DE1759630C3 - Device for aligning a track vertically and / or sideways - Google Patents

Device for aligning a track vertically and / or sideways

Info

Publication number
DE1759630C3
DE1759630C3 DE19681759630 DE1759630A DE1759630C3 DE 1759630 C3 DE1759630 C3 DE 1759630C3 DE 19681759630 DE19681759630 DE 19681759630 DE 1759630 A DE1759630 A DE 1759630A DE 1759630 C3 DE1759630 C3 DE 1759630C3
Authority
DE
Germany
Prior art keywords
measuring
track
monitoring
tools
movement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DE19681759630
Other languages
German (de)
Other versions
DE1759630B2 (en
DE1759630A1 (en
Inventor
Franz; Theurer Josef Ing.; Wien Plasser
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Franz Plasser Bahnbaumaschinen Industrie GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AT478567A external-priority patent/AT308802B/en
Application filed by Franz Plasser Bahnbaumaschinen Industrie GmbH filed Critical Franz Plasser Bahnbaumaschinen Industrie GmbH
Publication of DE1759630A1 publication Critical patent/DE1759630A1/en
Publication of DE1759630B2 publication Critical patent/DE1759630B2/en
Application granted granted Critical
Publication of DE1759630C3 publication Critical patent/DE1759630C3/en
Expired legal-status Critical Current

Links

Description

IOIO

Die Erfindung betrifft eine Vorrichtung zum Ausrichten eines Gleises ^ier Höhe und/oder der Seite nach an Hand eines zur Überwachung der SoUage wenigstens eines Schienenstrangs dienenden Bezugssystems und mit mindestens einem eine Differenz zwischen der SoIl- und Istlage dieses Schienenstrangs anzeigenden, mit dem Schienenstrang gemeinsam bewegbaren und mit dem Bezugssystem kontaktierenden Meß- und Überwachungsorgan sowie mit Gleisrichtwerkzeugen zum Anheben und/oder Seitwärtsve. schieben der Schiene und mit Bettungsverdichtungswerkzeugen zum Verdichten der Schotterbettung des Gleises.The invention relates to a device for aligning a track height and / or the side Hand of a reference system used to monitor the SoUage of at least one rail track and with at least one showing a difference between the target and actual position of this rail track, with the rail track jointly movable and contacting with the reference system measuring and monitoring device as well as with track straightening tools for lifting and / or Seitwärtsve. slide the rail and with bedding compaction tools for compacting the ballast bedding of the track.

Solche Maschinen, sogenannte Richt-Nivellier-Gleis-Stopfmaschinen, sind bereits in verschiedenerlei Varian ten bekannt, wobei das genannte Bezugssystem beispielsweise durch Bezugsgerade, etwa durch Spanndrähte, Lichtbündel od. dgl, aber auch durch starre Teile, wie Stangen od. dgl, verkörpert sein kann.Such machines, so-called straightening, leveling, track tamping machines, are already known in various Varian th, said reference system for example by reference line, for example through tension wires, light bundles or the like, but also through rigid parts, like rods or the like can be embodied.

Bei den bisher bekannten Vorrichtungen, z. B. entsprechend den deutschen Auslegeschriften 10 78 151 und 11 41 306 wurde das Gleis von den Gieisrichtwerkzeugen so lange bewegt, z. B. angehoben oder seitwärtsverschoben, bis das sich mit einer der Schienen des Gleises gemeinsam bewegende Meßorgan in seiner Stellung zum Bezugssystem das Erreichen der Soilage des Gleises anzeigte; diese Anzeige war zumeist mit einem Steuerimpuls gekoppelt, der ein Ausschalten der Tätigkeit der Gleisrichtwerkzeuge bewirkte.In the previously known devices such. B. accordingly the German Auslegeschriften 10 78 151 and 11 41 306 was the track of the track straightening tools moved so long, z. B. raised or shifted sideways, until the measuring element moving together with one of the rails of the track in his Position to the reference system indicated the reaching of the soil layer of the track; this ad was mostly with coupled to a control pulse that caused the track straightening tools to be switched off.

Während des Ausrichtens des Gleises und/oder auch noch nach dem Ausrichten erfolgte das Verdichten der im Bereich der Korrekturstelle befindlichen Bettung und durch diese Verdichtung der Bettung wurde das Gleis unter Umständen veranlaßt, sich noch weiter aufwärts oder seitwärts zu verschieben als es der Sollage entsprach. Man durfte aus diesem Grund den Verdichtungsgrad des Schotterbetts nicht allzu hoch wählen, um zu vermeiden, daß die richtige Lage des Gleises durch einen allzu hohen Druck der verdichteten Bettung verfälscht werden konnte. Andererseits ist aber ein möglichst hoher Verdichtungsgrad der Bettung wünschenswert, um sicherzustellen, daß die richtige Lage des Gleises über einen möglichst langen Zeitraum erhalten bleibt.During the alignment of the track and / or also after the alignment, the compaction of the The bedding located in the area of the correction point and this compaction of the bedding became the The track may cause it to move further upwards or sideways than the target position corresponded. For this reason, the degree of compaction of the gravel bed could not be chosen too high, in order to avoid the correct position of the track due to excessive pressure from the compacted bedding could be falsified. On the other hand, however, the highest possible degree of compaction of the bedding is required desirable to ensure that the track is in the correct position for as long as possible preserved.

Demnach ist es einigermaßen schwierig, die Größe des von den Verdichtungswerkzeugen ausgeübten Drucks richtig zu bestimmen, nämlich so, daß zwar einerseits eine einwandfreie Verdichtung des Schotterbetts sichergestellt ist, andererseits aber ein allzu großer Verdichtungsdruck der Werkzeuge keine unerwünschten Auswirkungen auf die Gleislage zeitigtAs a result, it is somewhat difficult to measure the size of the pressure exerted by the compaction tools To determine the pressure correctly, namely in such a way that, on the one hand, a proper compaction of the ballast bed is ensured, but on the other hand an excessively high compression pressure of the tools is not undesirable Has an impact on the track position

Es ist weiterhin, z. B. aus den deutschen Auslegeschriften Il 35 506 und 11 81 724, bekannt, die Richtbewegung des Gleises bis zum Erreichen der Sollage nur durch die Tätigkeit der Bettungsverdtchtungswerkzeuge allein durchzuführen. Auch hier ergibt sich der Nachteil, daß der Verdichtungsgrad des Bettungsschotters abhängig ist von der Gi öß^der durchzuführenden Korrekturbewegung, abgesehen davon, daß größere Korrekturen, z. B. der Höhenlage, einen erheblichen Zeitaufwand erforderaIt is still, e.g. B. from the German Auslegeschriften Il 35 506 and 11 81 724, known, the directional movement of the track until the target position is reached only through the activity of the bedding compression tools perform alone. Here, too, there is the disadvantage that the degree of compaction of the ballast ballast depends on the size of the work to be carried out Corrective movement, apart from the fact that larger corrections, e.g. B. the altitude, a considerable Time required

Aufgabe der vorliegenden Erfindung ist es, eine Vorrichtung der eingangs erläuterten Gattung so auszugestalten, daß das zu korrigierende Gleis bei optimalem und konstantem Verdichtungsdruck der Bettungsverdichtungswerkzeuge in eine genaue Sollage ausgerichtet wirdThe object of the present invention is to design a device of the type explained at the beginning in such a way that that the track to be corrected with optimal and constant compaction pressure of the bedding compaction tools is aligned in an exact target position

Diese Aufgabe wird gemäß der Erfindung dadurch gelöst, daß für das Meß- und Überwachungsorgan mindestens zwei differenzierte Kontaktstellen zu dem zugeordneten Bezugssystem vorgesehen sind, die bei der Korrekturbewegung des Gleises nacheinander zum Ansprechen kommen, und zwar die erste, bevor die Sollage des Gleises erreicht ist und die zweite bei Erreichen der Sollage desselben und daß eine Steuerungseinrichtung zur Stillsetzung zunächst der Gleisrichtwerkzeuge bei der ersten Kontaktnahme sowie der Bettungsverdichtungswerkzeuge bei der zweiten Kontaktnahme vorgesehen istThis object is achieved according to the invention in that for the measuring and monitoring element at least two differentiated contact points are provided for the associated reference system, which in the Corrective movements of the track come into play one after the other, namely the first before the The target position of the track is reached and the second when the target position is reached and that a control device to stop the track straightening tools at first contact and the Bedding compaction tools are provided for the second contact

Bei der Erfindung ist eine gemeinsam vom Meß- und Überwachungsorgan und dem Bezugssystem bei Erreichen der Soilage des Schienenstrangs beeinflußte Steuerungseinrichtung vorgesehen, die bei Erreichen der Soilage des Gleist» einen Impuls auslöst, der d?n Stillstand der Tätigkeit der Bettungsverdichtungswerkzeuge bewirkt während die Tätigkeit der Gleisrichtwerkzeuge schon vorher eingestellt wurde. Die Steuereinrichtung vermag zweierlei Impulse abzugeben, und zwar einen Impuls eine gewisse Zeit vor Erreichen der Sollage des Gleises zur Beendigung der Tätigkeit der Gleisrichtwerkzeuge und einen zweiten Impuls bei Erreichen der Sollage zur Beendigung der Tätigkeit der Bettungsverdichtungswerkzeuge.In the invention, one is common to the measuring and monitoring element and the reference system when it is reached the Soilage of the rail track influenced control device provided when reaching the Soilage des Gleist »triggers an impulse that thin The activity of the bedding compaction tools comes to a standstill while the track straightening tools are in operation was previously set. The control device can emit two types of pulses, and although a pulse a certain time before reaching the target position of the track to end the activity of the Track straightening tools and a second pulse when the target position is reached to end the activity of the Bed compaction tools.

