DE10321947A1 - Method for erecting of wooden house or building entails connecting of interior and exterior walls of two storeys to one or more floor slabs in form of solid floor/ceiling, especially as semi-finished component of concrete, for example - Google Patents
Method for erecting of wooden house or building entails connecting of interior and exterior walls of two storeys to one or more floor slabs in form of solid floor/ceiling, especially as semi-finished component of concrete, for example Download PDFInfo
- Publication number
- DE10321947A1 DE10321947A1 DE2003121947 DE10321947A DE10321947A1 DE 10321947 A1 DE10321947 A1 DE 10321947A1 DE 2003121947 DE2003121947 DE 2003121947 DE 10321947 A DE10321947 A DE 10321947A DE 10321947 A1 DE10321947 A1 DE 10321947A1
- Authority
- DE
- Germany
- Prior art keywords
- walls
- wooden house
- floor
- ceiling
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/02—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
- E04B1/10—Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of wood
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/164—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, only the horizontal slabs being partially cast in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B5/36—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor
- E04B5/38—Floor structures wholly cast in situ with or without form units or reinforcements with form units as part of the floor with slab-shaped form units acting simultaneously as reinforcement; Form slabs with reinforcements extending laterally outside the element
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B2005/322—Floor structures wholly cast in situ with or without form units or reinforcements with permanent forms for the floor edges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/32—Floor structures wholly cast in situ with or without form units or reinforcements
- E04B2005/324—Floor structures wholly cast in situ with or without form units or reinforcements with peripheral anchors or supports
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/24—Structural elements or technologies for improving thermal insulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B80/00—Architectural or constructional elements improving the thermal performance of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Wood Science & Technology (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Die Erfindung betrifft ein Verfahren zum Errichten eines Holzhauses oder dgl. Bauwerkes mit massiver Deckenplatte gemäß dem Oberbegriff des Anspruchs 1.The Invention relates to a method for building a wooden house or the like. Building with solid ceiling tile according to the generic term of claim 1.
Die Erfindung betrifft ausserdem ein danach errichtetes Holzhaus oder dgl. Bauwerk gemäß dem Oberbegriff des Anspruchs 6.The The invention also relates to a wooden house built thereafter or Like. structure according to the preamble of claim 6.
Beim Errichten eines Holzhauses oder dgl. Bauwerkes, bei dem die in Holzrahmen-, Fachwerk- oder Tafelbauweise gebildeten Aussen- und Innenwände zweier Stockwerke mit einer bzw. mehreren dazwischen angeordneten hölzernen Geschossplatten verbunden werden, wird in der bekannten Weise derart vorgegangen, dass dann, wenn die unteren Holzaussen- und -innenwände auf die üblicherweise aus Massivmaterial bestehende Bodenplatte bzw. auf ein Fundament aufgesetzt und hiermit verbunden worden sind, die gleichfalls als Holzkonstruktion ausgebildete Geschossplatte auf das obere Ende der unteren Wand aufgelegt und mit dieser verbunden wird. Erst danach werden die oberen Holzaussen- und -innenwände für das darüber liegende Stockwerk auf die Geschossplatte aufgesetzt und mit letzterer verbunden.At the Construction of a wooden house or the like, in which the in wooden frame, Half-timbered or panel construction formed outer and inner walls of two Floors with one or more wooden ones arranged in between Storey plates are connected in the known manner proceeded that when the lower wooden exterior and interior walls opened which usually consists of Solid material existing base plate or placed on a foundation and have been connected to it, also as a wooden structure trained floor slab on the upper end of the lower wall hung up and connected to it. Only then will the upper wooden exterior and interior walls for the about that horizontal floor placed on the floor slab and with the latter connected.
