Process for the production of wall elements from sand-lime bricks

Info

Publication number
DE1953633B
DE1953633B DE1953633B DE 1953633 B DE1953633 B DE 1953633B DE 1953633 B DE1953633 B DE 1953633B
Authority
DE
Germany
Prior art keywords
mortar
sand
bricks
hardening
lime
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
Other languages
German (de)
Inventor
Der Anmelder Ist
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual

Links

Description

stengründen und wegen arbeitsphysiologischer Rück- bringen und diese z. B. mit einer Schablone abzu-for reasons of stern and because of work-physiological return and this z. B. with a template

sichten nicht durchsetzen können. 65 ziehen, wodurch die Toleranzen der Kalksandstein-not be able to enforce sifting. 65 pull, whereby the tolerances of the sand-lime brick

Die im Wohn- und Industriebau sich allmählich Formlinge ausgeglichen und Wandelemente vonIn residential and industrial buildings, bricks and wall elements are gradually being balanced out

durchsetzende Verwendung vorgefertigter geschoß- genau gleicher Höhe hergestellt werden,enforcing use of prefabricated storeys of exactly the same height are made,

hoher Wände aus Beton oder Holz ermöglicht keine Zweckmäßig wird die Oberseite der Formlinge auf-high walls made of concrete or wood do not allow the top of the bricks

3 43 4

gerauht, um eine gute Haftung des Mörtels zu errei- aus Kalksandstein zusammengefügt ist, und zwar sind chen. die einzelnen Formlinge auf einem nicht gezeichneten Die aus der Presse kommenden Formlinge werden Härtewagen aufeinandergeschichtet, wobei in der bein üblicher Weise mittels einer elektrisch-mechani- schriebenen Weise unter die unterste Lage der Formschen Vorrichtung von einem Förderband, z. B, 5 linge eine Mörtelschicht 2 und zwischen den einzeleinem Stahlband, genommen und auf den Härtewa- nen Lagen eine Mörtelschicht 3 zur Ausfüllung der gen abgesetzt, worauf sie in der beschriebenen Weise Lagerfugen angebracht ist. Auf die Oberseite des so unter Aufbringen von Mörtel in die Lagerfugen über- gebildeten Wandelements ist eine Mörtelschicht 4 einandergeschichtet werden, wobei die Stoßfugen aufgetragen.roughened in order to achieve good adhesion of the mortar made of sand-lime brick, namely are chen. the individual briquettes on a not drawn The briquettes coming out of the press are layered on top of each other with hardening trolleys, with the leg in the Usually by means of an electrical-mechanical way under the lowest layer of the molds Device from a conveyor belt, e.g. B, 5 let a layer of mortar 2 and between each one Steel band, taken and a layer of mortar 3 on the hardness layers to fill in the gene discontinued, whereupon it is attached in the manner described bearing joints. On top of the so A layer of mortar 4 is formed by the application of mortar into the bed joints are layered one on top of the other, with the butt joints being applied.

übereinander zu liegen kommen. Formlinge können io Dieser Stapel von Formungen mit Mörtelschichten auch im Verband gegeneinander versetzt aufeinan- wird dann in der beschriebenen Weise mittels des dergeschichtet werden. An den Enden des Wandele- Härtewagens in den Härtekessel des Kalksandsteinments ergeben sich hierbei Verzahnungen in der werkes geschoben und in gleicher Weise wie bisher Tiefe eines halben Steines, die mit halbierten, bereits die Kalksandsteine hydrothermisch mit Hochdruckhydrothermal gehärteten Steinen von Hand ausgefüllt 15 dampf gehärtet, wobei die aus dem gleichen Baustoff werden, damit das Wandelement auch an den Stirn- wie die Formlinge bestehenden Mörtelschichten sich Seiten glatte Flächen erhält. innig mit diesen zu einem homogenen Block verbin-Zweckmäßig werden an den Stirnseiten der Form- den. Zur Erhöhung der Festigkeit sind in einzelnen linge Ausnehmungen vorgesehen, die zur Bildung der Lagerfugen Rundstäbe 6 eingelassen, die an den Stoßfugen auf der Baustelle unter Einbetten von Ver- ao Kopfseiten des Wandelements bei 7 rechtwinklig umbindungsmitteln, wie Stäben, mit Mörtel ausgegossen gebogen sind.come to lie on top of each other. Moldings can io this pile of moldings with layers of mortar offset against one another in the association is then carried out in the manner described by means of the be layered. At the ends of the Wandele hardening trolley in the hardening kettle of the sand-lime block this results in gears in the factory and pushed in the same way as before Depth of half a stone, with halved, already the sand-lime bricks hydrothermally filled with high pressure hydrothermally hardened stones by hand 15 steam-hardened, with those made of the same building material be so that the wall element also on the front like the moldings existing mortar layers Smooth surfaces on the sides. intimately connected with these to form a homogeneous block-expediently are on the end faces of the molds. To increase strength are in individual linge recesses are provided, the round bars 6 let in to form the bearing joints, which are attached to the Butt joints on the construction site with embedding of ver ao head sides of the wall element at 7 right-angled anchoring means, like rods, filled with mortar are bent.

