EP1118522B1 - Distance security method for trains - Google Patents

Distance security method for trains Download PDF

Info

Publication number
EP1118522B1
EP1118522B1 EP01250020A EP01250020A EP1118522B1 EP 1118522 B1 EP1118522 B1 EP 1118522B1 EP 01250020 A EP01250020 A EP 01250020A EP 01250020 A EP01250020 A EP 01250020A EP 1118522 B1 EP1118522 B1 EP 1118522B1
Authority
EP
European Patent Office
Prior art keywords
train
radio
axle
axles
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP01250020A
Other languages
German (de)
French (fr)
Other versions
EP1118522A2 (en
EP1118522A3 (en
Inventor
Michael Kobus
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of EP1118522A2 publication Critical patent/EP1118522A2/en
Publication of EP1118522A3 publication Critical patent/EP1118522A3/en
Application granted granted Critical
Publication of EP1118522B1 publication Critical patent/EP1118522B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or train
    • B61L1/14Devices for indicating the passing of the end of the vehicle or train
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L29/00Safety means for rail/road crossing traffic

Definitions

  • the invention relates to a method according to the preamble of claim 1. Such a method is known from Signal + Wire (88) 10/96, pages 11-19.
  • the published patent application DE 198 32 602 A1 discloses a matching method by means of radio axis counters.
  • a central control center can assign trains to certain routes and the trains themselves determine whether, when and how far they want to drive on these routes. For this they take on the radio path directly or indirectly contact with each other and / or with ahead track facilities in order to determine the passable by them free route can. A subsequent move may advance as far as it has been completely cleared by the preceding train on its assigned course.
  • the respective preceding train knows about its location, length of train and train cohesion in order to inform the next train, to where it can advance at most, without driving up to it, or to enable a subsequent train to determine from his position message even the waypoint up to which he can safely advance.
  • the following train for distance protection must make more or less frequent contact with the train in front in order to get an idea of the free and occupied status of the route ahead.
  • This is initiated Contact eg by driving on specified route points marked in the route atlas of the following train. These waypoints are chosen so that the following train can still reliably come to a stop in front of this danger point in the event that a preceding route point possibly representing a danger point can not be negotiated.
  • a potential danger point may be, for example, a railway station, a switch or a railroad crossing.
  • the prerequisite for determining the free route lying ahead is that a radio connection to the preceding train is made in good time and that the train in front knows about its location and train integrity. If such a radio link is not established in time or knows the train in front z. If, for example, he is not reliably informed about his cohesion, the following train must stop in front of a danger point to be assumed, namely the last waypoint that the preceding train has completely passed. This is the last waypoint at which the preceding train had supplied the following train with the corresponding position and completeness information.
  • Object of the present invention is to develop the method according to the preamble of claim 1 so that even in the event that no timely communication connection to a train in progress is made or that this train can not make reliable information about his train, at least limited Advance transfer of the following train is made possible in accordance with the distance traveled reliably by the train ahead.
  • the method is intended in particular to serve as a fallback level in the event of a communication disruption and then permits driving on the relevant road sections in the fixed block spacing as opposed to driving in the moving block spacing on the remaining road sections;
  • the method can also be used with sufficiently dense sequence of searchable waypoints for sole distance assurance of trains, the trains then follow each other consistently at predetermined block intervals.
  • Figure 1 shows a single-track S, which is traveled by a train Z1 in the direction of travel from left to right; the train Z1 stands for a single vehicle or a group of vehicles formed from several coupled vehicles.
  • the route S is crossed by a schematically indicated level crossing BU.
  • the train Z1 When approaching the switched railroad crossing BU the train Z1 transmits a identifying characteristic identifier J Z1 and the known target axle count SA Z1 of its vehicles by radio transmission to a fixed radio transmitting / receiving device of the railroad crossing, which is referred to below as radio axle counter FAZ.
  • the radio axle counter FAZ stores the target axle number SA Z1 communicated to it by the train Z1 together with the identity number J Z1 reported by the train with deletion of any still stored older identity numbers and axle numbers for a later clearance of the level crossing. It is also set up to count and store the drive messages transmitted to it from the switch-off contacts A1 and A2 of the level crossing or axle messages derived therefrom. He is thus able to check whether the level crossing BU is free of vehicles and whether the number of actually passed vehicle axles coincides with the target axle number transmitted by a train approaching the railroad crossing.
  • the radio axle counter stores the nominal and actual axle numbers of the train passing by it or a number derived therefrom, in each case enclosing the identity number of the relevant train, in order to later transmit them to a subsequent train on request. But it is also possible that the Funkachsterrorismer detected by the Ausschaltitchen actual axle numbers with assignment of the identity number of the associated train to an optionally common to several line elements superior radio transmitter - / - receiving device, eg. B.
  • a control center transmitted, with which a subsequent train to determine or to ask the free and busy state of the railroad crossing in conjunction;
  • the train in front of the control center has to communicate, for example via the track element its target number of axles or the track element determined from the notified him and the target determined by him actual axle numbers, whether the preceding train has passed the track element completely; the route element then transmits a corresponding identifier to the control center.
  • the transmission of the axle numbers from the radio axis counter to the higher-level radio transmitter / receiver device can be wired or wireless.
  • the train Z1 has completely passed the level crossing BU.
  • the radio axle counter has stored the target axle number SA Z1 communicated to it by the train Z1 on approach and the actual axle numbers JA Z1 detected by the switch-off contacts together with the identity number J Z1 assigned to the train Z1; if the announced target number of axles coincides with the actually determined actual axle numbers from both numbers of axles a number plate K Z1 is formed and stored in the radio axis counter, which states that the train Z1 has completely passed the level crossing with all its axles. With the complete passage of the railroad crossing its safety devices are turned off.
  • the considered train Z1 has advanced further; he has completely cleared the route S up to a route point P2.
  • This route point namely the point to which he has already cleared the route determines the train Z1 in knowledge of its train length and its integrity itself, for example by satellite positioning or using a synchronized at predetermined locations track encoder.
  • the distance indicated in the drawing between the actual end of the train Z1 and the route point P2 up to which the route is considered cleared by the train Z1 represents any tolerances in the vehicle location and the train length determination by the train Z1.
  • the train Z1 is followed by a train Z2, which is to drive the route S to the same destination point or to a separation point.
  • This train tries in good time, before due to the previously known position of the train end of the train in front an operational inhibiting Geswach einsreduzi für aminova, or when passing a marked in his route atlas or when passing a punctiform train control device to connect with the known train Z1 known him, by calling it via an available radio channel, for example, with its identity tag J Z1.
  • the knowledge about the identity of the preceding train Z1 has been transmitted to the train Z2 by a control center, not shown in the drawing, or else it removes it, for example.
  • B. an accompanying book timetable, in which the trains driving the route are recorded according to place and time.
  • the train Z1 informs after the conclusion of the communication link the train Z2 about his location, ie in this case on the location of the waypoint P2, which stands for the complete clearing of the previous route area by the train Z1; he transmits this notification of the location preferably with the addition of his identity flag J Z1 to the train Z2, so that this can be assigned to the train Z1 when receiving the position message P2 Z1 this unique.
  • the train Z2 knows that the route in front of it is cleared up to the route point P2 and that it may advance after the timely activation of the safety devices of the level crossing BU up to this route point P2.
  • the train Z2 now establishes a connection to the radio axis counter FAZ lying ahead of it and requests from it, preferably specifying the identification mark J Z1 of the preceding train Z1, the stored nominal and actual axle numbers or the identifier formed therefrom K Z1.
  • the Funkachsterrorismer transmits this information, possibly also with assignment of the identity plate J Z1 for the train Z1, to the train Z2 and this recognizes in the assumed constellation that the route ahead is vacated at least to the level crossing BU from the train Z1 ahead. He can now advance after turning on the safety devices of the railroad crossing to its Ausschalttern A1.
  • the level crossing should be turned on but only if it can then be completely cleared, for example, if the preceding train has already passed the next level crossing or if it is operational, a train in front, without his To know position, to follow "on sight". The level crossing can then be passed with the speed allowed for journeys "on sight”. Otherwise, the following train should stop before the then unsecured level crossing.
  • the request of a train to a radio axle counter for transmitting the number of axles of the train that has traveled ahead and the response of the radio axle counter to the train in question may each be accompanied by the identity number of the train traveling in front or of the last train crossing.
  • the following train Z2 may call the radio axle counters of these route elements in a given sequence in the knowledge that further preceding railroad crossings or other line elements for counting vehicle axles and for transmitting corresponding information and in the event that the preceding train has completely passed the route elements assigned to the corresponding radio axle counters, move the danger point, which he is advancing, further in the direction of travel until finally a radio axis counter with its data makes it recognizable that the associated route area has not yet been completely passed by the preceding train Z1.
  • the following train Z2 then has to set up its drive so that it stops in front of the track switching means of the last radio axle counter that has passed completely.
  • Funkachsterrorismer can be assigned to any waypoints or sections on which the number of axles of each passing vehicles can be determined via trackside sensors. The more radio axis counters are present on a route, the more sensitively the free registration of the respective passable route can be made.
  • the assignment of Funkachsterrorismern to level crossings is particularly advantageous because at the level crossings corresponding sensor devices for switching off the level crossing security devices are already available, which can be used for the Achsiereego. Also, at such level crossings usually radio transmitting and receiving devices for timely switching on the safety devices already exist, so that can be used advantageously for the distance assurance according to the inventive method on the existing infrastructure.
  • the method according to the invention is particularly suitable for providing a fallback level for the distance assurance of trains in the event that there is no timely radio connection to a train in front.
  • the following train as long as it communicates with the radio axle counters and not with the train in front, moves in a space distance defined by the arrangement of its track sensors to the train in front. If the succeeding train succeeds in reconnecting with the preceding train and receiving from it information about its actual location and train integrity, the following train can catch up to the end of the preceding train and travel in accordance with predetermined stopping distances in the traveling train Block distance continues behind the preceding train.
  • the method according to the invention can advantageously be used even if contact is made with the respective preceding train, but this train can make no statement about its train integrity. Then it must be expected that the train in front has lost one or more vehicles somewhere on the track.
  • the switching off of the safety devices of a railroad crossing is made dependent on the positive comparison of the actual number of axles of a train with the transmitted by this target number of axles, the safe switching off of the railroad crossing and thus the free signal of the past section is also possible if the railroad crossing passing train not aware of his cohesion; the railroad crossing then determines the train integrity.
  • Querying the available on a radio axle counter target and actual number of axles for a train ahead by a train on a railroad crossing advancing train may be made except for driving on a marked in the route atlas of the following train or predetermined by a track device route point alternatively also dependent on the subsequent train reaches or approaches the brake application point at a known danger point.
  • the train inquires at the respective upstream radio axis counter or the control center according to the stored axle numbers and determines therefrom the free and busy state of the route ahead.
  • the target number of axles of a train is the train as possible before departure z. B. from a control center or it can be determined on the basis of the accompanying documents of the train on the train or by fixed counters, z. B. when passing a special Funkachsweakeneders, determined and z. B. transmitted by radio to the train or displayed on a scoreboard.
  • a route is also used by trains that have no facilities for establishing a communication link to a radio axis counter or their designated facilities have failed, is provided according to a form of the invention that a central office, the train running in a suitable manner monitored, z. B. based on the book schedule, the Funkachsterrorismer when approaching such a train whose target number of axles transmitted, preferably in conjunction with an identity mark for the train.
  • This identity plate is known to at least the following train or is announced to it by the headquarters.
  • the following train can then interrogate when approaching the radio axle counter stored there after passing the preceding train stored there target and actual numbers of axles or derived therefrom and then determine whether the route cleared up to the sensors of Funkachsallegedlyers and thus for him is available or not.
  • a center that monitors the train run in a suitable manner, ask for this train the request to the radio axle counter for transmitting the stored there target and actual numbers of the preceding train.
  • the control panel can recognize from the response of the radio axle counter, whether the route is free or still traveled to the radio axis counter and can then the train driver of the approaching train z. B. via radio or via a trackside signaling device on the trafficability of the route ahead.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automation & Control Theory (AREA)
  • Train Traffic Observation, Control, And Security (AREA)
  • Mobile Radio Communication Systems (AREA)
  • Superconductors And Manufacturing Methods Therefor (AREA)
  • Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
  • Electric Cable Installation (AREA)
  • Metal Rolling (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)
  • Devices For Checking Fares Or Tickets At Control Points (AREA)

