DE202012104538U1 - Chute arrangement with a double cleaning device, in particular for a device for gluing - Google Patents

Chute arrangement with a double cleaning device, in particular for a device for gluing Download PDF

Info

Publication number
DE202012104538U1
DE202012104538U1 DE202012104538.9U DE202012104538U DE202012104538U1 DE 202012104538 U1 DE202012104538 U1 DE 202012104538U1 DE 202012104538 U DE202012104538 U DE 202012104538U DE 202012104538 U1 DE202012104538 U1 DE 202012104538U1
Authority
DE
Germany
Prior art keywords
chute
wall
arrangement
scraper
cleaning device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
DE202012104538.9U
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dieffenbacher GmbH Maschinen und Anlagenbau
Original Assignee
Dieffenbacher GmbH Maschinen und Anlagenbau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dieffenbacher GmbH Maschinen und Anlagenbau filed Critical Dieffenbacher GmbH Maschinen und Anlagenbau
Priority to DE202012104538.9U priority Critical patent/DE202012104538U1/en
Priority to CN201320744523.8U priority patent/CN203901478U/en
Priority to PCT/EP2013/074513 priority patent/WO2014079988A1/en
Priority to CN201380060878.8A priority patent/CN104812540B/en
Priority to EP13796037.3A priority patent/EP2922670B1/en
Publication of DE202012104538U1 publication Critical patent/DE202012104538U1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/30Cleaning by methods involving the use of tools by movement of cleaning members over a surface
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/08Cleaning containers, e.g. tanks
    • B08B9/0804Cleaning containers having tubular shape, e.g. casks, barrels, drums
    • B08B9/0808Cleaning containers having tubular shape, e.g. casks, barrels, drums by methods involving the use of tools, e.g. by brushes, scrapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/08Cleaning containers, e.g. tanks
    • B08B9/087Cleaning containers, e.g. tanks by methods involving the use of tools, e.g. brushes, scrapers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27NMANUFACTURE BY DRY PROCESSES OF ARTICLES, WITH OR WITHOUT ORGANIC BINDING AGENTS, MADE FROM PARTICLES OR FIBRES CONSISTING OF WOOD OR OTHER LIGNOCELLULOSIC OR LIKE ORGANIC MATERIAL
    • B27N1/00Pretreatment of moulding material
    • B27N1/02Mixing the material with binding agent
    • B27N1/029Feeding; Proportioning; Controlling

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Wood Science & Technology (AREA)
  • Forests & Forestry (AREA)
  • Road Signs Or Road Markings (AREA)
  • Chutes (AREA)
  • Accessories For Mixers (AREA)
  • Cleaning In General (AREA)
  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

Fallschachtanordnung (10; 20; 30; 40; 50; 60), insbesondere für eine Vorrichtung zur Beleimung von Partikeln (1), die zumindest teilweise aus zur Herstellung von Werkstoffplatten geeigneten Fasern und/oder Spänen bestehen, wobei die Fallschachtanordnung (10; 20; 30; 40; 50; 60) einen Fallschacht (21; 31; 41; 51; 61), der einen Einlass zur Zuführung der Partikel (1) und einen Auslass zur Abgabe der Partikel (1) aufweist und zumindest eine erste Reinigungseinrichtung zum Reinigen zumindest einer Innenwand (21a ... 21d) des Fallschachtes (21; 31; 41; 51; 61) aufweist; dadurch gekennzeichnet, dass die Fallschachtanordnung (10; 20; 30; 40; 50; 60) weiter zumindest eine zweite Reinigungseinrichtung zum Reinigen der zumindest einen ersten Reinigungseinrichtung aufweist.Fall chute arrangement (10; 20; 30; 40; 50; 60), in particular for a device for gluing particles (1) which at least partially consist of fibers and / or chips suitable for the production of material plates, the chute arrangement (10; 20 ; 30; 40; 50; 60) a chute (21; 31; 41; 51; 61), which has an inlet for feeding the particles (1) and an outlet for discharging the particles (1) and at least a first cleaning device for Cleaning at least one inner wall (21a ... 21d) of the chute (21; 31; 41; 51; 61); characterized in that the chute arrangement (10; 20; 30; 40; 50; 60) further comprises at least one second cleaning device for cleaning the at least one first cleaning device.

Description

Die vorliegende Erfindung betrifft eine Fallschachtanordnung nach dem Oberbegriff des Anspruchs 1.The present invention relates to a chute arrangement according to the preamble of claim 1.

Die Herstellung von Werkstoffplatten aus zum Beispiel Spänen oder mitteldichten Fasern oder anderen rieselfähigen Materialien sind mittlerweile automatisierte Prozesse und werden bereits in vielen Ländern seit Jahren angewandt. Wie bekannt findet die Verpressung von aufbereiteten Spänen oder Fasern entweder taktgebunden oder kontinuierlich statt. Dabei spielt neben den vielen Anlagenteilen vor und nach der Presse die Herstellung einer Streugutmatte mittels Streumaschinen eine herausragende Rolle, ist doch die Qualität der erstellten Streugutmatte neben der Qualität der Rohstoffe ein wichtiger Faktor. Der Drang zur Herstellung von kostengünstigen Werkstoffplatten aus natürlichen Rohstoffen und künstlich hergestelltem Bindemittel zwingt die Produzenten immer mehr effizientere Verfahren zu entwickeln. Besondere Schwerpunkte sind dabei insbesondere geringe Ausfallzeiten und niedriger Verschleiß.The production of material plates from, for example, chips or medium-density fibers or other free-flowing materials are now automated processes and have already been used in many countries for many years. As is known, the compression of processed chips or fibers takes place either clock-bound or continuously. In addition to the many plant components before and after the press, the production of a spreading material mat by means of spreading machines plays an outstanding role, since the quality of the produced spreading material mat is an important factor in addition to the quality of the raw materials. The urge to produce cost-effective material plates from natural raw materials and artificially produced binders forces producers to develop more and more efficient processes. Special emphasis is on low downtime and low wear.

Die vorliegende Ausarbeitung bezieht sich auf den Bereich der Beleimung der Partikel mit einem Bindemittel. Grundsätzlich versteht man unter Bindemittel eine so genannte Klebstoffflotte, die in ihrer Hauptkomponente aus einem Klebstoff besteht. Je nach Bedarf werden zusätzlich Emulsion, Härter, Formaldehydfänger, Farbstoffe, Insektenschutz und Pilzschutzmittel und andere Additive beigegeben. Es ist auch üblich den Klebstoff ohne Zusätze zu verwenden.The present development relates to the field of gluing the particles with a binder. Basically, the term binder is understood to mean a so-called adhesive liquor which consists of an adhesive in its main component. Depending on requirements, in addition emulsion, hardener, formaldehyde scavengers, dyes, insect repellent and antifungal agents and other additives are added. It is also common to use the adhesive without additives.

Als Bindemittel kommen ohne Anspruch auf Vollständigkeit in Frage: Isocyanate, MDI, Melaminharnstoffformaldehyd (MUF), Harnstoffformaldehyd (UF), MUPF oder PF.The following are suitable as binders without any claim to completeness: isocyanates, MDI, melamine urea formaldehyde (MUF), urea formaldehyde (UF), MUPF or PF.

Die Beleimung erfolgt typischer Weise derart, dass das Streugut beziehungsweise die Partikel mittels einer Dosiervorrichtung in einen Fallschacht eingebracht und mittels Düsen, die im Fallschacht oder diesem vorgelagert angeordnet sind, mit dem Bindemittel beaufschlagt wird beziehungsweise werden. Das beleimte Streugut wird meist in einer dem Fallschacht nachgelagerten Trommel mit drehenden Förderwerkzeugen (mechanischen Mischer) behandelt und/oder weiter beleimt und anschließend zu einer Streugutmatte gestreut und anschließend zeitnah, vor Aushärtung eines Leimes, verpresst. Alternativ kann das Streugut, ohne einen mechanischen Mischer zu durchlaufen, direkt in eine Streuvorrichtung eingebracht werden, um die Streugutmatte zu streuen, und anschließend zu verpressen.The gluing is typically carried out such that the grit or the particles are introduced by means of a metering device in a chute and by means of nozzles which are arranged in the chute or this upstream, is acted upon or become the binder. The glued spreading material is usually treated in a downstream of the chute drum with rotating conveyor tools (mechanical mixer) and / or glued on and then sprinkled to a grit mat and then pressed in real time, before curing a glue. Alternatively, the grit may be introduced directly into a spreader without passing through a mechanical mixer to sprinkle the grit mat and then crimp.

Eine derartige Vorrichtung ist beispielsweise aus DE 10 2010 064 339 A1 bekannt.Such a device is for example off DE 10 2010 064 339 A1 known.

Es besteht hierbei das Problem, dass sich Bindemittel sowie mit dem Bindemittel beleimte Partikel an der Innenwand des Fallschachtes anlagern können, so dass der Fallschacht dazu neigt, zu verschmutzen. Dies macht es notwendig, den Fallschacht regelmäßig zu reinigen. Hierzu muss die Anlage meist stillgesetzt werden, was einen entsprechenden Produktionsausfall mit sich bringt.Here, there is the problem that binders and particles glued to the binder may accumulate on the inner wall of the chute so that the chute tends to become soiled. This makes it necessary to clean the chute regularly. For this, the plant usually has to be shut down, which brings with it a corresponding loss of production.

Darüber hinaus besteht die Möglichkeit, dass sich mit der Zeit an der Innenwand des Fallschachtes feste Ablagerungen von nicht vernachlässigbarer Größe bilden können. Lösen sich solche Ablagerungen und fallen in den Mischer, ist es nicht sichergestellt, dass derartige Klumpen fester Ablagerungen im Mischer zerkleinert und aufgelöst werden. Es können sich daher in der Paste aus beleimten Partikeln, die den Mischer verlässt, weiter feste Klumpen befinden, welche im weiteren Verlauf der Herstellung von Werkstoffplatten zu einer Beeinträchtigung der Produktqualität und/oder zu Beschädigungen der Pressen führen können.In addition, there is the possibility that solid deposits of not negligible size may form on the inner wall of the chute over time. If such deposits dissolve and fall into the mixer, it is not ensured that such lumps of solid deposits in the mixer are crushed and dissolved. It may therefore be in the paste of glued particles leaving the mixer, further solid lumps, which in the further course of the production of material plates can lead to impairment of product quality and / or damage to the presses.

Um das Beschmutzen der Innenwände eines Fallschachtes und die Ausbildung fester Ablagerungen an diesen zu verhindern beziehungsweise zu vermindern, wird im Dokument WO 2011/134844 A1 vorgeschlagen, die Innenwände des Fallschachtes mit Schaberklingen beziehungsweise Spateln zu überstreifen. Die Spatel sind fest mit einer Stützkonstruktion befestigt, die aus einem oberen Ring und einem unteren Ring besteht. Der obere Ring ist mit einem Zahnkranz mit Innenverzahnung verbunden, welcher über ein Ritzel und einen Motor angetrieben wird. Derart angetrieben streifen die Schaberklingen in einer Drehbewegung um eine vertikale Achse über die Innenwand des rotationssymmetrischen Fallschachtes.In order to prevent or reduce the soiling of the inner walls of a chute and the formation of solid deposits on these, is in the document WO 2011/134844 A1 proposed to cover the inner walls of the chute with doctor blades or spatulas. The spatulas are firmly attached to a support structure consisting of an upper ring and a lower ring. The upper ring is connected to a toothed ring with internal teeth, which is driven by a pinion and a motor. Driven so driven the doctor blades in a rotational movement about a vertical axis on the inner wall of the rotationally symmetrical chute.

Zwar kann auf diese Weise verhindert werden, dass sich auf der Innenwand des Fallschachtes größere Ablagerungen bilden, jedoch um den Preis, dass mit den Schaberklingen neue Elemente und Oberflächen in den Fallschacht eingeführt sind, die wiederum beschmutzen und auf denen sich feste Ablagerungen ausbilden können. So kann es insbesondere in großen Anlagen dazu kommen, dass sich auf den Schaberklingen Anbackungen ausbilden können, die bis zu 50 kg wiegen und in einem Klumpen abfallen können, was zur Beschädigung des Mischers und/oder der nachfolgenden Maschinen führen kann.Although it can be prevented in this way that form larger deposits on the inner wall of the chute, but at the price that new elements and surfaces are introduced into the chute with the doctor blades, which in turn soil and on which solid deposits can form. Thus, it can happen, especially in large plants, that can form on the doctor blades caking, which weigh up to 50 kg and can fall off in a lump, which can lead to damage of the mixer and / or the subsequent machines.

In dem Dokument WO 2011/134844 A1 wird daher vorgeschlagen, die Schaberklingen auf eine Temperatur zu kühlen, die unter dem Kondensationspunkt der Luftfeuchte liegt, so dass sich ein Kondensatfilm auf den Oberflächen ausbildet, der die Klebefähigkeit der eingespritzten chemischen Komponenten, insbesondere von thermisch abbindenden Klebstoffen vermindern soll.In the document WO 2011/134844 A1 Therefore, it is proposed to cool the doctor blades to a temperature which is below the condensation point of the humidity, so that a Condensate film is formed on the surfaces, which is to reduce the adhesiveness of the injected chemical components, in particular of thermosetting adhesives.

Abhängig von den Anforderungen einer bestimmten Anwendung, insbesondere abhängig davon, welches Bindemittel und/oder welche Zusätze eingesetzt werden, kann es unerwünscht sein, dass im Fallschacht Feuchtigkeit auskondensiert. In diesem Fall kann die vom Dokument WO 2011/134844 A1 vorgeschlagene Schaberklingenkühlung nicht effektiv eingesetzt werden.Depending on the requirements of a particular application, in particular depending on which binder and / or which additives are used, it may be undesirable that condenses moisture in the chute. In this case, the document WO 2011/134844 A1 proposed doctor blade cooling can not be used effectively.

In anderen Fällen kann, abhängig vom eingesetzten Bindemittel und/oder den eingesetzten Zusätzen, der Effekt eines Kondensatfilms nicht oder nur gering gegeben sein, so dass ein Anhaften nur leicht verringert wird, oder sogar ins Gegenteil verkehrt werden, wenn bestimmte Bindemittel oder Zusätze bei Feuchtigkeit und/oder bei verminderten Temperaturen eine erhöhte Neigung zum Anhaften und/oder Verklumpen zeigen. Auch in diesen Fällen mag ein Einsatz der vom Dokument WO 2011/134844 A1 vorgeschlagenen Schaberklingenkühlung nicht angezeigt sein.In other cases, depending on the binder used and / or the additives used, the effect of a condensate film is not or only slightly, so that adhesion is only slightly reduced, or even reversed, if certain binders or additives in moisture and / or at reduced temperatures show an increased tendency to stick and / or clump together. Even in these cases, a use of the document WO 2011/134844 A1 proposed Schaberklingenkühlung not be displayed.

Darüber hinaus ist es zur Realisierung der vom Dokument WO 2011/134844 A1 vorgeschlagenen Schaberklingenkühlung erforderlich, entsprechende Zuleitungen und Ableitungen für ein Kühlfluid vorzusehen, die eine ausreichende Förderkapazität aufweisen. Um die Wände eines rotierenden Fallschachts und/oder rotierende Schaberklingen mit dem Kühlfluid zu versorgen, ist es zudem notwendig, dass entsprechende fluidführende Kupplungsmittel vorgesehen werden, die eine Übertragung von Kühlfluid von einem ruhenden Teil der Anlage zu den rotierenden Fallschachtwänden und/oder den rotierenden Schaberklingen ermöglichen. Die hierzu notwendigen mechanischen Konstruktionen können einen hohen Aufwand darstellen und es mag schwierig sein, eine dauerhaft wirkungsvolle Abdichtung zu erzielen.In addition, it is for the realization of the document WO 2011/134844 A1 proposed Schaberklingenkühlung required to provide appropriate supply lines and discharges for a cooling fluid having a sufficient delivery capacity. In order to supply the walls of a rotating chute and / or rotary doctor blades with the cooling fluid, it is also necessary that corresponding fluid-carrying coupling means are provided, which is a transfer of cooling fluid from a stationary part of the system to the rotating chute walls and / or the rotary doctor blades enable. The mechanical structures required for this can be a great effort and it may be difficult to achieve a permanently effective seal.

