DE19526817A1 - Process for operating a track system - Google Patents

Process for operating a track system

Info

Publication number
DE19526817A1
DE19526817A1 DE19526817A DE19526817A DE19526817A1 DE 19526817 A1 DE19526817 A1 DE 19526817A1 DE 19526817 A DE19526817 A DE 19526817A DE 19526817 A DE19526817 A DE 19526817A DE 19526817 A1 DE19526817 A1 DE 19526817A1
Authority
DE
Germany
Prior art keywords
vehicle
switch
track
turnout
points
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
DE19526817A
Other languages
German (de)
Other versions
DE19526817C2 (en
Inventor
Gerd Dipl Ing Dierkes
Volker Dipl Ing Matthee
Christoph Dipl Ing Wehmann
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Priority to DE19526817A priority Critical patent/DE19526817C2/en
Priority to AT96250150T priority patent/ATE178849T1/en
Priority to EP96250150A priority patent/EP0753445B1/en
Priority to DE59601646T priority patent/DE59601646D1/en
Publication of DE19526817A1 publication Critical patent/DE19526817A1/en
Application granted granted Critical
Publication of DE19526817C2 publication Critical patent/DE19526817C2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L17/00Switching systems for classification yards

Abstract

The method involves placing a first set of points (W1) in the vehicle's or vehicle group's route direction (FR) into its safety position (WS1) and locking it after opening of the points. After opening of the next set of points (W2) along the route, the first set of points, which has remained locked in the safety position until this point, is unlocked. The first set of points can now be set again on demand, and the second set of points is now set into the safety position (WS2) and locked. The exit rails are monitored and when the vehicle (F1) has completely moved onto them, the last set of points is unlocked, enabling them to be set on demand again.

Description

Die Erfindung liegt auf dem Gebiet der Rangiertechnik und insbesondere der automatisierten Ablaufanlagen und betrifft ein Verfahren zum Betrieb einer Gleisanlage mit mehreren in Fahrtrichtung eines Fahrzeugs oder einer Fahrzeuggruppe auf­ einanderfolgenden verzweigenden Weichen.The invention lies in the field of shunting technology and especially the automated drainage systems and concerns a method for operating a track system with several in Direction of travel of a vehicle or a group of vehicles successive branching points.

In automatisierten Ablaufanlagen können einzelne Abläufe von Fahrzeugen oder Fahrzeuggruppen durch anomales Ablaufverhal­ ten zu Störungen des Rangierbetriebs und nachfolgender Abläu­ fe führen. Insbesondere besteht bei zu langsamen Abläufen die Gefahr von Auflauf- oder Eckstößen durch nachfolgende Abläufe. Beim Auflaufen nachfolgender Abläufe können die ein­ zelnen Weichen zur individuellen selektiven Vereinzelung der Abläufe nicht mehr gestellt werden, so daß sich eine große Anzahl von Falschläufern bildet, die gezwungenermaßen dem führenden Fahrzeug in dessen End- oder Richtungsgleis folgen.In automated drainage systems, individual processes of Vehicles or vehicle groups due to anomalous behavior to malfunctions in shunting operations and subsequent discharge lead fe. In particular, if the processes are too slow, there is the Danger of bumps or corner impacts from the following Processes. When running subsequent processes, they can be a individual switches for individual selective isolation of the Processes can no longer be set, so that there is a large Number of false runners is forced to do so Follow the leading vehicle in its end or direction track.

Die Aufgabe der Erfindung besteht daher in der Schaffung ei­ nes Verfahrens, das einen frühzeitigen Schutz des aktuellen Ablaufs vor den nachfolgenden Abläufen gewährleistet und Falschläufer vermeidet.The object of the invention is therefore to create egg nes procedure, the early protection of the current Guaranteed before the subsequent processes and Avoid wrong-way.

