DE1212127B - Process for the production and sealing of space joints in road pavements or the like made of in-situ concrete and joint insert to carry out this process - Google Patents
Process for the production and sealing of space joints in road pavements or the like made of in-situ concrete and joint insert to carry out this processInfo
- Publication number
- DE1212127B DE1212127B DER28935A DER0028935A DE1212127B DE 1212127 B DE1212127 B DE 1212127B DE R28935 A DER28935 A DE R28935A DE R0028935 A DER0028935 A DE R0028935A DE 1212127 B DE1212127 B DE 1212127B
- Authority
- DE
- Germany
- Prior art keywords
- joint
- hose
- sealing
- sealing strip
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/02—Arrangement or construction of joints; Methods of making joints; Packing for joints
- E01C11/04—Arrangement or construction of joints; Methods of making joints; Packing for joints for cement concrete paving
- E01C11/10—Packing of plastic or elastic materials, e.g. wood, resin
- E01C11/106—Joints with only prefabricated packing; Packings therefor
Description
Verfahren zur Herstellung und Abdichtung von Raumfugen in Fahrbahndecken od. dgl. aus Ortbeton und Fugeneinlage zur Durchführung dieses Verfahrens Die Erfindung betrifft ein Verfahren zur Herstellung und Abdichtung von Raumfugen in Fahrbahndecken od. dgl. aus Ortbeton, bei dem zur Bildung der Raumfu-en in der Fahrbahn od. dgl. verbleibende Fugeneinlagen dienen, die über einem festen Fugenteil eine elastische Dichtungsleiste mit Hohlraum aufweisen, deren Breite der gewünschten Fugenbreite entspricht.Process for the production and sealing of space joints in road pavements od. The like. Made of in-situ concrete and joint insert for carrying out this method. The invention relates to a method for the production and sealing of space joints in road pavements Od. The like. Made of in-situ concrete, in which od to form the space feet in the roadway. The remaining joint inserts are used, which have an elastic over a fixed joint part Have sealing strip with cavity, the width of the desired joint width is equivalent to.
Es ist bekannt, Fahrbahndecken, z. B. auch Start-und Landebahnen für Flu- eu-e, fortlaufend zu be-CZ C -tonieren und durch Raumfugen in getrennte Felder zu unterteilen. In den Raumfugen befinden sich Fugeneinlagen. Eine solche bekannte Fugeneinlage weist über einem festen Fugenteil eine elastische Dichtungsleiste mit Hohlraum auf, deren Breite der gewünschten Fugenbreite entspricht. Nachteilig ist, daß auf diese Weise keine sichere Abdichtung der Raumfugen erreicht werden kann, weil die Fugeneinlaggen sich über eine vorgegebene Breite hinaus, die sie beim Einbringen in die Raumfuge einnehmen, nicht er-C weitern können.It is known to use road surfaces, e.g. B. also runways for Flu-eu-e, continuously to be-CZ C -toned and to be divided into separate fields by space joints. There are joint inserts in the space joints. Such a known joint insert has an elastic sealing strip with a cavity over a fixed joint part, the width of which corresponds to the desired joint width. The disadvantage is that no reliable sealing of the space joints can be achieved in this way, because the joint inserts cannot expand beyond a predetermined width that they occupy when they are introduced into the space joint.
Der Erfindut)g liegt die Aufgabe zugrunde, ein Verfahren zur Herstellung und Abdichtung von Raumfugen zu schaffen, das beim fortlaufenden Betonieren von Fahrbahndecken und Einbrinaen von Fugeueinlagen vor Erstellung der Decken später eine sichere Abilich',wig der Raurnfugen gewährleistet.The invention is based on the object of a method for production and to create sealing of space joints during the continuous concreting of Carriageway ceilings and installation of grout inlays before the ceilings are created later a safe balance is guaranteed.
Die Erfindung löst diese Aufgabe dadurch, daß ini Hohlraurn der Dichtuu-sleiste ein Unterdruck er-C zeuut wird und &ß der Hohlraum nach dein Einbriiwen des Befons mit der Außenluft in Verbindentzt wird.The invention achieves this object in that ini Hohlraurn sleiste-Dichtuu of a negative pressure it is-C & zeuut and ß the cavity by your Einbriiwen is the Befons with the outside air in Verbindentzt.
DJe zur Ausführuna, dieses Verfahrens dienende bosichend aus einem festen Fu-enteil und einerhohleti Dichtun2sleiste aus elastischem 34aterial, ist dadurch gekennzeichnet, cluß d-c DIchtungsleiste aus einem Schhu,ch aus od. d-l. best,#lit.DJe to carry out this procedure, serving from one solid foot part and a hollow sealing strip made of elastic material characterized by cluß d-c sealing strip from a Schhu, ch from od. d-l. best, # lit.