werden. rjje einzelnen Formlinge können die üblichen Ab-will. rjj e individual briquettes can have the usual

Die Erfindung soll im einzelnen an Hand der messungen eines Kalksandsteins im BundesformatThe invention is intended in detail on the basis of the measurements of a sand-lime brick in federal format

Zeichnung erläutert werden. Es zeigt haben.Drawing will be explained. It shows have.

F i g. 1 die Seitenansicht und 35 Die einzelnen Formlinge, die nach dem Härten zu-F i g. 1 the side view and 35 the individual briquettes, which after hardening

F i g. 2 die Vorderansicht eines nach dem Verfah- sammen mit dem Mörtel das Wandelement bilden,F i g. 2 the front view of a wall element after the method together with the mortar,

ren gemäß der Erfindung hergestellten Wandele- können statt aus einer Kalksandsteinmasse auch ausRen made according to the invention Wandele- can instead of a sand-lime brick mass from

ments. ähnlichen Baustoffen bestehen, beispielsweise zurments. Similar building materials exist, for example for

Die F i g. 1 und 2 zeigen ein Wandelement, das bei- Verbesserung des Raumgewichts aus Bims- oderThe F i g. 1 and 2 show a wall element that is made of pumice or when improving the density

spielsweise aus fünf Lagen von je vier Formlinge 1 30 Blähton-Kalksandgemischen, hergestellt sein.for example, be made from five layers of four briquettes 1 30 expanded clay-lime sand mixtures.

Hierzu 1 Blatt Zeichnungen1 sheet of drawings

Claims (7)