Diese Aufgabe wird bei einem Verfahren der eingangs genannten Art erfindungsgemäß dadurch gelöst, daß nach grenzzeichen­ freier Räumung einer in Fahrtrichtung des Fahrzeugs oder der Fahrzeuggruppe ersten Weiche diese in Schutzstellung gestellt und gesperrt wird, daß nach grenzzeichenfreier Räumung der in Fahrtrichtung des Fahrzeugs oder der Fahrzeuggruppe nachfol­ genden zweiten Weiche die bislang schutzbietende erste Weiche entsperrt wird, so daß die erste Weiche wieder bedarfsgemäß gestellt werden kann, und daß die zweite Weiche in Schutz­ stellung gestellt und gesperrt wird. Die Verwendung von Grenzzeichen und die Überwachung einer grenzzeichenfreien Räumung eines Abschnitts einer Gleisanlage sind für sich seit langem bekannt (DE-C3-26 31 076). Eine grenzzeichenfreie Räu­ mung ist bei eng vermaschten Bahnnetzen, beispielsweise in Rangierbereichen, erforderlich und erfolgt durch Überwachung des Profilraums der jeweiligen Streckenelemente wie z. B. Weichen. Die Streckenelemente werden beispielsweise durch Achszähler derart überwacht, daß die Meldung der Grenzzei­ chenfreiheit erst erfolgt, wenn keinerlei Teile von in dem jeweiligen Streckenelement befindlichen Fahrzeugen in den Profilraum benachbarter oder anschließender Streckenelemente hineinragen können.This task is carried out in a method of the type mentioned at the beginning Art solved according to the invention in that according to the border sign clearing one in the direction of travel of the vehicle or Vehicle group first switch this in protective position and it is blocked that after evacuation without border signs the Follow the direction of travel of the vehicle or group of vehicles second turnout is the first turnout to offer protection is unlocked so that the first switch again as required can be put and that the second switch in protection position and is blocked. The use of  Border signs and the surveillance of a border-free sign Clearance of a section of a track system has been done by itself long known (DE-C3-26 31 076). A border-free space mung is in tightly meshed railway networks, for example in Shunting areas, required and done by monitoring the profile space of the respective route elements such. B. Switches. The route elements are, for example, by Axle counter monitored in such a way that the message of the limit time freedom of movement only takes place if no parts of the vehicles located in the respective route element Profile space of adjacent or subsequent route elements can protrude.

Bei nachfolgenden weiteren Weichen kann das erfindungsgemäße Verfahren entsprechend fortgesetzt werden, so daß die zweite Weiche anstelle der ersten Weiche tritt und die weitere Weiche als zweite Weiche dient usw. Ein wesentlicher Vorteil des Verfahrens besteht darin, daß die jeweils vorhergehende, grenzzeichenfrei geräumte Weiche quasi dem aktuellen Ablauf folgend sukzessive als schutzgebende Weiche dient und unmittelbar nach grenzzeichenfreier Räumung der Folgeweiche wieder frei stellbar wird. Dadurch ergeben sich insgesamt weniger Falschläufer und somit weniger Gefahrensituationen. Dennoch wird der jeweils vorhergehende Ablauf zuverlässig gegen Eckstöße der nachfolgenden Abläufe geschützt.In the following further points, the invention Proceed accordingly, so that the second Switch instead of the first switch and the other Switch serves as a second switch, etc. A major advantage of the method is that the previous, Crossing point cleared quasi the current process subsequently serves as a protective switch and immediately after evacuation of the turnout becomes freely available again. This results overall fewer false runners and therefore fewer dangerous situations. Nevertheless, the previous procedure is always reliable protected against corner impacts of the subsequent processes.

Eine im Hinblick auf Ablaufanlagen mit Richtungsgleisen be­ vorzugte Ausgestaltung der Erfindung sieht vor, daß Auslauf­ gleise ohne weitere Weichen, beispielsweise Richtungsgleise in Rangieranlagen, überwacht werden und daß bei vollständigem Einlauf des Fahrzeugs oder der Fahrzeuggruppe in das Auslauf­ gleis die in Fahrtrichtung zurückliegende letzte Weiche ent­ sperrt wird, so daß diese bedarfsgemäß gestellt werden kann.One with regard to drainage systems with directional tracks preferred embodiment of the invention provides that spout tracks without further switches, for example directional tracks in marshalling yards, are monitored and that when complete Entry of the vehicle or group of vehicles into the outlet track the last switch back in the direction of travel is blocked so that it can be placed as needed.