Abstract

The method involves trains receiving information by radio from a control centre managing the stretch of track and/or from preceding trains regarding the fee stretch of track ahead. Trains transmit their desired axle count (SA Z1) and identity (J Z1) to radio axle counters (A1,A2) along the track that count the actual number of axles, store or compare this with the desired number and form an identifier (K Z1) if the numbers coincide. A following train (Z2) requests information regarding the preceding train (Z1) at the latest on reaching the braking point for the sensors. If the preceding train has completely passed, the counter transmits the desired and actual axle numbers or identifier to the following train, which concludes that the track is fee to the next sensor or busy.

Description

Die Erfindung bezieht sich auf ein Verfahren nach dem Oberbegriff des Patentanspruches 1. Ein solches Verfahren ist aus Signal + Draht (88)10/96, Seiten 11 bis 19 bekannt.The invention relates to a method according to the preamble of claim 1. Such a method is known from Signal + Wire (88) 10/96, pages 11-19.

Die Offenlegungsschrift DE 198 32 602 A1 offenbart ein zugrollstandigkeitsverfahren mittels Funkachszählern.The published patent application DE 198 32 602 A1 discloses a matching method by means of radio axis counters.

Für die Steuerung des Bahnverkehrs auf schwach und mäßig befahrenen Strecken wird zunehmend auf Stellwerke zur zentralen Steuerung und Überwachung des Betriebsgeschehens verzichtet. Statt dessen wird die hierfür erforderliche Logik auf die Fahrzeuge und/oder bestimmte Streckenelemente, vorzugsweise Weichen und Bahnübergänge, verteilt. Eine zentrale Leitstelle kann den Zügen bestimmte Fahrwege zuweisen und die Züge bestimmen selbst, ob, wann und wieweit sie diese Fahrwege befahren wollen. Hierzu nehmen sie auf dem Funkwege unmittelbar oder mittelbar Kontakt miteinander und/oder mit vorausliegenden Streckeneinrichtungen auf, um die von ihnen befahrbare freie Strecke bestimmen zu können. Ein nachfolgender Zug kann auf der ihm zugewiesenen Strecke so weit vorrücken wie diese vom vorausfahrenden Zug vollständig geräumt ist. Hierzu ist es erforderlich, dass der jeweils vorausfahrende Zug über seinen Fahrort, seine Zuglänge und den Zugzusammenhalt Bescheid weiß, um dem nachfolgenden Zug mitzuteilen, bis wohin er höchstens vorrücken darf, ohne auf ihn aufzufahren, oder um einen nachfolgenden Zug in die Lage zu versetzen, aus seiner Positionsmeldung selbst den Streckenpunkt zu bestimmen, bis zu dem er gefahrlos vorrücken kann. In jedem Fall ist es so, dass der nachfolgende Zug zur Abstandssicherung mehr oder weniger häufig zu dem vorausfahrenden Zug Kontakt aufnehmen muss, um sich ein Bild über den Frei- und Besetztzustand der vorausliegenden Strecke zu verschaffen. Initiiert wird diese Kontaktaufnahme z.B. durch das Befahren vorgegebener im Streckenatlas des nachfolgenden Zuges markierter Streckenpunkte. Diese Streckenpunkte sind so gewählt, dass der nachfolgende Zug für den Fall, dass ein vorausliegender, möglicherweise einen Gefahrenpunkt darstellender Streckenpunkt nicht befahren werden darf, noch zuverlässig vor diesem Gefahrenpunkt zum Halten kommen kann. Ein solcher möglicher Gefahrenpunkt kann beispielsweise ein Bahnhof, eine Weiche oder ein Bahnübergang sein.For the control of rail traffic on weak and moderately traveled routes is increasingly dispensed with interlocking for central control and monitoring of operations. Instead, the logic required for this purpose is distributed to the vehicles and / or certain route elements, preferably switches and railroad crossings. A central control center can assign trains to certain routes and the trains themselves determine whether, when and how far they want to drive on these routes. For this they take on the radio path directly or indirectly contact with each other and / or with ahead track facilities in order to determine the passable by them free route can. A subsequent move may advance as far as it has been completely cleared by the preceding train on its assigned course. For this purpose, it is necessary that the respective preceding train knows about its location, length of train and train cohesion in order to inform the next train, to where it can advance at most, without driving up to it, or to enable a subsequent train to determine from his position message even the waypoint up to which he can safely advance. In any case, it is the case that the following train for distance protection must make more or less frequent contact with the train in front in order to get an idea of the free and occupied status of the route ahead. This is initiated Contact eg by driving on specified route points marked in the route atlas of the following train. These waypoints are chosen so that the following train can still reliably come to a stop in front of this danger point in the event that a preceding route point possibly representing a danger point can not be negotiated. Such a potential danger point may be, for example, a railway station, a switch or a railroad crossing.