Gemäß einer vorteilhaften Ausgestaltung der Erfindung kann das Meß- oder Überwachungsorgan mit mehreren, nacheinander mit dem Bezugssystem zur Zusammenarbeit gelangenden Teilen versehen sein, um aufeinanderfolgende Steuerungs-, Anzeige- und/oder Signal-Impulse abgeben zu können.According to an advantageous embodiment of the invention can the measuring or monitoring organ with several, one after the other with the reference system for cooperation coming parts be provided to successive control, display and / or To be able to emit signal pulses.

Es können aber auch dem Meß- und Überwachungsorgan nacheinander mehrere, das Bezugssystem bildende Bezugsgerade zugeordnet sein, um bei Zusammenwirken mit diesen in Bewegungsrichtung aufeinanderfolgenden Bezugsgeraden aufeinanderfolgende Steuerungs-, Anzeige- und/oder Signal-Impulse abzugeben.But there can also be several consecutive measuring and monitoring elements forming the reference system Be assigned reference straight lines to be consecutive when interacting with these in the direction of movement To emit successive control, display and / or signal pulses.

Schließlich kann einer Weiterbildung der Erfindung zufolge das Meß- und Überwachungsorgan einen als Impulsgeber für einen Steuerungs-, Anzeige- und/oder Signal-Impuls dienenden, mit einer Bezugsgeraden des Bezugssystems zusammenwirkenden und hierzu mil einer Tastkante versehenen beweglichen Teil aufweisen, der nach einer ersten Berührung mit der Bezugsgeraden in eine unwirksame oder später neuerlich wirksa me Stellung verstellbar ist.Finally, according to a development of the invention, the measuring and monitoring element can be used as a Pulse generator for a control, display and / or signal pulse serving, with a straight reference line of the Have a moving part that interacts with the reference system and is provided with a tactile edge for this purpose, which after a first contact with the reference straight line becomes ineffective or later effective again me position is adjustable.

Weitere vorteilhafte Ausgestaltungen der Erfindung sind Gegenstand von Unteransprüchen.Further advantageous refinements of the invention are the subject matter of the subclaims.

Im folgenden sind an Hand der Zeichnungen bevor zugte Ausführungsbeispiele zur weiteren Erläuterung der Erfindung beschrieben. Es zeigtThe following are based on the drawings before Referred exemplary embodiments are described to further explain the invention. It shows

F i g. 1 und la im Seitenriß und zugehörigem Grund riß eine Gleisricht-Nivellier-Stopfmaschine,F i g. 1 and la in side elevation and associated reason tore off a leveling, leveling and tamping machine,

F i g. 2 und 2a eine Einrichtung, die am Meß- um Überwachungsorgan dieser Maschine anzubringen is und das zugehörige Schaltschema der Steuerung,F i g. 2 and 2a a device to be attached to the measuring and monitoring device of this machine and the associated circuit diagram of the control system,

F i g. 3 und 3a die vergleichende Darstellung der herF i g. 3 and 3a the comparative representation of the her

kömmlichen und der erfindungsgemäßen Arbeitsweise,conventional and the inventive method,

Fig.4 eine Einrichtung zur Höhenverstellung einer Bezugsgeraden,4 shows a device for adjusting the height of a Reference line,

F i g. 5 ein Ausführungsbeispiel unter Verwendung einer Zieltafel,F i g. 5 shows an embodiment using a target board,

Fig.6 und 6a ein Detail aus einer Vorrichtung zum Seitwärtsverschieben eines Gleises mit dem zugehörigen Schaltschema,6 and 6a a detail of a device for Shifting a track sideways with the associated switching scheme,

Fig. 7 bis 10 die Darstellungen verschiedene Möglichkeiten zur Anordnung von Bezugsgeraden und zu- )0 gehörigen Meß- und Überwachungsorganen teils im Aufriß, teils in Draufsicht und teils in schematischen Ansichten.FIGS. 7 to 10, the representations of various possibilities for the arrangement of the reference line and supply) 0 associated measurement and monitoring organs and partly in elevation, partly in plan and partly in schematic views.

In den Fig. 1 und la ist eine Gleisricht-Nivellier-Stopfmaschine dargestellt, deren Fahrgestellrahmen 1 mittels der Fahrwerke 2 und 3 auf den Schienen 4 des Gleises, das korrigiert werden soll, verfahrbar ist. Die Schwellen 5 dieses Gleises sind ebenfalls dargestellt.In Figs. 1 and la is a track straightening leveling tamping machine shown, the chassis frame 1 by means of the chassis 2 and 3 on the rails 4 of the The track to be corrected can be moved. The sleepers 5 of this track are also shown.

Die Maschine ist im Bereich der Seitenrichtstelle mit als Seitenrichtwerkzeuge ausgebildeten Gleisrichtwerkzeugen 6 und mit zugehörigen, seitlich außerhalb der Schwellenköpfe auf die Schotterbettoberseite aufsetzbaren Bettungsverdichtungswerkzeugen 7 ausgestattet, die als Oberflächenverdichter ausgestaltet sein können, auf beiden Seiten des Gleises höhenverstellbar und bedarfsweise auf der einen oder anderen Seite betätigbar angeordnet sind. Die Betätigung dieser seitlichen Bettungsverdichtungswerkzeuge 7 erfolgt jeweils nur auf jener Seite, von der das Gleis, und in die Sollage verschoben zu werden, abgerückt wird; solcherart vermögen diese Bettungsverdichtungswerkzeuge 7 das Verschieben des Gleises nach der jeweils gegenüberliegenden Seite wirksam zu unterstützen.The machine is in the area of the side straightening point with track straightening tools designed as side straightening tools 6 and with the associated, laterally outside the sleeper heads on the ballast bed top can be placed Equipped bed compaction tools 7, which are designed as surface compactors can, height-adjustable on both sides of the track and, if necessary, actuated on one side or the other are arranged. The actuation of these lateral bedding compaction tools 7 takes place in each case only on the side from which the track, and to be moved into the target position, is moved; such these bedding compaction tools 7 are capable of moving the track to the opposite one Page to support effectively.

Ferner besitzt die Maschine an der vorderen Seite des Fahrgestellrahmens 1 ein höhenverstellbares Gleisrichtwerkzeug 8 zum Anheben des Gleises mit einem Paar von Schienengreifern 9 für jeden Schienenstrang. Auch diesem Gleisrichtwerkzeug 8 sind Bettungsverdichtungswerkzeuge 10 zugeordnet, die in üblicher Weise auf einem höhenverstellbaren Träger im vorderen Teil des Fahrgestellrahmens 1 paarweise einander gegenüberliegend lagern, gegenläufig verstellbar sind und mit den unteren Enden in das Schotterbett eintauchen, um den Schotter unterhalb der der Hubstelle benachbarten Schwellen 5 zu verdichten und eine solide Basis für das in die neue Höhenlage angehobene Gleis zu schaffen. Diese Bettungsverdichtungswerkzeuge 10 sind in zwei Gruppen angeordnet um jeweils zwei benachbarte Schwellen 5 gleichzeitig unterstopfen zu können.The machine also has a height-adjustable track straightening tool on the front side of the chassis frame 1 8 for lifting the track with a pair of rail grippers 9 for each track. This track straightening tool 8 is also assigned bedding compaction tools 10, which are commonly used Way on a height-adjustable carrier in the front part of the chassis frame 1 in pairs to each other store opposite, are adjustable in opposite directions and immerse with the lower ends in the ballast bed, to compact the ballast below the sleepers 5 adjacent to the lifting point and create a solid one To create the basis for the track raised to the new altitude. These bedding compaction tools 10 are arranged in two groups to tamp two adjacent sleepers 5 at the same time be able.

Um das Erreichen der Sollage des Gleises überwachen zu können, ist die Maschine mit verschiedenen Bezugssystemen ausgestattet, und zwar beim dargestellten Ausführungsbeispiel mit Bezugsgeraden, die von Spanndrähten, Lichtstrahlen od. dgl verkörpert sein können.In order to be able to monitor the achievement of the target position of the track, the machine is with different Equipped reference systems, namely in the illustrated embodiment with reference lines that embodied by tension wires, rays of light or the like could be.