Das Erkennen der grenzzeichenfreien Räumung der zurückliegen­ den Weiche ist in an sich bekannter Weise durch optische Sy­ steme oder in Kenntnis des Laufverhaltens möglich. Eine im Hinblick auf die Störunanfälligkeit besonders bevorzugte Fortbildung der Erfindung sieht vor, daß die grenzzeichen­ freie Räumung jeweils durch Achszählung mittels Gleiskontak­ ten erkannt wird.Recognizing the evacuation of the past without any border signs the switch is in a known manner by optical sy  possible or with knowledge of running behavior. One in Particularly preferred in view of the immunity to interference Training of the invention provides that the border clearing in each case by counting the axles by means of track contact is recognized.

Ein Ausführungsbeispiel der Erfindung wird nachfolgend anhand einer Zeichnung näher erläutert, die das Verfahren unter Be­ trachtung eines Ausschnitts einer automatisierten Ablaufan­ lage darstellt.An embodiment of the invention is described below a drawing explains the process under Be consideration of a section of an automated process location.

Eine Gleisanlage GA enthält neben geraden Streckenabschnitten ST mehrere in Fahrtrichtung FR eines Fahrzeugs F1 aufeinan­ derfolgende verzweigende Weichen. Nachfolgend sollen nur die Weichen W1, W2 näher betrachtet werden, die für einen selek­ tiven Ablauf des Fahrzeugs F1 in ein Richtungsgleis RI1 ge­ stellt werden. Die jeweilige Stellung der Weichen W1, W2 ist jeweils durch eine größere Strichstärke hervorgehoben. Die Weiche W1 ist in der Situation (a) derart gestellt, daß das Fahrzeug F1 im Geradeauslauf zu den Richtungsgleisen RI1 bzw. RI2 geleitet wird; die Stellung der Weiche W2 ist derart, daß das Fahrzeug F1 in das vorgesehene Richtungsgleis RI1 ge­ langt. Zu jeder Weiche W1, W2 sind (virtuelle) Grenzzeichen GZ1, GZ2 vorgesehen. Das Grenzzeichen GZ1 korrespondiert mit den im Weichenauslauf angeordneten Gleiskontakten GK1 der Weiche W1. Entsprechend korrespondiert das Grenzzeichen GZ2 mit den im Auslaufbereich der Weiche W2 bzw. der darunter liegenden Weiche angeordneten Gleiskontakten GK2. In den Richtungsgleisen RI1 bis RI4 sind Überwachungskontakte GK3 angeordnet. Erst wenn sämtliche Achsen eines Ablaufs (Fahr­ zeug/Fahrzeuggruppe) den jeweiligen Gleiskontakt GK über­ fahren haben und in bekannter Weise der beim Einlauf gezähl­ ten Achsanzahl entsprechen, wird das jeweilige Element als grenzzeichenfrei geräumt angesehen. Die Gleiskontakte GK sind dabei derart angeordnet, daß ein mit seiner letzten Achse unmittelbar dahinter zum Stillstand kommendes Fahrzeug nicht in den Profilraum der benachbarten oder angrenzenden Streckenelemente hereinragt, so daß keine Eckstoßgefahr besteht.A GA track system contains straight line sections ST several in the direction of travel FR of a vehicle F1 the following branching switch. In the following, only the Points W1, W2 are considered in more detail for a selek tive sequence of the vehicle F1 in a directional track RI1 ge be put. The respective position of the switches W1, W2 is each highlighted by a larger line width. The Switch W1 is set in situation (a) such that the Vehicle F1 straight ahead to the direction tracks RI1 or RI2 is directed; the position of the switch W2 is such that the vehicle F1 in the intended directional track RI1 ge reaches. For each turnout W1, W2 are (virtual) limit signs GZ1, GZ2 provided. The boundary symbol GZ1 corresponds to the track contacts GK1 in the turnout outlet Turnout W1. The boundary symbol GZ2 corresponds accordingly with those in the outlet area of the turnout W2 or the one below Lying switch arranged track contacts GK2. In the Directional tracks RI1 to RI4 are monitoring contacts GK3 arranged. Only when all axes of a sequence (driving witness / vehicle group) the respective track contact GK have driving and counted in a known manner at the inlet corresponding to the number of axles, the respective element is called viewed cleared without border signs. The track contacts are GK arranged so that one with its last axis vehicle coming to a stop immediately behind it  in the profile space of neighboring or adjacent Track elements protrude so that there is no risk of corner impact consists.