1 2 Patentansprüche: individuelle Planungsmöglichkeit und erfordert im1 2 Claims: individual planning option and requires im 1. Verfahren zum Herstellen von Wandele- übrigen kostspielige Vorrichtungen, die nur bei einer menten aus Kalksandsteinen, dadurch ge- Massenfertigung derartiger Wandelemente rationell kennzeichnet, daß mehrere Kalksandstein- ist,1. Process for the production of Wandele- other expensive devices that only one elements made of sand-lime bricks, which means that mass production of such wall elements is efficient indicates that there are several sand-lime bricks, Formlinge (1) mit Mörtel zu einem Wandele- 5 Aus der Tonindustrie-Zeitung 1934, S. 830 bis 832Moldings (1) with mortar to form a wall element 5 From the Tonindustrie-Zeitung 1934, pp. 830 to 832 ment zusammengefügt werden, das anschließend ist es bekannt, Wandelemente vorzufertigen, indemment are assembled, which then it is known to prefabricate wall elements by durch Dampf gehärtet wird, normale Ziegelsteine mit Hilfe von Armierungseisenis hardened by steam, normal bricks with the help of reinforcing iron 2. Verfahren nach Anspruch 1, dadurch ge- und Mörtel auf ebener Erde zu Tafeln zusammengekennzeichnet, daß der Mörtel aus dem gleichen fügt werden, die nach dem Abbinden des Mörtels mit Baustoff wie die Formlinge unter Zusatz von io Hilfe eines Ladebaumes aufgerichtet und zu Außen-Wasser hergestellt wird. mauern und Innenwänden zusammengefügt werden.2. The method according to claim 1, characterized by grout and mortar on the ground to form panels, that the mortar will be added from the same that will be used after the mortar has set Building material like the briquettes with the addition of io the help of a loading boom erected and to outside water will be produced. walls and interior walls are joined together. 3. Verfahren nach einem der Ansprüche 1 oder Da hierbei normale Ziegelsteine verwendet werden, 2, dadurch gekennzeichnet, daß die Formlinge wird keine nennenswerte Arbeitsersparnis gegenüber auf der Ladefläche eines Härtewagens mit einer der konventionellen Ziegelbauweise erreicht.
Zwischenschicht (3) aus Mörtel übereinanderge- 15 Durch die Erfindung soll ein neuer Weg aufgezeigt schichtet und in den Härtekessel gebracht wer- werden, um auf besonders wirtschaftliche Weise ohne den. große Investitionen im Kalksandsteinwerk oder auf
3. The method according to any one of claims 1 or since normal bricks are used here, 2, characterized in that the briquettes are not achieved any significant labor savings compared to the loading area of a hardening car with one of the conventional brick construction.
Intermediate layer (3) made of mortar on top of one another. The invention is intended to show a new way of layering and bringing it into the hardening vessel in order to avoid the. large investments in sand-lime brick works or on
4. Verfahren nach Anspruch 3, dadurch ge- der Baustelle Wandelemente aus Kalksandsteinen kennzeichnet, daß auf die Oberseite des geschieh- herzustellen und auf der Baustelle zu versetzen,
teten Wandelements eine Mörtelschicht (4) zum 20 Gemäß der Erfindung werden zur Lösung dieser Ausgleich von Höhenunterschieden der Form- Aufgabe mehrere Kalksandstein-Formlinge mit Mörlinge (1) aufgebracht wird. tel zu einem Wandelement zusammengefügt, das an-
4. The method according to claim 3, characterized in that the construction site wall elements made of sand-lime bricks indicate that on top of the produced and relocated on the construction site,
According to the invention, several sand-lime bricks with mortars (1) are applied to compensate for height differences in the molding task. tel joined together to form a wall element that
5. Verfahren nach einem der Ansprüche 1 bis schließend durch Dampf gehärtet wird.5. The method according to any one of claims 1 to is finally hardened by steam. 4, dadurch gekennzeichnet, daß die Oberseite der Die Formlinge werden also gleichzeitig mit dem4, characterized in that the top of the moldings are so simultaneously with the Formlinge (1) aufgerauht wird. 35 Mörtel zu einem homogenen Block gehärtet, der alsMoldings (1) is roughened. 35 mortar hardened into a homogeneous block, which is called 6. Verfahren nach Anspruch 1, dadurch ge- großformatiges Bauelement auf der Baustelle verarkennzeichnet, daß die Formlinge (1) gegeneinan- beitet wird. Zweckmäßig hat das auf diese Weise erder versetzt im Verband aufeinandergeschichtet zeugte Wandelement die Abmessung von Vs Gewerden, wobei die an den Stirnseiten des gehärte- schoßhöhe oder für Keller von Vs Geschoßhöhe, ten Wandelements entstehenden Verzahnungen 30 Hierdurch wird eine wesentlich höhere Arbeitsprodurch gehärtete halbe Kalksandsteine ausgefüllt duktivität erreicht als bei Verwendung einzelner werden. Steine. Dabei ist eine vielseitige Verwendbarkeit die-6. The method as claimed in claim 1, characterized in that the large-format component is marked on the construction site, that the moldings (1) are worked against each other. This is useful in this way stacked in a staggered bond, the wall element gave the dimensions of Vs Gewerden, where the at the front of the hardened floor height or for basement of Vs floor height, The toothing 30 produced by the th wall element. This results in a much higher work rate hardened half sand-lime bricks filled with a higher ductility than when using single ones will. Stones. The versatility of the 7. Verfahren nach Anspruch 1, dadurch ge- ser Wandelemente sowie eine bei der bekannten kennzeichnet, daß