Es ist daher eine Aufgabe der vorliegenden Erfindung, eine Fallschachtanordnung anzugeben, welche das Ausbilden fester Anhaftungen innerhalb eines Fallschachts wirksam verhindern kann.It is therefore an object of the present invention to provide a chute assembly which can effectively prevent the formation of solid buildup within a chute.

Es ist daher eine Aufgabe der vorliegenden Erfindung, eine Fallschachtanordnung anzugeben, welche auf Fallschächte unterschiedlichster Formen anwendbar ist.It is therefore an object of the present invention to provide a chute assembly which is applicable to chutes of various shapes.

Weiter ist es eine Aufgabe der vorliegenden Erfindung, eine Fallschachtanordnung anzugeben, die sich einfach in bereits errichtete Anlagen integrieren lässt.Further, it is an object of the present invention to provide a chute assembly that can be easily integrated into already built facilities.

Diese und andere Aufgaben der Erfindung werden durch eine Fallschachtanordnung gemäß Anspruch 1 gelöst. Weitere bevorzugte Ausführungsformen sind in den abhängigen Ansprüchen dargelegt.These and other objects of the invention are achieved by a chute assembly according to claim 1. Further preferred embodiments are set forth in the dependent claims.

Als eine Lösung wird eine Fallschachtanordnung angegeben, insbesondere für eine Vorrichtung zur Beleimung von Partikeln, die zumindest teilweise aus zur Herstellung von Werkstoffplatten geeigneten Fasern und/oder Spänen bestehen, wobei die Fallschachtanordnung einen Fallschacht aufweist, der einen Einlass zur Zuführung der Partikel und einen Auslass zur Abgabe der Partikel aufweist, zumindest eine erste Reinigungseinrichtung zum Reinigen zumindest einer Innenwand des Fallschachtes und zumindest eine zweite Reinigungseinrichtung aufweist zum Reinigen der zumindest einen ersten Reinigungseinrichtung.As a solution, a chute arrangement is specified, in particular for a device for gluing particles which at least partially consist of fibers and / or chips suitable for producing material plates, wherein the chute arrangement has a chute which has an inlet for feeding the particles and an outlet for delivering the particles, at least one first cleaning device for cleaning at least one inner wall of the chute and at least one second cleaning device for cleaning the at least one first cleaning device.

Während die erste Reinigungseinrichtung es erlaubt, die Innenwand oder die Innenwände des Fallschachts sauber zu halten, erlaubt es die zweite Reinigungseinrichtung, dass auch die erste Reinigungseinrichtung gesäubert werden kann. Es kann somit wirkungsvoll sichergestellt werden, dass sich keine festen Ablagerungen im Fallschacht ausbilden.While the first cleaning device allows to keep the inner wall or the inner walls of the chute clean, the second cleaning device allows the first cleaning device to be cleaned as well. It can thus be effectively ensured that no solid deposits form in the chute.

In einer bevorzugten Ausgestaltung kann die erste Reinigungseinrichtung als zumindest ein verfahrbares Tragelement ausgestaltet sein, das relativ, insbesondere parallel, zu einer zugeordneten ersten Innenwand des Fallschachts verfahrbar angeordnet ist, wobei zumindest ein erstes Abstreifelement an dem verfahrbaren Tragelement angeordnet oder ausgebildet ist, derart, die zugeordnete Innenwand abzustreifen, wenn das verfahrbare Tragelement verfahren wird.In a preferred embodiment, the first cleaning device can be designed as at least one movable support element which is arranged to be movable relative to an associated first inner wall of the chute relatively, in particular parallel, wherein at least a first stripping element is arranged or formed on the movable support element, such stripped assigned inner wall when the movable support element is moved.

Auf diese Weise ist es möglich, mit relativ geringem konstruktiven Aufwand eine wirksame und zuverlässige erste Reinigungseinrichtung zu verwirklichen.In this way it is possible to realize an effective and reliable first cleaning device with relatively little design effort.

Das verfahrbare Tragelement kann so angeordnet sein, dass es durch einen Spalt hindurchgeht, der zwischen zwei benachbarten Innenwänden oder zwischen zwei Enden einer Innenwand ausgebildet ist.The movable support member may be arranged to pass through a gap formed between two adjacent inner walls or between two ends of an inner wall.

Dabei ist es auch vorgesehen, dass das Trageelement gleichzeitig eine Teilwand des Fallschachtes bzw. eine Innenwand des Fallschachtes darstellt.It is also contemplated that the support member simultaneously represents a partial wall of the chute or an inner wall of the chute.

Das verfahrbare Tragelement kann als eine Wand ausgebildet sein, mit einer Höhe, die der abzustreifenden Höhe der zugeordneten Innenwand entspricht.The movable support member may be formed as a wall, with a height corresponding to the stripped height of the associated inner wall.

Vorzugsweise kann das verfahrbare Tragelement federelastisch ausgebildet sein.Preferably, the movable support member may be formed resiliently.

Die zweite Reinigungseinrichtung kann insbesondere zumindest ein zweites Abstreifelement aufweisen. The second cleaning device may in particular comprise at least one second stripping element.

Insbesondere kann das zweite Abstreifelement an einer Wandung oder einem Trageelement angeordnet sein.In particular, the second stripping element can be arranged on a wall or a carrying element.

Auf diese Weise ist es mit relativ geringem konstruktiven Aufwand möglich, eine wirksame und zuverlässige zweite Reinigungseinrichtung zu verwirklichen.In this way it is possible with relatively little design effort to realize an effective and reliable second cleaning device.

Es ist insbesondere möglich, das verfahrbare Tragelement als ein eine Innenwand des Fallschachts ausbildendes Wandelement des Fallschachts auszubilden.It is in particular possible to form the movable support element as a wall element of the chute which forms an inner wall of the chute.

Der Fallschacht kann mehrere Wandelemente aufweisen, die jeweils bogenförmig ausgebildet sind, wobei jedes Wandelement ein anderes Wandelement an dessen Außenseite teilweise überlappt.The chute may have a plurality of wall elements, which are each formed arcuate, wherein each wall element partially overlaps another wall element on the outside thereof.

In einer weiteren bevorzugten Ausgestaltung kann die erste Reinigungseinrichtung zumindest einen ersten Schaber aufweisen, der der zumindest einen Innenwand zugeordnet ist, und die zweite Reinigungseinrichtung kann zumindest einen zweiten Schaber sowie Antriebsmittel zum Bewegen des zweiten Schabers von einer Ruheposition entlang einer im Wesentlichen zum Schaber parallelen Achse aufweisen, derart, den ersten Schaber abzustreifenIn a further preferred embodiment, the first cleaning device may have at least one first scraper associated with the at least one inner wall, and the second cleaning device may include at least one second scraper and drive means for moving the second scraper from a rest position along an axis substantially parallel to the scraper such as to scrape off the first scraper

In einer anderen bevorzugten Ausgestaltung kann die erste Reinigungseinrichtung zumindest einen ersten Schaber aufweisen, sowie Antriebsmittel zum Bewegen des ersten Schabers von einer Ruheposition entlang einer im Wesentlichen zu der zumindest einen Innenwand parallelen Achse, derart, die erste Innenwand abzustreifen, und die zweite Reinigungseinrichtung kann zumindest einen zweiten Schaber sowie Antriebsmittel zum Bewegen des zweiten Schabers von einer Ruheposition über den in der Ruheposition positionierten ersten Schaber aufweisen, derart, den ersten Schaber abzustreifen.In another preferred embodiment, the first cleaning device may comprise at least a first scraper and drive means for moving the first scraper from a rest position along an axis substantially parallel to the at least one inner wall, so as to scrape off the first inner wall, and the second cleaning device at least a second scraper and drive means for moving the second scraper from a rest position over the first scraper positioned in the rest position, so as to scrape off the first scraper.

In einer nochmals weiteren bevorzugten Ausgestaltung kann die erste Reinigungseinrichtung zumindest ein flexibles Abstreifelement, insbesondere ein endloses Abstreifelement, zum Reinigen der zumindest einen Innenwand aufweisen.In yet another preferred embodiment, the first cleaning device may have at least one flexible stripping element, in particular an endless stripping element, for cleaning the at least one inner wall.

Die Verwendung eines flexiblen Abstreifelements hat die vorteilhafte Wirkung, dass das Abstreifelement sich leicht unterschiedlichen Formen des Fallschachts anpassen kann.The use of a flexible stripping element has the advantageous effect that the stripping element can easily adapt to different shapes of the chute.

Die Fallschachtanordnung kann insbesondere weiter eine erste Führungseinrichtung und eine zweite Führungseinrichtung aufweisen, wobei die erste Führungseinrichtung und die zweite Führungseinrichtung eingerichtet sind, das zumindest eine Abstreifelement zu halten und zu führen, derart, eine Relativbewegung in tangentialer Richtung zu der zumindest einen Innenwand zwischen dem Abstreifelement und der zumindest einen Innenwand des Fallschachts zu erlauben, wobei weiter Antriebsmittel vorgesehen sind, die eingerichtet sind, auf den Fallschacht, die erste Führungseinrichtung, die zweite Führungseinrichtung und/oder das zumindest eine Abstreifelement einzuwirken zur Erzeugung der Relativbewegung.In particular, the chute arrangement may further comprise a first guide device and a second guide device, wherein the first guide device and the second guide device are arranged to hold and guide the at least one stripping element in a tangential direction relative to the at least one inner wall between the stripping element and to allow the at least one inner wall of the chute, further comprising drive means adapted to act on the chute, the first guide means, the second guide means and / or the at least one stripping member to produce the relative movement.

Bevorzugt weist die erste und/oder die zweite Führungseinrichtung auf: eine Mehrzahl von Führungsmitteln, insbesondere Führungsrollen oder Führungszahnrädern, und ein endloses Führungselement, insbesondere ein endloses Führungsseil, ein endloses Führungsband, ein endloser Führungsdraht oder eine endlose Führungskette, welches beziehungsweise welche die Führungsmittel umläuft, wobei das zumindest eine flexible Abstreifelement direkt oder über Haltemittel und/oder Umlenkmittel an das endlose Führungselement befestigt ist.Preferably, the first and / or the second guide means comprises: a plurality of guide means, in particular guide rollers or guide gears, and an endless guide element, in particular an endless guide cable, an endless guide belt, an endless guide wire or an endless guide chain, which or which circulates the guide means wherein the at least one flexible stripping element is attached directly or via holding means and / or deflection means to the endless guide element.

Insbesondere die Verwendung eines Seiles oder eines Drahtes hat den Vorteil, dass dieses beziehungsweise dieser im Aufbau sehr variierend sein kann und bereits unbearbeitet eine raue Oberfläche aufweist, die besonders zur Reinigung geeignet ist. Zudem weisen beide eine relativ geringe Oberfläche auf, was einem Ausbilden großer Anhaftungen wirksam entgegensteht. Auf Grund seiner hohen Flexibilität weist darüber hinaus ein Seil relativ hohe Selbstreinigungscharakteristiken auf und lässt sich zudem einfach reinigen.In particular, the use of a rope or a wire has the advantage that this or this can be very varied in structure and already unprocessed has a rough surface, which is particularly suitable for cleaning. In addition, both have a relatively small surface, which effectively precludes the formation of large adhesions. In addition, due to its high flexibility, a rope has relatively high self-cleaning characteristics and is also easy to clean.

Das endlose Abstreifelement kann mittels Umlenkmitteln so angeordnet ist, ein die zumindest eine Innenwand aufweisendes Wandelement des Fallschachts zu umschließen.The endless stripping element can be arranged by means of deflecting means to enclose a wall element of the chute which has at least one inner wall.

Das endlose Abstreifelement kann auch so angeordnet sein, dass es im Bereich der Innenwand innerhalb des Fallschachts verlaufend angeordnet ist.The endless scraper element can also be arranged so that it is arranged running in the region of the inner wall within the chute.

Wenn das endlose Abstreifelement innerhalb des Fallschachts verlaufend angeordnet ist, befinden sich zwei Abschnitte des endlosen Abstreifelements benachbart der Innenwand angeordnet, so dass sich eine doppelte Abstreifwirkung durch das endlose Abstreifelement ergibt.When the endless scraper element is disposed to extend within the chute, two portions of the endless scraper element are located adjacent the inner wall so as to provide a double stripping action by the endless scraper element.

Es können vorzugsweise Antriebsmittel vorgesehen sein, die eingerichtet sind, das zumindest eine flexible Abstreifelement in eine Hin- und Herbewegung in Richtung der Längserstreckung des Abstreifelements zu versetzen.Drive means may preferably be provided which are set up to set the at least one flexible stripping element into a reciprocating movement in the direction of the longitudinal extension of the stripping element.

Durch die Hin- und Herbewegung des Abstreifelements, die insbesondere eine oszillierende Bewegung sein kann, kann die Abstreifwirkung, die das Abstreifelement auf die Innenwand beziehungsweise auf Ablagerungen, die auf der Innenwand anhaften, verbessert werden. By the reciprocating movement of the scraper element, which can be in particular an oscillating movement, the stripping effect, which the scraper element on the inner wall or deposits, which adhere to the inner wall, can be improved.

Bevorzugt sind weiter zwei Wickeleinrichtungen vorgesehen, wobei das flexible Abstreifelement mit den Wickeleinrichtungen verbunden ist, um von den Wickeleinrichtungen aufgewickelt und abgewickelt werden zu können.Preferably, two winding devices are further provided, wherein the flexible stripping element is connected to the winding devices in order to be wound and unwound by the winding devices can.

Es können weiter Antriebsmittel vorgesehen sein, die eingerichtet sind, das endlose Abstreifelement in eine umlaufende Bewegung zu versetzen.It can further be provided drive means which are adapted to put the endless stripping element in a circumferential movement.

Durch die umlaufende Bewegung des Abstreifelements, die insbesondere kontinuierlich, intermittierend und/oder mit einer Hin- und Herbewegung kombiniert sein kann, kann die Abstreifwirkung, die das Abstreifelement auf die Innenwand beziehungsweise auf Ablagerungen, die auf der Innenwand anhaften, verbessert werden.By the circumferential movement of the scraper element, which in particular can be combined continuously, intermittently and / or with a reciprocating movement, the stripping effect which the scraper element adheres to the inner wall or to deposits adhering to the inner wall can be improved.

Das zumindest eine endlose Abstreifelement kann sich benachbart der zumindest einer Innenwand des Fallschachts in einer im Wesentlichen horizontalen Richtung erstrecken.The at least one endless stripping element may extend adjacent the at least one inner wall of the chute in a substantially horizontal direction.

Das zumindest eine endlose Abstreifelement kann sich auch benachbart der zumindest einer Innenwand des Fallschachts in einer im Wesentlichen vertikalen Richtung erstrecken und/oder einer Form des Fallschachts in vertikaler Richtung entsprechend verlaufen.The at least one endless scraper element can also extend adjacent to the at least one inner wall of the chute in a substantially vertical direction and / or extend correspondingly to a shape of the chute in the vertical direction.

Es können weiter Spannmittel vorgesehen sein, die eingerichtet sind, so auf die erste Führungseinrichtung und/oder die zweite Führungseinrichtung und/oder das zumindest eine Abstreifelement zu wirken, dass das zumindest eine Abstreifelement unter Spannung gehalten wird.It can further be provided clamping means which are adapted to act on the first guide means and / or the second guide means and / or the at least one stripping, that the at least one stripping element is kept under tension.

Das Abstreifelement kann an der zweiten Reinigungseinrichtung vorbei verlaufend oder durch die zweite Reinigungseinrichtung hindurch verlaufend geführt sein.The stripping element can be guided past the second cleaning device or guided through the second cleaning device.

Die zweite Reinigungseinrichtung kann auch als ein Fluidbad, eine Bürste, eine Abstreiferkante, oder ein Abstreifzylinder ausgeführt sein.The second cleaning device can also be designed as a fluid bath, a brush, a wiper edge, or a stripping cylinder.

Bevorzugt kann die zweite Reinigungseinrichtung als ein im Verfahrweg des zumindest einen Abstreifelements angeordnetes oder einbringbares Hindernis ausgebildet sein.Preferably, the second cleaning device can be configured as an obstacle arranged or insertable in the travel path of the at least one stripping element.