In der Situation (a) läuft das Fahrzeug F1 gerade in die in Fahrtrichtung FR erste Weiche W1 ein. Die Weiche W1 wird da­ mit besetzt gemeldet und gegen Umstellung gesperrt. Durch Achszählung der dem Grenzzeichen GZ1 zugeordneten Gleiskon­ takte GK1 wird geprüft, ob die Weiche W1 grenzzeichenfrei ge­ räumt worden ist. In der Situation (b) ist dies noch nicht der Fall, weil die letzte Achse des Fahrzeugs F1 den dem Grenzzeichen GZ1 zugeordneten im Auslaufbereich der Weiche W1 angeordneten Gleiskontakt GK1 noch nicht überfahren hat.In situation (a), vehicle F1 is currently running into Direction FR first turnout W1. The switch W1 is there reported with busy and locked against changeover. By Axis count of the track cone assigned to the boundary symbol GZ1 cycle GK1 is checked whether the turnout W1 is free of boundary signs has been cleared. This is not the case in situation (b) the case because the last axis of the vehicle F1 the the Boundary sign GZ1 assigned in the outlet area of the switch W1 has not yet run over the arranged track contact GK1.

In der Situation (c) befindet sich das Fahrzeug F1 in dem Streckenabschnitt ST und hat die Weiche W1 grenzzeichenfrei geräumt. Unabhängig von der für den nächsten Ablauf gewünsch­ ten Stellung wird die Weiche W1 vorübergehend in abweisende Stellung bzw. Schutzstellung WS1 gebracht. Nachfolgende Ab­ läufe würden daher durch die schutzbietende Stellung der Wei­ che W1 zu den Richtungsgleisen RI3 bzw. RI4 gelenkt, so daß das Fahrzeug F1 in jedem Fall geschützt ist. Selbst wenn das Fahrzeug F1 in dem Streckenabschnitt ST zum Stehen kommt, ist eine Gefährdung oder Beschädigung des Fahrzeugs F1 oder nach­ folgender Abläufe verhindert. In der Situation (d) läuft das Fahrzeug F1 in die Weiche W2 ein, die gemäß dem gewünschten Ablauf des Fahrzeugs F1 auf das Richtungsgleis RI1 gestellt ist. Außerdem erkennt man bereits ein nachfolgendes Fahrzeug F2, das sich noch auf einem Streckenabschnitt vor der Weiche W1 befindet. Auch die grenzzeichenfreie Räumung der Weiche W2 wird überwacht. Dazu dienen die dem Grenzzeichen GZ2 zuge­ ordneten Gleiskontakte GK2 im Auslaufbereich der Weiche W2.In situation (c) the vehicle F1 is in the Section ST and has the switch W1 without border signs cleared. Regardless of the one you want for the next process In this position, the switch W1 is temporarily turned into a repellent one Position or protective position WS1 brought. Subsequent Ab runs would therefore be due to the protective position of Wei che W1 directed to the direction tracks RI3 or RI4, so that the vehicle F1 is protected in any case. Even if that Vehicle F1 comes to a standstill in section ST a hazard or damage to the vehicle F1 or after following procedures prevented. In situation (d) it works Enter vehicle F1 into the turnout W2, according to the desired The course of the vehicle F1 is placed on the direction track RI1 is. In addition, you can already see a following vehicle F2, which is still on a stretch of track in front of the switch W1 is located. Also the clearing of the turnout W2 without border signs is being supervised. This is served by the border symbol GZ2 arranged track contacts GK2 in the outlet area of the switch W2.

In der Situation (e) befindet sich das Fahrzeug F1 bereits im Einlauf in das Richtungsgleis RI1 und hat die Weiche W2 grenzzeichenfrei geräumt. Dies führt zur Entsperrung der Weiche W1, die nun gemäß dem gewünschten Lauf des Fahrzeugs F2 stellbar ist. Da im vorliegenden Beispiel das Fahrzeug F2 in das Richtungsgleis RI2 einlaufen soll, wird die Weiche W1 aus ihrer Schutzstellung WS1 in den Geradeauslauf umgestellt. Gleichzeitig läuft die Weiche W2 in abweisende Schutzstellung WS2 um, in der das Fahrzeug F1 vor nachfolgenden Abläufen ge­ schützt ist.In situation (e) vehicle F1 is already in Entry into the directional track RI1 and has the switch W2 cleared without border signs. This leads to the unlocking of the  Turnout W1, which is now according to the desired run of the vehicle F2 is adjustable. Since in the present example the vehicle F2 Turnout W1 is to enter the direction track RI2 changed from their protective position WS1 to straight-ahead. At the same time, the switch W2 runs in a protective position WS2 um, in which the vehicle F1 ge before subsequent processes protects.