an den Stirnseiten der Form- Großtafelbauweise nicht mögliche individuelle PIalinge (1) Ausnehmungen vorgesehen werden, die 35 nungsmöglichkeit gewährleistet.7. The method according to claim 1, characterized in that there are wall elements and one in the known one indicates that individual panels are not possible on the front sides of the large-panel form (1) Recesses are provided, which guarantees the possibility of operation. zur Bildung der Stoßfugen auf der Baustelle gege- Zum Zusammenfügen der einzelnen Kalksandsteinbenenfalls unter Einbetten von Verbindungsmit- Formlinge können alle Arten Mörtel aus kalziumhalteln, wie Rundstäben (6), mit Mörtel ausgegossen tigen Bindemitteln und quarzhaltigen Zuschlagstoffen werden. verwendet werden. Vorzugsweise wird der Mörtel aus 40 dem gleichen Baustoff wie die Formlinge unter Zusatz von Wasser hergestellt, so daß der Mörtel beimto form the butt joints on the construction site, if necessary, to join the individual sand-lime bricks by embedding connecting pieces, all types of mortar made of calcium can be retained, such as round rods (6), with mortar-filled binding agents and aggregates containing quartz will. be used. The mortar is preferably made from the same building material as the moldings with an additive made of water, so that the mortar when Die Erfindung betrifft ein Verfahren zum Herstel- Härtevorgang sich besonders innig und fugenlos zuThe invention relates to a method of manufacturing the hardening process which is particularly intimate and seamless len von Wandelementen aus Kalksandsteinen. einem homogenen Block mit den einzelnen Formlin-len of wall elements made of sand-lime bricks. a homogeneous block with the individual form Kalksandsteine werden im allgemeinen in kleinen gen verbindet. Das in dieser Weise hergestellte Wand-Abmessungen, dem sogenannten Bundesformat, her- 45 element hat daher eine hohe Festigkeit,
gestellt. In letzter Zeit sind auch größere Steinfor- Da die Formlinge vor dem Härten nur eine geringe mate in der Größe 2 DF und 3 DF auf den Markt ge- Festigkeit haben, können selbst kleine Unebenheiten langt, die auf Grund ihres günstigen Gewichtes und der Ladefläche des Härtewagens zu einem Bruch der ihrer Kalksandsteine eigenen Maßhaltigkeit Eingang Formlinge führen. Dies wird nach einer weiteren in die Praxis gefunden haben. Größere Formate, wie 50 Ausgestaltung der Erfindung dadurch mit Sicherheit DF und 10 DF, konnten sich jedoch nicht durchset- vermieden, daß die Formlinge auf der Ladefläche des zen, da sie wegen ihres hohen Gewichtes schlecht zu Härtewagens mit einer Zwischenschicht aus Mörtel vermauern sind, obwohl sie sich in ihren Abmessun- übereinandergeschichtet und in den Härtekessel gegen den üblichen Mauerwerksnormen anpassen. bracht werden. Diese Zwischenschicht gleicht alle
Sand-lime bricks are generally connected in small amounts. The wall dimensions produced in this way, the so-called federal format, therefore have a high strength,
placed. Since the bricks have only a small mate in size 2 DF and 3 DF on the market before hardening, even small bumps can reach, which due to their low weight and the loading area of the Hardening car can lead to a break in the dimensional accuracy of their sand-lime bricks. This will have been found in practice after another. Larger formats, such as 50 embodiment of the invention with certainty DF and 10 DF, could not prevail, however, avoided that the briquettes on the loading area of the zen, because they are difficult to wall with an intermediate layer of mortar due to their high weight to hardening wagons, although their dimensions are stacked one on top of the other and in the hardening tank they adapt to the usual masonry standards. be brought. This intermediate layer is all the same
Um die im Verhältnis zu einem Fabrikarbeiter bei 55 Unebenheiten der Ladefläche sowie auch etwaige Unvollautomatisierter Produktion geringe Arbeitspro- ebenheiten der Formlinge aus, so daß diese vor jeder duktivität des Maurers zu erhöhen, hat man drei Beschädigung sicher geschützt sind. Nach dem Auf-Steine des Formats 10 DF mit Hilfe eines kleinen bringen der ersten Schicht Formlinge wird Mörtel in Kranes auf das zu erstellende Mauerwerk gehoben und die übrigen Lagerfugen entweder von Hand oder mit gleichzeitig vermauert. Man hat auch Steine der Ab- 60 einer Mörtelspritze oder in anderer üblicher Weise messungen 35,5X30,0X23,8 cm oben und unten plan aufgebracht.In relation to a factory worker with 55 unevenness of the loading area as well as any non-fully automated Production of low work evenness of the briquettes, so that these are in front of each To increase the bricklayer's productivity, one has to safely protect three types of damage. After the on-stones of the format 10 DF with the help of a small bring the first layer of bricks is mortar in Crane lifted onto the masonry to be created and the remaining horizontal joints either by hand or with walled up at the same time. You also have stones from a mortar syringe or in some other conventional way Measurements 35.5X30.0X23.8 cm above and below are applied flat. gefräst, um sie ohne Lagerfuge versetzen zu können. "Es empfiehlt sich, auch auf die Oberseite des ge-milled so that they can be moved without a horizontal joint. "It is advisable to also use the top of the AlIe diese bekannten Verfahren haben sich aus Ko- schichteten Wandelements eine Mörtelschicht aufzu-All these known methods have made a layer of mortar from coated wall elements.