Das einbringbare Hindernis kann insbesondere in einer die zumindest eine Innenwand aufweisende Wandung des Fallschachts angeordnet sein, wobei das einbringbare Hindernis zwischen einer ersten Stellung, in der das Hindernis von der Innenwand in Richtung des Inneren des Fallschachts vorsteht, und einer zweiten Stellung, in der das Hindernis nicht über die Innenwand in Richtung des Inneren des Fallschachts vorsteht, verstellbar ist.The insertable obstacle may in particular be arranged in a wall of the chute having the at least one inner wall, wherein the engageable obstacle projects between a first position in which the obstacle protrudes from the inner wall in the direction of the interior of the chute, and a second position in which Obstacle does not protrude beyond the inner wall towards the interior of the chute, is adjustable.

Das erste Abstreifelement und/oder das zweite Abstreifelement und/oder der Schaber können als Spachtelklinge, als Spatel, oder als Stab, insbesondere Rundstab, ausgebildet sein.The first stripping element and / or the second stripping element and / or the scraper can be designed as a spatula blade, as a spatula, or as a rod, in particular a round rod.

Das erste Abstreifelement und/oder das zweite Abstreifelement und/oder das flexible Abstreifelement können auch als Seil, insbesondere Drahtseil, als Draht, als Band oder als Kette ausgebildet sein.The first stripping element and / or the second stripping element and / or the flexible stripping element can also be designed as a rope, in particular a wire rope, as a wire, as a band or as a chain.

Da ein Stab, insbesondere ein Rundstab, ein Seil, ein Draht oder ein Band eine vergleichsweise kleine Oberfläche aufweisen, ist die Wahrscheinlichkeit, dass sich größere feste Anhaftungen darauf ausbilden verringert.Since a rod, in particular a round rod, a rope, a wire or a band has a comparatively small surface area, the likelihood that larger solid adhesions form on it is reduced.

Bevorzugt ist der Fallschacht sich in Fallrichtung der Partikel von oben nach unten im Querschnitt verjüngend ausgebildet.Preferably, the chute is tapered in the direction of the particle from top to bottom in cross section.

Der Fallschacht kann zylindrisch, konisch, würfelförmig, als regelmäßiges oder unregelmäßiges Vieleck, oder keilförmig ausgeführt sein.The chute can be cylindrical, conical, cube-shaped, regular or irregular polygon, or wedge-shaped.

Der Fallschacht im Bereich des Einlasses und im Bereich des Auslasses Querschnitte unterschiedlicher Form aufweisen.The chute in the region of the inlet and in the region of the outlet have cross-sections of different shapes.

Die Querschnitte unterschiedlicher Form können ausgewählt sein aus kreisförmig, ellipsenförmig, quadratisch, rechteckig, einer Form eines regelmäßigen oder unregelmäßigen Vielecks, und einer Form bestehend aus zusammengesetzten Bogensegmenten.The cross sections of different shapes may be selected from circular, elliptical, square, rectangular, a shape of a regular or irregular polygon, and a shape consisting of composite arc segments.

Der Fallschacht kann mehrteilig ausgebildet sein, mit einer Mehrzahl von Wandungen, die jeweils eine Innenwand des Fallschachts ausbilden.The chute can be designed in several parts, with a plurality of walls, each forming an inner wall of the chute.

Der Fallschacht kann eine im Wesentlichen konkave Form aufweisen.The chute can have a substantially concave shape.

Die zumindest eine Innenwand, bevorzugt alle Innenwände des Fallschachts können zumindest einmal in zwei Minuten, insbesondere einmal in einer Minute abgestreift werden.The at least one inner wall, preferably all inner walls of the chute can be stripped at least once in two minutes, in particular once a minute.

Bevorzugt kann weiter eine Temperiereinrichtung vorgesehen sein zum Temperieren der zumindest einen Innenwand auf eine Temperatur, die unterhalb einer Schwelle für das Aushärten des Bindemittels liegt, bevorzugt unterhalb 70°C.Preferably, a tempering device may further be provided for tempering the at least one inner wall to a temperature which is below a threshold for the curing of the binder, preferably below 70 ° C.

In einer bevorzugten Weiterbildung kann die erste Reinigungseinrichtung zumindest einen Spachtel aufweisen, der eingerichtet ist, sich relativ zu der zumindest einen Innenwand zu bewegen und die zweite Reinigungseinrichtung ein flexibles Abstreifelement aufweist, das im Verfahrweg des Spachtels über die zumindest eine Innenwand gespannt ist. In a preferred development, the first cleaning device can have at least one spatula which is set up to move relative to the at least one inner wall and the second cleaning device has a flexible stripping element, which is stretched over the at least one inner wall in the travel path of the spatula.

Als eine weitere Lösung wird eine Vorrichtung zur Beleimung von Partikeln, die zumindest teilweise aus zur Herstellung von Werkstoffplatten geeigneten Fasern und/oder Spänen bestehen, wobei die Vorrichtung eine Fallschachtanordnung aufweist.As a further solution is a device for the gluing of particles, which consist at least partially of suitable for the production of material plates fibers and / or chips, wherein the device comprises a chute assembly.

Die Vorrichtung kann weiter eine Zufuhreinrichtung zum Zuführen der Partikel und eine Mehrzahl von Düsen zur Abgabe eines Bindemittels aufweisen, wobei die Düsen angeordnet sind in einem Bereich innerhalb des Fallschachts und/oder oberhalb einer Einlassöffnung des Fallschachts.The apparatus may further comprise a supply means for feeding the particles and a plurality of nozzles for discharging a binder, the nozzles being arranged in an area inside the chute and / or above an inlet opening of the chute.

Weiter bevorzugt weist die Vorrichtung eine der Fallschachtanordnung nachgelagerte Mischvorrichtung auf.More preferably, the device has a mixing device downstream of the chute arrangement.

Ausführungsbeispiele der Erfindung werden nachfolgend anhand der Zeichnungen dargestellt:Embodiments of the invention are illustrated below with reference to the drawings:

1 zeigt schematisch eine Vorrichtung zur Beleimung von Partikeln; 1 shows schematically a device for the gluing of particles;

2A zeigt in einer schematischen Draufsicht eine Fallschachtanordnung gemäß einer ersten Ausführungsform der vorliegenden Erfindung; 2A shows a schematic plan view of a chute arrangement according to a first embodiment of the present invention;

2B stellt eine schematische seitliche Querschittsansicht der Fallschachtanordnung der 2A dar; 2 B FIG. 12 is a schematic lateral cross-sectional view of the chute assembly of FIG 2A group;

2C stellt eine schematische seitliche Querschittsansicht der Fallschachtanordnung der 2A in einer Variante dar; 2C FIG. 12 is a schematic lateral cross-sectional view of the chute assembly of FIG 2A in a variant;

2D stellt eine schematische Draufsicht der Fallschachtanordnung der 2A in einer weiteren Variante dar; 2D FIG. 12 is a schematic plan view of the chute assembly of FIG 2A in a further variant;

3A zeigt in einer schematischen Draufsicht eine Fallschachtanordnung gemäß einer zweiten Ausführungsform der vorliegenden Erfindung; 3A shows a schematic plan view of a chute arrangement according to a second embodiment of the present invention;

3B zeigt die Fallschachtanordnung der 3A in einem Zustand mit verstellten Wandungen; 3B shows the chute arrangement of 3A in a condition with distorted walls;

4 zeigt in einer schematischen seitlichen Querschittsansicht eine Fallschachtanordnung gemäß einer dritten Ausführungsform der vorliegenden Erfindung; 4 shows in a schematic lateral cross-sectional view of a chute assembly according to a third embodiment of the present invention;

5 zeigt in einer schematischen seitlichen Querschittsansicht eine Fallschachtanordnung gemäß einer vierten Ausführungsform der vorliegenden Erfindung; 5 shows in a schematic lateral cross-sectional view of a chute assembly according to a fourth embodiment of the present invention;

6A zeigt in einer schematischen seitlichen Querschittsansicht eine Fallschachtanordnung gemäß einer fünften Ausführungsform der vorliegenden Erfindung; 6A shows in a schematic lateral cross-sectional view of a chute assembly according to a fifth embodiment of the present invention;

6B stellt eine schematische Draufsicht der Fallschachtanordnung der 6A dar; 6B FIG. 12 is a schematic plan view of the chute assembly of FIG 6A group;

6C und 6D zeigen schematisch eine erste Variante der Fallschachtanordnung der 6A und 6B; 6C and 6D schematically show a first variant of the chute arrangement of 6A and 6B ;

6E zeigt schematisch eine weitere Variante der Fallschachtanordnung der 6A und 6B; 6E schematically shows a further variant of the chute arrangement of 6A and 6B ;

6F zeigt eine beispielhafte Ausgestaltung einer zweiten Reinigungseinheit; 6F shows an exemplary embodiment of a second cleaning unit;

6G und 6H zeigen schematisch eine nochmals weitere Variante der Fallschachtanordnung der 6A und 6B; und 6G and 6H schematically show a further variant of the chute arrangement of 6A and 6B ; and

6I und 6J zeigen schematisch eine wiederum weitere Variante der Fallschachtanordnung der 6A und 6B. 6I and 6J schematically show a turn variant of the chute arrangement of 6A and 6B ,

Aufgrund der umfangreichen Beispiele werden im Folgenden die Bezugszeichen 21x, 23x, 24x, 31x, 32x, 33x, 34x, eingeführt als Hinweis auf Mehrteiligkeit, anstelle von x mit a bis d bezeichnet.Due to the extensive examples, the reference numerals will be referred to below 21x . 23x . 24x . 31x . 32x . 33x . 34x introduced as an indication of multipartite, denoted by a to d instead of x.

In 1 ist in schematischer Ansicht eine Vorrichtung zur Beleimung von Partikeln beginnend mit der Dosiervorrichtung 2 und endend mit einer Mischvorrichtung 7 in einer allgemeinen Darstellung dargestellt. Dazwischen sind ein Fallschacht 3 und eine im Nachfolgenden näher zu beschreibende Fallschachtanordnung 10 angeordnet. Die Partikel werden dabei als Partikelstrom 1 in die Dosiervorrichtung 2, in der Regel aus einem Partikelbunker mittels Austragsvorrichtungen, eingetragen, dort gewogen und über eine übliche Bandregelung (nicht dargestellt) zur Dosierung in den Fallschacht 4 eingebracht. Dort trifft der Partikelstrom oder die Partikel 1 auf eine Auflösevorrichtung 3 und wird dort zu einem Partikelvorhang 5 aufgelöst und/oder aufgeteilt. Die Auflösevorrichtung 3 kann insbesondere Rechen und/oder Prallbleche, Speichenwalzen (bestehend aus zumindest zwei Scheiben, die in einem radialen Abstand zur Rotationsachse (mit oder ohne durchgehender Welle) Stangen, Rohre oder dergleichen parallel zur Rotationsachse angeordnet aufweisen) und/oder Auflösewalzen, vorzugsweise als Stachelwalzen ausgebildet, aufweisen. Der aufgelöste Partikelvorhang 5 wird anschließend mittels geeigneter Düsen 6 mit einem Bindemittel besprüht und beleimt.In 1 is a schematic view of a device for gluing of particles starting with the metering device 2 and ending with a mixing device 7 shown in a general representation. In between are a chute 3 and a chute assembly to be described in more detail below 10 arranged. The particles are thereby as particle stream 1 in the metering device 2 , usually from a particle bunker by means of discharge devices, registered, weighed there and a standard band control (not shown) for dosing in the chute 4 brought in. There the particle flow or particles hits 1 on a dissolving device 3 and becomes a particle curtain there 5 resolved and / or split. The dissolving device 3 can in particular rake and / or baffles, spoke rollers (consisting of at least two discs which have arranged at a radial distance from the axis of rotation (with or without a continuous shaft) rods, tubes or the like parallel to the axis of rotation) and / or opening rollers, preferably designed as spiked rollers , exhibit. The dissolved particle curtain 5 becomes then by means of suitable nozzles 6 sprayed with a binder and glued.

Im weiteren Verlauf fällt der Partikelvorhang 5 durch die Fallschachtanordnung 10 und gelangt anschließend in die der Fallschachtanordnung 10 nachgelagerte Mischvorrichtung 7, in der mittels einer durch eine rotierend angetriebene Welle 9 Mischwerkzeuge 8 die beleimten Partikel nochmals mechanisch durchmischen und schließlich als durchmischten Partikelstrom (Austragspfeil) ausgeben. Der beleimte Partikelstrom wird anschließend in einem Dosierbunker zwischengelagert oder direkt in eine Streuvorrichtung zur Ausbildung einer Streugutmatte, die im weiteren Verlauf in einer Presse zu einer Werkstoffplatte verpresst und/oder ausgehärtet werden kann, eingeführt.In the course of the particle curtain falls 5 through the chute arrangement 10 and then enters the chute assembly 10 downstream mixing device 7 in which by means of a shaft driven by a rotating 9 Mixing tools 8th Mix the glued particles again mechanically and finally output as a mixed particle flow (discharge arrow). The glued particle stream is then stored in a dosing hopper or directly into a spreader to form a grit mat, which can be pressed in a further press in a press to a material plate and / or cured, introduced.

Grundsätzlich sollte die Fallschachtanordnung 10 eine ausreichende Fallhöhe aufweisen, damit sich das Bindemittel ausreichend stark mit den Partikeln verbinden kann und sollte vorzugsweise in Fallrichtung zumindest halb so lang wie der Fallschacht 4 ausgebildet sein. Wie dargestellt, können der Fallschacht 4 und die Fallschachtanordnung 10 als getrennte Einrichtungen vorgesehen sein. Alternativ ist es auch möglich, dass der Fallschacht 4 eine Einheit mit einem Fallschacht der Fallschachtanordnung 10 bildet.Basically, the chute arrangement should 10 have a sufficient drop height so that the binder can bond sufficiently strong with the particles and should preferably in the direction of fall at least half as long as the chute 4 be educated. As shown, the chute can 4 and the chute arrangement 10 be provided as separate facilities. Alternatively, it is also possible that the chute 4 a unit with a chute of the chute arrangement 10 forms.

Mit Bezug auf die 2A bis 6J sollen nun verschiedene Ausführungsformen einer Fallschachtanordnung beschrieben werden, die als Fallschachtanordnung 10 in der Vorrichtung der 1 verwendbar ist.With reference to the 2A to 6J Now, various embodiments of a chute assembly will be described, which serves as a chute arrangement 10 in the device of 1 is usable.

Eine erste Ausführungsform einer Fallschachtanordnung 20 ist in den 2a bis 2c dargestellt.A first embodiment of a chute arrangement 20 is in the 2a to 2c shown.

Die 2A bis 2C stellen eine Fallschachtanordnung 20 mit einem Fallschacht 21 dar. Der Fallschacht 21 weist einen rechteckigen Querschnitt auf, wobei vier Wandungen beziehungsweise Wandelemente jeweils eine Innenwand 21a, ..., 21d des Fallschachts 21 definieren. Zwischen jeweils zwei Innenwänden 21a, ..., 21d, beziehungsweise den die betreffenden Innenwände aufweisenden Wandungen beziehungsweise Wandelemente, ist jeweils ein Spalt ausgebildet, durch den hindurch zumindest ein Trageelement 23a, ..., 23d angeordnet ist.The 2A to 2C provide a chute arrangement 20 with a chute 21 dar. The chute 21 has a rectangular cross-section, wherein four walls or wall elements each have an inner wall 21a , ..., 21d of the chute 21 define. Between each two inner walls 21a , ..., 21d , or the respective inner walls having walls or wall elements, in each case a gap is formed, through which at least one support element 23a , ..., 23d is arranged.

Die Trageelemente 23a, ..., 23d sind jeweils einer Innenwand 21a, ..., 21d zugeordnet und entlang einer zu deren Oberfläche im Wesentlichen parallelen Richtung verschiebbar angeordnet. An einem Endbereich jedes Trageelements 23a, ..., 23d ist ein Abstreifelement 22a, ..., 22d angeordnet.The carrying elements 23a , ..., 23d are each an inner wall 21a , ..., 21d associated and slidably disposed along a direction substantially parallel to the surface thereof. At an end region of each support element 23a , ..., 23d is a scraping element 22a , ..., 22d arranged.