In der Situation (f) ist das Fahrzeug F2 in die Weiche W1 eingelaufen und das Fahrzeug F1 hat den Überwachungskontakt GK3 passiert. Der dadurch erkennbare vollständige Einlauf des Fahrzeugs F1 in das Richtungsgleis RI1 führt dazu, daß die Weiche W2 entsperrt und stellbar für das Fahrzeug F2 wird. Im vorliegenden Fall ist eine Umstellung der Weiche W2 zufällig nicht erforderlich, weil die bisherige Schutzstellung WS2 be­ reits in das Richtungsgleis RI2 führt. Der nachfolgende Ab­ lauf des Fahrzeugs F2 wird weiter so behandelt, wie zuvor ausführlich im Zusammenhang mit dem Fahrzeug F1 beschrieben. Demgemäß wird die grenzzeichenfreie Räumung der Weiche W1 ge­ prüft, die in der Situation (g) erfolgt ist, so daß diese in die Schutzstellung WS1 umläuft und gesperrt wird. Gleichzei­ tig ist das Fahrzeug F2 bereits in die Weiche W2 eingelaufen und setzt seinen Weg damit in Richtung des Richtungsgleises RI2 fort.In situation (f) the vehicle F2 is in the switch W1 run in and vehicle F1 has the monitoring contact GK3 happens. The recognizable complete enema of the Vehicle F1 in the directional track RI1 causes the Turnout W2 is unlocked and adjustable for the vehicle F2. in the In the present case, a changeover of the turnout W2 is random not necessary because the previous protection position WS2 be already leads in the direction track RI2. The following Ab The running of the vehicle F2 continues to be treated as before described in detail in connection with the vehicle F1. Accordingly, the border-free evacuation of the switch W1 ge checks that took place in situation (g), so that this in the protection position WS1 rotates and is blocked. Simultaneously The vehicle F2 has already entered switch W2 and thus sets its way in the direction of the directional track RI2 continues.

Wäre in der Situation (c) die grenzzeichenfreie Räumung der Weiche W1 durch das Fahrzeug F1 nicht rechtzeitig erfolgt, so wäre die Weiche W1 nicht in die Schutzstellung gelangt, son­ dern in der Lage "Aufpuffern" geblieben. Ein Aufpuffern des Fahrzeugs F2 auf das Fahrzeug F1 birgt wesentlich weniger Gefahren, als ein möglicherweise bei Stellung der Weiche W1 ohne Grenzzeichenfreiheit auftretender Eckstoß zwischen den Fahrzeugen F1 und F2. Die jeweils schutzbietende Stellung der zurückliegenden Weiche ist nur so lange erforderlich, bis die Folgeweiche grenzzeichenfrei geräumt ist. Dies vermindert insgesamt die Anzahl der Falschläufer und die Gefahr von Eck­ stößen.If situation (c) were the evacuation of the Switch W1 is not done in time by vehicle F1, so the switch W1 would not have reached the protective position, son remained in the position of "buffering". Buffering the Vehicle F2 on vehicle F1 contains much less Dangers as a possibly when setting the switch W1 corner joint between the F1 and F2 vehicles. The respective protective position of the back turnout is only required until the Follow-up switch is cleared without any border signs. This diminishes  in total the number of false runners and the risk of corner bump.

Das vorbeschriebene Verfahren kann vorzugsweise nur dann an­ gewendet werden, wenn für einen vorhergehenden Ablauf (Fahrzeug F1) ein ungenügendes Laufverhalten (insbesondere zu geringe Ablaufgeschwindigkeit) festgestellt wird oder auf­ grund einer Prognose zu erwarten ist.The method described above can preferably only then be turned over if for a previous run (Vehicle F1) an insufficient running behavior (especially to low running speed) is determined or on is to be expected on the basis of a forecast.