Voraussetzung für das Bestimmen der vorausliegenden freien Strecke ist, dass eine Funkverbindung zum vorausfahrenden Zug zeitgerecht zustande kommt und dass der vorausfahrende Zug über seinen Fahrort und seine Zugintegrität Bescheid weiß. Kommt eine solche Funkverbindung nicht rechtzeitig zustande oder aber weiß der vorausfahrende Zug z. B. nicht zuverlässig über seinen Zusammenhalt Bescheid, so muss der nachfolgende Zug vor einem dann anzunehmenden Gefahrenpunkt anhalten, nämlich dem letzten Streckenpunkt, den der vorausfahrende Zug vollständig passiert hat. Dies ist der letzte Streckenpunkt, an dem der vorausfahrende Zug den nachfolgenden Zug mit den entsprechenden Positions- und Vollständigkeitsangaben versorgt hatte.The prerequisite for determining the free route lying ahead is that a radio connection to the preceding train is made in good time and that the train in front knows about its location and train integrity. If such a radio link is not established in time or knows the train in front z. If, for example, he is not reliably informed about his cohesion, the following train must stop in front of a danger point to be assumed, namely the last waypoint that the preceding train has completely passed. This is the last waypoint at which the preceding train had supplied the following train with the corresponding position and completeness information.

Ein solcher Gefahrenpunkt wird auch dann angenommen, wenn keine oder keine rechtzeitige Funkverbindung zum vorausfahrenden Zug zustande kommt. Dies kann z. B. bei defekten Funksende-/-empfangseinrichtungen des einen oder anderen Zuges der Fall sein, aber auch dann, wenn der vorausfahrende Zug für die Kommunikation mit dem nachfolgenden Zug augenblicklich keinen Funkkanal zur Verfügung stellen kann, weil er z. B. damit beschäftigt ist, Daten mit in seinem Fahrweg vorausliegenden Streckenelementen oder anderen Züge auszutauschen.Such a danger point is assumed even if no or no timely radio connection to the train in front comes about. This can be z. B. in case of defective radio transmitter - / - receiving facilities of one or the other train be the case, but also if the preceding train for communication with the train following immediately can not provide a radio channel available, because he z. B. busy with data ahead in his track Exchange track elements or other trains.

Aufgabe der vorliegenden Erfindung ist es, das Verfahren nach dem Oberbegriff des Patentanspruches 1 so weiterzubilden, dass auch für den Fall, dass keine rechtzeitige Kommunikationsverbindung zu einem vorausfahrenden Zug zustande kommt oder dass dieser Zug keine zuverlässigen Angaben über seinen Zugschluss machen kann, ein mindestens begrenztes Weitervorrücken des nachfolgenden Zuges nach Maßgabe der vom vorausfahrenden Zug zuverlässig freigefahrenen Strecke ermöglicht wird.Object of the present invention is to develop the method according to the preamble of claim 1 so that even in the event that no timely communication connection to a train in progress is made or that this train can not make reliable information about his train, at least limited Advance transfer of the following train is made possible in accordance with the distance traveled reliably by the train ahead.

Die Erfindung löst diese Aufgabe durch die Merkmale des Patentanspruches 1.The invention solves this problem by the features of claim 1.

Vorteilhafte Ausgestaltungen und Weiterbildungen des erfindungsgemäßen Verfahrens sind in den Unteransprüchen angegeben.Advantageous embodiments and further developments of the method according to the invention are specified in the subclaims.

Das Verfahren soll insbesondere als Rückfallebene für den Fall einer Kommunikationsstörung dienen und gestattet dann auf den betreffenden Streckenbereichen ein Fahren im festen Blockabstand im Gegensatz zum Fahren im moving Blockabstand auf den übrigen Streckenbereichen; das Verfahren kann aber auch bei genügend dichter Folge abfragbarer Streckenpunkte zur alleinigen Abstandssicherung von Zügen verwendet sein, wobei die Züge dann durchgängig in vorgegebenen Blockabständen aufeinander folgen.The method is intended in particular to serve as a fallback level in the event of a communication disruption and then permits driving on the relevant road sections in the fixed block spacing as opposed to driving in the moving block spacing on the remaining road sections; However, the method can also be used with sufficiently dense sequence of searchable waypoints for sole distance assurance of trains, the trains then follow each other consistently at predetermined block intervals.

Die Erfindung ist nachstehend anhand eines in der Zeichnung verdeutlichten Ausführungsbeispieles näher erläutert. Die Zeichnung zeigt in

Figur 1
einen mit einem Funkachszähler ausgerüsteten Bahnübergang mit einem sich dem Bahnübergang nähernden Zug, in
Figur 2
den Bahnübergang mit dem inzwischen vorübergelaufenen Zug, der beim Bahnübergang bestimmte Daten deponiert hat, in
Figur 3
einen sich dem Bahnübergang nähernden nachfolgenden Zug, der Kontakt mit dem vorausfahrenden Zug aufgenommen hat und in
Figur 4
einen nachfolgenden Zug, der die für seine Fahrzeugsteuerung erforderlichen Daten bei dem Bahnübergang erfragt.
The invention is explained below with reference to an embodiment illustrated in the drawing. The drawing shows in
FIG. 1
equipped with a Funkachszähler railroad crossing with a train approaching the railroad crossing, in
FIG. 2
the railroad crossing with the now overrun train, which deposited certain data at the level crossing, in
FIG. 3
a following train approaching the railroad crossing which has made contact with the preceding train and in
FIG. 4
a subsequent train, which asks for the required data for his vehicle control at the railroad crossing.