Die Trageelemente 23a, ..., 23d und die Abstreifelemente 22a, ..., 22d stellen erste Reinigungseinrichtungen zum Reinigen der zugeordneten Innenwände 21a ... 21d des Fallschachtes dar, wobei das Reinigen einer Innenwand 21a, ..., 21d erfolgt, indem das zugeordnete Trageelement in einer Richtung parallel zu der betreffenden Innenwand 21a, ..., 21d versetzt wird, so dass das Abstreifelement 22a, ..., 22d über die Innenwand 21a, ..., 21d streift und diese auf diese Weise reinigt und von etwaigem Bindemittel oder Partikeln 1, die sich auf dieser abgelagert haben, reinigt.The carrying elements 23a , ..., 23d and the stripping elements 22a , ..., 22d provide first cleaning means for cleaning the associated inner walls 21a ... 21d the chute, wherein the cleaning of an inner wall 21a , ..., 21d takes place by the associated support member in a direction parallel to the respective inner wall 21a , ..., 21d is offset, so that the stripping element 22a , ..., 22d over the inner wall 21a , ..., 21d strips and cleans them in this way and of any binder or particles 1 who have deposited on this cleanse.

Die Abstreifelemente 22a, ..., 22d können als Spachtelklinge, als Spatel, als Stab, insbesondere Rundstab, als Seil, als Draht, als Band, als Kette, als Bürste oder in anderer geeigneter Form ausgebildet sein.The stripping elements 22a , ..., 22d may be formed as a spatula blade, as a spatula, as a rod, in particular round rod, as a rope, as a wire, as a band, as a chain, as a brush or in any other suitable form.

Die Tragelemente 23a, ..., 23d können beispielsweise als längliche Bleche ausgebildet sein, wie in der 2b dargestellt, wobei beispielsweise jeweils zwei Bleche 23a übereinander angeordnet parallel verlaufen und das Abstreifelement 22a an den beiden Blechen 23a angeordnet ist.The supporting elements 23a , ..., 23d can be formed, for example, as elongated sheets, as in the 2 B represented, for example, in each case two sheets 23a arranged one above the other in parallel and the stripping element 22a on the two sheets 23a is arranged.

Es ist ebenso möglich, wie in 2C dargestellt, die Tragelemente 23a, ..., 23d jeweils als eine Wand auszubilden, die sich in der Höhe im Wesentlichen über den abzustreifenden Bereich der jeweils zugeordneten Innenwand 21a, ..., 21d erstrecken.It is possible as well as in 2C shown, the support elements 23a , ..., 23d each form as a wall, which in height substantially over the stripped area of the respective associated inner wall 21a , ..., 21d extend.

Andere Ausgestaltungen der Trageelemente 23a, ..., 23d sind ebenfalls möglich.Other embodiments of the support elements 23a , ..., 23d are also possible.

Während die 2A bis 2C einen Fallschacht 21 mit rechteckigem Querschnitt darstellen, der sich in Fallrichtung der Partikel in gerader Linie erstreckt, ist dies nicht beschränkend. So kann der Fallschacht 21, beispielsweise in Form eines umgekehrten Pyramidenstumpfes, von oben nach unten in Fallrichtung der Partikel 1, sich verjüngend ausgebildet sein.While the 2A to 2C a chute 21 With a rectangular cross-section extending in the direction of the particle in the direction of the particle in a straight line, this is not limiting. So can the chute 21 , For example, in the form of a reverse truncated pyramid, from top to bottom in the direction of the particle 1 to be rejuvenated.

Auch sind andere Querschnitte, beispielsweise in Form regelmäßiger oder unregelmäßiger Vielecke möglich. Die Innenwände 21a, ..., 21d können in horizontaler Richtung in gerader Linie verlaufen, oder können konkav mit einer nach Innen des Fallschachts weisenden Wölbung oder konvex mit einer nach Außen des Fallschachts weisenden Wölbung ausgebildet sein; in diesen Fällen können die Trageelemente ebenfalls mit entsprechenden Krümmungen ausgebildet sein, so dass sie beim Verstellen der Wölbung der jeweils zugeordneten Innenwände folgen und es auf diese Weise sichergestellt ist, dass die Abstreifelemente 21a, ..., 21d die zugeordneten Innenwände durch überstreifen reinigen können.Also other cross sections, for example in the form of regular or irregular polygons are possible. The interior walls 21a , ..., 21d can run in a horizontal direction in a straight line, or may be formed concave with a pointing inward of the chute curvature or convex with a pointing outward of the chute curvature; In these cases, the support elements may also be formed with corresponding curvatures, so that they follow when adjusting the curvature of the respective associated inner walls and it is ensured in this way that the stripping 21a , ..., 21d can clean the assigned inner walls by overlapping.

Die Tragelemente 23a, ..., 23d werden beim Verfahren an jeweils zugeordneten zweiten Reinigungseinrichtungen 24a, ..., 24d vorbeibewegt, welche die Trageelemente 23a, ..., 23d reinigen. The supporting elements 23a , ..., 23d be in the process at respectively associated second cleaning facilities 24a , ..., 24d passed, which the carrying elements 23a , ..., 23d clean.

Die zweiten Reinigungseinrichtungen 24a, ..., 24d können auf verschiedene Weise angeordnet sein, wie beispielsweise in der 2a dargestellt. Die zweite Reinigungseinrichtung säubert also zumindest Teile der ersten Reinigungsvorrichtung.The second cleaning facilities 24a , ..., 24d can be arranged in various ways, such as in the 2a shown. The second cleaning device thus cleans at least parts of the first cleaning device.

Die zweiten Reinigungseinrichtungen können als eine Seite oder eine Kante einer Innenwand, oder auch als Abstreifelemente 24a, ..., 24d, insbesondere als Spachtelklinge, als Spatel, als Stab, insbesondere Rundstab, als Seil, als Draht, als Band, als Kette oder in anderer geeigneter Form ausgebildet sein.The second cleaning means may be as a side or an edge of an inner wall, or as stripping elements 24a , ..., 24d be designed in particular as a spatula blade, as a spatula, as a rod, in particular round rod, as a rope, as a wire, as a band, as a chain or in any other suitable form.

So kann die zweite Reinigungseinrichtung (das Abstreifelement 24b) als eine Seite oder eine Kante einer Innenwand 21a ausgebildet sein bzw. wirken, an der ein Trageelement 23 oder andere Teile der ersten Reinigungsvorrichtung beim Verschieben vorbeiläuft, um auf diese Weise abgestreift und gereinigt zu werden (2A, rechts oben).Thus, the second cleaning device (the stripping element 24b ) as a side or edge of an inner wall 21a be formed or act on the one supporting element 23 or other parts of the first cleaning device pass by during shifting so as to be stripped and cleaned ( 2A , top right).

Auf ähnliche Weise kann als die zweite Reinigungseinrichtung an der Seite einer Innenwand 21d ein Abstreifelement 24a angeordnet sein. Wird das Trageelement 23a versetzt, streift es mit seiner dem Inneren des Fallschachts 21 zugewandten Oberfläche an dem Abstreifelement 24a vorbei und wird auf diese Weise abgestreift und gereinigt (2A, links oben).Similarly, as the second cleaning means on the side of an inner wall 21d a stripping element 24a be arranged. Will the carrying element 23a staggered, it touches with its inside the chute 21 facing surface on the stripping element 24a over and gets stripped and cleaned this way ( 2A , top left).

Ebenso ist es möglich als zweite Reinigungseinrichtung das Abstreifelement 24c an einem Ende eines der Trageelemente 23b auszubilden. Wenn das Trageelement 23b vollständig in Richtung in das Innere des Fallschachts 21 bewegt ist, kommt das Abstreifelement 24c in Kontakt mit der dem Inneren des Fallschachts 21 zugewandten Seite des Trageelements 23c. Wird das Trageelement 23c versetzt, streift es an dem Abstreifelement 24c vorbei und wird auf diese Weise abgestreift und gereinigt (2A, rechts unten).It is also possible as a second cleaning device, the stripping 24c at one end of one of the carrying elements 23b train. When the carrying element 23b completely in the direction of the inside of the chute 21 is moved, the scraper comes 24c in contact with the interior of the chute 21 facing side of the support element 23c , Will the carrying element 23c offset, it touches the scraper element 24c over and gets stripped and cleaned this way ( 2A , bottom right).

Schließlich kann das Abstreifelement 24d auch außerhalb des Fallschachts 21 angeordnet sein, derart, dass, wenn das Trageelement 23d versetzt wird, es mit seiner dem Inneren des Fallschachts 21 zugewandten Oberfläche an dem Abstreifelement 24d vorbei streift und auf diese Weise abgestreift und gereinigt wird (2A, links unten).Finally, the stripping element 24d also outside the drop shaft 21 be arranged such that when the support member 23d it is offset with its inside the chute 21 facing surface on the stripping element 24d touches and is stripped and cleaned in this way ( 2A , bottom left).

Es kann nach 2D hierbei bevorzugt sein, dass die Tragelemente 23a, ..., 23d federelastisch ausgebildet sind, so dass das an dem Ende eines Tragelements 23a angeordnete Abstreifelement 22a durch die Wirkung der federelastischen Kraft gegen die Innenwand 21a gedrückt wird. Wird das Trageelement 23a versetzt, kann daher auch im Fall einer gekrümmten Innenwand, das Abstreifelement 22a sicher entlang und über die gekrümmte Innenwand 21a streifen, um diese abzustreifen und zu reinigen.It can be after 2D be preferred in this case that the support elements 23a , ..., 23d are resilient, so that at the end of a support element 23a arranged scraper element 22a by the effect of the elastic force against the inner wall 21a is pressed. Will the carrying element 23a offset, therefore, even in the case of a curved inner wall, the scraper element 22a safely along and over the curved inner wall 21a strip to strip and clean.

So kann es, wie im Beispiel der 2D gezeigt, ausreichend sein, den Fallschacht 21 mit im Wesentlichen kreisförmigen oder ellipsenförmigen Querschnitt auszubilden, mit einer einzelnen Wandung, welche eine Innenwand 21a aufweist. Durch einen Spalt zwischen den beiden Enden der Wandung ist das Trageelement 23a in das Innere des Fallschachts 21 hinein geführt. Die Wandung kann in Form einer Spirale gekrümmt sein, so dass sich die beiden Enden der Wandung überlappen, mithin die Wandung einen Winkel größer als 360° umschreibt. Zwischen den Enden ist der Spalt ausgebildet, durch den das Trageelement 23a hindurch geführt ist.So it can, as in the example of 2D shown to be sufficient, the chute 21 form with a substantially circular or elliptical cross-section, with a single wall, which has an inner wall 21a having. Through a gap between the two ends of the wall is the support element 23a into the interior of the chute 21 led into it. The wall may be curved in the form of a spiral, so that the two ends of the wall overlap, thus the wall circumscribes an angle greater than 360 °. Between the ends of the gap is formed, through which the support member 23a passed through.

Das Trageelement 23a kann als federelastische Wand ausgebildet sein, deren Höhe im Wesentlichen der Höhe des abzustreifenden Bereichs der Innenwand 21a des Fallschachts 21 entspricht.The carrying element 23a can be designed as a resilient wall whose height is substantially the height of the stripped area of the inner wall 21a of the chute 21 equivalent.

Werden zumindest zwei bevorzugt schmale Tragelemente 23a verwendet, an deren Ende ein bevorzugt steifes Abstreifelement 22a, wie beispielsweise ein Rundstab, angeordnet ist, ist es auch möglich, den Fallschacht 21a als sich in Fallrichtung der Partikel von oben nach unten verjüngend auszugestalten, insbesondere in Form eines umgekehrten Kegelstumpfes. Es ist dabei bevorzugt, das für jedes Trageelement 23a ein eigener Antrieb (nicht dargestellt) vorgesehen ist, wobei die Antriebe so gesteuert werden, die Tragelemente 23a so zu versetzen, dass das Abstreifelement 22a mit im Wesentlichen gleich bleibender vertikaler Orientierung entlang der Innenwand 21a des Fallschachts 21 bewegt wird. Analog zur 2A ist die zweite Reinigungsvorrichtung im Beispiel separat außerhalb des Fallschachts 21 als Abstreifelement 24d angeordnet.Be at least two preferably narrow support elements 23a used, at the end of a preferably rigid scraper element 22a , such as a round bar, is arranged, it is also possible, the chute 21a than in the direction of the particle to taper from top to bottom, in particular in the form of an inverted truncated cone. It is preferred that for each support element 23a a separate drive (not shown) is provided, wherein the drives are controlled, the support elements 23a so that the stripping element 22a with substantially constant vertical orientation along the inner wall 21a of the chute 21 is moved. Analogous to 2A the second cleaning device in the example is separately outside the chute 21 as a scraping element 24d arranged.

Mit Bezug auf die 3A und 3B wird nun eine Fallschachtanordnung 30 gemäß einer zweiten Ausführungsform beschrieben.With reference to the 3A and 3B now becomes a chute arrangement 30 described according to a second embodiment.

Die Fallschachtanordnung 30 weist einen Fallschacht 31 auf, der aus mehreren Wandelementen gebildet ist, die jeweils eine Innenwand 31a, ..., 31d aufweisen, welche gemäß einer im Wesentlichen Bogenform, insbesondere eine Kreisbogenform oder Ellipsenbogenform gekrümmt sind.The chute arrangement 30 has a chute 31 on, which is formed of a plurality of wall elements, each having an inner wall 31a , ..., 31d which are curved according to a substantially arc shape, in particular a circular arc shape or elliptical arc shape.

Die von den bogenförmigen Wandelementen in Summe umfasste Winkelsumme entspricht mindestens einem Winkel von 360° + dem Winkel, der von dem längsten Wandelement umfasst wird.The total sum of angles included in the arcuate wall elements corresponds at least to an angle of 360 ° + the angle encompassed by the longest wall element.

Wie in der 3A zu erkennen, überlappen sich die Wandelemente teilweise, derart, dass ein Wandelement mit einer Innenwand 31a ein benachbartes Wandelement mit einer Innenwand 31b außen überlappt, sowie von einem anderen benachbarten Wandelement mit einer Innenwand 31d außen überlappt wird. Like in the 3A to recognize, overlap the wall elements partially, such that a wall element with an inner wall 31a an adjacent wall element with an inner wall 31b overlapped outside, as well as from another adjacent wall element with an inner wall 31d is overlapped on the outside.

An jedem Wandelement ist ein Abstreifelement 32a, ..., 32d angeordnet, derart, die jeweils außen liegende Innenwand 31a, ..., 31d des zugeordneten, benachbarten Wandelements zu überstreifen.On each wall element is a stripping element 32a , ..., 32d arranged, in such a way, the respective outer inner wall 31a , ..., 31d to overlap the associated, adjacent wall element.

Wie durch die Pfeile angezeigt, kann jedes der Wandelemente verstellt beziehungsweise bewegt werden, so dass das Wandelement insbesondere um einen dem Bogen zugeordneten Mittelpunkt rotiert werden kann. Dies ist beispielhaft in der 3B dargestellt. Auf diese Weise können beispielsweise die Innenwände 31a und 31b relativ zueinander versetzt werden, so dass das Abstreifelement 32b über die Innenwand 31a abstreift und diese reinigt.As indicated by the arrows, each of the wall elements can be adjusted or moved, so that the wall element can be rotated in particular about a center associated with the arc. This is exemplary in the 3B shown. In this way, for example, the inner walls 31a and 31b be offset relative to each other, so that the stripping element 32b over the inner wall 31a strips and cleans them.

Für die Innenwand 31a stellt daher das Wandelement 31b und das Abstreifelement 31b eine erste Reinigungseinrichtung dar, die die Innenwand 31a reinigt. Das Wandelement 31c und das Abstreifelement 32c wiederum stellen eine zweite Reinigungseinrichtung dar, welche die Innenwand 32b und damit die erste Reinigungseinrichtung reinigt.For the inner wall 31a therefore represents the wall element 31b and the stripping element 31b a first cleaning device, which is the inner wall 31a cleans. The wall element 31c and the stripping element 32c turn represent a second cleaning device, which the inner wall 32b and thus cleans the first cleaning device.