Zum Seitenrichten des Gleises mittels der Gleisrichtwerkzeuge 6 sind zwei verschieden lange Bezugsgerade vorgesehen, die Sehnen eines CHeisbogens darstellen, und zwar eine längere Senne 11 and eine halb so lange kürzere Seime ti. Die PFeühohen dieser Sehnen If and 12 werden an einer MeBstefle M Miteinander and am vorderen ßnde der fcSrzeren SehneFor lateral straightening of the track by means of the track straightening tools 6, two reference lines of different lengths are provided, which represent the chords of a C-arc, namely a longer Senne 11 and half as long a shorter Seime ti. The height of these tendons If and 12 are measured at a measuring point M with each other and at the front end of the short tendon

pt, also im Bereich der Sdtefflichtstelle R, die mit ^eW fteifoaar beyeidinEi fet, wst3 das Gids verschobett, ftfe «ie Pfäthfilte der kurzen Sehne 12 «nt einem ans der örärcfeeo Pfeilhöhe der längere» Sehne 11 erbtftteftafeft Säflwert iSfeeretaüÖmint Die Sehnenendpunkte sind an kleinen Wagen 13, 14, 15 und 16 verankert, die über ausziehbare Stangen od. dgl. mit dem Fahrgestellrahmen 1 verbunden sind. pt, i.e. in the area of the southern light point R, which is shifted with ^ eW fteifoaar beyeidinEi, wst3 the gids, ftfe "the Pfäthfilte of the short tendon 12" nt an at the örärcfeeo arrow height of the longer "tendon 11 inherited the small sawing points iSfeeretaümintafeft Anchored trolleys 13, 14, 15 and 16, which are connected to the chassis frame 1 via pull-out rods or the like.

Zum Nivellieren des Gleises mittels des Gleisrichtwerkzeugs 8 ist zumindest eine zur Sollage des Gleises parallele Bezugsgerade 17 vorgesehen, z. B. ein Wellenbüno'ei, das von einer als Sender ausgebildeten StationFor leveling the track by means of the track straightening tool 8, at least one is for the target position of the track parallel reference line 17 provided, for. B. a Wellenbüno'ei, from a station trained as a transmitter

18 ausgeht und über ein Meß- und Überwachungsorgan18 goes out and a measuring and monitoring organ

19 zu einem Empfänger 20 verläuft. Sender und Empfänger können auch vertauscht sein.19 runs to a receiver 20. Sender and receiver can also be swapped.

Der im noch nicht korrigierten Gleisbereich befindliche Sender befindet sich als vordere Station 18 auf dem Vorwagen 13, der auch als Endpunkt der langen Sehne 11 benutzbar ist. Das Meß- und Überwachungsorgan 19 ruht mittelbar auf dem zu korrigierenden Schienenstrang auf und «it mit diesem gemeinsam aufwärts bewegbar, um bei Erreichen der Sollage als Blende in das die Bezugsgerade 17 verkörpernde Wellenbündel od. dgl. einzuwandern, die Verbindung zwischen Sender und Empfänger 20 dadurch zu unterbrechen und solcherart einen Steuerimpuls zu erzeugen. Der Empfänger 20 liegt über ein Fahrwerk 21 gleichfalls unmittelbar auf dem zu korrigierenden Schienenstrang auf.The transmitter located in the not yet corrected track area is located as the front station 18 on the Front carriage 13, which can also be used as the end point of the long chord 11. The measuring and monitoring body 19 rests indirectly on the rail line to be corrected and can be moved upwards together with it, to when the target position is reached as a diaphragm in the wave bundle embodying the reference straight line 17 od. Like. Immigrate, thereby interrupting the connection between transmitter and receiver 20 and such to generate a control pulse. The receiver 20 is also directly above a chassis 21 on the rail line to be corrected.

In den F i g. 2 und 2a ist als Ausführungsbeispiel eine Einrichtung dargestellt, die zu einer vorzeitigen, nämlich noch vor Erreichen der Sollage des Gleises durchzuführenden Abschaltung der Tätigkeit der Gleisrichtwerkzeuge 6, 8, im dargestellten Fall der als Gleishebewerkzeuge ausgebildeten Gleisrichtwerkzeuge 8, benutzt werden kann, um dann die mit dem Maß χ bezeichnete letzte Hubphase der Schiene 4 durch die Tätigkeit der Bettungsverdichtungswerkzeuge 10 allein durchzuführen.In the F i g. 2 and 2a, a device is shown as an exemplary embodiment, which can be used for a premature shutdown of the activity of the track straightening tools 6, 8, in the case shown, the track straightening tools 8, which are designed as track lifting tools, to be carried out before the target position of the track is reached, in order to then switch off the with the dimension χ designated last lifting phase of the rail 4 by the activity of the bedding compaction tools 10 alone.

Die Fig.2 und 2a zeigen das Meß- und Überwachungsorgiir 19 aus F i g. 1 in größerem Maßstab. Dieses Meß- und Überwachungsorgan 19 besteht aus einem feststehenden Teil 22, der über eine nicht dargestellte Stange od. dgl. auf der infolge der Tätigkeit der Gleisricht werkzeuge 8 allmählich hochwandernden Schiene 4 aufruht und somit bei der Korrektur des Gleises in F'feilrichtung allmählich gegen dre Bezugsgerade 17 hochwandert. An diesem feststehenden Teil 22 ist ein mit einer Tastkante für die Bezugsgerade 17 versehener beweglicher Teil 23 in Bewegungsrichtung des Meß- und Überwachungsorgans 19 verschiebbar geführt und kann um ein einstellbares Maß χ über die Tastkante des feststehenden Teils 22 hinaus verschoben werden. In der aufwärts verschobenen Endstellung kommt in Bewegungsrichtung des hochwandernden Meß- und Übenvachungsorgans 19 zuerst die Tastkante des beweglichen Teils 23 mit der Bezugsgeraden 17 in Kontakt: der bewegliche Teil 23 kann sodann in eine unwirksame Stellung, also unter die Tastkante des feststehenden Teils 22 rückverschoben werden, am solcherart der Tastkante dieses feststehenden Teils 22 beim weiteren Hochwandern des Meß- and Oberwachungsorgars 19 das Zusammenwirken mit der Bezugsgeraden 17 20 ermöglichen.FIGS. 2 and 2a show the measuring and monitoring organ 19 from FIG. 1 on a larger scale. This measuring and monitoring element 19 consists of a stationary part 22, which rests on a rod, not shown dre reference straight line 17 wanders up. On this stationary part 22 a movable part 23 provided with a sensing edge for the reference line 17 is guided displaceably in the direction of movement of the measuring and monitoring element 19 and can be displaced by an adjustable amount χ beyond the sensing edge of the stationary part 22. In the upwardly displaced end position, in the direction of movement of the measuring and monitoring organ 19 moving upwards, the touching edge of the movable part 23 first comes into contact with the reference line 17: the moving part 23 can then be moved back into an inoperative position, i.e. below the touching edge of the stationary part 22 , at such the touch edge of this fixed part 22 enable interaction with the reference straight line 17 20 as the measuring and monitoring organ 19 continues to wander upward.

Zorn Verstellen des beweglichen Teiis 23 dient ein aus einem Kolben 24 und einem Zylinder 25 bestehender drackmittelbetätigter Antrieb, z.B. ei» hydraulischer oder pneumatischer Antrieb.Zorn adjusting the movable part 23 is made up of a piston 24 and a cylinder 25 Pressure-actuated drive, e.g. a »hydraulic or pneumatic drive.

Wie die F i g. 2a zeigt, ist die Dnicfe^ttelsttaierung dieses Aiariebs in das zur Betätigung des Güekäarichtwerkzeugs» and des Bettangs^niicAtangswerJoDeuge 10 dienende Druckmrttelsystem einbeaogen, and «war derart, daß durch den Beginn der Tätigkeit der BettangsveniidWimgswerkzeuge 1© vorerst ein VorschubAs the F i g. 2a shows, is the Dnicfe ^ ttsttaierung this Aiariebs into the operation of the Güekäaricht tool » and des Bettangs ^ niicAtangswerJoDeuge 10 used printing material system bent in, and «was such that by starting the activity of BettangsveniidWimgswerkzeuge 1 © for the time being a feed

3 615]3 615]

10"10 "

ο» ο:>υο »ο:> υ

des beweglichen Teils 23 des MeD- und Überwachungsorgans 19 über den feststehenden Teil 22 hinaus und sodann durch den beim Zusammenwirken des beweglichen Teils 23 des Meß- und Überwachungsorgans 19 mit der Bezugsgeraden 17 ausgelösten Impuls eine Beendigung der Tätigkeit der Gleisrichtwerkzeuge 8 und eine Verschiebung des beweglichen Teils 23 unter den feststehenden Teil 22 gesteuert wird.of the movable part 23 of the MeD and monitoring organ 19 beyond the fixed part 22 and then by the interaction of the movable Part 23 of the measuring and monitoring element 19 with the reference straight line 17 triggered a pulse Termination of the activity of the track straightening tools 8 and a displacement of the movable part 23 below the fixed part 22 is controlled.

