forming ceiling slabs and parapets | |
EP3502374B1 (en) | Method for creating a staircase with integrated lift shaft on or in an existing building | |
EP4108619A1 (en) | Elevator shaft for an elevator installation in a building | |
DE1684725A1 (en) | Retractable multi-storey car park garage | |
DE102022107586A1 (en) | Auxiliary scaffolding and method for retrofitting a building with an elevator system | |
EP1258446B1 (en) | Door frame for elevator hallway doors | |
DE4217200A1 (en) | Double garage parking system - with vehicles parked on platform which can be raised and lowered into excavated garage, and second car parked on covering deck | |
DE202021001856U1 (en) | stairway | |
EP4282804A1 (en) | Elevator system with a cabin that can be moved outside the shaft | |
DE102022107589A1 (en) | Foundation frame and method for retrofitting a building with an elevator system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R207 | Utility model specification |
Effective date: 20141023 |
|
R150 | Utility model maintained after payment of first maintenance fee after three years | ||
R151 | Utility model maintained after payment of second maintenance fee after six years | ||
R152 | Utility model maintained after payment of third maintenance fee after eight years | ||
R071 | Expiry of right |