In einer dritten Ausführungsform, die in der 4 dargestellt ist, weist eine Fallschachtanordnung 40 einen Fallschacht 41 auf, in dem auf bekannte Art zumindest eine Schaberklinge oder ein Schaber 42 als erste Reinigungseinrichtung angeordnet ist, um die Innenwand 41a abzustreifen. Es kann dabei der Fallschacht 41 relativ zum Schaber 42 und/oder der Schaber 42 relativ zum Fallschacht 41 bewegt, insbesondere um eine Drehachse rotiert werden.In a third embodiment, in the 4 is shown, has a chute arrangement 40 a chute 41 on, in the known manner at least a scraper blade or a scraper 42 is arranged as a first cleaning device to the inner wall 41a slough. It can be the chute 41 relative to the scraper 42 and / or the scraper 42 relative to the chute 41 moved, in particular be rotated about a rotation axis.

Die Fallschachtanordnung 40 weist weiter eine zweite Reinigungseinrichtung in Form zumindest einer Schaberklinge oder eines Schabers 44 auf, der mittels einer elektromotorisch, hydraulisch oder pneumatisch betätigbaren Zustellachse als Antriebsmittel 43 von einer Ruheposition entlang einer im Wesentlichen zum Schaber 42 parallelen Achse verstellt werden kann, derart, den Schaber 42 abzustreifen und auf diese Weise zu reinigen.The chute arrangement 40 further comprises a second cleaning means in the form of at least one scraper blade or a scraper 44 on, by means of an electric motor, hydraulically or pneumatically actuated feed axis as a drive means 43 from a rest position along a substantially to the scraper 42 parallel axis can be adjusted, so, the scraper 42 strip and clean in this way.

Im Fall eines beweglichen Schabers 42 kann dabei vorgesehen sein, dass der Schaber 42 zunächst in eine Reinigungsposition bewegt und in dieser stillgesetzt wird, bevor der Schaber 44 aus der Ruheposition bewegt wird.In the case of a movable scraper 42 can be provided that the scraper 42 first moved to a cleaning position and shut down in this before the scraper 44 is moved from the rest position.

Zusätzlich kann, wie in der 4 dargestellt ein Einfülltrichter 45 vorgesehen sein, der nicht Teil der Fallschachtanordnung 10 zu sein braucht. Der Einfülltrichter 45 bildet zusammen mit der Innenwand 41a des Fallschachts 41 einen Spalt aus, durch den der Schaber 42 in das Innere des Fallschachts 41 geführt werden kann. Der Einfülltrichter 45 kann weiter einen Schutz gegen Beschmutzen durch das Beleimungsmittel und/oder beleimte Partikel 1 bilden. In diesen Spalt könnten zur Reinhaltung des Fallschachtes 41 auch ein Mantel aus Luft oder nicht mehr klebrigen, aber bereits beleimten Partikeln eingeführt werden.In addition, as in the 4 represented a hopper 45 be provided, which is not part of the chute arrangement 10 needs to be. The funnel 45 forms together with the inner wall 41a of the chute 41 a gap through which the scraper 42 into the interior of the chute 41 can be performed. The funnel 45 may further provide protection against soiling by the gluing agent and / or glued particles 1 form. In this gap could be to keep the chute clean 41 Also, a coat of air or no longer sticky, but already glued particles are introduced.

In einer vierten Ausführungsform, die in der 5 dargestellt ist, weist eine Fallschachtanordnung 50 einen Fallschacht 51 auf.In a fourth embodiment, in the 5 is shown, has a chute arrangement 50 a chute 51 on.

Die Fallschachtanordnung 50 weist auch eine erste Reinigungseinrichtung in Form zumindest einer Schaberklinge oder eines Schabers 52 auf, der mittels einer elektromotorisch, hydraulisch oder pneumatisch betätigbaren Zustellachse als Antriebsmittel 53 von einer durch gestrichelte Linien angezeigten Ruheposition entlang einer im Wesentlichen zur Innenwand 51a parallelen Achse verstellt werden kann, derart, die Innenwand 51a abzustreifen und auf diese Weise zu reinigen.The chute arrangement 50 also has a first cleaning device in the form of at least one scraper blade or a scraper 52 on, by means of an electric motor, hydraulically or pneumatically actuated feed axis as a drive means 53 from a rest position indicated by dashed lines along a substantially inner wall 51a parallel axis can be adjusted, so, the inner wall 51a strip and clean in this way.

Die Fallschachtanordnung 50 weist auch eine zweite Reinigungseinrichtung auf, die bevorzugt in Form zumindest einer Schaberklinge oder eines Schabers 54 ausgebildet ist, der mittels einer elektromotorisch, hydraulisch oder pneumatisch betätigbaren Zustellachse 55 als Antriebsmittel von einer Ruheposition über den in der Ruheposition positionierten Schaber 52 bewegt werden kann, derart, den Schaber 52 abzustreifen und auf diese Weise zu reinigen.The chute arrangement 50 also has a second cleaning device, preferably in the form of at least one scraper blade or a scraper 54 is formed, by means of an electric motor, hydraulically or pneumatically actuated feed axis 55 as drive means from a rest position over the scraper positioned in the rest position 52 can be moved, so, the scraper 52 strip and clean in this way.

Anstelle einer Schaberklinge oder eines Schabers 54 kann auch eine andere geeignete Abstreifvorrichtung als Reinigungseinrichtung eingesetzt werden. Wenn darüber hinaus der Schaber 54 oder die andere geeignete Abstreifvorrichtung derart angeordnet wird, dass die Schaberklinge oder der Schaber 52 beim Herausfahren aus dem Fallschacht 51 an dieser vorbeifährt, kann auch auf ein Antriebsmittel 55 verzichtet werden.Instead of a scraper blade or a scraper 54 Another suitable stripping device can also be used as a cleaning device. If beyond the scraper 54 or the other suitable stripping device is arranged such that the scraper blade or the scraper 52 when moving out of the chute 51 Passing this, can also drive on a 55 be waived.

In einer fünften Ausführungsform weist eine Fallschachtanordnung 60 ein flexibles Abstreifelement 62 als erste Reinigungseinrichtung auf, wie in den 6A bis 6J dargestellt.In a fifth embodiment, a chute arrangement 60 a flexible stripping element 62 as the first cleaning device, as in the 6A to 6J shown.

Wie in den 6A und 6B dargestellt, kann in dieser Ausführungsform der Fallschacht 61 rotationssymmetrisch, insbesondere konisch ausgestaltet sein, mit einer Wandung, die eine Innenwand 61a definiert. Die Wandung des Fallschachts kann bogenförmig gekrümmt sein, so dass sich der Fallschacht 61 in Fallrichtung der Partikel von oben nach unten verjüngt.As in the 6A and 6B shown in this embodiment, the chute 61 be rotationally symmetrical, in particular conical, with a wall having an inner wall 61a Are defined. The wall of the chute may be arcuately curved, so that the chute 61 in the direction of the particle from top to bottom tapers.

In dieser Ausführungsform kann die erste Reinigungseinrichtung ein flexibles Abstreifelement 62, insbesondere ein endloses Seil, bevorzugt als Drahtseil ausgeführt, aufweisen.In this embodiment, the first cleaning device may be a flexible stripping element 62 , in particular an endless rope, preferably designed as a wire rope having.

Das endlose Seil ist über ein Umlenkmittel 63, hier eine Umlenkrolle, so geführt und gehalten, dass es die Wandung des Fallschachts 61 umschließt, so dass das Seil sowohl im Fallschacht 61 angrenzend der Innenwand 61a, als auch außerhalb des Fallschachts 61 verläuft.The endless rope is over a deflection 63 , here a pulley, so guided and held that it is the wall of the chute 61 wraps around, leaving the rope in both the chute 61 adjacent to the inner wall 61a , as well as outside the drop shaft 61 runs.

Der Umlenkrolle kann ein Antrieb (nicht dargestellt) zugeordnet sein, um über die Umlenkrolle das Seil in Richtung der Erstreckung des endlosen Seils in Bewegung zu versetzen. Die Bewegung kann eine intermittierende oder kontinuierliche umlaufende Bewegung des Seils sein, oder eine oszillierende Hin- und Herbewegung des Seils, oder eine Kombination davon.The pulley may be associated with a drive (not shown) to move over the pulley rope in the direction of extension of the endless rope in motion. The movement may be an intermittent or continuous circumferential movement of the rope, or an oscillating reciprocation of the rope, or a combination thereof.

Um eine Relativbewegung zwischen dem Abstreifelement 62 und dem Fallschacht 61 beziehungsweise dessen Innenwand 61a zu erzeugen, damit sich das Seil tangential zur Innenwand 61a bewegt, um diese abzustreifen, kann mittels geeigneter Antriebsmittel (nicht dargestellt) der Fallschacht 61 bewegt, insbesondere um eine Drehachse rotiert werden, und/oder es können Führungseinrichtungen vorgesehen sein, denen die Umlenkmittel 63 zugeordnet sind, wie in größerem Detail mit Bezug auf die 6C und 6D beschrieben werden wird.To a relative movement between the stripping 62 and the chute 61 or its inner wall 61a to generate, so that the rope tangential to the inner wall 61a moved to strip these can by suitable drive means (not shown) of the chute 61 moved, in particular be rotated about a rotation axis, and / or guide means may be provided, which the deflection means 63 are assigned, as in more detail with respect to the 6C and 6D will be described.

Zur Vermeidung, dass sich auf dem Seil Anhaftungen des Beleimungsmittels oder von beleimten Partikeln 1 ausbilden, die verklumpen könnten, ist eine zweite Reinigungseinrichtung mit Abstreifelement 66 zum Reinigen des Seils vorgesehen und so angeordnet, dass das Seil an dieser vorbei oder durch diese hindurch verläuft.To prevent the attachment of gluing agents or glued particles on the rope 1 form, which could clump, is a second cleaning device with stripping 66 provided for cleaning the rope and arranged so that the rope passes past or through this.

Diese zweite Reinigungsvorrichtung kann beispielsweise als Bürste, Abstreifklinge, oder als Abstreifkante ausgebildet sein, an denen das Seil vorbeibewegt wird, oder als Abstreifspalt oder als Abstreifzylinder, durch den das Seil hindurch verläuft. Die zweite Reinigungseinrichtung kann auch als ein Fluidbad ausgestaltet sein, das beispielsweise mit Wasser und/oder einem Reinigungsmittel gefüllt ist und durch welches das Abstreifelement 62 geführt wird, um Beleimungsmittel und/oder Partikel 1 von diesem abzuwaschen und zu lösen.This second cleaning device may be formed, for example, as a brush, doctor blade, or as a scraping edge, where the rope is moved past, or as a stripping gap or as a stripping cylinder, through which the rope passes. The second cleaning device can also be configured as a fluid bath which is filled, for example, with water and / or a cleaning agent and through which the wiping element 62 is led to gluing agents and / or particles 1 to wash off and solve this.

Auf Grund der zum Inneren des Fallschachts 61 weisend gekrümmten beziehungsweise konkaven Formgebung des Fallschachts 61, bei dem die Wandung insbesondere bombiert ausgebildet sein kann, ergibt sich der vorteilhafte Effekt, dass das Seil zu einer besonders guten Auflage gegen die Innenwand 61a des Fallschachts 61 zu liegen kommt und sich auf Grund seiner Flexibilität der Form der Innenwand 61a anpasst. Dadurch kann eine besonders sichere Reinigung der Innenwand 61a des Fallschachts 61 erzielt werden.Due to the interior of the chute 61 pointing curved or concave shape of the chute 61 , in which the wall may be formed in particular cambered, there is the advantageous effect that the rope to a particularly good support against the inner wall 61a of the chute 61 comes to rest and due to its flexibility the shape of the inner wall 61a adapts. This allows a particularly secure cleaning of the inner wall 61a of the chute 61 be achieved.

Um diesen Effekt noch zu verstärken, können zusätzlich Spannmittel 64, 65 vorgesehen sein, die in der 6A beispielhaft als eine Feder und eine Andruckrolle dargestellt sind, um das Seil zu spannen.In order to increase this effect even more tensioning devices can be added 64 . 65 be provided in the 6A exemplified as a spring and a pinch roller to tension the rope.

Die Flexibilität des Seils als Abstreifelement 62 erlaubt es auch, dass sich das Seil an unterschiedliche Querschnitte des Fallschachts 61 anpasst, wie einem Rechteckquerschnitt mit großer Öffnungsweite im Einlassbereich und einem wesentlich kleineren kreisförmigen Querschnitt im Auslassbereich, wie beispielsweise in den 6C und 6D dargestellt.The flexibility of the rope as a stripping element 62 it also allows that the rope to different cross sections of the chute 61 as a rectangular cross-section with a large opening width in the inlet region and a much smaller circular cross-section in the outlet region, such as in the 6C and 6D shown.

Wie in den 6C und 6D dargestellt, kann der Fallschacht 61 mehrteilig ausgestaltet sein, beispielsweise mit vier Wandungen, die die vier Innenwände 61a bis 61d definieren. Im Bereich des Einlasses weist der Fallschacht 61 einen rechteckigen Querschnitt auf, während der Fallschacht 61 im Bereich des Auslasses mit einem kreisförmigen Querschnitt ausgebildet ist. Die Wandungen des Fallschachts sind bogenförmig gekrümmt, so dass sich der Fallschacht 61 in Fallrichtung der Partikel 1 von oben nach unten verjüngt.As in the 6C and 6D shown, the chute can 61 be designed in several parts, for example, with four walls that the four inner walls 61a to 61d define. In the area of the inlet points the chute 61 a rectangular cross-section on while the chute 61 is formed in the region of the outlet with a circular cross-section. The walls of the chute are curved arcuately, so that the chute 61 in the direction of the particle 1 tapered from top to bottom.

Wie in dem Beispiel der 6A und 6B ist auch in dem Beispiel der 6C und 6D das Abstreifelement 62 als Seil über ein Umlenkmittel 63 so geführt und gehalten, dass es eine Wandung des Fallschachts umschließt, so dass das Seil sowohl im Fallschacht 61 angrenzend einer Innenwand 61d, als auch außerhalb des Fallschachts 61 verläuft. Unterschiedlich zum Beispiel der 6A sind in dem Beispiel der 6C im unteren Endbereich des Fallschachts 61 die Wandungen jeweils mit einem Wulst oder Bogenabschnitt als ein Umlenkmittel 67 für das Seil ausgebildet, der dazu dient, das Seil umzulenken und zu halten. Der Wulst kann daher als Führungseinrichtung und als Umlenkeinrichtung betrachtet werden.As in the example of 6A and 6B is also in the example of 6C and 6D the stripping element 62 as a rope over a deflection 63 guided and held so that it encloses a wall of the chute so that the rope both in the chute 61 adjacent to an interior wall 61d , as well as outside the drop shaft 61 runs. Different for example from the 6A are in the example of 6C in the lower end of the chute 61 the walls each with a bead or arc portion as a deflection 67 formed for the rope, which serves to redirect the rope and hold. The bead can therefore be considered as a guide device and as a deflection device.

Das Umlenkmittel 63 ist einer Führungseinrichtung zugeordnet, die ein endloses Führungselement 69, wie beispielsweise eine Kette, und Führungsmittel 68, wie beispielsweise Zahnräder, aufweist. Wie insbesondere in 6D dargestellt, sind die Führungsmittel 68 so angeordnet, dass sie die sie umlaufende Kette so spannen, dass sie den Fallschacht 61 umläuft.The deflection 63 is associated with a guide device, which is an endless guide element 69 such as a chain, and guide means 68 , such as gears. As in particular in 6D shown, are the guiding means 68 arranged so that they tension the circulating chain so that they are the chute 61 circulates.

Die genannten Beispiele sind nicht beschränkend und es kann als Führungselement 69 auch ein Seil, insbesondere ein Stahlseil, ein Band, ein Draht oder ähnliches verwendet werden. Als Führungsmittel 68 können auch Rollen, Gleitschienen oder andere Elemente verwendet werden, die geeignet sind, die entsprechende Führungseinrichtung zu halten und entsprechend zu führen und nach bedarf umzulenken.The examples mentioned are not restrictive and it can serve as a guide element 69 also a Rope, in particular a steel cable, a band, a wire or the like can be used. As a guide 68 It is also possible to use rollers, slide rails or other elements which are suitable for holding and guiding the corresponding guide device and redirecting it as required.