Auf diese Weise ist das Meß- und Überwachungsorgan 19 dazu befähigt, zweierlei Impulse abzugeben, und |0 zwar zuerst einen Impuls bei Berührung der Tastkante des beweglichen Teils 23 mit der Bezugsgeraden 17 und sodann — nach Rückverschiebung des beweglichen Teils 23 hinter den feststehenden Teil 22 — einen zweiten Impuls bei Berührung der Tastkante des feststehen- ]S den Teils 22 mit der Bezugsgeraden 17. Diese Impulse werden einem Empfänger E übermittelt, der sie über einen Verstärker V einer Steuerungseinrichtung S weiterleitet. Die voll ausgezogenen Leitungen des Schaltschemas bezeichnen elektrische Leitungen., die strichpunktiert ausgezogenen Leitungen sind Druckmittelleitungen. In this way, the measuring and monitoring element 19 is able to emit two types of impulses, and | 0 Although first then a pulse on contact with the tracing edge of the movable part 23 with the reference line 17 and - after rear displacement of the movable portion 23 behind the fixed part 22 - a second pulse when touching the tracing edge of the feststehen-] S the part 22 with the reference line 17. These pulses are transmitted to a receiver E , which forwards them to a control device S via an amplifier V. The lines drawn out in full in the circuit diagram denote electrical lines, the lines drawn out in dash-dotted lines are pressure medium lines.

Die Steuerungseinrichtung 5 öffnet am Beginn des Arbeitsvorgangs zuerst die Druckmittelzufuhr zu einem hydraulischen Kolben-Zylinder-Antrieb 26 der Gleisrichtwerkzeuge 8 und zu einer hydraulischen Verstelleinrichtung 27 der Bettungsverdichtungswerkzeuge 10. Die Druckmittelzufuhr wird von Ventilen 28 und 29 gesteuert, und zwar vermittels der Steuerungseinrichtung S. Gleichzeitig wird auch der Zylinder 25 des Ver-Stellantriebs des beweglichen Teils 23 beaufschlagt und dieser bewegliche Teil 23 wandert hoch, also näher zur Bezugsgeraden 17. Sobald die aus mehreren Relais bestehende Steuerungseinrichtung S vom Empfänger E über den Verstärker V den ersten durch die Berührung des beweglichen Teils 23 des Meß- und Überwachungsorgans 19 mit der Bezugsgeraden 17 ausgelösten Impuls erhält, wird durch diese Steuerungseinrichtung S die Druckmittelzufuhr zum Gleichrichtwerkzeug 8 beendet. Gleichzeitig wird die Druckmittelzufuhr ?um Antrieb des beweglichen Teils 23 des Meß- und Überwachungsorgans 19 umgekehrt und dieser bewegliche Teil 23 wird abwärts, also in Bewegungsrichtung des Meß- und Überwachungsorgans 19 gesehen, hinter den feststehenden Teil 22, von der Bezugsgeraden 17 weg verschoben. Die Beistellung und Tätigkeit der Bettungsverdichtungswerkzeuge 10 wird jedoch fortgesetzt, und zwar bis zum Eintreten des zweiten Impulses, der durch die Berührung der Tastkante des feststehenden Teils 22 des MeB- und Überwachungsorgans 19 mit der Bezugsgeraden 17 ausgelöst wird. Dieser zweite Impuls zeigt an, daß die Soll-Höhenlage des Gleises erreicht ist und veranlaßt die Beendigung der Tätigkeit der Bettungsverdichtungswerkzeuge 10. Er kann sowohl die Beistellung gegenläufig bewegbarer Bettungs-Verdichtungswerkzeuge beenden ab auch die Vibration soldier Werkzeuge und er kann auch ein Herausziehen «ngetaachter, höhenversteDbarer Werkzeuge aus dem Schoöerbett veranlassen. Jedenfalls arbeiten in der Riase zwischen dem ersten und dent zweiten Impuls fedigfich die Bettungsverdichtungswerkzeuge 10 zur Beeinflussung der Gleislage; das Maß * der Korrek turfcewegang der Schiene wird also aBein durch die Tätigkeit dieser Bettungsverdichtungswerkzeuge 10 bewiirkt At the beginning of the work process, the control device 5 first opens the pressure medium supply to a hydraulic piston-cylinder drive 26 of the track straightening tools 8 and to a hydraulic adjustment device 27 of the bedding compaction tools 10. The pressure medium supply is controlled by valves 28 and 29, specifically by means of the control device S. At the same time, the cylinder 25 of the Ver-actuator of the movable part 23 is acted upon and this movable part 23 moves up, so closer to the reference line 17. As soon as the control device S consisting of several relays from the receiver E via the amplifier V the first by touching the Movable part 23 of the measuring and monitoring element 19 with the reference straight line 17 receives the triggered pulse, the pressure medium supply to the rectifying tool 8 is terminated by this control device S. At the same time, the pressure medium supply is reversed in order to drive the movable part 23 of the measuring and monitoring element 19 and this movable part 23 is shifted downwards, i.e. in the direction of movement of the measuring and monitoring element 19, behind the stationary part 22, away from the reference straight line 17. The provision and activity of the bedding compaction tools 10 continues, however, until the occurrence of the second pulse, which is triggered by the contact of the sensing edge of the fixed part 22 of the measuring and monitoring element 19 with the reference straight line 17. This second impulse indicates that the track has reached the desired height and causes the work of the bedding compaction tools 10 to be terminated Arrange height-adjustable tools from the bed. In any case, in the gap between the first and the second impulse, the bedding compaction tools 10 work smoothly to influence the track position; the measure of the correct turfcewegang of the rail is thus caused by the activity of these bedding compaction tools 10

Den Erfolg dieser Maßnahmen im Vergleich zum Wfbekanaten veranschaulichen die Fi g. 3 and 3a. Bei *em bisher üblichen Verfahren hoben die Schienengrei- «er9 dre Schiene 4 mit den Schwellen 5 auf einen Sollabstand a von der Bezugsgeraden 17. Währenddessen und auch noch später arbeiteten aber die Bettungsverdichtungswerkzeuge im Nachbarbereich weiter und erreichten gegen Ende ihrer Tätigkeit ihren höchsten Preß- und Verdichtungsdruck und somit den größten Verdichtungsgrad unterhalb der jeweils bearbeiteten Schwelle 5. Durch diese Tätigkeit der Bettungsverdichtungswerkzeuge 10 wurde aber die bearbeitete Schwelle 5 höher als notwendig angehoben und gelangte über ihre Sollhöhe hinaus; der Gleisverlauf erhielt in diesem Bereich einen Buckel in unkontrollierbarer Höhe und entsprach nicht dem Sollverlauf.The success of these measures in comparison to the Wfbekanaten illustrate the Fi g. 3 and 3a. In the previously common method, the rail grabbers 9 lifted three rails 4 with sleepers 5 to a desired distance a from the reference straight line 17. During this time and later, however, the bedding compacting tools in the neighboring area continued to work and reached their highest compression force towards the end of their work. and compression pressure and thus the greatest degree of compression below the respectively processed threshold 5. Due to this activity of the bedding compression tools 10, however, the processed threshold 5 was raised higher than necessary and came above its nominal height; the track layout in this area received a hump at an uncontrollable height and did not correspond to the target layout.

Bei der Erfindung hingegen wird, wie es im Schema in Fig.3a dargestellt ist, die Schiene 4 von den Schienengreifern 9 nicht ganz bis auf die Sollhöhe angehoben, sondern nur um das Maß χι, und bleibt um das Maß χ unterhalb des Sollabstands a von der Bezugsgeraden 17. In der letzten Phase der Hubbewegung, also im Bereich des Maßes χ dieser Bewegung, erfolgt das Anheben der Schiene 4 allein durch die Tätigkeit der Bettungsverdichtungswerkzeuge 10.In the invention, however, the rail 4 is as shown in the diagram in Figure 3a, raised by the rail grippers 9 is not quite up to the desired height, but χι only by the amount and remains to the extent χ below the setpoint distance a from of the reference straight line 17. In the last phase of the lifting movement, that is to say in the area of dimension χ of this movement, the rail 4 is lifted solely by the activity of the bedding compaction tools 10.

Wie schon eingangs erwähnt, ist es von Vorteil, gleichzeitig mit der Auslösung des ersten Impulses des Meß- und Übergangsorgans 19 einen beweglichen Teil 23 desselben vom Bezugssystem zu distanzieren, wobei das Maß χ dieser Distanzierung jener letzten Phase der Korrekturbewegung entspricht, in der die Korrekturbewegung durch die Bettungsverdichtungswerkzeuge 10 allein bewirkt wird. Wie die Ausführungsform nach den F i g. 2 und 2a gezeigt hat, ist es möglich, diese Distanzierung dadurch zu bewerkstelligen, daß das Meß- und Überwachungsorgan 19 bzw. ein mit der Bezugsgeraden 17 zusammenwirkender, beweglicher Teil 23 dieses Meß- und Überwachungsorgans verstellt wird.As already mentioned at the beginning, it is advantageous, at the same time as the triggering of the first pulse of the measuring and transition element 19, to distance a movable part 23 of the same from the reference system, the amount χ of this distance corresponding to that last phase of the correction movement in which the correction movement is effected by the bedding compaction tools 10 alone. Like the embodiment according to FIGS. 2 and 2a, it is possible to achieve this distance by adjusting the measuring and monitoring element 19 or a movable part 23 of this measuring and monitoring element which cooperates with the reference straight line 17.

