DE19827820A1 - Method of manufacturing tombs - Google Patents

Method of manufacturing tombs

Info

Publication number
DE19827820A1
DE19827820A1 DE1998127820 DE19827820A DE19827820A1 DE 19827820 A1 DE19827820 A1 DE 19827820A1 DE 1998127820 DE1998127820 DE 1998127820 DE 19827820 A DE19827820 A DE 19827820A DE 19827820 A1 DE19827820 A1 DE 19827820A1
Authority
DE
Germany
Prior art keywords
pipe
bore
burial site
lid
burial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
DE1998127820
Other languages
German (de)
Inventor
Tatjana Schuldt
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE1998127820 priority Critical patent/DE19827820A1/en
Publication of DE19827820A1 publication Critical patent/DE19827820A1/en
Ceased legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H13/00Monuments; Tombs; Burial vaults; Columbaria
    • E04H13/008Memorials for cremation ashes

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

An underground bore hole is made and lined with a fixed wall and a lid is mounted on the opening at ground level. After boring the hole an extension tube with or without closed base can be inserted therein. Independent claim describes tomb comprising fixed walls in ground and made from underground shaft to infinite depth to take any number of family urns. The pipe can be made from steel, concrete or plastics.

Description

Die Erfindung betrifft eine Grabstätte zur dauerhaften Aufbewahrung von Urnen oder Leichname. Derartige Räume gibt es in Form einer Gruft für Särge oder Urnenhalle (Kolumbarium) für Urnen.The invention relates to a burial site for permanent Storage of urns or corpses. Such spaces exist in Form of a crypt for coffins or urn hall (columbarium) for Urns.

Allgemein üblich ist die Erdbestattung in einem Sarg. Diese Bestattungsform beinhaltet viele Nachteile. Sie benötigt viel Fläche, gefährdet das Grundwasser und bietet eine geringe Sicherheit bei Überschwemmungen und anderen Einwirkungen. Aufgrund des Flächenbedarfs ergeben sich im städtischen Raum hohe Kosten. In dicht besiedelten Regionen ist eine Friedhofserweiterung häufig nicht möglich und die Flächen reichen für Erdbestattungen nicht mehr aus. Eine Familiengrabstätte oder eine Gruft ist deshalb für viele Menschen nicht mehr finanzierbar. Spätestens nach einer Generation wird somit die Grabstätte im allgemeinen aufgegeben, bzw. für eine Nutzung durch Dritte eingeebnet.Common burial in a coffin is common. This The form of burial has many disadvantages. It needs a lot Area, endangers the groundwater and offers a small Safety in the event of floods and other impacts. Due to the space requirement, there are high urban areas Costs. There is one in densely populated regions Cemetery expansion is often not possible and the areas are sufficient no longer sufficient for burials. A family tomb or a crypt is therefore no longer for many people affordable. So at the latest after a generation Tomb generally abandoned, or for use by Third leveled.

Aus diesen Gründen wächst die Bedeutung der Urnenbestattung. Der Raumbedarf ist geringer, aber eine sichere Verwahrung ist auch hier gewünscht. Bekannt sind hierfür Gebäude mit Kammern für die Urnen. Der Bauaufwand hierfür ist erheblich und eine natürliches Umfeld nicht mehr gegeben.For these reasons, the importance of urn burial is growing. Of the Space is less, but safe storage is also wanted here. Buildings with chambers are known for this Urns. The construction effort for this is considerable and a natural one Environment no longer exists.

In der DE 31 50 023 wird eine wiederverwendbare Grabkammer aus Beton vorgeschlagen. Durch eine gezielte Belüftung soll die Verwesung beschleunigt werden. Nach kürzer als üblicher Zeitspanne können die verbliebenen Reste in der Grabkammer umgelagert, und der Raum wieder genutzt werden. Neben dem hohen baulichen Aufwand ist die erforderliche Umbettung ein großer Nachteil. Die vorhandene Kapazität ist trotz des Aufwandes gering.DE 31 50 023 discloses a reusable burial chamber Concrete suggested. Through targeted ventilation, the Decay will be accelerated. After shorter than usual The remaining remains in the burial chamber can last for a period of time relocated, and the space can be used again. In addition to the high The necessary reallocation is a major structural effort Disadvantage. The existing capacity is despite the effort low.

Aufgabe der Erfindung ist es deshalb, eine Grabstätte mit großem Volumen bei geringem Flächenbedarf zu schaffen. Die Aufbewahrung von Urnen oder Leichname soll wahlweise möglich und mit hohem Sicherheitsgrad erfolgen. Die Grabstätte muß weiterhin für ungünstige Bodenverhältnisse geeignet sein und geringe Kosten verursachen. The object of the invention is therefore a burial site with a large To create volume with a small footprint. The storage of urns or corpses should be possible and with high Security level. The grave must continue for unfavorable soil conditions and low costs cause.  