Dieser sich gleichsam natürlicherweise ergebende Vorgang des Errichtens eines Holzhauses oder dgl. Bauwerkes beinhaltet jedoch verschiedene Nachteile. So ist zum einen der Vorgang des Verbindens der Aussen- und Innenwände zweier Stockwerke mit der dazwischen anzuordnenden Geschossplatte relativ arbeits- und vor allen Dingen zeitaufwändig. Ausserdem sind die Schallschutz- sowie Brandschutzqualitäten der hölzernen Geschossplatte nicht zufriedenstellend, was auch hinsichtlich deren Wärmespeicherfähigkeit gilt.This yourself, as it were, naturally resulting process of erecting a wooden house or the like however, has several disadvantages. This is the process on the one hand connecting the outer and inner walls of two floors with the floor slab to be arranged in between relatively work and above all time-consuming. In addition, the sound insulation and fire protection qualities of wooden Floor slab is not satisfactory, which also in terms of its heat storage capacity applies.
Der Erfindung liegt daher die Aufgabe zugrunde, zur Beseitigung der geschilderten Nachteile ein Verfahren zum Errichten eines Holzhauses oder dgl. Bauwerkes sowie ein danach errichtetes Holzhaus zu schaffen, mit denen ein schneller Aufbau bei verbessertem Schallschutz, Brandschutz und Wärmespeichertähigkeit erreicht ist.The The invention is therefore based on the object to eliminate the Disadvantages described a method for building a wooden house or the like building and to create a wooden house built afterwards, with which a quick assembly with improved sound insulation, fire protection and heat storage capability is reached.
Die Merkmale des zur Lösung dieser Aufgabe geschaffenen Verfahrens gemäß der Erfindung ergeben sich aus Anspruch 1. Das nach einem solchen Verfahren errichtete Holzhaus oder dgl. Bauwerk gemäß der Erfindung ist in Anspruch 6 beschrieben. Vorteilhafte Ausgestaltungen der Erfindung ergeben sich aus den jeweils abhängigen Ansprüchen.The Features of the solution This object created method according to the invention result from claim 1. The wooden house built according to such a method or the like. Structure according to the invention is described in claim 6. Advantageous embodiments of the Invention result from the respective dependent claims.
Dem erfindungsgemäßen Verfahren zum Errichten eines Holzhauses oder dgl. Bauwerkes liegt der wesentliche Gedanke zugrunde, eine Kombination aus Holzbauweise und Stahlbetonweise bzw. allgemein mineralstofflicher Massivbauweise (Beton, Ziegel usw.) vorzusehen, und zwar dadurch, dass als Geschossplatte eine Massivdecke, insbesondere in Form eines Halbfertigbauteils, verwendet wird. Diese Massivdeckenplatte kann aus Beton , insbesondere Stahlbeton, bestehen oder eine Ziegelelementdecke, eine Hohlsteindecke usw. sein.the method according to the invention the essential for building a wooden house or the like The idea is based on a combination of wood construction and reinforced concrete or generally mineral solid construction (concrete, brick etc.) to be provided, namely in that a Solid ceiling, especially in the form of a semi-finished component, used becomes. This solid ceiling slab can be made of concrete, in particular reinforced concrete, exist or a brick element ceiling, a hollow stone ceiling, etc. his.
Hierdurch lässt sich auf bisher nicht erreichte, verblüftend einfache Weise ein schneller Aufbau des gesamten Bauwerkes erzielen. Gleichzeitig ist aufgrund der vorgesehenen Verwendung einer Massivdecke eine wesentliche Verbesserung hinsichtlich Schallschutz, Brandschutz und Wärmespeicherfähigkeit erreicht.hereby let yourself in an astonishingly simple way that has never been achieved before Achieve construction of the entire structure. Is due at the same time the proposed use of a solid ceiling a significant improvement with regard to sound insulation, fire protection and heat storage capacity reached.
Die erfindungsgemäß vorgesehene Art der Verbindung zwischen Holzarten- und -innenwand einerseits und Massivdecke andererseits erfolgt derart, dass – im Gegensatz zur bisher bekannten Vorgehensweise – die Massivdecke bildenden Halbfertigteile auf die Wandköpfe des Erdgeschosses nach Positionsplan verlegt werden. Im Anschluss daran können sofort die aufgehenden Obergeschosswände aufgesetzt und fixiert werden. Dies erfolgt unter Einhaltung eines vorbestimmten Abstandes, wobei erfindungsgemäß spezielle Abstandshalter zur Anwendung gelangen. Die Höhe, welche durch die Abstandshalter gebildet wird, entspricht etwa der Enddicke der Massivdecke. Auf diese Weise wird beim Errichten eines Holzhauses ein erhebliches Ausmaß an Zeit und Arbeitsaufwand eingespart.The provided according to the invention Type of connection between the type of wood and the inner wall on the one hand and solid ceiling, on the other hand, is done in such a way that - in contrast to the previously known procedure - forming the solid ceiling Semi-finished parts on the wall heads of the ground floor according to the position plan. In connection about it the rising upper floor walls immediately put on and fixed become. This is done with a predetermined distance, according to the invention special Spacers are used. The height given by the spacers is formed, corresponds approximately to the final thickness of the solid ceiling. On this becomes a significant one when building a wooden house Amount of time and saved labor.