Bei eiiier Weitetbildung der Fugen-C C einkige ist der Schlauch am festen Fugenteil fest an-##e13racht. Vorzi##-s##-eise sind Fuoeiiiell und Schlauch als eine Einheit aus Gummi oder ihnlichem ehistischem Material hen-,estellt.In eiiier Weitetbildung the joint-C C einkige the hose at the fixed joints device firmly in - e13racht ##. Vorzi ## - s ## - eise are Fuoeiiiell and hose as a unit made of rubber or similar religious material.
In der Zeieli-iiiii- ist eine Ausführun-sforrn der C C Fugeneilulage, dargestellt. Es zeigt F i g. 1 einen Teilquerschnitt der frisch betonierten Falirbalindecke mit Fugeneinlage und F i g. 2 einen Teilquerschnitt der Fahrbahndecke, nachdem der Beton erstarrt ist.In the Zeieli-iiiii- a version of the C C joint insert is shown. It shows F i g. 1 shows a partial cross-section of the freshly concreted Falirbalin ceiling with joint insert and FIG. 2 shows a partial cross-section of the road surface after the concrete has set.
Die Fugeneinlage 1 besteht aus einer langgestreckten Platte 2 od. dol., die an ihrer einen Läncrskante C mit einem in der Ebene der Platte 2 durch Evakuierung flachgedrückten Schlauch 3 aus Gummi oder C ähnlichem elastischem Material versehen ist. Die Platte 2 kann aus einem steifen Material, z. B. Eternit, bestehen, wobei der Schlauch 3 an der Platte 2 fest # aie -ebracht ist. Der Schlauch 3 besitzt zu diesem Zweck eine mit, in die die eine Längskante der Platte 2 ein-eführt ist. Nach einer anderen Ausführun-siorm sind die Platte 2 und der Schlauch 3 einslück-ig a3-...s Gummi oder ähnlichem Material hergestellt.The joint insert 1 consists of an elongated plate 2 od. Dol. Which is provided on its one Läncrskante C with a hose 3 made of rubber or C similar elastic material in the plane of the plate 2 by evacuation. The plate 2 can be made of a rigid material, e.g. B. Eternit, exist, with the tube 3 on the plate 2 is fixed # aie-attached. For this purpose, the hose 3 has one into which the one longitudinal edge of the plate 2 is inserted. According to another embodiment, the plate 2 and the hose 3 are made of one-piece a3 -... s rubber or a similar material.
Die uwere Kante der Fti-eiieinlace 1 soll s;ch auf der Unterlage 4 für die Betonbahn 5 abstützen. Ge-(ye,belleilfalls kann diese Kante zu diesem Zweck einen aLii der Unterlage 4 ruhenden Flansch od. dgl. aufweisen.The outer edge of the Fti-egg inlaid 1 should be supported on the base 4 for the concrete sheet 5 . If necessary, this edge can have a flange or the like resting on the base 4 for this purpose.
Die Evaluieiiiiic, eles Schlauches 3 kann bei dessen Herstellung vollzogen werden oder auch am Arbeitsplatz unmittelbar nach dein Anbringen der Fu 'geneinlacen 1 auf der Unterla-c 4. Der Verschluß des Schlauches 3 ist so gestaliet, daß dem Schlauch nach der Evakuierun- leicht wieder Luft zu-eführt werden kann.The evaluation of the hose 3 can be carried out during its manufacture or also at the workplace immediately after you have attached the Fu 'geneinlacen 1 on the lower surface 4. The closure of the hose 3 is designed so that the hose is easy to return after evacuation Air can be supplied.
Nach Aubrin-en der Fugeneinlagen 1 auf der Unterla-e 4 wird die Fahrbahn gegossen, wobei sich der Beton über den flachgedrückten Schlauch 3 erstrecken soll. Geaebenenfalls kann der Beton vor seinem Erstarren oberhalb des Schlauches 3 entfernt werden, wie in F i g. 1 durch gestrichelte Linien angedeutet ist. Die Fahrbahndecke wird normalerweise bewehrt sein.After the joint inlays 1 have been rubbed out on the substrate 4, the roadway is poured, with the concrete extending over the hose 3 which has been pressed flat. If necessary, the concrete can be removed above the hose 3 before it solidifies, as shown in FIG. 1 is indicated by dashed lines. The road surface will normally be reinforced.
Aus F i g. 2 ist ersichtlich, wie der Schlauch 3 nacb dem Betonieren und nach Zufuhr von Luft infolge seiner Elastizität an den Seitenwänden 6 und 7 der von der Fugeneinlage 1 gebildeten Raumfuge 8 anliegt. Die Abmessungen des Schlauches 3 sind so gewählt, daß seine Anlage auch dann gewährleistet ist, wenn sich die Breite der Raumfuge 8 durch Schrumpfen, Dehnung u. dgl. des Betons ändert. Der Schlauch 3 kann außerdem über seinen Steg oder die Platte 2 derart mit der Unterlage 4 verankert sein, daß er trotz Bewegungen in der Fuge seine Lage in der Raumfuge 8 beibehält.From Fig. 2 shows how the hose 3 rests against the side walls 6 and 7 of the space joint 8 formed by the joint insert 1 after concreting and after the supply of air due to its elasticity. The dimensions of the hose 3 are chosen so that its installation is guaranteed even if the width of the space joint 8 changes due to shrinkage, expansion and the like of the concrete. The hose 3 can also be anchored to the base 4 via its web or the plate 2 in such a way that it maintains its position in the spatial joint 8 despite movements in the joint.