Figur 1 zeigt eine eingleisige Strecke S, die von einem Zug Z1 in Fahrrichtung von links nach rechts befahren wird; der Zug Z1 steht für ein Einzelfahrzeug oder einen aus mehreren gekuppelten Fahrzeugen gebildeten Fahrzeugverband. Die Strecke S wird von einem schematisch angedeuteten Bahnübergang BU gekreuzt. Bei Annäherung an den eingeschalteten Bahnübergang BU übermittelt der Zug Z1 ein ihn bezeichnendes Identitätskennzeichen J Z1 und die ihm bekannte Soll-Achszahl SA Z1 seiner Fahrzeuge auf funktechnischem Wege an eine ortsfeste Funksende-/-empfangseinrichtung des Bahnüberganges, die nachfolgend als Funkachszähler FAZ bezeichnet ist. Der Funkachszähler FAZ speichert die ihm vom Zug Z1 übermittelte Soll-Achszahl SA Z1 zusammen mit dem vom Zug gemeldeten Identitätskennzeichen J Z1 unter Löschung etwaiger noch gespeicherter älterer Identitätskennzeichen und Achszahlen für eine spätere Freimeldung des Bahnüberganges ab. Er ist ferner dazu eingerichtet, die ihm von den Ausschaltkontakten A1 und A2 des Bahnüberganges übermittelten Befahrungsmeldungen oder daraus abgeleitete Achsmeldungen zu zählen und zu speichern. Damit ist er in der Lage, zu prüfen, ob der Bahnübergang BU frei von Fahrzeugen ist und ob die Anzahl der tatsächlich vorübergelaufenen Fahrzeugachsen übereinstimmt mit der von einem Zug bei Annäherung an den Bahnübergang übermittelten Soll-Achszahl. Der Funkachszähler speichert die Soll- und die Ist-Achszahlen des an ihm vorbeigefahrenen Zuges oder ein daraus abgeleitetes Kennzeichen jeweils unter Beifügung des Identitätskennzeichens des betreffenden Zuges ab, um sie später auf Anfrage an einen nachfolgenden Zug zu übermitteln. Es ist aber auch möglich, dass der Funkachszähler die von den Ausschaltkontakten detektierten Ist-Achszahlen unter Beiordnung des Identitätskennzeichens des zugehörigen Zuges an eine gegebenenfalls für mehrere Streckenelemente gemeinsame übergeordnete Funksende-/-empfangseinrichtung, z. B. eine Leitstelle, übermittelt, mit der sich ein nachfolgender Zug zur Ermittlung oder zum Erfragen des Frei- und Besetztzustandes des Bahnüberganges in Verbindung setzt; hierzu hat der vorausfahrende Zug der Leitstelle z.B. über das Streckenelement seine Soll-Achszahl mitzuteilen oder das Streckenelement bestimmt aus den ihm mitgeteilten Soll- und den von ihm ermittelten Ist-Achszahlen, ob der vorausfahrende Zug das Streckenelement vollständig passiert hat; das Streckenelement übermittelt dann ein entsprechendes Kennzeichen an die Leitstelle. Die Übermittlung der Achszahlen vom Funkachszähler an die übergeordnete Funksende-/-empfangseinrichtung kann dabei leitungsgebunden oder drahtlos erfolgen.Figure 1 shows a single-track S, which is traveled by a train Z1 in the direction of travel from left to right; the train Z1 stands for a single vehicle or a group of vehicles formed from several coupled vehicles. The route S is crossed by a schematically indicated level crossing BU. When approaching the switched railroad crossing BU the train Z1 transmits a identifying characteristic identifier J Z1 and the known target axle count SA Z1 of its vehicles by radio transmission to a fixed radio transmitting / receiving device of the railroad crossing, which is referred to below as radio axle counter FAZ. The radio axle counter FAZ stores the target axle number SA Z1 communicated to it by the train Z1 together with the identity number J Z1 reported by the train with deletion of any still stored older identity numbers and axle numbers for a later clearance of the level crossing. It is also set up to count and store the drive messages transmitted to it from the switch-off contacts A1 and A2 of the level crossing or axle messages derived therefrom. He is thus able to check whether the level crossing BU is free of vehicles and whether the number of actually passed vehicle axles coincides with the target axle number transmitted by a train approaching the railroad crossing. The radio axle counter stores the nominal and actual axle numbers of the train passing by it or a number derived therefrom, in each case enclosing the identity number of the relevant train, in order to later transmit them to a subsequent train on request. But it is also possible that the Funkachszähler detected by the Ausschaltkontakten actual axle numbers with assignment of the identity number of the associated train to an optionally common to several line elements superior radio transmitter - / - receiving device, eg. B. a control center, transmitted, with which a subsequent train to determine or to ask the free and busy state of the railroad crossing in conjunction; For this purpose, the train in front of the control center has to communicate, for example via the track element its target number of axles or the track element determined from the notified him and the target determined by him actual axle numbers, whether the preceding train has passed the track element completely; the route element then transmits a corresponding identifier to the control center. The transmission of the axle numbers from the radio axis counter to the higher-level radio transmitter / receiver device can be wired or wireless.

In Figur 2 hat der Zug Z1 den Bahnübergang BU vollständig passiert. Annahmegemäß hat der Funkachszähler die ihm vom Zug Z1 bei Annäherung mitgeteilte Soll-Achszahl SA Z1 und die von den Ausschaltkontakten detektierten Ist-Achszahlen JA Z1 zusammen mit dem dem Zug Z1 zugewiesenen Identitätskennzeichen J Z1 gespeichert; bei Übereinstimmung der angekündigten Soll-Achszahl mit den tatsächlich ermittelten Ist-Achszahlen kann aus beiden Achszahlen ein Kennzeichen K Z1 gebildet und im Funkachszähler abgelegt sein, das besagt, dass der Zug Z1 mit allen seinen Achsen den Bahnübergang vollständig passiert hat. Mit dem vollständigen Passieren des Bahnüberganges werden dessen Sicherungseinrichtungen ausgeschaltet.In Figure 2, the train Z1 has completely passed the level crossing BU. According to the assumption, the radio axle counter has stored the target axle number SA Z1 communicated to it by the train Z1 on approach and the actual axle numbers JA Z1 detected by the switch-off contacts together with the identity number J Z1 assigned to the train Z1; if the announced target number of axles coincides with the actually determined actual axle numbers from both numbers of axles a number plate K Z1 is formed and stored in the radio axis counter, which states that the train Z1 has completely passed the level crossing with all its axles. With the complete passage of the railroad crossing its safety devices are turned off.

In Figur 3 ist der betrachtete Zug Z1 weiter vorgerückt; er hat dabei die Strecke S bis hin zu einem Streckenpunkt P2 vollständig freigefahren. Diesen Streckenpunkt, nämlich den Punkt, bis zu dem er die Strecke bereits geräumt hat, bestimmt der Zug Z1 in Kenntnis seiner Zuglänge und seiner Integrität selbst, beispielsweise durch Satellitenortung oder unter Verwendung eines an vorgegebenen Fahrorten synchronisierbaren Wegimpulsgebers. Der in der Zeichnung angedeutete Abstand zwischen dem tatsächlichen Ende des Zuges Z1 und dem Streckenpunkt P2, bis zu dem die Strecke als vom Zug Z1 geräumt angesehen wird, steht für etwaige Toleranzen bei der Fahrzeugortung und der Zuglängenermittlung durch den Zug Z1.In Figure 3, the considered train Z1 has advanced further; he has completely cleared the route S up to a route point P2. This route point, namely the point to which he has already cleared the route determines the train Z1 in knowledge of its train length and its integrity itself, for example by satellite positioning or using a synchronized at predetermined locations track encoder. The distance indicated in the drawing between the actual end of the train Z1 and the route point P2 up to which the route is considered cleared by the train Z1 represents any tolerances in the vehicle location and the train length determination by the train Z1.

Dem Zug Z1 folgt ein Zug Z2 nach, der die Strecke S bis zum gleichen Zielpunkt oder bis zu einem Trennpunkt befahren soll. Dieser Zug versucht rechtzeitig, bevor aufgrund der ihm bisher bekannten Position des Zugendes des vorausfahrenden Zuges eine betrieblich hemmende Geswchwindigkeitsreduzierung nötig wird, oder beim Passieren eines in seinem Streckenatlas markierten Fahrortes oder beim Passieren einer punktförmigen Zugbeeinflussungseinrichtung, mit dem ihm bekannten vorausfahrenden Zug Z1 Verbindung aufzunehmen, indem er ihn über einen verfügbaren Funkkanal z.B. mit dessen Identitätskennzeichen J Z1 anruft. Die Kenntnis über die Identität des vorausfahrenden Zuges Z1 ist dem Zug Z2 von einer in der Zeichnung nicht dargestellten Leitstelle übermittelt worden oder aber er entnimmt sie z. B. einem mitgeführten Buchfahrplan, in dem die die Strecke befahrenden Züge nach Ort und Zeit vermerkt sind. Es ist angenommen, dass eine Kommunikationsverbindung zwischen dem Zug Z2 und dem Zug Z1 zustande kommt. Der Zug Z1 unterrichtet nach dem Zustandekommen der Kommunikationsverbindung den Zug Z2 über seinen Fahrort, d. h. vorliegend über die Lage des Streckenpunktes P2, der für das vollständige Räumen des zurückliegenden Streckenbereiches durch den Zug Z1 steht; er übermittelt diese Fahrortmeldung vorzugsweise unter Beigabe seines Identitätskennzeichens J Z1 an den Zug Z2, so dass dieser beim Empfang der Positionsmeldung P2 Z1 diese eindeutig dem Zug Z1 zuordnen kann. Aufgrund der übermittelten Positionsmeldung weiß der Zug Z2, dass die vor ihm liegende Strecke bis hin zum Streckenpunkt P2 geräumt ist und dass er nach dem rechtzeitigen Einschalten der Sicherungseinrichtungen des Bahnüberganges BU bis zu diesem Streckenpunkt P2 vorrücken darf.The train Z1 is followed by a train Z2, which is to drive the route S to the same destination point or to a separation point. This train tries in good time, before due to the previously known position of the train end of the train in front an operational inhibiting Geswachgeschwindigkeitsreduzierung is necessary, or when passing a marked in his route atlas or when passing a punctiform train control device to connect with the known train Z1 known him, by calling it via an available radio channel, for example, with its identity tag J Z1. The knowledge about the identity of the preceding train Z1 has been transmitted to the train Z2 by a control center, not shown in the drawing, or else it removes it, for example. B. an accompanying book timetable, in which the trains driving the route are recorded according to place and time. It is assumed that a communication connection between the train Z2 and the train Z1 comes about. The train Z1 informs after the conclusion of the communication link the train Z2 about his location, ie in this case on the location of the waypoint P2, which stands for the complete clearing of the previous route area by the train Z1; he transmits this notification of the location preferably with the addition of his identity flag J Z1 to the train Z2, so that this can be assigned to the train Z1 when receiving the position message P2 Z1 this unique. On the basis of the transmitted position message, the train Z2 knows that the route in front of it is cleared up to the route point P2 and that it may advance after the timely activation of the safety devices of the level crossing BU up to this route point P2.