Bei der erfindungsgemäßen Vorgehensweise wird der vorbestimmte Abstand zwischen den Aussen- und Innenwänden zweier Stockwerke, wie erwähnt, unter Verwendung von Abstandshaltern gebildet.at the procedure according to the invention the predetermined distance between the outer and inner walls of two Floors as mentioned formed using spacers.
Im Sinn der Erfindung wird im übrigen unter dem Ausdruck „Wand" jede geeignete Holzrahmenwand, Fachwerkwand, Tafelbauwand usw. verstanden, insbesondere sofern sie in Holzleichtbauweise gebildet ist.in the The purpose of the invention is otherwise under the expression "wall" any suitable wooden frame wall, Truss wall, panel building wall, etc. understood, especially if it is made of lightweight wood.
Erfindungsgemäß ist weiterhin vorgesehen, dass die Betondecke schubfest mit den Aussenwänden verbunden wird. Diese schubfeste Verbindung zwischen den Aussenwänden und der Betondecke kann in erfindungsgemäßer Ausgestaltung unter Verwendung eines haarnadelförmigen Bügels oder dgl. gebildet werden, der den Wandabstandshalter umgreift.According to the invention is still provided that the concrete ceiling is connected to the outer walls in a shear-resistant manner becomes. This shear resistant connection between the outer walls and the concrete ceiling can be used in an embodiment according to the invention a hairpin-shaped bracket or the like. That surrounds the wall spacer.
Das nach einem derartigen Verfahren errichtete Holzhaus oder dgl. Bauwerk zeichnet sich somit erfindungsgemäß dadurch aus, dass die zwischen den Aussen- und Innenwänden zweier Stockwerke angeschlossene Geschossplatte eine Massivdecke aus Beton, insbesondere in Form eines Stahlbeton-Halbfertigbauteils, bzw. eine Ziegelelementdecke, eine Hohlsteindecke usw. ist.According to the invention, the wooden house or the like structure erected by such a method is characterized in that the floor slab connected between the outer and inner walls of two floors has a solid ceiling made of concrete, in particular in the form of a reinforced concrete semi-finished component, or a brick element ceiling, a hollow stone ceiling, etc.
Der erfindungsgemäß vorgesehene Abstandshalter, der an seinen beiden Enden mit den Stirnseiten der Aussen- und Innenwände verbindbar ist, kann ein mit Gewinde versehener Dorn, eine metallene Stange mit Gewindeenden oder dgl. sein, die im mittleren Abschnitt zwei Abstandshalterplatten aufweist, deren Abstand voneinander weitgehend der Enddicke der Massivdecke entspricht.The provided according to the invention Spacer, which at its two ends with the front sides of the Outside and inside walls is connectable, a threaded mandrel, a metal Rod with threaded ends or the like. That in the middle section has two spacer plates, the distance from each other largely Final thickness of the solid ceiling corresponds.
Zweckmäßigerweise greifen die Enden des Abstandshalters in stirnseitige Abschlussstücke der Aussen- und Innenwände ein und sind dort festlegbar.Conveniently, engage the ends of the spacer in the end pieces of the outer and interior walls and can be specified there.