Ein Motor (nicht dargestellt) kann mit einem der Führungsmittel 68 verbunden sein, um die Kette als Führungselement 69 anzutreiben und in Bewegung zu setzen. Da die Umlenkrolle mit der Kette 62 der Führungseinrichtung verbunden ist, wird das flexible, endlose Abstreifelement beziehungsweise das Seil auf diese Weise dazu gebracht, sich in einer Richtung tangential zur Fläche der Innenwand 61d zu bewegen. Auf diese Weise kann das Seil die Innenwand 61d, beziehungsweise alle Innenwände 61a, ..., 61d des Fallschachts 61 überstreifen und diese reinigen, indem etwaiges Bindemittel, oder beleimte Partikel 1, die sich auf den Innenwänden 61a, ..., 61d angeheftet haben, abgestreift werden.A motor (not shown) may be connected to one of the guide means 68 be connected to the chain as a guide element 69 to drive and set in motion. Because the pulley with the chain 62 the guide means is connected, the flexible, endless stripping element or the rope is brought in this way, in a direction tangential to the surface of the inner wall 61d to move. In this way, the rope can be the inner wall 61d , or all interior walls 61a , ..., 61d of the chute 61 strip and clean them using any binder, or glued particles 1 that are on the inner walls 61a , ..., 61d have been staked off.

Die zweite Reinigungseinrichtung als Abstreifelement 66 kann an einem vorgegebenen, festen Ort installiert sein, um das Seil zu reinigen, wenn es mittels der Führungseinrichtung und zugeordneten Antriebsmitteln in eine entsprechende Reinigungsposition bewegt wird. Die Reinigungseinrichtung kann auch einer Führungseinrichtung zugeordnet sein und sich mitbewegen, um der Bewegung des Seils über die Innenwände 61a bis 61d des Fallschachts 61 zu folgen.The second cleaning device as a stripping element 66 may be installed in a predetermined, fixed location to clean the rope when it is moved by means of the guide means and associated drive means in a corresponding cleaning position. The cleaning device may also be associated with a guide device and move with it, in order to move the rope over the inner walls 61a to 61d of the chute 61 to follow.

Während in den 6A bis 6D das endlose Seil eine Wandung umschließt, ist es in einer in 6E dargestellten Abwandlung auch möglich, das endlose Seil über ein Umlenkmittel 72 so zu führen, dass das endlose Seil als Abstreifelement 62 innerhalb des Fallschachts 61 verläuft, so dass der hinlaufende und der rücklaufende Abschnitt des Seils beide in Auflage gegen die Innenwand 61d des Fallschachts 61 kommen. Eine derartige Führung des Seils hat den vorteilhaften Effekt eines geringeren Raumbedarfs, da kein Freiraum für den außerhalb des Fallschachts 61 verlaufenden Abschnitt des Seils erforderlich ist. Darüber hinaus wird die Innenwand 61d durch das doppelt verlaufende Seil entsprechend doppelt überstrichen, was zu einer besseren Reinigungsleistung führt.While in the 6A to 6D the endless rope enclosing a wall, it is in an in 6E illustrated modification also possible, the endless rope over a deflection 72 to guide so that the endless rope as a stripping element 62 within the chute 61 runs so that the trailing and the return portion of the rope both in abutment against the inner wall 61d of the chute 61 come. Such guidance of the rope has the advantageous effect of a smaller space requirement, since no clearance for the outside of the chute 61 extending portion of the rope is required. In addition, the inner wall 61d twice overlined by the double rope, resulting in a better cleaning performance.

Die zweite Reinigungseinrichtung ist im Beispiel der 6E als eine Abstreifkante 71 ausgeführt, an der das Seil vorbeigeführt wird, um dieses abzustreifen.The second cleaning device is in the example of 6E as a wiper edge 71 carried out, at which the rope is passed to strip this.

In einer in der 6E und 6F dargestellten Variante kann die zweite Reinigungseinrichtung als ein im Verfahrweg 74 des Seils als Abstreifelement 62 einbringbares Hindernis 75 ausgebildet sein, das bevorzugt in einer die zumindest eine Innenwand 61a ... 61d aufweisende Wandung des Fallschachts 61 angeordnet ist, wobei das einbringbare Hindernis 75 zwischen einer ersten Stellung, in der das Hindernis von der Innenwand 61a ... 61d in Richtung des Inneren des Fallschachts 61 vorsteht, und einer zweiten Stellung, in der das Hindernis nicht über die Innenwand 61a ... 61d vorsteht, verstellbar sein kann. Das einbringbare Hindernis 75 kann zum Beispiel pneumatisch, hydraulisch oder elektromotorisch verstellt werden und kann beispielsweise als Dorn oder Konus ausgebildet sein. In diesem Aspekt ist der Verfahrweg 74 zum besseren Verständnis in 6E illustriert.In one in the 6E and 6F illustrated variant, the second cleaning device as a in the travel 74 of the rope as a stripping element 62 insertable obstacle 75 be formed, preferably in a the at least one inner wall 61a ... 61d having wall of the chute 61 is arranged, with the einbringbare obstacle 75 between a first position in which the obstacle from the inner wall 61a ... 61d towards the interior of the chute 61 protrudes, and a second position in which the obstacle does not have the inner wall 61a ... 61d protrudes, can be adjustable. The insertable obstacle 75 For example, can be adjusted pneumatically, hydraulically or by electric motor and can be formed for example as a mandrel or cone. In this aspect is the travel path 74 for better understanding in 6E illustrated.

Wenn das einbringbare Hindernis 75 eingebracht ist, stellt es sich der Bewegung des Seils entgegen. Das Seil wird dadurch gespannt, bis es an dem Hindernis 75 „vorbeischnappt” oder bis das Seil durch verstellen des Hindernisses 75 freigegeben wird. Das derart unter Spannung gesetzte Seil entspannt sich in einer plötzlichen Bewegung, die das Seil schwingen und „zittern” und/oder auf die Innenwand 61a, ..., 61d aufschlagen lassen kann, wodurch Beleimungsmittel und/oder Partikel 1, die sich auf dem Seil abgesetzt haben, abgeschüttelt werden können. Es ist dabei bevorzugt, dass die Bewegungsrichtung des Seils umgekehrt werden kann, um das Seil aus beiden Richtungen gegen das verstellbare Hindernis 75 zu bewegen.If the incurable obstacle 75 is introduced, it opposes the movement of the rope. The rope is thereby stretched until it reaches the obstacle 75 "Snaps by" or until the rope by adjusting the obstacle 75 is released. The thus tensioned rope relaxes in a sudden movement that swing the rope and "tremble" and / or on the inner wall 61a , ..., 61d can whip up, causing gluing agents and / or particles 1 , which have settled on the rope, can be shaken off. It is preferred that the direction of movement of the rope can be reversed to the rope from both directions against the adjustable obstacle 75 to move.

Die 6G und 6H zeigen eine weitere Variante, in welcher ein Seil an zwei Wickeleinrichtungen 73 befestigt ist, welche das Seil aufwickeln und abwickeln können. Durch entsprechende Steuerung eines Antriebs (nicht dargestellt) der Wickeleinrichtungen 73 kann das Seil so in eine Hin- und Herbewegung in Längsrichtung des Seils versetzt werden.The 6G and 6H show a further variant in which a rope to two winding devices 73 is attached, which can wind up and unwind the rope. By appropriate control of a drive (not shown) of the winding devices 73 For example, the rope can be moved in a reciprocating motion in the longitudinal direction of the rope.

Die 6G und 6H zeigen weiter Führungseinrichtungen, die beispielsweise als Zustellachsen oder Laufschienen 76 ausgebildet sein können, an denen die Wickeleinrichtungen 73 befestigt sind, beispielsweise mittels einem Schlitten oder einem Gleitelement (nicht dargestellt), der beziehungsweise das in der Laufschiene 76 fährt. In der 6H sind beispielhaft Laufschienen 76 dargestellt, welche die Wickeleinrichtungen 73 führen und zu halten, und über die Wickeleinrichtungen 73 das diese umlaufende Seil. Mittels der Laufschienen 76 kann daher das Seil über die Oberflache der Innenwand 61d hinweg bewegt werden.The 6G and 6H continue to show leadership institutions, for example, as Zustellachsen or rails 76 may be formed, where the winding devices 73 are fastened, for example by means of a carriage or a sliding element (not shown), or in the running rail 76 moves. In the 6H are exemplary rails 76 represented, which the winding devices 73 guide and hold, and about the winding facilities 73 the this circulating rope. By means of the rails 76 Therefore, the rope can over the surface of the inner wall 61d be moved away.

Für die weiteren Innenwände des Fallschachtes 61 können ebenfalls jeweils Laufschienen 76 vorgesehen sein, an denen Wickeleinrichtungen angeordnet sind, denen entsprechende Seile zugeordnet sind; der Klarheit der Darstellung wegen wurde in den 6G und 6H auf deren Darstellung verzichtet. Alternativ ist die Laufschiene 76 entsprechend dem Fallschacht 61 bogenförmig und umlaufend ausgeführt.For the other interior walls of the chute 61 can also each rails 76 be provided, on which winding devices are arranged, which are associated with corresponding ropes; Because of the clarity of the presentation was in the 6G and 6H waived their representation. Alternatively, the running rail 76 according to the chute 61 arcuate and running around.

Mit Bezug auf die 6A bis 6H wurden Beispiele gegeben, in denen ein flexibles Abstreifelement 62 wie ein Seil in einer im Wesentlichen vertikalen Richtung im Bereich einer Innenwand 61a, ..., 61d verläuft. Dies ist jedoch nicht beschränkend, und wie in dem in den 6I und 6J gezeigten Beispiel dargestellt, kann die Fallschachtanordnung 60 auch so ausgebildet sein, dass ein flexibles Abstreifelement 62 sich benachbart einer Innenwand 61a, ..., 61d des Fallschachts 61 in einer im Wesentlichen horizontalen Richtung erstreckt, beispielsweise als endloses Seil, das über Umlenkmittel 63 geführt wird.With reference to the 6A to 6H Examples have been given in which a flexible stripping element 62 like a rope in a substantially vertical direction in the area of an inner wall 61a , ..., 61d runs. However, this is not limiting, and as in the 6I and 6J shown example, the chute arrangement 60 also be designed so that a flexible scraper element 62 adjacent to an interior wall 61a , ..., 61d of the chute 61 extends in a substantially horizontal direction, for example as an endless rope that via deflection 63 to be led.

Bevorzugt ist für jede Innenwand 61a, ..., 61d des Fallschachts 61 jeweils ein flexibles Abstreifelement 62 vorgesehen, dass beispielsweise als ein endloses Seil ausgeführt sein kann, welches so angeordnet ist, die betreffende Innenwand 61a, ..., 61d zu umfassen, wie es in der 6I am Beispiel der Innenwand 61d dargestellt ist.Preferred is for each inner wall 61a , ..., 61d of the chute 61 one flexible stripping element each 62 provided that, for example, can be designed as an endless rope, which is arranged so the respective inner wall 61a , ..., 61d to embrace how it is in the 6I the example of the inner wall 61d is shown.

Die Innenwände 61a, ..., 61d des Fallschachts 61 können sich in horizontaler Richtung im Wesentlichen geradlinig erstrecken, oder können konkav, insbesondere bombiert ausgebildet sein, so dass sie in Richtung des Inneren des Fallschachts 61 weisend gebogen sind, wie in der 6I am Beispiel der Innenwand 61b dargestellt.The interior walls 61a , ..., 61d of the chute 61 may extend in a substantially straight line in the horizontal direction, or may be concave, in particular cambered, so that they are in the direction of the interior of the chute 61 bent as shown in the 6I the example of the inner wall 61b shown.

Die Umlenkmittel 63 sind jeweiligen Führungseinrichtungen (nicht dargestellt) zugeordnet, welche eingerichtet sein können, die Umlenkmittel 63 in einer im Wesentlichen vertikalen Richtung zu bewegen, wie durch die Pfeile der 6J angezeigt, so dass das Abstreifelement 62 der Erstreckung der Innenwand 61d des Fallschachts folgend in einer im Wesentlichen vertikalen Richtung tangential zur Oberfläche der Innenwand 61d bewegt wird und diese in im Wesentlichen vertikaler Richtung abstreift. Die Bewegungsachse kann dabei in geeigneter Weise im Wesentlichen senkrecht, im Wesentlichen dem Verlauf des seitlichen Randes der Innenwand 61d folgend, oder auf andere geeignete weise ausgerichtet sein.The deflection 63 are associated with respective guide means (not shown) which may be arranged, the deflection means 63 to move in a substantially vertical direction, as indicated by the arrows of 6J displayed so that the wiper element 62 the extent of the inner wall 61d following the chute in a substantially vertical direction tangential to the surface of the inner wall 61d is moved and this wipes in a substantially vertical direction. The movement axis can be suitably substantially perpendicular, substantially the course of the lateral edge of the inner wall 61d following or otherwise appropriate.

Als Führungseinrichtungen können Band- oder Seilzüge vorgesehen sein, ähnlich den mit Bezug auf die 6A bis 6H beschriebenen.As guide means band or cables may be provided, similar to those with respect to the 6A to 6H described.

Ebenfalls ist es möglich, die Führungseinrichtungen als Zustellachsen oder als Führungen, insbesondere Linearführungen, auszugestalten, wobei die Umlenmittel 63 jeweils an einem in der Führung laufenden Schlitten (nicht dargestellt) befestigt sind, der elektromotorisch, pneumatisch oder hydraulisch betätigt wird.It is also possible, the guide means as Zustellachsen or as guides, in particular linear guides to design, the Umlenmittel 63 each on a running in the guide carriage (not shown) are attached, which is actuated by electric motor, pneumatic or hydraulic.

Während die Erfindung am Beispiel bevorzugter Ausführungsformen beschrieben wurde, sind diese nicht beschränkend. So können verschiedene Aspekte der verschiedenen Ausführungsformen kombiniert oder gegeneinander ausgetauscht werden. Insbesondere können in einer Fallschachtanordnung verschiedene Formen erster und/oder zweiter Reinigungseinrichtungen kombiniert werden. Ebenso können verschiedene Arten von Abstreifelemente 62 oder Führungseinrichtungen kombiniert werden.While the invention has been described by way of example of preferred embodiments, these are not limiting. Thus, various aspects of the various embodiments may be combined or interchanged. In particular, different forms of first and / or second cleaning devices can be combined in a chute arrangement. Similarly, different types of scraper elements 62 or leadership facilities are combined.

Auch sind die Führungseinrichtungen nicht auf die beschriebenen Beispiele begrenzt. So können anstatt der beschriebenen Führungseinrichtungen beispielsweise auch als Führungen, insbesondere Linearführungen, ausgestaltete Führungseinrichtungen vorgesehen werden, die einen in der Führung laufenden Schlitten (nicht dargestellt) aufweisen, der elektromotorisch, pneumatisch oder hydraulisch betätigt wird.Also, the guide means are not limited to the examples described. Thus, instead of the guide means described, for example, as guides, in particular linear guides, designed guide means are provided which have a running in the guide carriage (not shown), which is actuated by electric motor, pneumatic or hydraulic.

Ebenfalls können Führungseinrichtungen verwendet werden, die in Form einer Gleitschiene ausgeführt sind, an denen ein Abstreifelement gleitend, beispielsweise durch ein in der Schiene angeordnetes Gleitelement oder eine Rolle, gehalten wird.Also, guide means may be used which are in the form of a slide rail on which a scraper member is slidably held by, for example, a sliding member or roller disposed in the rail.

Während Beispiele gegeben wurden, in denen das Abstreifelement 62 mittels der ersten und der zweiten Führungseinrichtung relativ zu einer Innenwand 61a, ..., 61d des Fallschachts 61 bewegt wird, ist dies nicht beschränkend, und es ist ebenso möglich, den Fallschacht selbst durch geeignete Antriebsmittel zu bewegen. So kann beispielsweise der Fallschacht 61 rotationssymmetrisch ausgestaltet sein und durch entsprechende Antriebsmittel in eine Rotationsbewegung versetzt werden, so dass sich die Innenwand des Fallschachts 61 mit Bezug zum Abstreifelement 62 bewegt. Das Abstreifelement 62 kann dabei durch entsprechende erste und zweite Führungseinrichtungen ortsfest gehalten werden, während sich die Innenwand an dem Abstreifelement 62 vorbei bewegt. Auch ist es möglich, ein bewegliches Abstreifelement 62 mit einem beweglichen Fallschacht zu 61 kombinieren.While examples have been given in which the wiper element 62 by means of the first and second guide means relative to an inner wall 61a , ..., 61d of the chute 61 is moved, this is not limiting, and it is also possible to move the chute itself by suitable drive means. For example, the chute 61 Be configured rotationally symmetrical and are offset by appropriate drive means in a rotational movement, so that the inner wall of the chute 61 with reference to the stripping element 62 emotional. The stripping element 62 can be held stationary by corresponding first and second guide means, while the inner wall of the stripping 62 moved over. It is also possible, a movable scraper element 62 with a movable chute too 61 combine.