Gelöst wird diese Aufgabe durch ein Verfahren, in dem ein Untergrundaufschluß durch eine Bohrung erfolgt, die Bohrung mit einer festen Wandung ausgebaut, und an der Öffnung im Bereich der Erdoberfläche ein Deckel befestigt wird.This task is solved by a procedure in which a Underground digestion takes place through a hole, the hole with a solid wall, and at the opening in the area of A lid is attached to the surface of the earth.

Die Grabstätte besteht erfindungsgemäß aus einem festen, dichtem Rohr im Untergrund und einem Deckel im Bereich der Erdoberfläche. Mit dieser Erfindung wird mit geringem Aufwand eine Grabstätte mit großem Volumen geschaffen, indem der Untergrund bis in größere Tiefe genutzt wird. Der Grundwasserspiegel und andere Faktoren sind keine Begrenzung, wenn das Ausbaurohr und der Boden dicht ausgeführt werden. Durch das große Volumen ist genügend Zeit für die Verwesung gegeben, so daß die Grabstätte auch langjährig als Familienstätte mit Erdbestattung genutzt werden kann. Die kleine obere Öffnung ermöglicht eine hohe Sicherheit, die durch einen Verschluß noch erhöht wird. Der Verbrauch an Oberfläche ist dagegen geringer als bei einer üblichen Erdbestattung.According to the invention, the burial site consists of a solid, dense one Pipe in the underground and a cover in the area of the earth's surface. With this invention, a burial site is made with little effort created with large volume by extending the underground to larger Depth is used. The water table and other factors are no limit if the extension pipe and the floor are tight be carried out. Due to the large volume there is enough time for given the decay, so that the burial site is also long standing as Family site with burial can be used. The little one Upper opening allows a high level of security through a Closure is increased. The surface consumption is on the other hand less than with a normal burial.

In der Praxis kann eine Fläche gleichzeitig durch mehrere Bohrungen aufbereitet werden, so daß eine spätere Störung vermieden wird und die Herstellungskosten sinken.In practice, one surface can be divided by several Drilled holes are prepared so that a later malfunction is avoided and the manufacturing costs decrease.

Spezielle Ausgestaltungen der Erfindung sind in den Unteransprüchen dargelegt.Special embodiments of the invention are in the Sub-claims set out.

Nachfolgend wird die Erfindung an einem Beispiel erläutert. Die Figur zeigt eine rohrförmige Grabstätte in der Seitenansicht im Schnitt.The invention is explained below using an example. The figure shows a tubular tomb in side view on average.

Ein Ausbaurohr aus Stahl ist senkrecht in einer Bohrung im Erdreich angeordnet. Der Raum zwischen dem Ausbaurohr und dem Erdbereich, in dem während der Bohrung das Stützrohr stand, ist mit Kies oder Ton ausgefüllt. Seitliche Klappanker am Ausbaurohr verhindern ein Herausziehen durch Unbefugte. Der Innendurchmesser entspricht in diesem Beispiel etwa dem Urnendurchmesser. Die Länge des Rohres kann über 10 m betragen, so daß eine größere Zahl von Urnen übereinander gestapelt werden kann. Das Ausbaurohr ist unten durch einen Bodendeckel fest verschlossen. Am oberen Ende, im Bereich der Erdoberfläche, ist ein Stutzen auf dem Ausbaurohr aufgeschraubt, der einen verschließbaren Deckel trägt. A steel extension pipe is vertical in a hole in the Soil arranged. The space between the expansion pipe and the Earth area in which the support tube stood during the drilling filled with gravel or clay. Folding anchors on the side of the extension pipe prevent unauthorized persons from pulling it out. The inside diameter corresponds approximately to the urn diameter in this example. The Length of the tube can be over 10 m, so that a larger Number of urns can be stacked on top of each other. The expansion pipe is firmly closed at the bottom by a bottom cover. At the top At the end, in the area of the earth 's surface, there is a nozzle on the Unscrewed extension pipe, which carries a lockable lid.  

Um diesen ist eine Einfassung aus Stein angeordnet, die mit einer Grabplatte abgedeckt ist.Around this is a stone edging, arranged with a Grave slab is covered.

Abwandlungen der Erfindung sind mehrfach möglich, ohne den erfinderischen Gedanken zu verlassen. Mit einem größeren Durchmesser des Ausbaurohres wird eine Sarg,- bzw. Erdbestattung in senkrechter Form durchführbar. Denkbar ist hierfür auch eine schräge Anordnung des Ausbaurohres im Erdreich.Modifications of the invention are possible several times without the to leave inventive thoughts. With a bigger one The diameter of the extension pipe becomes a coffin or burial feasible in vertical form. One is also conceivable for this oblique arrangement of the expansion pipe in the ground.