Claims (2)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE1212127X | 1959-10-21 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE1212127B true DE1212127B (en) | 1966-03-10 |
Family
ID=20422116
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DER28935A Pending DE1212127B (en) | 1959-10-21 | 1960-10-20 | Process for the production and sealing of space joints in road pavements or the like made of in-situ concrete and joint insert to carry out this process |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE1212127B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2241272A1 (en) * | 1971-08-30 | 1973-03-08 | Robert Warthmann | PROCEDURE AND JOINT PROFILE FOR SEALING CONCRETE JOINTS |
DE102004045278A1 (en) * | 2004-09-16 | 2006-04-06 | Quithell Gmbh | Expansion joints strips |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1742842U (en) * | 1956-12-12 | 1957-04-11 | Ruhenstroth G M B H Wirus W | EXPANSION JOINT STRIPS FOR CONCRETE ROADS. |
DE1788857U (en) * | 1959-01-08 | 1959-05-21 | Horst Dr Averbeck | INSERTION DEVICE IN CONCRETE ROADS OD. DGL. |
-
1960
- 1960-10-20 DE DER28935A patent/DE1212127B/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1742842U (en) * | 1956-12-12 | 1957-04-11 | Ruhenstroth G M B H Wirus W | EXPANSION JOINT STRIPS FOR CONCRETE ROADS. |
DE1788857U (en) * | 1959-01-08 | 1959-05-21 | Horst Dr Averbeck | INSERTION DEVICE IN CONCRETE ROADS OD. DGL. |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2241272A1 (en) * | 1971-08-30 | 1973-03-08 | Robert Warthmann | PROCEDURE AND JOINT PROFILE FOR SEALING CONCRETE JOINTS |
DE102004045278A1 (en) * | 2004-09-16 | 2006-04-06 | Quithell Gmbh | Expansion joints strips |
DE102004045278B4 (en) * | 2004-09-16 | 2008-01-24 | Quithell Gmbh | Expansion joints strips |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2455775C3 (en) | Expansion joint strip for screed floors | |
DE2000784C3 (en) | Process for the repair of damaged concrete pavements and fillings for the implementation of the process | |
DE1212127B (en) | Process for the production and sealing of space joints in road pavements or the like made of in-situ concrete and joint insert to carry out this process | |
DE3424198A1 (en) | Two-part settlement-joint moulding for screeds | |
DE2714016A1 (en) | Two-layer slab for playground or sports ground - with concrete base and coating of rubber granules with polyurethane binder | |
DE2252408B2 (en) | Process and devices for the production of a prefabricated wall part from glass blocks | |
DE2553242A1 (en) | PROCEDURE FOR THE FORMATION OF EXPANSION JOINTS IN A CONCRETE SLAB AND EXPANSION JOINT PROFILE | |
AT203187B (en) | Process for the production of a cavity ceiling including ceiling plaster and sound insulation, as well as hollow body shapes for carrying out the process | |
DE807015C (en) | Reinforced concrete ceiling | |
DE1075696B (en) | Cable duct composed of precast reinforced concrete parts in the form of a floor pan and several frame and plate-shaped prefabricated parts | |
DE1246788B (en) | Joint insert for dummy joints | |
AT242306B (en) | Template for making a lining in a mold | |
AT164915B (en) | Process for the production of poured wall and ceiling plaster in concrete construction | |
DE2314922C3 (en) | Procedure for renovating pavements | |
DE1559355A1 (en) | Expansion joint construction | |
DE669025C (en) | Method of making road surfaces with reinforcement from metal gratings | |
DE1684389A1 (en) | Process for producing concrete floors and concrete sheets | |
DE2238963C3 (en) | Hollow edge body made of sheet steel for concrete pavement or the like | |
DE872114C (en) | Formwork for the inner delimitation of hollow bodies | |
DE1916918C (en) | Method for producing leveled surfaces and device for carrying out the method | |
CH269999A (en) | Method and device for the production of tubular cavities in malleable, hardenable material in a building during its construction. | |
DE3036620A1 (en) | Damp-proof concrete bridge slab cover - has rib protrusions on pref. elastomer strip profile engaging side seal | |
DE2061979A1 (en) | Method for waterproofing the base connection in the case of subterranean structures, in particular tunnels, made with diaphragm walls and subsequently installed base | |
DE1127929B (en) | Method and device for fastening rails to a concrete substructure | |
DE7012856U (en) | DEVICE FOR THE FORMATION OF TOE BOARDS. |