Claims (3)

1. Verfahren zum Betrieb einer Gleisanlage (GA) mit mehreren in Fahrtrichtung (FR) eines Fahrzeugs (F1) oder einer Fahr­ zeuggruppe aufeinanderfolgenden verzweigenden Weichen (W1, W2), dadurch gekennzeichnet, daß nach grenzzeichenfreier Räumung einer in Fahrtrichtung (FR) des Fahrzeugs (F1) oder der Fahrzeuggruppe ersten Weiche (W1) diese in Schutzstellung (WS1) gestellt und gesperrt wird, daß nach grenzzeichenfreier Räumung der in Fahrtrichtung (FR) des Fahrzeugs (F1) oder der Fahrzeuggruppe nachfolgenden zweiten Weiche (W2) die bislang schutzbietende erste Weiche (W1) ent­ sperrt wird, so daß die erste Weiche (W1) wieder bedarfsgemäß gestellt werden kann, und daß die zweite Weiche (W2) in Schutzstellung (WS2) gestellt und gesperrt wird.1. A method for operating a track system (GA) with several in the direction of travel (FR) of a vehicle (F1) or a vehicle group consecutive branching points (W1, W2), characterized in that after clearing a boundary in the direction of travel (FR) of the vehicle (F1) or the vehicle group first switch (W1) this is placed in the protective position (WS1) and locked so that after clearing the boundary in the direction of travel (FR) of the vehicle (F1) or the vehicle group following second switch (W2) the first one to provide protection Turnout (W1) is locked, so that the first turnout (W1) can be set again as required, and that the second turnout (W2) is placed in the protective position (WS2) and locked. 2. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß Auslaufgleise (RI1 bis RI4) ohne weitere Weichen, beispiels­ weise Richtungsgleise in Rangieranlagen, überwacht werden und daß bei vollständigem Einlauf des Fahrzeugs (F1) oder der Fahrzeuggruppe in das Auslaufgleis (RI1 bis RI4) die in Fahrtrichtung (FR) zurückliegende letzte Weiche (W2) ent­ sperrt wird, so daß diese bedarfsgemäß gestellt werden kann.2. The method according to claim 1, characterized in that Exit tracks (RI1 to RI4) without further switches, for example wise directional tracks in marshalling yards, are monitored and that when the vehicle (F1) or the Vehicle group in the exit track (RI1 to RI4) the in Direction (FR) past last switch (W2) ent is blocked so that it can be placed as needed. 3. Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die grenzzeichenfreie Räumung jeweils durch Achszählung mit­ tels Gleiskontakten (GK) erkannt wird.3. The method according to claim 1 or 2, characterized in that the clearing of the boundary signs in each case by counting the axles tels track contacts (GK) is recognized.
DE19526817A 1995-07-12 1995-07-12 Process for operating a track system Expired - Fee Related DE19526817C2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE19526817A DE19526817C2 (en) 1995-07-12 1995-07-12 Process for operating a track system
AT96250150T ATE178849T1 (en) 1995-07-12 1996-07-10 METHOD FOR OPERATING A TRACK SYSTEM
EP96250150A EP0753445B1 (en) 1995-07-12 1996-07-10 Method for operating railway tracks
DE59601646T DE59601646D1 (en) 1995-07-12 1996-07-10 Process for operating a track system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19526817A DE19526817C2 (en) 1995-07-12 1995-07-12 Process for operating a track system

Publications (2)

Publication Number Publication Date
DE19526817A1 true DE19526817A1 (en) 1997-01-23
DE19526817C2 DE19526817C2 (en) 2000-11-30

Family

ID=7767532

Family Applications (2)

Application Number Title Priority Date Filing Date
DE19526817A Expired - Fee Related DE19526817C2 (en) 1995-07-12 1995-07-12 Process for operating a track system
DE59601646T Expired - Lifetime DE59601646D1 (en) 1995-07-12 1996-07-10 Process for operating a track system

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE59601646T Expired - Lifetime DE59601646D1 (en) 1995-07-12 1996-07-10 Process for operating a track system

Country Status (3)