Family

ID=

Similar Documents

Publication Publication Date Title
AT405204B (en) WALL PANEL AND METHOD FOR PRODUCING A WALL PANEL
DE1284076B (en) Method of erecting a building
DE2156006A1 (en) CONCRETE FRAMEWORK (DIAGONAL ARRANGEMENT) WITH HARD FOAM OR. LIGHTWEIGHT FORMING ELEMENTS WHICH ARE FILLING, PLASTERING AND INSULATING PARTS AT THE SAME TIME
DE2944424C2 (en) Process for the production of reinforced concrete slab aggregates
EP0936320A1 (en) Structural concrete member
DE2608848C3 (en) Wall element made of sand-lime bricks
DE2646231A1 (en) CONSTRUCTION
DE1953633B (en) Process for the production of wall elements from sand-lime bricks
DE1953633C (en) Process for the production of wall elements from sand-lime bricks
DE2647521A1 (en) Double skinned sand-lime block wall - consists of prefabricated sand lime slabs of storey height with core insulation
DE3230078A1 (en) Prefabricated planar building element and method for manufacturing the same
AT404950B (en) PRECAST ELEMENTS FOR THE BUILDING OF BUILDINGS
DE3005707A1 (en) LARGE-SIZED BUILDING BOARD AND METHOD FOR THE PRODUCTION THEREOF, AND WALL ELEMENT COMPOSED FROM THESE BOARDS
DE4317336A1 (en) Process for erecting a wall using prefabricated masonrywork slabs, and masonrywork slabs which are suitable for this purpose
DE1953633A1 (en) Process for the production of wall elements from sand-lime bricks
DE860920C (en) Process for the manufacture of reinforced stone beams or slabs and the product manufactured by this process
AT525045B1 (en) Method for manufacturing a room cell and a room cell part
EP0872609B1 (en) Method of making a layered wall-slab
DE2545925B2 (en) Acid-proof floor covering
DE19855917C1 (en) Producing wall elements, involves computer controlled erection and filling
DE2236463A1 (en) WALL CONSTRUCTION AND METHOD OF MANUFACTURING IT
DE811285C (en) Building wall made of factory-made prefabricated parts as well as processes for the production of the latter
DE19733755C2 (en) Large wall elements and method and device for producing them
DE2406852A1 (en) PROCESS FOR THE PRODUCTION OF BUILDINGS WITH ROCK CONCRETE WALLS AND REINFORCED CONCRETE SOLID SLABS
DE102020208628A1 (en) Wood-based building panel element, in particular wall or ceiling element, and method for its production