Es ist aber auch möglich, die Bezugsgerade 17 bzw. jenen Teil der Bezugsgeraden, mit dem das Meß- und Überwachungsorgan 19 zusammenwirkt, um das Maß χ zeitweise zu verstellen und dadurch die für die Auslösung eines zweiten Impulses erforderliche Distanzierung zwischen Meß- und Überwachungsorgan und Bezugssystem zu gewinnen.But it is also possible to adjust the reference line 17 or that part of the reference line with which the measuring and monitoring element 19 interacts to temporarily adjust the dimension χ and thereby the distance between the measuring and monitoring element and the necessary for triggering a second pulse To win reference system.

Eine konstruktive Variante einer solchen Vorrichtung ist in Fi g. 4 dargestellt. Die Bezugsgerade 17 ist hier durch einen über Spannrollen 30 geführten Spanndraht verkörpert. Schwenkbar gelagerte, hebelartige Organe 31 vermögen von oben her auf den die Bezugsgerade 17 verkörpernden Spanndraht zu drücken. Ist nur ein solches hebelartiges beidseits 31 auf nur einer Seite (in der Zeichnung rechts) angeordnet, so erhält die Bezugsgerade 17 durch die Wirkung dieses Organs den Verlauf 17a (gestrichelt dargestellt); werden hingegen solche schwenkbare Organe 31 auf beiden Seiten vorgesehen, dann erhält die Bezugsgerade den strichpunktiert angedeuteten Verlauf 17ft, wenn beide Organe gleichzeitig verschwenkt werden. In beiden Fällen befindet sich dann die Bezugsgerade 17 (zumindest annähernd) im Bereich des Meß- und Überwachungsorgans 19 um das dargestellte Maß χ näher dem MeB- und Überwachungsorgan. Die erste Berührung des Meß- und Ctoerwachumjsorgaas 19 mit der Bezugsgeraden 17 veranlaßt eine Rflckverschwenfeang der hebelaregen Organe 31; die Bezugsgerade 17_veriäoft dann am das Maß χ neuerlich vom Msefi- and C&erwachungsorgan 19 distanziert in einein die Sollage des Gleises anzeigenden Abstand a (voll ausgezogen dargestellt} parallel zum Gleis (F i g. 3a). A structural variant of such a device is shown in Fi g. 4 shown. The reference straight line 17 is embodied here by a tension wire guided over tensioning rollers 30. Pivotably mounted, lever-like organs 31 are able to press from above onto the tension wire embodying the reference line 17. If only one such lever-like arrangement is arranged on both sides 31 on only one side (on the right in the drawing), the reference straight line 17 is given the course 17a (shown in dashed lines) as a result of the action of this organ; on the other hand, if such pivotable organs 31 are provided on both sides, then the reference straight line receives the course 17ft indicated by dash-dotted lines if both organs are pivoted at the same time. In both cases the reference straight line 17 is then (at least approximately) in the area of the measuring and monitoring organ 19 by the illustrated dimension χ closer to the measuring and monitoring organ. The first contact of the measuring and Ctoerwachumjsorgaas 19 with the reference straight line 17 causes a backward pivoting of the lever-facing organs 31; the reference straight line 17_veriäoft then at the dimension χ again distanced from the Msefi- and C & awakening organ 19 at a distance a (shown in full line) parallel to the track (FIG. 3a) indicating the target position of the track.

Die Verstellung der beweglichem Organe 31 erfoigt mittels hydraulischer oder pnumatischer Amriebe 32The adjustment of the movable organs 31 takes place by means of hydraulic or pneumatic drives 32

£09631/71£ 09631/71

36153615

gegen den Druck von Rückholfedern 33 und wird von dem bei der Berührung des Meß- und Überwachungsorgans 19 mit der Bezugsgeraden 17 ausgelösten ersten Impuls gesteuert.against the pressure of return springs 33 and is triggered by the first triggered when the measuring and monitoring element 19 touches the reference straight line 17 Impulse controlled.

Selbstverständlich können aber auch die Spannrollen 30 selbst höhenverstellbar sein und in der mit Pfeil angedeuteten Vorschubrichtung des Meß- und Überwachungsorgans in zweierlei Stellungen verstellt werden, nämlich in eine dem Meßorgan nähere und eine weitere entfernte Stellung, um nach einer ersten Berührung des Meß- und Überwachungsorgans 19 die gewünschte Distanzierung und das Maß χ herbeiführen zu können.Of course, the tensioning rollers 30 themselves can also be height-adjustable and can be adjusted in two different positions in the direction of advance of the measuring and monitoring element indicated by the arrow, namely in a position closer to the measuring element and a further distant position, after a first contact with the measuring and monitoring element 19 to be able to bring about the desired distance and the dimension χ.

In F i g. 5 ist eine Nivelliereinrichtung veranschaulicht, bei welcher das Meßorgan nicht aus einer Tastkante, Blende od. dgl. besteht, sondern selbst als eine Zieltafel, ein Empfänger, ein Sender od. dgl. ausgebildet ist.In Fig. 5 illustrates a leveling device in which the measuring element does not consist of a sensing edge, Aperture or the like exists, but rather itself as a target plate, a receiver, a transmitter or the like is.

Auf einem Vorwagen 13 befindet sich beim dargestellten Ausführungsbeispiel eine Station 18, von der eine als Bezugsgerade 17 dienende Visierlinie in einer vorbestimmten Richtung gegen die Zieltafel 34 hin verläuft; diese Zieltafel 34 in mit Zielmarken 35 versehen, an Hand derer das Maß χ ersichtlich ist. Die erste Einstellung, bei der die Gleisrichtwerkzeuge 8 ihre Tätigkeit einzustellen haben, wird von einem Beobachter an der Station 18 an Hand der Zeilen der Zielmarke 35 festgestellt und dieser Beobachter stellt dann auch das Eintreten der Sollage des Gleises an Hand einer anderen Zeile der Zielmarke 35 fest und läßt daraufhin die Tätigkeit der Bettungsverdichtungswerkzeuge 10 beenden. In the illustrated embodiment, a station 18 is located on a front carriage 13, from which a line of sight serving as a reference straight line 17 runs in a predetermined direction towards the target board 34; this target board 34 is provided with target marks 35, on the basis of which the dimension χ can be seen. The first setting, in which the track straightening tools 8 have to stop working, is determined by an observer at the station 18 on the basis of the lines of the target mark 35 and this observer then also determines the entry of the target position of the track on the basis of another line of the target mark 35 fixed and can then stop the activity of the bedding compaction tools 10.

Station 18 und Zieltafel 34 können aber ohne weiteres auch durch Sender und Empfänger eines Wellenbündels ersetzt werden, wobei dann entweder der Sender oder der Empfänger seine Höhenlage selbsttätig verändert, sobald der erste Impuls erfolgt, der anzeigt, daß sich das Gleis im Abstand χ von der Sollage befindet. Die Impulse werden in diesem Fall dadurch ausgelöst, daß der Empfänger in das Wellenbündel oder das Wellenbündel in den Empfänger einwandert.Station 18 and target board 34 can easily be replaced by transmitter and receiver of a wave bundle, in which case either the transmitter or the receiver changes its altitude automatically as soon as the first pulse occurs, which indicates that the track is at a distance χ from the Target position is located. The pulses are triggered in this case by the fact that the receiver migrates into the wave bundle or the wave bundle into the receiver.

Gleichermaßen kann auch das Seitenrichten von Gleisen durchgeführt werden und eine hierfür geeignete Vorrichtung mit zugehöriger Steuerung ist in den F i g. 6 und 6a dargestellt.The side straightening of tracks can also be carried out in the same way, and a suitable one for this The device with the associated control is shown in FIGS. 6 and 6a shown.