Die Führungseinrichtungen können sowohl außerhalb als auch innerhalb des durch den Fallschacht 61 aufgespannten Raumes angeordnet sein. Werden die Führungseinrichtungen innerhalb des Fallschachts 61 angeordnet, können bevorzugt Abdeckungen vorgesehen werden, um die Führungseinrichtungen vor einem Verschmutzen zu schützen, und/oder zusätzliche Abstreifmittel, die beispielsweise an dem flexiblen Abstreifelement angeordnet sein können, um die innerhalb des Fallschachts angeordneten Führungseinrichtungen zu überstreifen und so zu reinigen.The guiding devices can be both outside and inside through the chute 61 be arranged spanned space. Be the management facilities within the chute 61 Covers may preferably be provided to protect the guide means from fouling, and / or additional wiping means which may, for example, be disposed on the flexible wiper member for overstretching and thus cleaning the guide means disposed within the chute.

Weiter kann die Fallschachtanordnung eine Temperiereinrichtung aufweisen zum Temperieren einer oder mehrerer Innenwände auf eine Temperatur, die unterhalb einer Schwelle für das Aushärten des Bindemittels liegt, bevorzugt unterhalb 70°C. Furthermore, the chute arrangement can have a tempering device for tempering one or more inner walls to a temperature which is below a threshold for the curing of the binder, preferably below 70 ° C.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
Partikelparticle
22
Dosiervorrichtungmetering
33
Auflösevorrichtungdissolver
44
Fallschachtchute
55
Partikelvorhangparticle curtain
66
Düsejet
77
Mischvorrichtungmixing device
88th
MischwerkzeugeMixing tools
99
Wellewave
1010
FallschachtanordnungChute arrangement
2020
FallschachtanordnungChute arrangement
2121
Fallschachtchute
21x, a, b, c, d21x, a, b, c, d
Innenwandinner wall
2222
Abstreifelementstripping element
2323
Tragelementsupporting member
2424
Führungselementguide element
3030
FallschachtanordnungChute arrangement
3131
Fallschachtchute
31x, a, b, c, d31x, a, b, c, d
Innenwandinner wall
3232
Abstreifelementstripping element
4040
FallschachtanordnungChute arrangement
4141
Fallschachtchute
41x, a, b, c, d41x, a, b, c, d
Innenwandinner wall
4242
Schaberscraper
4343
Antriebsmitteldrive means
4444
Schaberscraper
4545
Einfülltrichterhopper
5050
FallschachtanordnungChute arrangement
5151
Fallschachtchute
51a51a
Innenwandinner wall
5252
Schaberscraper
5353
Antriebsmitteldrive means
5454
Schaberscraper
5555
Antriebsmitteldrive means
6060
FallschachtanordnungChute arrangement
6161
Fallschachtchute
61x, a, b, c, d61x, a, b, c, d
Innenwandinner wall
6262
Abstreifelementstripping element
6363
Umlenkmitteldeflecting
6464
Spannmittelclamping means
6565
Spannmittelclamping means
6666
Abstreifelementstripping element
6767
Umlenkmitteldeflecting
6868
Führungsmittelguide means
6969
Führungselementguide element
7171
Abstreifkantestripping
7272
Umlenkmitteldeflecting
7373
Wickeleinrichtungwinding device
7474
Verfahrwegtraverse
7575
Hindernisobstacle
7676
Laufschienerunner

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102010064339 A1 [0006] DE 102010064339 A1 [0006]
  • WO 2011/134844 A1 [0009, 0011, 0012, 0013, 0014] WO 2011/134844 A1 [0009, 0011, 0012, 0013, 0014]

Claims (30)

Fallschachtanordnung (10; 20; 30; 40; 50; 60), insbesondere für eine Vorrichtung zur Beleimung von Partikeln (1), die zumindest teilweise aus zur Herstellung von Werkstoffplatten geeigneten Fasern und/oder Spänen bestehen, wobei die Fallschachtanordnung (10; 20; 30; 40; 50; 60) einen Fallschacht (21; 31; 41; 51; 61), der einen Einlass zur Zuführung der Partikel (1) und einen Auslass zur Abgabe der Partikel (1) aufweist und zumindest eine erste Reinigungseinrichtung zum Reinigen zumindest einer Innenwand (21a ... 21d) des Fallschachtes (21; 31; 41; 51; 61) aufweist; dadurch gekennzeichnet, dass die Fallschachtanordnung (10; 20; 30; 40; 50; 60) weiter zumindest eine zweite Reinigungseinrichtung zum Reinigen der zumindest einen ersten Reinigungseinrichtung aufweist.Chute arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ), in particular for a device for gluing particles ( 1 ), which consist at least partially of fibers and / or chips suitable for producing material plates, wherein the drop shaft arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ) a chute ( 21 ; 31 ; 41 ; 51 ; 61 ) having an inlet for feeding the particles ( 1 ) and an outlet for dispensing the particles ( 1 ) and at least one first cleaning device for cleaning at least one inner wall ( 21a ... 21d ) of the chute ( 21 ; 31 ; 41 ; 51 ; 61 ) having; characterized in that the chute arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ) further comprises at least one second cleaning device for cleaning the at least one first cleaning device. Fallschachtanordnung (20; 30) nach Anspruch 1, dadurch gekennzeichnet, dass die erste Reinigungseinrichtung als zumindest ein verfahrbares Tragelement (23x; 31x) ausgestaltet ist, das relativ, insbesondere parallel, zu einer zugeordneten ersten Innenwand (21x; 31x) des Fallschachts (21; 31) verfahrbar angeordnet ist, wobei zumindest ein erstes Abstreifelement (22x; 32x) an dem verfahrbaren Tragelement (23x; 31x) angeordnet oder ausgebildet ist, derart, die zugeordnete Innenwand (21x; 31x) abzustreifen, wenn das verfahrbare Tragelement (23x; 31x) verfahren wird.Chute arrangement ( 20 ; 30 ) according to claim 1, characterized in that the first cleaning device as at least one movable support element ( 23x ; 31x ) is configured, the relative, in particular parallel, to an associated first inner wall ( 21x ; 31x ) of the chute ( 21 ; 31 ) is arranged movable, wherein at least a first stripping element ( 22x ; 32x ) on the movable support element ( 23x ; 31x ) is arranged or formed, in such a way, the associated inner wall ( 21x ; 31x ) when the movable support element ( 23x ; 31x ). Fallschachtanordnung (20; 30) nach Anspruch 2, dadurch gekennzeichnet, dass das verfahrbare Tragelement (23x; 31x) durch einen Spalt hindurchgehend angeordnet ist, der zwischen zwei benachbarten Innenwänden (21x) oder zwischen zwei Enden einer Innenwand (21x) ausgebildet ist.Chute arrangement ( 20 ; 30 ) according to claim 2, characterized in that the movable support element ( 23x ; 31x ) is arranged through a gap passing between two adjacent inner walls ( 21x ) or between two ends of an inner wall ( 21x ) is trained. Fallschachtanordnung (20; 30) nach einem der Ansprüche 2 bis 3, dadurch gekennzeichnet, dass das verfahrbare Tragelement (23x; 31x) als eine Wand ausgebildet ist, mit einer Höhe, die der abzustreifenden Höhe der zugeordneten Innenwand (21x; 31x) entspricht.Chute arrangement ( 20 ; 30 ) according to one of claims 2 to 3, characterized in that the movable support element ( 23x ; 31x ) is formed as a wall, with a height corresponding to the height to be scrapped of the associated inner wall ( 21x ; 31x ) corresponds. Fallschachtanordnung (20) nach einem der Ansprüche 2 bis 4, dadurch gekennzeichnet, dass das verfahrbare Tragelement (23x; 31x) federelastisch ausgebildet ist.Chute arrangement ( 20 ) according to one of claims 2 to 4, characterized in that the movable support element ( 23x ; 31x ) is resilient. Fallschachtanordnung (20) nach einem der Ansprüche 2 bis 5, dadurch gekennzeichnet, dass die zweite Reinigungseinrichtung zumindest ein zweites Abstreifelement (24x) aufweist.Chute arrangement ( 20 ) according to one of claims 2 to 5, characterized in that the second cleaning device at least a second stripping element ( 24x ) having. Fallschachtanordnung (20) nach Anspruch 6, dadurch gekennzeichnet, dass das zweite Abstreifelement (24x) an einer Wandung oder einem Trageelement (23x) angeordnet ist.Chute arrangement ( 20 ) according to claim 6, characterized in that the second stripping element ( 24x ) on a wall or a support element ( 23x ) is arranged. Fallschachtanordnung (30) nach einem der Ansprüche 2 bis 4, dadurch gekennzeichnet, dass das verfahrbare Tragelement als ein eine Innenwand (31x) des Fallschachts (31) ausbildendes Wandelement des Fallschachts (31) ausgebildet ist.Chute arrangement ( 30 ) according to one of claims 2 to 4, characterized in that the movable support element as an an inner wall ( 31x ) of the chute ( 31 ) forming wall element of the chute ( 31 ) is trained. Fallschachtanordnung (30) nach Anspruch 8, dadurch gekennzeichnet, dass der Fallschacht (31) mehrere Wandelemente aufweist, die jeweils bogenförmig ausgebildet sind, wobei jedes Wandelement ein anderes Wandelement an dessen Außenseite teilweise überlappt.Chute arrangement ( 30 ) according to claim 8, characterized in that the chute ( 31 ) has a plurality of wall elements, which are each formed arcuate, wherein each wall element partially overlaps another wall element on the outside thereof. Fallschachtanordnung (40) nach Anspruch 1, dadurch gekennzeichnet, dass die erste Reinigungseinrichtung zumindest einen ersten Schaber (42) aufweist, der der zumindest einen Innenwand (41a) zugeordnet ist; und die zweite Reinigungseinrichtung zumindest einen zweiten Schaber (44) sowie Antriebsmittel (43) aufweist zum Bewegen des zweiten Schabers (44) von einer Ruheposition entlang einer im Wesentlichen zum ersten Schaber (42) parallelen Achse, derart, den ersten Schaber (42) abzustreifenChute arrangement ( 40 ) according to claim 1, characterized in that the first cleaning device at least a first scraper ( 42 ), of the at least one inner wall ( 41a ) assigned; and the second cleaning device at least one second scraper ( 44 ) as well as drive means ( 43 ) for moving the second scraper ( 44 ) from a rest position along a substantially to the first scraper ( 42 ) parallel axis, so, the first scraper ( 42 ) strip Fallschachtanordnung (50) nach Anspruch 1, dadurch gekennzeichnet, dass die erste Reinigungseinrichtung zumindest einen ersten Schaber (52) aufweist, sowie Antriebsmittel (53) zum Bewegen des ersten Schabers (52) von einer Ruheposition entlang einer im Wesentlichen zu der zumindest einen Innenwand (51a) parallelen Achse, derart, die erste Innenwand (51a) abzustreifen; und die zweite Reinigungseinrichtung zumindest einen zweiten Schaber (54) sowie Antriebsmittel (55) aufweist zum Bewegen des zweiten Schabers (44) von einer Ruheposition über den in der Ruheposition positionierten ersten Schaber (52), derart, den ersten Schaber (52) abzustreifen.Chute arrangement ( 50 ) according to claim 1, characterized in that the first cleaning device at least a first scraper ( 52 ), and drive means ( 53 ) for moving the first scraper ( 52 ) from a rest position along a substantially to the at least one inner wall ( 51a ) parallel axis, in this way, the first inner wall ( 51a ) strip; and the second cleaning device at least one second scraper ( 54 ) as well as drive means ( 55 ) for moving the second scraper ( 44 ) from a rest position above the first scraper positioned in the rest position ( 52 ), so, the first scraper ( 52 ) strip. Fallschachtanordnung (60) nach Anspruch 1, dadurch gekennzeichnet, dass die erste Reinigungseinrichtung zumindest ein flexibles Abstreifelement (62), insbesondere ein endloses Abstreifelement (62), zum Reinigen der zumindest einen Innenwand (61x) aufweist.Chute arrangement ( 60 ) according to claim 1, characterized in that the first cleaning device at least one flexible stripping element ( 62 ), in particular an endless stripping element ( 62 ), for cleaning the at least one inner wall ( 61x ) having. Fallschachtanordnung (60) nach Anspruch 12, dadurch gekennzeichnet, dass die Fallschachtanordnung (60) weiter eine erste Führungseinrichtung; und eine zweite Führungseinrichtung aufweist, wobei die erste Führungseinrichtung und die zweite Führungseinrichtung eingerichtet sind, das zumindest eine Abstreifelement (62) zu halten und zu führen, derart, eine Relativbewegung in tangentialer Richtung zu der zumindest einen Innenwand (61x) zwischen dem Abstreifelement (62) und der zumindest einen Innenwand (61x) des Fallschachts (61) zu erlauben, wobei weiter Antriebsmittel vorgesehen sind, die eingerichtet sind, auf den Fallschacht (61), die erste Führungseinrichtung, die zweite Führungseinrichtung und/oder das zumindest eine Abstreifelement (62) einzuwirken zur Erzeugung der Relativbewegung.Chute arrangement ( 60 ) according to claim 12, characterized in that the chute arrangement ( 60 ) further a first guide means; and a second guide device, wherein the first guide device and the second guide device are arranged, the at least one scraper element ( 62 ) to hold and guide, in such a way, a relative movement in the tangential direction to the at least one inner wall ( 61x ) between the stripping element ( 62 ) and the at least one inner wall ( 61x ) of the chute ( 61 ), further providing drive means are set up on the chute ( 61 ), the first guide device, the second guide device and / or the at least one stripping element ( 62 ) to produce the relative movement. Fallschachtanordnung (60) nach Anspruch 13, dadurch gekennzeichnet, dass die erste und/oder die zweite Führungseinrichtung aufweist: eine Mehrzahl von Führungsmitteln (68), insbesondere Führungsrollen oder Führungszahnräder, und ein endloses Führungselement (69), insbesondere ein endloses Führungsseil, ein endloses Führungsband, ein endloser Führungsdraht oder eine endlose Führungskette, welches beziehungsweise welche die Führungsmittel (68) umläuft, wobei das zumindest eine flexible Abstreifelement (62) direkt oder über Haltemittel und/oder Umlenkmittel (63, 72) an das endlose Führungselement (69) befestigt ist.Chute arrangement ( 60 ) According to claim 13, characterized in that the first and / or the second guide means comprises: a plurality (of guide means 68 ), in particular guide rollers or guide gears, and an endless guide element ( 69 ), in particular an endless guide wire, an endless guide band, an endless guide wire or an endless guide chain, which or the guide means ( 68 ), wherein the at least one flexible stripping element ( 62 ) directly or via holding means and / or deflection means ( 63 . 72 ) to the endless guide element ( 69 ) is attached. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 14, dadurch gekennzeichnet, dass das endlose Abstreifelement (62) mittels Umlenkmitteln (63, 67) so angeordnet ist, dass es ein Wandelement des Fallschachts (61) umschließt, das die zumindest eine Innenwand (61x) aufweist.Chute arrangement ( 60 ) according to one of claims 12 to 14, characterized in that the endless stripping element ( 62 ) by means of deflection means ( 63 . 67 ) is arranged so that it is a wall element of the chute ( 61 ) enclosing the at least one inner wall ( 61x ) having. Fallschachtanordnung (60) nach einem der Ansprüche 5 bis 7, dadurch gekennzeichnet, dass das endlose Abstreifelement (62) so angeordnet ist, dass es im Bereich der Innenwand (61x) innerhalb des Fallschachts (61) verlaufend angeordnet ist.Chute arrangement ( 60 ) according to one of claims 5 to 7, characterized in that the endless stripping element ( 62 ) is arranged so that it is in the region of the inner wall ( 61x ) within the chute ( 61 ) is arranged running. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 16, dadurch gekennzeichnet, dass Antriebsmittel vorgesehen sind, die eingerichtet sind, das zumindest eine flexible Abstreifelement (62) in eine Hin- und Herbewegung in Richtung der Längserstreckung des Abstreifelements (62) zu versetzen.Chute arrangement ( 60 ) according to any one of claims 12 to 16, characterized in that drive means are provided, which are arranged, the at least one flexible stripping element ( 62 ) in a reciprocating motion in the direction of the longitudinal extent of the stripping element ( 62 ) to move. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 17, dadurch gekennzeichnet, dass zwei Wickeleinrichtungen (73) vorgesehen sind, wobei das flexible Abstreifelement (62) mit den Wickeleinrichtungen (73) verbunden ist, um von den Wickeleinrichtungen (73) aufgewickelt und abgewickelt werden zu können.Chute arrangement ( 60 ) according to one of claims 12 to 17, characterized in that two winding devices ( 73 ) are provided, wherein the flexible stripping element ( 62 ) with the winding devices ( 73 ) is connected to the winding devices ( 73 ) can be wound up and handled. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 17, dadurch gekennzeichnet, dass Antriebsmittel vorgesehen sind, die eingerichtet sind, das endlose Abstreifelement (62) in eine umlaufende Bewegung zu versetzen.Chute arrangement ( 60 ) according to one of claims 12 to 17, characterized in that drive means are provided, which are arranged, the endless stripping element ( 62 ) in a circumferential movement. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 19, dadurch gekennzeichnet, dass das zumindest eine endlose Abstreifelement (62) sich benachbart der zumindest einer Innenwand (61x) des Fallschachts (61) in einer im Wesentlichen horizontalen Richtung erstreckt.Chute arrangement ( 60 ) according to one of claims 12 to 19, characterized in that the at least one endless stripping element ( 62 ) adjacent to the at least one inner wall ( 61x ) of the chute ( 61 ) extends in a substantially horizontal direction. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 19, dadurch gekennzeichnet, dass das zumindest eine endlose Abstreifelement (62) sich benachbart der zumindest einer Innenwand (61x) des Fallschachts (61) in einer im Wesentlichen vertikalen Richtung erstreckt und/oder einer Form des Fallschachts (21; 31; 41; 51; 61) in vertikaler Richtung entsprechend verläuft.Chute arrangement ( 60 ) according to one of claims 12 to 19, characterized in that the at least one endless stripping element ( 62 ) adjacent to the at least one inner wall ( 61x ) of the chute ( 61 ) extends in a substantially vertical direction and / or a shape of the chute ( 21 ; 31 ; 41 ; 51 ; 61 ) runs in the vertical direction accordingly. Fallschachtanordnung (60) nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass weiter Spannmittel (64, 65) vorgesehen sind, die eingerichtet sind, so auf die erste Führungseinrichtung und/oder die zweite Führungseinrichtung und/oder das zumindest eine Abstreifelement (62) zu wirken, dass das zumindest eine Abstreifelement (62) unter Spannung gehalten wird.Chute arrangement ( 60 ) according to one of the preceding claims, characterized in that further clamping means ( 64 . 65 ) are provided, which are arranged on the first guide device and / or the second guide device and / or the at least one stripping element ( 62 ), that the at least one stripping element ( 62 ) is kept under tension. Fallschachtanordnung (60) nach einem der Ansprüche 12 bis 22, dadurch gekennzeichnet, dass das Abstreifelement (62) an der zweiten Reinigungseinrichtung vorbei verlaufend oder durch die Reinigungseinrichtung hindurch verlaufend geführt ist.Chute arrangement ( 60 ) according to one of claims 12 to 22, characterized in that the stripping element ( 62 ) passing past the second cleaning device or passing through the cleaning device. Fallschachtanordnung (60) nach Anspruch 23, dadurch gekennzeichnet, dass die zweite Reinigungseinrichtung als ein Fluidbad, eine Bürste, eine Abstreiferkante, oder ein Abstreifzylinder ausgeführt ist.Chute arrangement ( 60 ) according to claim 23, characterized in that the second cleaning device is designed as a fluid bath, a brush, a stripper edge, or a stripping cylinder. Fallschachtanordnung (60) nach Anspruch 23, dadurch gekennzeichnet, dass die zweite Reinigungseinrichtung als ein im Verfahrweg (74) des zumindest einen Abstreifelements (62) angeordnetes oder einbringbares Hindernis (75) ausgebildet ist.Chute arrangement ( 60 ) according to claim 23, characterized in that the second cleaning device as a in the travel path ( 74 ) of the at least one stripping element ( 62 ) arranged or insertable obstacle ( 75 ) is trained. Fallschachtanordnung (60) nach Anspruch 25, dadurch gekennzeichnet, dass das einbringbare Hindernis in einer die zumindest eine Innenwand (61x) aufweisende Wandung des Fallschachts (61) angeordnet ist, wobei das einbringbare Hindernis (75) zwischen einer ersten Stellung, in der das Hindernis von der Innenwand (61x) in Richtung des Inneren des Fallschachts (61) vorsteht, und einer zweiten Stellung, in der das Hindernis (75) nicht über die Innenwand (61x) in Richtung des Inneren des Fallschachts (61) vorsteht, verstellbar ist.Chute arrangement ( 60 ) according to claim 25, characterized in that the insertable obstacle in one of the at least one inner wall ( 61x ) wall of the chute ( 61 ), wherein the insertable obstacle ( 75 ) between a first position in which the obstacle from the inner wall ( 61x ) in the direction of the interior of the chute ( 61 ) and a second position in which the obstacle ( 75 ) not over the inner wall ( 61x ) in the direction of the interior of the chute ( 61 ) protrudes, is adjustable. Fallschachtanordnung (10; 20; 30; 40; 50; 60) nach einem der Ansprüche 2 bis 26, dadurch gekennzeichnet, dass das erste Abstreifelement (22x; 32x) und/oder das zweite Abstreifelement (24x; 32x) und/oder der Schaber (42, 44) als Spachtelklinge, als Spatel, oder als Stab, insbesondere Rundstab, ausgebildet ist.Chute arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ) according to one of claims 2 to 26, characterized in that the first stripping element ( 22x ; 32x ) and / or the second stripping element ( 24x ; 32x ) and / or the scraper ( 42 . 44 ) is designed as a spatula blade, as a spatula, or as a rod, in particular round rod. Fallschachtanordnung (10; 20; 30; 40; 50; 60) nach einem der Ansprüche 2 bis 26, dadurch gekennzeichnet, dass das erste Abstreifelement (22x; 32x) und/oder das zweite Abstreifelement (24x; 32x) und/oder das flexible Abstreifelement (62) als Seil, insbesondere Drahtseil, als Draht, als Band oder als Kette ausgebildet ist.Chute arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ) according to one of claims 2 to 26, characterized in that the first stripping element ( 22x ; 32x ) and / or the second stripping element ( 24x ; 32x ) and / or the flexible stripping element ( 62 ) is designed as a rope, in particular wire rope, as a wire, as a band or as a chain. Fallschachtanordnung (10; 20; 30; 40; 50; 60) nach einem der vorstehenden Ansprüche, dadurch gekennzeichnet, dass der Fallschacht (21; 31; 41; 51; 61) im Bereich des Einlasses und im Bereich des Auslasses Querschnitte unterschiedlicher Form aufweist.Chute arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ) according to one of the preceding claims, characterized in that the chute ( 21 ; 31 ; 41 ; 51 ; 61 ) has cross sections of different shape in the region of the inlet and in the region of the outlet. Fallschachtanordnung (10; 20; 30; 40; 50; 60) nach Anspruch 1, dadurch gekennzeichnet, dass die erste Reinigungseinrichtung zumindest einen Spachtel aufweist, der eingerichtet ist, sich relativ zu der zumindest einen Innenwand zu bewegen; und die zweite Reinigungseinrichtung ein flexibles Abstreifelement aufweist, das im Verfahrweg des Spachtels über die zumindest eine Innenwand gespannt ist.Chute arrangement ( 10 ; 20 ; 30 ; 40 ; 50 ; 60 ) according to claim 1, characterized in that the first cleaning device comprises at least one spatula which is adapted to move relative to the at least one inner wall; and the second cleaning device comprises a flexible scraper element, which is tensioned in the travel path of the spatula over the at least one inner wall.
DE202012104538.9U 2012-11-22 2012-11-22 Chute arrangement with a double cleaning device, in particular for a device for gluing Expired - Lifetime DE202012104538U1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
DE202012104538.9U DE202012104538U1 (en) 2012-11-22 2012-11-22 Chute arrangement with a double cleaning device, in particular for a device for gluing
CN201320744523.8U CN203901478U (en) 2012-11-22 2013-11-21 Descending material path structure
PCT/EP2013/074513 WO2014079988A1 (en) 2012-11-22 2013-11-22 Fall duct arrangement with a dual cleaning device, in particular for a device for gluing particles in the course of producing material boards
CN201380060878.8A CN104812540B (en) 2012-11-22 2013-11-22 Device for the decline material road structure of glued particle and for glued particle
EP13796037.3A EP2922670B1 (en) 2012-11-22 2013-11-22 Fall duct arrangement with a dual cleaning device, in particular for a device for gluing particles in the course of producing material boards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202012104538.9U DE202012104538U1 (en) 2012-11-22 2012-11-22 Chute arrangement with a double cleaning device, in particular for a device for gluing