In Figur 4 ist angenommen, dass die Kommunikationsverbindung zwischen dem Zug Z2 und dem Zug Z1 aus hier nicht näher zu erläuternden Gründen nicht zeitgerecht zustande kommt. Der Zug Z2 setzt sich deshalb nach ggf. mehrmaligem fruchtlosen Versuch zum Kommunikationsaufbau mit dem Funkachszähler FAZ des vor ihm liegenden Bahnüberganges BU in Verbindung. Dort hatte der Zug Z1 bei Annäherung an den Bahnübergang sein Identitätskennzeichen J Z1 sowie seine Soll-Achszahl SA Z1 hinterlegt. Im Funkachszähler FAZ ist ferner die Ist-Achszahl JA Z1 des Zuges Z1 hinterlegt, die gemäß Figur 2 beim Passieren des Bahnüberganges durch den Zug Z1 ermittelt wurde. Der Zug Z2 baut nun also auf funktechnischem Wege eine Verbindung zu dem vorausliegenden Funkachszähler FAZ auf und fordert von ihm, vorzugsweise unter Angabe des Identitätskennzeichens J Z1 des vorausfahrenden Zuges Z1, die für diesen gespeicherten Soll- und Ist-Achszahlen bzw. das daraus gebildete Kennzeichen K Z1 an. Der Funkachszähler übermittelt diese Angaben, gegebenenfalls ebenfalls unter Beiordnung des Identitätskennzeichens J Z1 für den Zug Z1, an den Zug Z2 und dieser erkennt bei der angenommenen Konstellation, dass die vorausliegende Strecke mindestens bis zum Bahnübergang BU vom vorausfahrenden Zug Z1 geräumt ist. Er kann nun nach dem Einschalten der Sicherungseinrichtungen des Bahnüberganges bis zu dessen Ausschaltkontakten A1 vorrücken.In FIG. 4, it is assumed that the communication connection between the train Z2 and the train Z1 does not come about on time for reasons which are not explained in more detail here. Therefore, the train Z2 is contacted after possibly repeated fruitless attempt to establish communication with the Funkachszähler FAZ of lying in front of him level crossing BU. There, the train Z1 had deposited its identity mark J Z1 and its target number of axles SA Z1 when approaching the railroad crossing. In Funkachszähler FAZ also the actual number of axles JA Z1 of the train Z1 is deposited, which was determined in accordance with Figure 2 when passing the railroad crossing by the train Z1. The train Z2 now establishes a connection to the radio axis counter FAZ lying ahead of it and requests from it, preferably specifying the identification mark J Z1 of the preceding train Z1, the stored nominal and actual axle numbers or the identifier formed therefrom K Z1. The Funkachszähler transmits this information, possibly also with assignment of the identity plate J Z1 for the train Z1, to the train Z2 and this recognizes in the assumed constellation that the route ahead is vacated at least to the level crossing BU from the train Z1 ahead. He can now advance after turning on the safety devices of the railroad crossing to its Ausschaltkontakten A1.

Damit der Straßenverkehr nicht unnötig behindert wird, sollte der Bahnübergang aber nur dann eingeschaltet werden, wenn er anschließend vollständig geräumt werden kann, beispielsweise wenn der vorausfahrende Zug bereits auch den folgenden Bahnübergang passiert hat oder wenn es betrieblich erlaubt ist, einem vorausfahrenden Zug, ohne seine Position zu kennen, "auf Sicht" zu folgen. Der Bahnübergang kann dann mit der für Fahrten "auf Sicht" erlaubten Geschwindigkeit passiert werden. Andernfalls sollte der nachfolgende Zug vor dem dann ungesicherten Bahnübergang anhalten.
Der Anfrage eines Zuges an einen Funkachszähler zur Übermittlung der Achszahlen des jeweils vorausgefahrenen Zuges und der Antwort des Funkachszählers an den fragenden Zug kann jeweils das Identitätskennzeichen des vorausfahrenden bzw. des letzten den Bahnübergang befahrenden Zuges beigegeben sein. Dadurch wird eine eindeutige Zuordnung der übermittelten Daten zu dem in Rede stehenden Zug möglich und zwar sowohl beim Funkachszähler als auch beim fragenden Zug. Es reicht jedoch aus, dieses Kennzeichen nur der Abfrage oder der Antwort beizuordnen; in diesem Falle übernimmt entweder der Funkachszähler oder der fragende Zug die Zuordnung der Daten zum Identitätskennzeichen des vorausfahrenden Zuges.
So that the traffic is not obstructed unnecessarily, the level crossing should be turned on but only if it can then be completely cleared, for example, if the preceding train has already passed the next level crossing or if it is operational, a train in front, without his To know position, to follow "on sight". The level crossing can then be passed with the speed allowed for journeys "on sight". Otherwise, the following train should stop before the then unsecured level crossing.
The request of a train to a radio axle counter for transmitting the number of axles of the train that has traveled ahead and the response of the radio axle counter to the train in question may each be accompanied by the identity number of the train traveling in front or of the last train crossing. This makes an unambiguous assignment of the transmitted data to the train in question possible, both in the radio axis counter and in the questioning train. However, it suffices to match this flag only to the query or the response; In this case, either the radio axis counter or the questioning train assumes the assignment of the data to the identity number of the preceding train.

Der nachfolgende Zug Z2 kann in Kenntnis weiterer vorausliegender Bahnübergänge oder sonstiger Streckenelemente zum Zählen von Fahrzeugachsen und zum Übermitteln entsprechender Informationen die Funkachszähler dieser Streckenelemente in gegebener Folge anrufen und so für den Fall, dass der vorausfahrende Zug die den entsprechenden Funkachszählern zugeordneten Streckenelemente vollständig passiert hat, den Gefahrenpunkt, auf den er vorrückt, weiter in Fahrrichtung verschieben bis schließlich ein Funkachszähler mit seinen Daten erkennbar macht, dass der zugehörige Streckenbereich noch nicht vollständig vom vorausfahrenden Zug Z1 passiert wurde. Der nachfolgende Zug Z2 hat dann seine Fahrt so einzurichten, dass er vor den Gleisschaltmitteln des letzten als vollständig passiert geltenden Funkachszählers zum Halten kommt.The following train Z2 may call the radio axle counters of these route elements in a given sequence in the knowledge that further preceding railroad crossings or other line elements for counting vehicle axles and for transmitting corresponding information and in the event that the preceding train has completely passed the route elements assigned to the corresponding radio axle counters, move the danger point, which he is advancing, further in the direction of travel until finally a radio axis counter with its data makes it recognizable that the associated route area has not yet been completely passed by the preceding train Z1. The following train Z2 then has to set up its drive so that it stops in front of the track switching means of the last radio axle counter that has passed completely.