Längs einer Spindel 36 ist eine Wandermutter 37 quer zur Gleisachse verschiebbar gelagert. Diese Wandermutter 37 trägt eine Gabel 38, welche die die Bezugsgerade verkörpernde Sehne 12 beiderseits erfaßt. Vermittels beidseits der Sehne 12 angeordneter Gabelkontakte kann festgestellt werden, wann sich die Wandermutter 37 in einer der Lage der Sehne 12 entsprechenden Stellung befindet, bei der die Sehne 12 weder den einen noch den anderen Gabelkontakt berührt und kontaktfrei durch die Gabel 38 verläuft.A traveling nut 37 is mounted along a spindle 36 such that it can be displaced transversely to the track axis. This traveling nut 37 carries a fork 38 which grasps the tendon 12 embodying the reference line on both sides. Means on both sides of the tendon 12 arranged fork contacts can be detected when the traveling nut 12 is located corresponding position in one of the position of the tendon 37, wherein the tendon 12 neither the one nor touches the other fork contact and non-contact passes through the fork 38th

Vermittels eines druckmittelbetätigbaren Antriebs. bestehend aias einem Zylinder 39, einem Kolben 40. einer Kolbenstange 41 und einer Rückholfeder 42 wird die verschiebbar in bezug zur Wandermutter 37 geführte Gabel 38 vorerst um das Maß χ uet Sehne 12 näher verstellt, so «laß die auf der Gabel angeordneten Kontakte beim itasrichten des Gleises mittels der als Sdtenrichtwerkzeuge ausgebildeten Gleisrichtwerkzeuge6 scfaOn vor dem Eintreten der eigentlichen Sollage ie$ Gleises uinen Impuls abgeben; auf Grund dieses ersten Impaiites wird die Tätigkeit der Gleisrichtwerk- < isage 6 beendet By means of a pressure medium-actuated drive. Consisting of a cylinder 39, a piston 40, a piston rod 41 and a return spring 42, the fork 38, which is guided displaceably with respect to the traveling nut 37, is initially adjusted closer by the amount of tendon 12, so let the contacts arranged on the fork be adjusted when it is of the track by means of the track straightening tools designed as south straightening tools, emit an impulse before the actual target position ie the track occurs; Due to this first impact, the activity of the track straightening plant 6 is terminated

Nach diesem ersten Impuls erfolgt die Verschiebung ies die Gabel 38 tragenden Teils um das Maß* und dasThe shift takes place after this first pulse ies the fork 38 supporting part by the measure * and that

weitere Verschieben des Gleises (mitsamt dem Anzeigeorgan) bis zum Eintreten des zweiten Impulses, der anzeigt, daß das Gleis seine Sollage erreicht hat.further shifting of the track (including the display element) until the occurrence of the second impulse, the indicates that the track has reached its target position.

Analog der Darstellung nach F i g. 2a ist das Schalt- ? schema einer Vorrichtung zum Seitenrichten des Gleises in F ι g. 6a dargestellt, und zwar ist der Antrieb des aus den Teilen 37. 38 bestehenden Meß-" und Anzeigeorgans nach Fi g. 6 über eine Druckmittelleitung 43 in jenes Leitungssystem einbezogen, das auch die Ver-Analogous to the representation according to FIG. 2a is the switching? Scheme of a device for side straightening the track in FIG. 6a is shown, namely the drive of the measuring and display element consisting of parts 37, 38 according to Fig. 6 included via a pressure medium line 43 in that line system that also

ό sorgung des Antriebs der als Seitenrichtwerkzeuge ausgebildeten Gleisrichtwerkzeuge 6 und der seitlich vor den Schwellenköpfen angeordneten Bettungsverdichtungswerkzeuge 7 umfaßt. Die zu diesem System gehörenden Steuerungsventile 44, 45 und 46 werden vonό Supply of the drive for the side straightening tools Track straightening tools 6 and the bedding compaction tools arranged laterally in front of the sleeper heads 7 includes. The control valves 44, 45 and 46 belonging to this system are controlled by

'5 einer Steuerungsvorrichtung S betätigt, die ihre Impulse über einen Verstärker V von einem Empfänger Eerhalt.Der Empfänger £ erhält Impulse von den Kontak-'5 actuated a control device S , which receives its pulses via an amplifier V from a receiver E. The receiver £ receives pulses from the contact

1Λ" ,1 el 38 im ZLsammenwirken mit der Sehne 12 als Kontaktgeber. 1 Λ " , 1 el 38 in cooperation with the tendon 12 as a contactor.

^o Beim ersten Impuls, also noch vor Erreichen der Sollage des Gleises, wird die Tätigkeit der Seitenrichtwerkzeuge 6 beendet und nur die Bettungsverdichtungswerkzeuge 7 arbeiten auf jener Seite, von der das uleis abzurücken ist, weiter.^ o At the first impulse, i.e. before reaching the target position of the track, the activity of the side straightening tools 6 is ended and only the bedding compaction tools 7 continue working on the side from which the uleis is to be moved.

«GleichJeiiig wird mit dem ersten 'mpuls die Gabel J8 vom Kolben-Zylinder-Antrieb um das Maß χ entgegen der jeweiligen Korrekturrichtung, also von der Sehne 12 weg zurückverschoben, so daß eine neuerli- "Immediately J e ii ig is the first 'mpuls the fork J8 from the piston-cylinder drive by the amount χ opposite to the respective adjustment direction, shifted back away so from the tendon 12, so that a neuerli-

w h B7egun.8 des Guises und der Gabel 38 zur Sehne w h B 7 egun .8 des Guises and fork 38 to the string

hin erforderl.ch wird, um wieder einen neuen Impuls auszulosen, der anzeigt, daß die Stellung der Gabel dem Verlauf der Sehne entspricht. Dieser zweite Impuls zeigt dann das Erreichen der Sollseitenlage des Gleises an und dient zur Beendigung der Tätigkeit deris required in order to generate a new impetus trigger, which indicates that the position of the fork corresponds to the course of the tendon. This second pulse then shows that the target lateral position has been reached And serves to terminate the activity of the

Bettungsverdichtungswerkzeuge?. die in der letzten m„aS!i I Glei,sverschiebung allein für die Durchführung der Korrektur der Gleislage sorgenBed compaction tools ?. who in the last m " aS ! i I Glei , s shifting only take care of the implementation of the correction of the track position

Weitere Ausführungsbeispiele zeigen die F i g. 7 und 8: diese Darstellungen sollen erläutern, daß es möglichFurther exemplary embodiments are shown in FIGS. 7 and 8: These representations are intended to explain that it is possible

st. mit mehreren Bezugsgeraden 17 und 17' zu arbeiten mit denen das Meß- und Überwachungsorgan 19 nachemander zur Zusammenarbeit gelangt. Solche Be-st. to work with several reference lines 17 and 17 ' with which the measuring and monitoring element 19 comes to work one after the other. Such demands

MeßSerunHe ni,17' "nen In Bewegungsrichtung des 4S /ι* τ 1 Ubfwachungsorgans 19 hintereinander 7r UnH «', 7^ und/oder nebeneinander (F i g. 7b,Measuring Ser UNH e ni, 17 'kÖ "nen In direction of movement of 4S / ι * τ 1 Ub fwachungsorgans 19 consecutively 7r UnH"', 7 ^ and / or side by side (F i g. 7b

™hJ ■ · J an^eordnet sein· Befinden sich die Bezugsge-2e?Jn der pichen, zur Bewegungsrichtung des Meß- und Uberwachungsorgans 19 senkrechten Ebene, dann L„d p*e T,astkamdes Meßorgans und das Maß χ gegenenander versetzt angeordnet (F i g. 8a) VPrSK" SiCwdie Bezugsgeraden 17, 17' sowohl in verschiedenen Vertikalebenen als auch in verschiedenen Horizontalebenen und besitzt auch das Meß- und™ hJ ■ * J to ^ the Bezugsge-2 eordnet be · If there are e? J n the Pichen, to the direction of measurement and Uberwachungsorgans 19 vertical plane, then L "d p * e T, astkam of the measuring element and the measure χ arranged offset from one another (Fig. 8a) VPrSK " SiC w the reference g s straight 17, 17 'both in different vertical planes and in different horizontal planes and also has the measuring and

einan7 gSOrgan W ίη Bewegungsrichtung gegeneinander verseme Tastkanten, dann ergibt sid, das Mais Af als eme Funktion aas der Differenz y der Lage der Bezugsgeraden 17, 17' einerseits und der D^ der Laire der Tastkanten; so ergibt sich bei. A one-way organ W ίη direction of movement against one another, different tactile edges, then results in the corn Af as a function of the difference y of the position of the reference straight line 17, 17 'on the one hand and the D ^ the laire of the tactile edges; so it results at.

55 Rpi Aasfü}Tm^f< >™ nach F i g. 7 und 8 sind beiBezugsgerade 17. 17- durch LichtetraWen M 55 Rpi Aasfü } Tm ^ f <> ™ according to F i g. 7 and 8 are at the reference line 17. 17- through LichtetraWen M

bei der gleiche» werden; so ist z. a bei 4er Varianteat the same »be; so is z. a for the 4 variant

3 615]3 615]

11 V11 V

F i g. 9 die obere, gestrichelt dargestellte Bezugsgerade 17 durch einen über Spannrollen 30 geführten Spanndraht, die untere Bezugsgerade 17' hingegen durch einen zwischen Station 18 und Empfänger 20 verlaufenden Lichtstrahl verkörpert. Das Meß- und Überwachungsorgan 19 ist eine Blende, die beim Aufwärtswandern (Heben des Gleises) zuerst den Lichtstrahl unterbricht, um den ersten Impuls auszulösen, und dann mit dem Spanndraht zusammen den zweiten Impuls auslöst. Auch in diesem Fall ist eine der Anordnung nach F i g. 7c analoge Anordnung der Bezugsgeraden 17, 17' möglich.F i g. 9 the upper reference line 17, shown in dashed lines, through a tensioning wire guided over tensioning rollers 30, the lower reference straight line 17 ', however, through a line running between station 18 and receiver 20 Light beam embodies. The measuring and monitoring element 19 is a diaphragm, which when walking upwards (Lifting the track) first interrupts the light beam to trigger the first pulse, and then with the tension wire together triggers the second pulse. In this case, too, one is according to the arrangement F i g. 7c, an analogous arrangement of the reference straight lines 17, 17 'is possible.