Publications (1)

Publication Number Publication Date
DE202012104538U1 true DE202012104538U1 (en) 2014-04-29

Family

ID=49674283

Family Applications (1)

Application Number Title Priority Date Filing Date
DE202012104538.9U Expired - Lifetime DE202012104538U1 (en) 2012-11-22 2012-11-22 Chute arrangement with a double cleaning device, in particular for a device for gluing

Country Status (4)

Country Link
EP (1) EP2922670B1 (en)
CN (2) CN203901478U (en)
DE (1) DE202012104538U1 (en)
WO (1) WO2014079988A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104690012A (en) * 2015-02-12 2015-06-10 吴中区甪直渡岘工艺品厂 Degumming machine

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102012111307A1 (en) * 2012-11-22 2014-05-22 Dieffenbacher GmbH Maschinen- und Anlagenbau Chute arrangement with a double cleaning device, in particular for a device for gluing particles in the course of the production of material plates
CN106347976A (en) * 2016-11-04 2017-01-25 云南中翼鼎东能源科技开发有限公司 Buffering and storage quantitative feeding device applicable to sticky materials
DE102017103460A1 (en) 2017-02-20 2018-08-23 Dieffenbacher GmbH Maschinen- und Anlagenbau A control device and method for dosing a binder, a delivery device and method for introducing a binder into a flow of material and a system for producing material plates
DE202017100935U1 (en) 2017-02-20 2018-03-21 Dieffenbacher GmbH Maschinen- und Anlagenbau Control device for metering a binder, a feed device for introducing a binder into a material flow and a system for producing material plates
DE102019114039A1 (en) 2019-05-26 2020-11-26 Dieffenbacher GmbH Maschinen- und Anlagenbau Device for gluing particles in the course of the production of material panels and a method for operating the device
CN111252481B (en) * 2019-12-18 2021-06-01 浙江锦鑫建设工程有限公司 Boiler external ash discharge conveying system
CN112476763A (en) * 2020-12-16 2021-03-12 阜宁东益新港混凝土制品有限公司 Preparation device and preparation method of concrete with good water permeability
CN113479984B (en) * 2021-07-23 2023-03-10 杭州富丽达热电有限公司 Desalination water production system
CN114313907A (en) * 2021-12-21 2022-04-12 安徽国瑞种业有限公司 Agricultural seed dust removal screening equipment loading attachment is with preventing stifled structure

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011134844A1 (en) 2010-04-30 2011-11-03 Imal S.R.L. Apparatus for injecting chemical components into a flow of loose wooden material
DE102010064339A1 (en) 2010-12-29 2012-07-05 Dieffenbacher GmbH Maschinen- und Anlagenbau Method and device for wetting spreading material, in particular of fibers and / or chips, with a fluid

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH428536A (en) * 1965-03-11 1967-01-15 Kalich Rudolf Method and device for producing binder mixtures, and application of the method
DE3230763A1 (en) * 1982-08-16 1984-02-16 Schering AG, 1000 Berlin und 4709 Bergkamen DEVICE FOR REMOVING SUBSTANCES ON CONTAINER WALLS
DE10247413B4 (en) * 2002-10-11 2009-05-07 Siempelkamp Maschinen- Und Anlagenbau Gmbh & Co. Kg Plant for gluing fibers for the production of fiberboard, in particular MDF boards or the like wood-based panels
ITMO20030104A1 (en) * 2003-04-15 2004-10-16 Imal Srl METHOD AND PLANT FOR ADDING GLUE TO A FLOW
DE102006058625B3 (en) * 2006-12-13 2008-06-05 Siempelkamp Maschinen- Und Anlagenbau Gmbh & Co. Kg Fibers gluing system for producing e.g. medium density fiberboard plates, has nozzles that are transferred in gluing operation from standby into operating positions to glue fibers and transferred during operation interruption
CN102275199A (en) * 2011-08-08 2011-12-14 西北农林科技大学 Recombined material glue applicator

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011134844A1 (en) 2010-04-30 2011-11-03 Imal S.R.L. Apparatus for injecting chemical components into a flow of loose wooden material
DE102010064339A1 (en) 2010-12-29 2012-07-05 Dieffenbacher GmbH Maschinen- und Anlagenbau Method and device for wetting spreading material, in particular of fibers and / or chips, with a fluid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104690012A (en) * 2015-02-12 2015-06-10 吴中区甪直渡岘工艺品厂 Degumming machine

Also Published As

Publication number Publication date
WO2014079988A1 (en) 2014-05-30
EP2922670A1 (en) 2015-09-30
CN104812540A (en) 2015-07-29
CN203901478U (en) 2014-10-29
CN104812540B (en) 2017-10-24
EP2922670B1 (en) 2018-10-24

Similar Documents

Publication Publication Date Title
EP2922670B1 (en) Fall duct arrangement with a dual cleaning device, in particular for a device for gluing particles in the course of producing material boards
EP2922671B1 (en) Free-fall shaft arrangement with double cleaning unit, more particularly for a device for the gluing of particles during production of board
DE2741710C2 (en) Device for separating solids and liquids from a suspension
DE102009057916A1 (en) Method and apparatus for continuous mixing of fibers with a binder
WO2017157567A1 (en) Screening device for the generative manufacturing of components
WO2008098682A1 (en) Dispersion installation
DE202013105331U1 (en) Chute arrangement with improved cleaning
EP2922672B1 (en) Fall duct arrangement, device, and method for cleaning a fall duct, in particular a device for gluing particles
EP2868822A1 (en) Sieve device for separating and removing contaminants from waste water
DE2040945A1 (en) Method and device for separating the first part from the second part of a plant
WO2006100187A1 (en) Device and method for size-reducing agglomerates
DE202012104539U1 (en) Chute arrangement, in particular for a device for gluing particles in the course of the production of material plates
DE102012111308A1 (en) Chute arrangement, in particular for a device for gluing particles in the course of the production of material plates
DE202012104541U1 (en) Chute arrangement
DE19756670C2 (en) Feed, support and storage device for shredding machines
DE102007036551A1 (en) Assembly to remove over spray from paint spray cabin surfaces, using slow-drying paint, has belt separators moved continuously or intermittently with strippers to detach the collected paint
EP2524725A1 (en) Device for removing screenings from a liquid
WO2014079986A1 (en) Cleaning arrangement for fall ducts, in particular for a device for gluing particles in the course of producing material boards
DE202012104540U1 (en) Chute arrangement and in particular apparatus for gluing particles
EP1201381B1 (en) Apparatus for distributing loose material on a continuously travelling support
DE1757249C3 (en)
AT114514B (en) Method and device for cleaning yarn.
DE1632450C3 (en) Device for continuously mixing relatively small amounts of a finely divided component with a carrier material moved by an air stream
DE202019102963U1 (en) Device for applying glue to particles
DE102019114039A1 (en) Device for gluing particles in the course of the production of material panels and a method for operating the device

Legal Events

Date Code Title Description
R207 Utility model specification

Effective date: 20140605

R150 Utility model maintained after payment of first maintenance fee after three years
R151 Utility model maintained after payment of second maintenance fee after six years
R082 Change of representative

Representative=s name: HARTDEGEN, ANTON, DIPL.-ING.(FH), DE

R158 Lapse of ip right after 8 years