Funkachszähler können beliebigen Streckenpunkten oder Streckenabschnitten zugeordnet sein, an denen über gleisseitige Sensoren die Achszahl der jeweils vorüberlaufenden Fahrzeuge festgestellt werden kann. Je mehr Funkachszähler an einer Strecke vorhanden sind, um so feinfühliger kann die Freimeldung der jeweils befahrbaren Strecke vorgenommen werden. Die Zuordnung von Funkachszählern zu Bahnübergängen ist deshalb besonders vorteilhaft, weil an den Bahnübergängen entsprechende Sensoreinrichtungen zum Ausschalten der Bahnübergangssicherungseinrichtungen ohnehin vorhanden sind, die für die Achszahlermittlung genutzt werden können. Auch sind an solchen Bahnübergängen meist Funksende- und -empfangseinrichtungen zum rechtzeitigen Einschalten der Sicherungseinrichtungen bereits vorhanden, so dass zur Abstandssicherung nach dem erfindungsgemäßen Verfahren vorteilhaft auf die bereits vorhandene Infrastruktur zurückgegriffen werden kann.Funkachszähler can be assigned to any waypoints or sections on which the number of axles of each passing vehicles can be determined via trackside sensors. The more radio axis counters are present on a route, the more sensitively the free registration of the respective passable route can be made. The assignment of Funkachszählern to level crossings is particularly advantageous because at the level crossings corresponding sensor devices for switching off the level crossing security devices are already available, which can be used for the Achszahlermittlung. Also, at such level crossings usually radio transmitting and receiving devices for timely switching on the safety devices already exist, so that can be used advantageously for the distance assurance according to the inventive method on the existing infrastructure.

Es ist auch möglich, mehrere oder alle Funkachszähler nur zum drahtlosem Empfang von Fahrzeugdaten im Nahbereich der Funkachszähler auszurüsten und die von den Gleissensoren tatsächlich-festgestellten Achszahlen zusammen mit den ermittelten Fahrzeugdaten an eine übergeordnete Funksende- und -empfangseinrichtung zu übermitteln, mit der sich die nachfolgenden Züge bedarfsweise in Verbindung setzen können. Solche übergeordneten Funksende- und -empfangseinrichtungen können beispielsweise in Leitstellen angeordnet sein, von denen ohnehin zu den einzelnen Zügen Daten zu übermitteln sind. Eine solche Leitstelle könnte einen Zug bei der Kontaktaufnahme mit einem Funkachszähler aus ihrer Kenntnis der auch von den übrigen Funkachszählern stammenden Soll- und Ist-Achszahlen darüber informieren, wie weit er die vorausliegende Strecke insgesamt gefahrlos befahren darf.It is also possible to equip several or all Funkachszähler only for wireless reception of vehicle data in the vicinity of the Funkachszähler and actually determined by the track sensors-axis numbers together with the determined vehicle data to a parent radio transmitting and receiving device to communicate with the following Trains can connect as needed. Such higher-level radio transmitting and receiving devices can be arranged, for example, in control centers, of which data are to be transmitted in any case to the individual trains. Such a control center could inform a train when contacting a Funkachszähler from their knowledge of the derived also from the remaining radio axle counters target and actual axle numbers about how far he may ride the entire route ahead safely.

Das erfindungsgemäße Verfahren ist insbesondere dazu geeignet, eine Rückfallebene bei der Abstandssicherug von Zügen für den Fall bereitzustellen, dass keine rechtzeitige Funkverbindung zu einem vorausfahrenden Zug zustande kommt. Der nachfolgende Zug fährt, solange er mit den Funkachszählern und nicht mit dem vorausfahrenden Zug kommuniziert, in einem durch die Anordnung von deren Gleissensoren definierten Raumabstand zu dem vorausfahrenden Zug. Gelingt es dem nachfolgenden Zug, wieder mit dem vorausfahrenden Zug in Verbindung zu treten und von diesem Angaben über seinen tatsächlichen Fahrort und seine Zugintegrität zu empfangen, so kann der nachfolgende Zug bis ans Ende des vorausfahrenden Zuges aufschließen und seine Fahrt unter Einhaltung vorgegebener Bremswege im wandernden Blockabstand hinter dem vorausfahrenden Zug fortsetzen.The method according to the invention is particularly suitable for providing a fallback level for the distance assurance of trains in the event that there is no timely radio connection to a train in front. The following train, as long as it communicates with the radio axle counters and not with the train in front, moves in a space distance defined by the arrangement of its track sensors to the train in front. If the succeeding train succeeds in reconnecting with the preceding train and receiving from it information about its actual location and train integrity, the following train can catch up to the end of the preceding train and travel in accordance with predetermined stopping distances in the traveling train Block distance continues behind the preceding train.

Das erfindungsgemäße Verfahren lasst sich mit Vorteil auch dann anwenden, wenn zwar Kontakt mit dem jeweils vorausfahrenden Zug gegeben ist, dieser Zug aber keine Aussage über seine Zugintegrität machen kann. Dann muss damit gerechnet werden, dass der vorausfahrende Zug irgendwo auf der Strecke ein oder mehrere Fahrzeuge verloren hat. Durch Ansprechen der einzelnen Streckeneinrichtungen bzw. ihrer Funkachszähler und Vergleich der vom vorausfahrenden Zug an diese übermittelten Soll-Achszahlen mit der tatsächlichen Ist-Achszahl lässt sich feststellen, ob der vorausfahrende Zug mit allen seinen Achsen den betreffenden Bahnübergang vollständig passiert hat. Durch aufeinanderfolgendes Abfragen der folgenden Bahnübergänge bzw. Funkachszähler lässt sich so nach und nach die gesamte Strecke auf ihren Freizustand überprüfen.The method according to the invention can advantageously be used even if contact is made with the respective preceding train, but this train can make no statement about its train integrity. Then it must be expected that the train in front has lost one or more vehicles somewhere on the track. By responding to the individual route facilities or their Funkachszähler and comparison of the preceding train transmitted to this target number of axles with the actual actual number of axles, it can be determined whether the preceding train with all its axles has passed the relevant level crossing completely. By successive queries of the following level crossings or Funkachszähler can thus gradually check the entire route to its free state.

Wenn das Ausschalten der Sicherungseinrichtungen eines Bahnüberganges vom positiven Vergleich der Ist-Achszahl eines Zuges mit der von diesem übermittelten Soll-Achszahl abhängig gemacht ist, ist das sichere Ausschalten des Bahnüberganges und damit die Freimeldung des zurückliegenden Streckenabschnittes auch möglich, wenn der den Bahnübergang passierende Zug über seinen Zusammenhalt nicht Bescheid weiß; der Bahnübergang stellt dann die Zugintegrität fest.If the switching off of the safety devices of a railroad crossing is made dependent on the positive comparison of the actual number of axles of a train with the transmitted by this target number of axles, the safe switching off of the railroad crossing and thus the free signal of the past section is also possible if the railroad crossing passing train not aware of his cohesion; the railroad crossing then determines the train integrity.

Das Abfragen der an einem Funkachszähler verfügbaren Soll- und Ist-Achszahlen für einen vorausfahrenden Zug durch einen auf einen Bahnübergang vorrückenden nachfolgenden Zug kann außer vom Befahren eines im Streckenatlas des nachfolgenden Zuges markierten oder durch eine Streckeneinrichtung vorgegebenen Streckenpunktes alternativ auch davon abhängig gemacht sein, dass der nachfolgende Zug den Bremseinsatzpunkt auf einen ihm bekannten Gefahrenpunkt erreicht oder sich diesem nähert. Bevor er einen betrieblich vielleicht nicht mehr erforderlichen Bremsvorgang einleitet, erkundigt sich der Zug bei dem jeweils vorausliegenden Funkachszähler bzw. der Leitstelle nach den gespeicherten Achszahlen und ermittelt daraus den Frei- und Belegtzustand der vorausliegenden Strecke.Querying the available on a radio axle counter target and actual number of axles for a train ahead by a train on a railroad crossing advancing train may be made except for driving on a marked in the route atlas of the following train or predetermined by a track device route point alternatively also dependent on the subsequent train reaches or approaches the brake application point at a known danger point. Before he might no longer need a company Initiating the braking process, the train inquires at the respective upstream radio axis counter or the control center according to the stored axle numbers and determines therefrom the free and busy state of the route ahead.

Die Soll-Achszahl eines Zuges ist dem Zug möglichst vor Fahrtantritt z. B. von einer Leitstelle mitzuteilen oder sie kann anhand der Begleitpapiere des Zuges auf dem Zug ermittelt oder durch ortsfeste Zähleinrichtungen, z. B. beim Passieren eines speziellen Funkachszählers, ermittelt und z. B. per Funk an den Zug übertragen oder ihm auf einer Anzeigetafel angezeigt werden.The target number of axles of a train is the train as possible before departure z. B. from a control center or it can be determined on the basis of the accompanying documents of the train on the train or by fixed counters, z. B. when passing a special Funkachszählers, determined and z. B. transmitted by radio to the train or displayed on a scoreboard.