Ebenso ist es möglich, gemäß F i g. 10, 10a verschiedenerlei Bezugsgerade 17, 17' nebeneinanderliegend zu kombinieren und eine mit gestaffelter Tastkante ausgebildete Blende als Meß- und Überwachungsorgan 19 zu benulzen, analog F i g. 8a.It is also possible, according to FIG. 10, 10a different types of reference lines 17, 17 'adjacent to one another combine and an aperture formed with a staggered tactile edge as a measuring and monitoring element 19 benulzen, analogous to FIG. 8a.

Alle Varianten nach den F i g. 7 bis 10 sind im übrigen gleichermaßen sowohl beim Seitenrichten des Gleises als auch beim Nivellieren des Gleises anwendbar; nur beispielsweise sind diese Varianten als zum Nivellieren des Gleises bestimmt dargestellt worden.All variants according to FIGS. 7 to 10 are also the same for both page straightening of the The track can also be used for leveling the track; just for example, these variants are considered to be used for leveling of the track has definitely been shown.

Wenn beispielsweise die Höhenlage einer der beiden Schienenstränge in Abhängigkeit von der vorzugsweise an Hand einer Bezugsgeraden korrigierten Lage des anderen Schienenstrangs mittels eines Querneigungsanzeigers überwacht wird, dann kann dieser Querneigungsanzeiger eine Steuerungseinrichtung aufweisen, die geeignet ist, bei einer vor Erreichen der Sollquerneigung eintretenden ersten Anzeige einen Impuls bzw. ein Signal abzugeben, um die Tätigkeit der Gleisrichtwerkzeuge zu beenden und sodann die letzte Phase der Hubbewegung lediglich mit den Bettungsverdichtungswerkzeugen durchführen zu können.If, for example, the altitude of one of the two rail lines depending on the preferred Position of the other rail track corrected using a straight reference line using a slope indicator is monitored, then this slope indicator can have a control device, which is suitable, if the first display occurs before the target cross slope is reached, a pulse or give a signal to end the activity of the track straightening tools and then the last phase of the To be able to carry out lifting movement only with the bedding compaction tools.

Hierzu 3 Blatt ZeichnungenFor this purpose 3 sheets of drawings

Claims (14)