Der obere Abschluß ist ebenfalls in verschiedenen Formen, mit Figuren, mit erhöhtem Abschluß, oder ohne jede zusätzliche Gestaltung ausführbar.The top finish is also in various forms, with Figures, with increased degrees, or without any additional Design executable.

Claims (13)

1. Verfahren zur Herstellung einer Grabstätte unter Einbringung eines festen Grabraumes in das Erdreich, dadurch gekennzeichnet, daß ein Untergrundaufschluß durch eine Bohrung erfolgt, die Bohrung mit einer festen Wandung ausgebaut, und an der Öffnung im Bereich der Erdoberfläche ein Deckel angeordnet wird.1. A process for the preparation of a burial site with the introduction of a solid burial space in the ground, characterized in that an underground disruption takes place through a bore, the bore is expanded with a solid wall, and a cover is arranged at the opening in the area of the earth's surface. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß nach Abschluß der Bohrung ein Ausbaurohr mit verschlossenem Boden in die Bohrung eingebracht wird.2. The method according to claim 1, characterized, that after completion of the bore a pipe with a closed Soil is introduced into the bore. 3. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß nach Abschluß der Bohrung ein Ausbaurohr ohne Boden in die Bohrung eingebracht wird.3. The method according to claim 1, characterized, that after completion of the bore a pipe without a bottom in the Hole is made. 4. Verfahren nach Anspruch 1 bis 3, dadurch gekennzeichnet, daß nach Einbringung des Ausbaurohres ein Rahmen mit Deckel form- oder kraftschlüssig mit dem oberen Rohrende verbunden wird.4. The method according to claim 1 to 3, characterized, that after inserting the extension pipe, a frame with a lid is positively or non-positively connected to the upper pipe end. 5. Verfahren nach Anspruch 1 bis 4, dadurch gekennzeichnet, daß mehrere Bohrungen für je eine Grabstätte in Gruppen nebeneinander in den Erdboden eingebracht werden.5. The method according to claim 1 to 4, characterized, that several holes for each burial site in groups placed next to each other in the ground. 6. Verfahren nach Anspruch 1 bis 5, dadurch gekennzeichnet, daß die Bohrung/Ausbaurohrwandung mit einem inneren Durchmesser ausgeführt wird, der geringfügig über dem Urnendurchmesser, bzw. Körperdurchmesser liegt. 6. The method according to claim 1 to 5, characterized, that the bore / extension pipe wall with an inner diameter that is slightly above the urn diameter or Body diameter lies.   7. Grabstätte, bestehend aus einer festen Wandung im Erdbereich mit einer verschließbaren Öffnung, dadurch gekennzeichnet, daß diese aus einem festen Rohr oder Schacht im Untergrund und einem Deckel im Bereich der Erdoberfläche besteht.7. Gravesite, consisting of a solid wall in the earth area with a closable opening, characterized, that this from a solid pipe or shaft in the underground and a lid in the area of the earth's surface. 8. Grabstätte nach Anspruch 7, dadurch gekennzeichnet, daß das Ausbaurohr annähernd senkrecht im Erdreich steht, das untere Rohrende verschlossen ist, und das obere Rohrende unter oder über dem Erdreich endet.8. burial site according to claim 7, characterized, that the extension pipe is almost vertical in the ground, the lower end of the pipe is closed, and the top of the pipe ends below or above the ground. 9. Grabstätte nach Anspruch 7 und 8, dadurch gekennzeichnet, daß das Ausbaurohr, daß untere Rohrende und der obere Verschluß wasserdicht ausgeführt sind.9. burial site according to claim 7 and 8, characterized, that the extension pipe, the lower pipe end and the upper closure are waterproof. 10. Grabstätte nach Anspruch 7 bis 9, dadurch gekennzeichnet, daß das Rohr aus Beton, Stahl oder Kunststoff besteht.10. burial site according to claim 7 to 9, characterized, that the pipe is made of concrete, steel or plastic. 11. Grabstätte nach Anspruch 7 bis 10, dadurch gekennzeichnet, daß die Öffnung des Rohres einen verschließbaren Deckel besitzt.11. burial site according to claim 7 to 10, characterized, that the opening of the tube has a closable lid. 12. Grabstätte nach Anspruch 7 bis 11, dadurch gekennzeichnet, daß der Deckel eine größere Fläche für Inschriften und/oder eine räumliche Gestaltung besitzt, oder über dem Deckel dafür eine zusätzliche Platte angeordnet ist.12. burial site according to claim 7 to 11, characterized, that the cover has a larger area for inscriptions and / or a has spatial design, or an additional plate is placed over the lid is. 13. Grabstätte nach Anspruch 7 bis 11, dadurch gekennzeichnet, daß im Bereich der Öffnung/des Deckels eine Absenkeinrichtung oder eine Aufnahme für diese angeordnet ist.13. burial site according to claim 7 to 11, characterized, that a lowering device in the area of the opening / the lid or a recording for this is arranged.
DE1998127820 1998-06-17 1998-06-17 Method of manufacturing tombs Ceased DE19827820A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE1998127820 DE19827820A1 (en) 1998-06-17 1998-06-17 Method of manufacturing tombs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE1998127820 DE19827820A1 (en) 1998-06-17 1998-06-17 Method of manufacturing tombs