Für den Fall, dass eine Strecke auch von Zügen befahren wird, die keine Einrichtungen zum Aufbau einer Kommunikationsverbindung zu einem Funkachszähler aufweisen oder deren dafür vorgesehene Einrichtungen ausgefallen sind, ist nach einer Ausprägung der Erfindung vorgesehen, dass eine Zentrale, die den Zuglauf in geeigneter Weise überwacht, z. B. anhand des Buchfahrplans, dem Funkachszähler bei Annäherung eines solchen Zuges dessen Soll-Achszahl übermittelt, vorzugsweise in Verbindung mit einem Identitätskennzeichen für den Zug. Dieses Identitätskennzeichen ist mindestens dem nachfolgenden Zug bekannt oder wird ihm von der Zentrale bekannt gegeben. Der nachfolgende Zug kann dann bei Annäherung an den Funkachszähler die nach dem Passieren des vorausfahrenden Zuges dort gespeicherten Soll- und Ist-Achszahlen bzw. das daraus abgeleitete Kennzeichen abfragen und dann bestimmen, ob die Strecke bis zu den Sensoren des Funkachszählers geräumt und damit für ihn verfügbar ist oder nicht.In the event that a route is also used by trains that have no facilities for establishing a communication link to a radio axis counter or their designated facilities have failed, is provided according to a form of the invention that a central office, the train running in a suitable manner monitored, z. B. based on the book schedule, the Funkachszähler when approaching such a train whose target number of axles transmitted, preferably in conjunction with an identity mark for the train. This identity plate is known to at least the following train or is announced to it by the headquarters. The following train can then interrogate when approaching the radio axle counter stored there after passing the preceding train stored there target and actual numbers of axles or derived therefrom and then determine whether the route cleared up to the sensors of Funkachszählers and thus for him is available or not.

Befindet sich ein ohne oder mit defekten Einrichtungen zur Kommunikation mit einem Funkachszähler ausgestatteter Zug auf dem Weg zu einem Funkachszähler, so kann nach einer weiteren Ausprägung der Erfindung eine Zentrale, die den Zuglauf in geeigneter Weise überwacht, für diesen Zug die Anfrage an den Funkachszähler zur Übermittlung der dort gespeicherten Soll- und Ist-Achszahlen des vorausfahrenden Zuges stellen. Die Zentrale kann aus der Antwort des Funkachszählers erkennen, ob die Strecke bis zum Funkachszähler frei oder noch befahren ist und kann dann den Zugführer des anrückenden Zuges z. B. über Sprechfunk oder über eine gleisseitige Signalisierungseinrichtung über die Befahrbarkeit der vorausliegenden Strecke informieren.Is there a train equipped with or without faulty equipment for communicating with a radio axle counter the way to a Funkachszähler, so according to a further embodiment of the invention, a center that monitors the train run in a suitable manner, ask for this train the request to the radio axle counter for transmitting the stored there target and actual numbers of the preceding train. The control panel can recognize from the response of the radio axle counter, whether the route is free or still traveled to the radio axis counter and can then the train driver of the approaching train z. B. via radio or via a trackside signaling device on the trafficability of the route ahead.

Claims (17)

  1. Method for ensuring separation between trains travelling in the same direction on one track, in which the trains receive information by radio about the free track in front of them from a signal box which is controlling the track and/or from track elements which are located in its path as well as from trains travelling in front of it,
    characterized
    in that radio axle counters (FAZ) are arranged along the track (S) to which radio axle counters (FAZ) the trains (Z1) transmit their respective nominal number of axles (SA Z1) together with an identity tag (J Z1) which identifies them as they approach,
    in that the radio axle counters use associated sensors (A1, A2) to determine the actual number of axles (JA Z1) of the train as it travels past them after reception of an identity tag, and the radio axle counters store this actual number of axles (JA Z1) together with the notified nominal number of axles, or compare the two, with a tag (K Z1) relating to this being formed if the two numbers of axles match,
    and in that, at the latest when the braking start point reaches the sensors of the radio axle counter, a subsequent train (Z2) attempts to check with the radio axle counter (FAZ) the nominal and the actual number of axles of the previous train or the tag which is formed for this, in response to which, in the situation where the previous train has already completely passed it, the radio axle counter transmits the nominal and the actual number of axles of the previous train, or the tag which is formed for this, to the requesting train, and in that the subsequent train uses the transmitted response to deduce that the track is free as far as the sensors of the radio axle counter, and otherwise that the track is occupied to that point.
  2. Method according to Claim 1,
    characterized
    in that the radio axle counters transmit the tag which is formed by them and/or the nominal and the actual number of axles of the last train which passed by them together with its identity tag to at least one device which is equipped with radio transmitting/receiving devices, with which device this data or data derived from it can be checked by a subsequent train.
  3. Method according to Claim 1 or 2,
    characterized
    in that the subsequent train (Z2) attaches to its request to a radio axle counter (FAZ) or to a device which is equipped with radio transmitting/receiving devices the identity tag (J Z1) of the previous train (Z1) and/or in that the radio axle counter or the device which is equipped with radio transmitting/receiving devices attaches to its or their response the identity tag of the last train which passed by the radio axle counter.
  4. Method according to one of Claims 1 to 3,
    characterized
    in that the radio axle counters (FAZ) are associated with level crossings (BU), with the actual number (JA Z1) of the vehicle axles which pass the switching-off contacts (A1, A2), which are related to the direction of travel, in the same direction of travel in each case being recorded together with the respectively notified nominal number of axles (SA Z1), and/or the tag (K Z1) being formed from this by comparison.
  5. Method according to Claim 4,
    characterized
    in that, on approaching a level crossing (BU), a train (Z1) transmits its nominal number of axles (SA Z1) and its identification tag (J Z1) to this level crossing (BU) related in time to the switch-on order in order to protect the level crossing,
    in that the level-crossing stores this data on a track-related basis at least until a subsequent switch-on command is received, or transmits this to a device which is equipped with radio transmitting/receiving devices, and
    in that the level crossing or the device which is equipped with radio transmitting/receiving devices transmits this data or data (K Z1) derived from it to a subsequent train (Z2), on request.
  6. Method according to Claim 4 or 5,
    characterized
    in that the switching on of the safety devices for a level crossing is made dependent on the train which is approaching the level crossing having clearance to move beyond the level crossing, and in that, in the absence of such clearance to travel beyond the level crossing, the safety devices for the level crossing are not switched on, and the train is stopped before the level crossing.
  7. Method according to Claim 4 or 5,
    characterized
    in that the switching off of the safety devices for a level crossing is made dependent on the level crossing having been travelled over and cleared correctly by a train with a notified nominal number of axles.
  8. Method according to one of Claims 1 to 6,
    characterized
    in that, in the situation where there is initially no link to a previous train (Z1) and a subsequent train (Z2) therefore passes an appropriate request to a radio axle counter (FAZ) or to a device which is equipped with radio transmitting/receiving devices in order to determine a free minimum track length, the subsequent train (Z2) continues to attempt to set up a radio link to the respective previous train in order to check its current location (P2).
  9. Method according to one of Claims 1 to 8,
    characterized
    in that, in the situation where there is no link to a previous train (Z1) or this previous train (Z1) makes no statement about its completeness and a subsequent train (Z2) therefore passes an appropriate request to a radio axle counter or to a device which is equipped with radio transmitting/receiving devices, the subsequent train (Z2) first of all makes this request to the radio axle counter which is closest to it and then continues onwards step by step to the radio axle counters on its route as far as the end of the common route with the previous train or until it accesses the first radio axle counter for which no tag for the complete passing or no matching nominal and actual number of axles has been stored for the identity tag of the previous train (Z1)
  10. Method according to one of Claims 1 to 8,
    characterized
    in that, in the situation where the radio axle counters pass on the data transmitted to them and the data determined by them to a central device which is equipped with radio transmitting/receiving devices, the respective subsequent train makes its request to this central device, and in that, on the basis of the knowledge of the data supplied to it from the radio axle counters, this central device signals to the requesting train the last radio axle counter which has been cleared by the previous train and to which it may travel onwards.
  11. Method according to one of Claims 1 to 10,
    characterized
    in that a central device is provided which monitors the train running and, in the situation in which a train does not have any devices or has defective devices for communication with the radio axle counters, uses its knowledge of the actual location of the train or the location of the train as assumed by it to transmit to the respective next radio axle counter in the course of the track the nominal number of axles of the train as it approaches.
  12. Method according to Claim 11,
    characterized
    in that the central device attaches the nominal number of axles of the train to an identity tag which identifies the train and which is known to the other vehicle or vehicles travelling on that track.
  13. Method according to one of Claims 1 to 12,
    characterized
    in that a central device is provided, which monitors the train running and, in the situation where a train cannot set up a communication link to the respective next radio axle counter, uses its knowledge of the actual location of the train or the location of the train as assumed by it to make the request to the respective next radio axle counter on behalf of this train,
    in that the radio axle counter transmits to the central device the data determined for the last train which passed by it,
    and in that, depending on whether the track has or has not been completely cleared as far as the radio axle counter, this central device reports, preferably by voice radio, to the train whether it may travel onwards to the next radio axle counter.
  14. Method according to one of Claims 1 to 13,
    characterized
    in that, on receiving a tag which has been requested by them or on receiving matching nominal and actual numbers of axles for a previous train, the trains automatically extend the clearance of the route to the respective next radio axle counter from which the relevant tag or the number of axles originated.
  15. Method according to one of Claims 1 to 14,
    characterized
    in that the making of the request from a train to a radio axle counter or to a device which is equipped with radio transmitting/receiving devices is made dependent on the passing of a location which has been noted in a track atlas for that train, or the passing of a trackside influencing device.
  16. Method according to one of Claims 1 to 15,
    characterized
    in that a train makes the request to a radio axle counter or to a device which is equipped with radio transmitting/receiving devices at the latest when it has to start braking for a danger point that is known to it.
  17. Use of the method according to one of Claims 1 to 16, as a reversionary level in order to check the current location of a previous train in the situation in which there is no radio link to the previous train, or in the situation in which the previous train has no means, or no serviceable means, for technical train completeness identification.
EP01250020A 2000-01-19 2001-01-16 Distance security method for trains Expired - Lifetime EP1118522B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE10002908A DE10002908A1 (en) 2000-01-19 2000-01-19 Procedure for securing distances of trains
DE10002908 2000-01-19