Patentansprüche:Patent claims: I. Vorrichtung zum Ausrichten eines Gleises der Höhe und/oder der Seite nach an Hand eines zur Überwachung der Sollage wenigstens eines Schienenstrangs dienenden Bezugssystems und mit mindestens einem eine Differenz zwischen der Soll- und Istlage dieses Schienenstrangs anzeigenden, mit dem Schienenstrang gemeinsam bewegbaren und mit dem Bezugssystem kontaktierenden Meß- und Überwachungsorgan sowie mit Gleisrichtwerkzeugen zum Anheben und/oder Seitwärtsverschieben der Schiene und mit Bettungsverdichtungswerkzeugen zum Verdichten der Schotterbettung des Gleises, dadurch gekennzeichnet, daß für das Meß- und Überwachungsorgan (19) mindestens zwei differenzierte Kontaktstellen zu dem zugeordneten Bezugssystem vorgesehen sind, die bei der Korrekturbewegung des Gleises nacheinander zum Ansprechen kommen, und zwar die erste, bevor die Sollage des Gleises erreicht ist und die zweite bei Erreichen der Soffage desselben und daß eine Steuerungseinrichtung (S) zur Stillsetzung zunächst der Gleisrichtwerkzeuge (6. 8,1 bei der ersten Kontaktnahme sowie der Bettungsverdichtungswerkzeuge (7, 10) bei der zweiten K.ontaktnahme vorgesehen ist.I. Device for aligning a track vertically and / or laterally on the basis of a reference system used to monitor the target position of at least one rail track and with at least one system that shows a difference between the target and actual position of this rail track, can be moved together with the rail track and with The measuring and monitoring organ contacting the reference system as well as with track straightening tools for lifting and / or sideways displacement of the rail and with bedding compaction tools for compacting the ballast bedding of the track, characterized in that at least two differentiated contact points to the assigned reference system are provided for the measuring and monitoring organ (19) are that come to the corrective movement of the track one after the other to respond, namely the first before the target position of the track is reached and the second when it reaches the Soffage and that a control device (S) to stop the track first ht tools (6. 8.1 at the first contact and the bedding compaction tools (7, 10) at the second contact. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß da·. Me3- und Überwachungsorgan y. (19) mit mehreren, nacheinander mit dem Bezugssystem zur Zusammenarbeit gelangenden Teilen versehen ist.2. Apparatus according to claim 1, characterized in that there ·. Me3 and monitoring body y. (19) is provided with a number of parts that work one after the other with the reference system. 3. Vorrichtung nach Anspruch 2, dadurch gekennzeichnet, daß das Meß- und Überwachungsorgan (19) einen als Impulsgeber für einen Steuerungs-, Anzeige- und/oder Signal-Impuls dienenden, mit einer Bezugsgeraden (17) des Bezugssystems zusammenwirkenden und hierzu mit einer Tastkante versehenen beweglichen Teil (23) aufweist, der nach einer ersten Berührung mit der Bezugsgeraden (17) in eine unwirksame oder später neuerlich wirksame Stellung verstellbar ist (F i g. 2).3. Apparatus according to claim 2, characterized in that the measuring and monitoring element (19) one serving as a pulse generator for a control, display and / or signal pulse a reference straight line (17) of the reference system cooperating and for this purpose with a tactile edge provided movable part (23), which after a first contact with the reference straight line (17) can be adjusted to an ineffective position or a position that will be effective again later (FIG. 2). 4. Vorrichtung nach Anspruch 3. dadurch gekennzeichnet, daß der bewegliche Teil (23) des Meß- und Überwachungsorgans (19) in einer zur Tastkante senkrechten Richtung, d. h. in Bewegungsrichtung des Meßorgans relativ in bezug zu einem feststehenden Teil (22) des Meß- und Überwachungsorgans (19), verschiebbar gelagert ist und daß der feststehende Teil eine zweite zur ersten am beweglichen Teil (23) parallel angeordnet Tastkante aufweist, die zur Zusammenarbeit mit dem Bezugssystem bestimmt im, sobald die erste Tastkante in Bewegungsrichtung des Meßorgans hinter die zweite Tastkante verschoben ist (F i g. 2).4. Apparatus according to claim 3, characterized in that the movable part (23) of the measuring and monitoring element (19) in a direction perpendicular to the sensing edge, ie in the direction of movement of the measuring element relative to a fixed part (22) of the measuring and monitoring member (19), is displaceably mounted and that the fixed part has a second scanning edge arranged parallel to the first on the movable part (23), which is intended to cooperate with the reference system as soon as the first scanning edge is behind the second scanning edge in the direction of movement of the measuring element is shifted (Fig. 2). 5. Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß für den beweglichen Teil (23) des Meß- und Überwachungsorgans (19) ein mechanischer oder mittels eines Druckmittels betätigbarer aus einem Kolben (24) und einem 2:ylinder (25) bestehenden Antrieb vorgesehen ist, der durch den vom Zusammenwirken des beweglichen Teils (23) mit dem Bezugssystem ausgelösten Impuls steuerbar ist (Fi g. 2, 2a).5. Apparatus according to claim 4, characterized in that that a mechanical one for the movable part (23) of the measuring and monitoring element (19) or actuatable by means of a pressure medium consisting of a piston (24) and a 2: ylinder (25) Drive is provided, which by the interaction of the movable part (23) with the reference system triggered pulse is controllable (Fi g. 2, 2a). 6. Vorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß die Druckmittelversorgung des Antriebs für den beweglichen Teil (23) des Meß- und Überwachungsorgans (19) in das zur Betätigung di Gleisrichtwerkzeuge (6,8) und der Bettungsverdiel tungswerkzeuge (7.10) dienende Druckmittelsystei derart einbezogen ist daß durch den Beginn der Ti tigkeit der Gleisrichtwerkzeuge (6, 8) ein Vorschu des beweglichen leiSs (23) über den feststehende Teil (22) des Meß- und Überwachungsorgans (1< hinaus und durch den beim Zusammenwirken de beweglichen Teils (23) mit dem Bezugssystem aus gelösten Impuls bei Beendigung der Tätigkeit de Gleisrichtwerkzeuge (6, 8) eine Verschiebung de beweglichen Teils (23) hinter den feststehenden Tei (22) ausgelöst wird (F i g. 2.2a).6. Apparatus according to claim 5, characterized in that the pressure medium supply of the drive for the movable part (23) of the measuring and monitoring element (19) in the actuation di track straightening tools (6,8) and the bedding processing tools (7.10) serving pressure medium system It is included in such a way that, when the track straightening tools (6, 8) begin to work, the movable track (23) is advanced beyond the fixed part (22) of the measuring and monitoring element (1 <and through the movable part ( 23) with the reference system from released impulse at the end of the activity of the track straightening tools (6, 8) a displacement of the movable part (23) behind the fixed part (22) is triggered (Fig. 2.2a). 7. Vorrichtung nach Anspruch 1 oder 2, dadurcl gekennzeichnet, daß dem Meß- und Überwachungs organ (19) in seiner Bewegungsrichtung nacheinander mehrere das Bezugssystem bildende Bezugsgerade (17,17') zugeordnet sind.7. Apparatus according to claim 1 or 2, characterized in that the measuring and monitoring organ (19) consecutively several reference lines forming the reference system in its direction of movement (17,17 ') are assigned. 8. Vorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß die in Bewegungsrichtung des Meß- und Überwachungsorgans (19) erste Bezugsgerade (17') durch einen Lichtstrahl und die zweite Bezugs gerade (17) durch einen Spanndraht verkörpert ist (F ig. 9.10).8. The device according to claim 7, characterized in that the in the direction of movement of the measuring and monitoring member (19) first reference line (17 ') is embodied by a light beam and the second reference straight (17) by a tension wire (Fig. 9.10) . 9. Vorrichtung nach Anspruch 7 oder 8, dadurch gekennzeichnet, daß das Meß- und Überwachungsorgan (19) mit in Bewegungsrichtung gegeneinander versetzt angeordneten T^stkanten ausgestattet ist und daß jeder Tastkante eine eigene Bezugsgerade (17.17') zugeordnet ist, mit denen die Tastkanten im Bewegungsablauf des Meßorgans nacheinander zur Zusammenarbeit gelangen (F i g. 7c, 8a. 9b, 10a).9. Apparatus according to claim 7 or 8, characterized in that the measuring and monitoring member (19) with one another in the direction of movement offset arranged T ^ stkanten is equipped and that each tactile edge has its own reference line (17.17 ') is assigned with which the tactile edges in the course of movement of the measuring element one after the other get to work together (Figs. 7c, 8a, 9b, 10a). 10. Vorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß dem Meß- und Überwachungsorgan (19) eine in ihrer Distanz von diesem Meßorgan verstellbare Bezugsgerade (17) zugeordnet ist, die nach einem ersten Zusammenwirken mit dem Meßorgan in eine zunächst unwirksame und später wieder wirksame Stellung verstellbar ist (F i g. 4).10. Apparatus according to claim 1 or 2, characterized in that the measuring and monitoring element (19) one in its distance from this measuring element adjustable reference line (17) is assigned, which after a first interaction with the Measuring element can be adjusted into an initially ineffective and later effective position again (FIG. 4). 11. Vorrichtung nach Anspruch 10, dadurch gekennzeichnet, daß zur Verstellung zumindest eines Teils der Bezugsgeraden (17) verstellbare, auf die Bezugsgerade bzw. zumindest auf ei.ies ihrer Enden bzw. Verankerungen einwirkende Organe (31) vorgesehen sind, deren Betätigung durch den beim ersten Zusammenwirken des Meß- und Überwachungsorgans (19) mit der ßezugsgeraden (17) ausgelösten Impuls so gesteuert ist, daß die Bezugsgerade (17) infolge des genannten Impulses in Bewegungsrichtung des Meßorgans vom Meßorgan weg verstellt wird (F i g. 4).11. The device according to claim 10, characterized in that that for adjusting at least part of the reference straight line (17) adjustable on the Reference line or organs (31) acting at least on some of their ends or anchors are provided are whose actuation by the first interaction of the measuring and monitoring organ (19) is controlled with the ßzuggeraden (17) triggered pulse so that the reference straight line (17) as a result of the said pulse in the direction of movement of the measuring element away from the measuring element is adjusted (Fig. 4). 12. Vorrichtung nach Anspruch 11, dadurch gekennzeichnet, daß die auf die als Spanndraht ausgebildete Bezugsgerade (17) einwirkenden verstellbaren Organe (31) von verschwenk- oder verschiebbar gegen den Spanndraht drückbaren Hebeln gebildet werden, deren Druck gegen den Spanndraht entgegen der Bewegungsrichtung des Meß- und Überwachungsorgans (19) eine zumindest bereichsweise Verstellung der Bezugsgeraden (17) zum Meß- und Überwachungsorgan (19) hin auslöst (F i g. 4).12. The device according to claim 11, characterized in that that acting on the straight reference line (17) designed as a tension wire is adjustable Organs (31) formed by levers which can be pivoted or displaced against the tension wire the pressure against the tension wire against the direction of movement of the measuring and monitoring element (19) an at least regional adjustment of the reference straight line (17) for measuring and Monitoring organ (19) triggers (Fig. 4). 13. Vorrichtung nach Anspruch I oder 2, dadurch gekennzeichnet, daß das Bezugssystem von mindestens einer von einer Station (18) ausgehenden, durch eine Visierlinie oder einen Lichtstrahl verkörperten Bezugsgeraden (17) und das Meß- und Überwachungsorgan (19) von einer mit mindestens 7wci13. Apparatus according to claim I or 2, characterized in that the reference system of at least one emanating from a station (18) embodied by a line of sight or a beam of light Reference straight line (17) and the measuring and monitoring element (19) of one with at least 7wci neben- oder übereinander angeordneten Zielmarken (35) versehenen Zieltaiel (34), an der die Bezugsgerade endet» gebildet ist, wobei die Bezugsgerade (17) oder die Zieltafel (34) mit dem zu korrigierenden Schienenstrang bewegbar ist (F i g. 5).Target marks (35) arranged next to or on top of one another are provided with target points (34) on which the reference line ends »is formed, the reference line (17) or the target table (34) with the to be corrected Rail track is movable (Fig. 5). 14. Vorrichtung nach Anspruch I, dadurch gekennzeichnet, daß das Meß- und Oberwachungsorgan (19) als Querneigungsaiizeiger ausgebildet ist.14. The device according to claim I, characterized in that the measuring and monitoring element (19) is designed as a cross slope indicator.
DE19681759630 1967-05-22 1968-05-22 Device for aligning a track vertically and / or sideways Expired DE1759630C3 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AT478567A AT308802B (en) 1967-05-22 1967-05-22 Mobile device with track alignment tools for aligning a track in terms of height and / or side
AT478567 1967-05-22

Publications (3)

Publication Number Publication Date
DE1759630A1 DE1759630A1 (en) 1975-04-10
DE1759630B2 DE1759630B2 (en) 1975-12-18
DE1759630C3 true DE1759630C3 (en) 1976-07-29

Family

ID=

Similar Documents

Publication Publication Date Title
DE2001542C3 (en) Mobile device for monitoring and / or correcting the position of a track
DE3409851C2 (en) Track tamping, levelling and straightening machine with a device for correcting the elevation and transverse inclination of a track
DE2023955B2 (en) Continuous track leveling, bedding compacting and, if necessary, leveling machine
DE1534078B2 (en) Mobile tamping, leveling and straightening machine
DE1901889A1 (en) Track maintenance machine in the form of a rail vehicle with two working heads
DE3903381A1 (en) DEVICE FOR STOPPING FOLDED PRODUCTS
CH652430A5 (en) TRACKING MACHINE.
DE1459605A1 (en) Device for aligning a track sideways
DE2718859A1 (en) MOBILE TRACK LEVELING AND BALL BALANCING MACHINE
DE2627845C2 (en) Method and device for setting sleepers on the ballast bed of a track
DE3137457A1 (en) MOBILE MACHINE SYSTEM WITH MULTIPLE, INDEPENDENTLY TRAVELABLE RAILWAY MACHINES
DE1605354A1 (en) Work car for checking and correcting the course of railway tracks
DE1759630C3 (en) Device for aligning a track vertically and / or sideways
DE2057119B2 (en) MOBILE DEVICE FOR MONITORING AND, IF NECESSARY, CORRECTING THE ALTITUDE AND CROSS-SLOPE OF A TRACK
DE1784147C3 (en) Mobile machine for correcting the
DE1759630B2 (en) Device for aligning a track vertically and / or sideways
DE1800110A1 (en) Method and arrangement for aligning a track vertically and / or sideways
DE2065134C3 (en) Device for checking and / or correction and, if necessary, for displaying the position of tracks
DE1759631C3 (en) Method and device for aligning a track vertically and / or laterally
EP0731216B1 (en) Method for tamping a plurality of sleepers for a railway track
DE1759631B2 (en) METHOD AND DEVICE FOR ALIGNING A TRACK IN ELEVATION AND / OR SIDE
DE1459605C (en) Device for straightening a track sideways
AT338858B (en) TRACK POT MACHINE
DE2737976C2 (en) Mobile machine for measuring and / or correcting the track elevation