Publications (1)

Publication Number Publication Date
DE19827820A1 true DE19827820A1 (en) 1999-12-23

Family

ID=7871679

Family Applications (1)

Application Number Title Priority Date Filing Date
DE1998127820 Ceased DE19827820A1 (en) 1998-06-17 1998-06-17 Method of manufacturing tombs

Country Status (1)

Country Link
DE (1) DE19827820A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004024078A1 (en) * 2004-05-13 2005-12-08 Günter Lang Urns-burial method for cemetery, involves covering and locking upper end of urn receiving pipe by cover plate, containing ash of deceased in successively buried urn, adjusting urn into pipe, and attaching visible grave symbol to plate
AT13291U1 (en) * 2012-10-09 2013-10-15 Franz Guertler Urn vault with screw-on cover
US20220396966A1 (en) * 2021-06-11 2022-12-15 Stephen J. Sabo Urn Pedestal
WO2023278140A1 (en) * 2021-07-02 2023-01-05 Columbarium By Design, Llc In-ground niche

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004024078A1 (en) * 2004-05-13 2005-12-08 Günter Lang Urns-burial method for cemetery, involves covering and locking upper end of urn receiving pipe by cover plate, containing ash of deceased in successively buried urn, adjusting urn into pipe, and attaching visible grave symbol to plate
DE102004024078B4 (en) * 2004-05-13 2006-04-13 Günter Lang Urns-burial method for cemetery, involves covering and locking upper end of urn receiving pipe by cover plate, containing ash of deceased in successively buried urn, adjusting urn into pipe, and attaching visible grave symbol to plate
AT13291U1 (en) * 2012-10-09 2013-10-15 Franz Guertler Urn vault with screw-on cover
US20220396966A1 (en) * 2021-06-11 2022-12-15 Stephen J. Sabo Urn Pedestal
WO2023278140A1 (en) * 2021-07-02 2023-01-05 Columbarium By Design, Llc In-ground niche
US12065849B2 (en) 2021-07-02 2024-08-20 Columbarium By Design, Llc In-ground niche

Similar Documents

Publication Publication Date Title
DE19827820A1 (en) Method of manufacturing tombs
DE3534327C1 (en) Prefabricated container forming coffin-receiving vault - comprises GRP trough and lid with perimeter holes allowing air circulation
DE102004024078B4 (en) Urns-burial method for cemetery, involves covering and locking upper end of urn receiving pipe by cover plate, containing ash of deceased in successively buried urn, adjusting urn into pipe, and attaching visible grave symbol to plate
DE202006011205U1 (en) Monument or gravestone has weighted base plate provided with plastics visible part which can take an inscription plate
EP2390440A2 (en) Urn container with covering and anti-theft device
DE19606583C1 (en) Casing of resistant plastic sheeting, for cladding earth grave
DE202019100996U1 (en) Pedestal for an urn grave to fix a grave sign
DE2059547A1 (en) Crypt
DE3150023A1 (en) Reusable concrete burial vault
DE202010002248U1 (en) Urnenerdkammer
EP2022911B1 (en) Structure for storing urns and concrete prefabricated part
DE19839040B4 (en) safe
DE102022209348A1 (en) Foundation arrangement for a grave site and burial site
EP1878857A2 (en) Foundation for gravestones and funerary monuments
EP1786997B1 (en) Method for sanitising graves, creating new graves and burial site
DE7627247U1 (en) TOMBSTONE WITH FOUNDATION
DE102004053414A1 (en) Cremation device for urns, has two-part dome with upper and lower parts, and handling opening closed by cover, where urns are transferred from support plate into substructure when upper dome part is in rest position
EP1277898B1 (en) Method of decontaminating graves
DE202009003248U1 (en) Urn burial system
DE102014013134B3 (en) Device for storing urns in cemeteries od. Like.
EP1273742B1 (en) Grave excavation shoring with aerating function
DE7309646U (en) Installation device for cemetery graves
DE202014007213U1 (en) Device for storing urns in cemeteries od. Like.
DE4431709A1 (en) Modular grave installation with path element
DE2158989A1 (en) UNDERGROUND CHAMBER

Legal Events

Date Code Title Description
8122 Nonbinding interest in granting licenses declared
8110 Request for examination paragraph 44
8131 Rejection