Publications (3)

Publication Number Publication Date
EP1118522A2 EP1118522A2 (en) 2001-07-25
EP1118522A3 EP1118522A3 (en) 2002-10-30
EP1118522B1 true EP1118522B1 (en) 2006-03-22

Family

ID=7628543

Family Applications (1)

Application Number Title Priority Date Filing Date
EP01250020A Expired - Lifetime EP1118522B1 (en) 2000-01-19 2001-01-16 Distance security method for trains

Country Status (6)

Country Link
EP (1) EP1118522B1 (en)
AT (1) ATE320955T1 (en)
DE (2) DE10002908A1 (en)
DK (1) DK1118522T3 (en)
ES (1) ES2258507T3 (en)
PT (1) PT1118522E (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106515797A (en) * 2016-12-20 2017-03-22 交控科技股份有限公司 Train tracing running method implemented without secondary railway testing equipment and communication based train control (CBTC) system

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2319062B1 (en) * 2007-09-19 2010-02-03 Lineas Y Cables, S.A. RAIL PEDAL.
CN108216308B (en) * 2017-12-22 2019-11-29 合肥工大高科信息科技股份有限公司 A method of judging that meter shaft section fault occupies

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19832602A1 (en) * 1998-07-09 2000-01-13 Siemens Ag Train integrity verification method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106515797A (en) * 2016-12-20 2017-03-22 交控科技股份有限公司 Train tracing running method implemented without secondary railway testing equipment and communication based train control (CBTC) system
CN106515797B (en) * 2016-12-20 2018-04-17 交控科技股份有限公司 The train tracking operation method and CBTC systems of no secondary track detection device

Also Published As

Publication number Publication date
DK1118522T3 (en) 2006-07-24
EP1118522A2 (en) 2001-07-25
DE50109283D1 (en) 2006-05-11
ES2258507T3 (en) 2006-09-01
DE10002908A1 (en) 2001-07-26
EP1118522A3 (en) 2002-10-30
ATE320955T1 (en) 2006-04-15
PT1118522E (en) 2006-07-31

Similar Documents

Publication Publication Date Title
DE19509696C2 (en) Procedure for mutual contact between trains and facility for carrying out the procedure
DE69022193T2 (en) Highway crossing control system for rail road using a transmission link between the train locomotive and the crossing protection device.
DE4406720C2 (en) Train protection system
EP3400160A1 (en) Railway-technical installations and method for operating a railway-technical installation
EP1097077A2 (en) Method for reducing data in railway operation
EP0739802A2 (en) Method for improving availability of multi-section axle counters
DE4331431C1 (en) Traffic control device for controlling the driving operation and the traffic flow for the rail-bound traffic
EP1118522B1 (en) Distance security method for trains
EP1892171A1 (en) Method for operation of an interlocking system and method for operation of a central control station
EP3400161A1 (en) Track installation and method for operating a track installation
DE4423787C1 (en) Process and device for train-controlled changes of direction in single-track operation
EP3109127A1 (en) Method for signalling an expansion of a movement authority from a route control station to a positioning body
EP4116170A1 (en) Method for operating a train control system
EP1118185B1 (en) Communication system for radio-contolled driving
DE19957258C2 (en) Track vacancy detection method using axle counting
DE3445115A1 (en) Arrangement for simplifying and improving safety of running trains
EP0802871B1 (en) Method and system for the safety-relevant collection and processing of data concerning the status of non-central/central control units on board rail traction units
DE19749697A1 (en) Railway operations controller
DE4406721C2 (en) Procedure for the safe operation of a route
DE19526158C2 (en) Train protection system
EP0985587B1 (en) Method for controlling level crossings
DE10240376A1 (en) Safe operation of rail systems uses travel and status data entered into protocol memory and continuously transmitted to central point to control alarm system
EP1022208B1 (en) Procedure for the optimization of the closing time of level crossings
DE102004062987A1 (en) Train controlling and securing method, involves blocking virtual blocks after clearing following train for other trains and issuing dis-positive drive assignment by host computer or dispatcher that is connected via cellular radio network
DE3502115C2 (en) Control device for central signal box

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20021203

AKX Designation fees paid

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 20060322

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: SIEMENS SCHWEIZ AG

REF Corresponds to:

Ref document number: 50109283

Country of ref document: DE

Date of ref document: 20060511

Kind code of ref document: P

REG Reference to a national code

Ref country code: GR

Ref legal event code: EP

Ref document number: 20060401560

Country of ref document: GR

REG Reference to a national code

Ref country code: SE

Ref legal event code: TRGR

REG Reference to a national code

Ref country code: DK

Ref legal event code: T3

REG Reference to a national code

Ref country code: PT

Ref legal event code: SC4A

Effective date: 20060512

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20060706

REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2258507

Country of ref document: ES

Kind code of ref document: T3

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070131

26N No opposition filed

Effective date: 20061227

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20070322

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20070403

Year of fee payment: 7

BERE Be: lapsed

Owner name: SIEMENS A.G.

Effective date: 20070131

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070131

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FI

Payment date: 20071211

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DK

Payment date: 20080110

Year of fee payment: 8

Ref country code: ES

Payment date: 20080218

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20080114

Year of fee payment: 8

Ref country code: GR

Payment date: 20071219

Year of fee payment: 8

Ref country code: IE

Payment date: 20080122

Year of fee payment: 8

Ref country code: IT

Payment date: 20080130

Year of fee payment: 8

Ref country code: NL

Payment date: 20080111

Year of fee payment: 8

Ref country code: PT

Payment date: 20080104

Year of fee payment: 8

Ref country code: SE

Payment date: 20080110

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20071212

Year of fee payment: 8

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20080116

Year of fee payment: 8

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080131

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080131

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20080801

REG Reference to a national code

Ref country code: PT

Ref legal event code: MM4A

Free format text: LAPSE DUE TO NON-PAYMENT OF FEES

Effective date: 20090716

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20070116

EUG Se: european patent has lapsed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20090116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20060322

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 20090801

REG Reference to a national code

Ref country code: DK

Ref legal event code: EBP

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090116

Ref country code: FI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090116

Ref country code: PT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090716

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20091030

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090801

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090804

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 20090117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090202

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090117

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DK

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090731

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090116

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20090117