Country Link
EP (1) EP0753445B1 (en)
AT (1) ATE178849T1 (en)
DE (2) DE19526817C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114312915A (en) * 2021-12-15 2022-04-12 中国铁路南宁局集团有限公司 Shunting construction safety protection method for railway special line

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102152804B (en) * 2011-03-24 2012-11-14 天津七一二通信广播有限公司 Railway flat radio shunting system using shiborne automatic identification technology
CN102303629B (en) * 2011-07-29 2013-08-07 河南辉煌科技股份有限公司 Method of automatically selecting shunting route
CN110203256B (en) * 2019-04-26 2020-12-11 昆明聚讯科技有限公司 Wireless shunting light display system and method with non-interlocking shunting route guidance function
CN112722018B (en) * 2021-04-06 2021-06-18 上海富欣智能交通控制有限公司 Shunting route midway turning-back processing method and device and electronic equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2631076C3 (en) * 1976-07-09 1980-11-27 Siemens Ag, 1000 Berlin Und 8000 Muenchen Circuit for the profile detection of railway turnouts

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1040588B (en) * 1956-04-03 1958-10-09 Siemens Ag Arrangement for sequence systems with automatic point control through sequence memory
DE1089004B (en) * 1956-09-27 1960-09-15 Siemens Ag Circuit for sequence systems with automatic switch control
DE1138089B (en) * 1961-02-11 1962-10-18 Werk Signal Sicherungstech Veb Circuit for drainage systems with automatically controlled switches

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2631076C3 (en) * 1976-07-09 1980-11-27 Siemens Ag, 1000 Berlin Und 8000 Muenchen Circuit for the profile detection of railway turnouts

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114312915A (en) * 2021-12-15 2022-04-12 中国铁路南宁局集团有限公司 Shunting construction safety protection method for railway special line

Also Published As

Publication number Publication date
EP0753445B1 (en) 1999-04-14
DE59601646D1 (en) 1999-05-20
ATE178849T1 (en) 1999-04-15
DE19526817C2 (en) 2000-11-30
EP0753445A1 (en) 1997-01-15

Similar Documents

Publication Publication Date Title
EP0662898B1 (en) Device for correcting axle counting errors in railway layouts
EP0739802B1 (en) Method for improving availability of multi-section axle counters
DE19526817C2 (en) Process for operating a track system
EP1097077A2 (en) Method for reducing data in railway operation
DE4423787C1 (en) Process and device for train-controlled changes of direction in single-track operation
EP0788961A2 (en) Method of treating hardware failures at clear track signalling by means of axle counting and device for carrying out the method
EP3210847B1 (en) Method and system for operating a confined track section with a number of points assembled therein
DE19907466C1 (en) Train sequence safety method for rail network allows second train to enter occupied track section with safety distance between successive trains maintained to prevent collision
EP3299249B1 (en) Method for operating a classification humpyard and control device for such a classification humpyard
WO2020239372A1 (en) Method for operating a rail vehicle
DE19522585C2 (en) Process for avoiding resolution problems in signal boxes and device for carrying out the process
DE102004062987A1 (en) Train controlling and securing method, involves blocking virtual blocks after clearing following train for other trains and issuing dis-positive drive assignment by host computer or dispatcher that is connected via cellular radio network
EP1022208B1 (en) Procedure for the optimization of the closing time of level crossings
DE2840929C2 (en) Method for determining an occupied or vacant message for a route section
DE19725320A1 (en) Device for controlling level crossings
DE4429403C2 (en) Process for treating overlapping slipping paths
EP1118522B1 (en) Distance security method for trains
DE19714388A1 (en) Arrangement for automatically setting track sections near stations in conjunction with direction changes
DE10216215A1 (en) Device for operating track transition safety devices has 2 direction detecting axle counters remote from and 2 close to transition; three axle counter sections are provided by adjacent axle counters
AT407518B (en) Warning system
EP2143614A1 (en) Method and device for secured notification that a section of track is available
DE102016202743A1 (en) Method for carrying out a train service and train for carrying out a train service
DE2424161C2 (en) Process for centrally controlled distance securing of track-bound vehicles
DE1938311C3 (en)
DE3409598C2 (en)

Legal Events

Date Code Title Description
OP8 Request for examination as to paragraph 44 patent law
D2 Grant after examination
8364 No opposition during term of opposition
8339 Ceased/non-payment of the annual fee