Ein besonders vorteilhafter und schneller Aufbau des Holzhauses ergibt sich dann, wenn jede obere Geschosswand bereits werkseitig an ihrem unteren Ende mit dem hieran endseitig befestigten Wandabstandshalter versehen ist, der mit seinem anderen freien Ende in das obere Ende der zugeordneten unteren Geschosswand einsteckbar und dort festlegbar ist. Zu diesem Zweck kann die untere Geschosswand nahe ihrem oberen Ende eine seitliche Öffnung aufweisen, die den Zugang zu dem eingesteckten Ende des Wandabstandshalters bildet. Diese seitliche Öffnung kann vorteilhafterweise gleichzeitig zum Einblasen der Wärmedämmung genutzt werden.On particularly advantageous and quick construction of the wooden house results when each upper floor wall is already attached to its factory lower end with the wall spacer attached to the end is provided, with its other free end in the upper end the assigned lower floor wall can be inserted and fixed there is. For this purpose, the lower floor wall can be close to its upper one End of a side opening have access to the inserted end of the wall spacer forms. This side opening can advantageously be used at the same time for blowing in the thermal insulation.
Es liegt im Rahmen der Erfindung, dass zur schubfesten Verbindung der Massivdecke mit den Wänden ein haarnadelförmiger Bügel oder dgl. vorgesehen ist, der den Wandabstandshalter umgreift und an der Massivdecke festgelegt ist.It is within the scope of the invention that the shear-resistant connection of Solid ceiling with the walls a hairpin-shaped Bracket or Like. Is provided that engages around the wall spacer and on the solid ceiling is fixed.
Um einen wetterfesten Abschluss der Eckverbindung zwischen den Aussenwänden und der Massivdecke zu erreichen, ist es von Vorteil, wenn der nach aussen gerichtete Abschnitt des zwischen den Aussenwänden gebildeten Zwischenraums durch ein eingepasstes Abschlussteil verschlossen ist. Dies dient gleichzeitig der Schalung und auch Dämmung.Around a weatherproof closure of the corner connection between the outer walls and to reach the solid ceiling, it is advantageous if the after outwardly directed section of the formed between the outer walls Intermediate space is closed by a fitted end piece. This serves both formwork and insulation.
Die Erfindung wird im Folgenden anhand der Zeichnung näher erläutert. Hierbei zeigen:The The invention is explained in more detail below with reference to the drawing. in this connection demonstrate:
Wie
aus der Zeichnung, insbesondere aus
Die
Aussenwände
Die
untere Aussenwand
Demgegenüber erfolgt
die Verbindung der Geschossplatte
Wie
im einzelnen aus
Nach
dem Stabilisieren dieser Holzinnen- und -aussenwände
Sofort
im Anschluss daran werden dann die aufgehenden Holzwände
Während die
Holzwände
Der
durch die Abstandshalter
Zur
Bildung des erwähnten
Zwischenraums
Die
Enden des Abstandshalters
Die
schubfeste Verbindung der Massivdecke
Wie
weiterhin aus
Wie
schliesslich aus
Hinsichtlich vorstehend nicht im einzelnen näher erläuterter Merkmale der Erfindung wird im übrigen ausdrücklich auf die Ansprüche sowie die Zeichnung verwiesen.Regarding not detailed above Illustrated Features of the invention will be the rest expressly on the claims as well as the drawing referenced.
Claims (14)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10321947A DE10321947B4 (en) | 2003-05-15 | 2003-05-15 | Method for erecting a wooden house or the like. Bauwerkes |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10321947A DE10321947B4 (en) | 2003-05-15 | 2003-05-15 | Method for erecting a wooden house or the like. Bauwerkes |
Publications (2)
Publication Number | Publication Date |
---|---|
DE10321947A1 true DE10321947A1 (en) | 2004-12-09 |
DE10321947B4 DE10321947B4 (en) | 2009-09-24 |
Family
ID=33440858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE10321947A Expired - Fee Related DE10321947B4 (en) | 2003-05-15 | 2003-05-15 | Method for erecting a wooden house or the like. Bauwerkes |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE10321947B4 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102011110918A1 (en) * | 2011-08-18 | 2013-02-21 | B & O Stammhaus GmbH & Co. KG | Wall construction structure for load bearing wall of multi-storey building, has vertical spacers that are mounted on upper surface of crosswise top runner, so that upper surface of top runner is set as support portion of floor board |
EP1953302A3 (en) * | 2007-01-26 | 2014-07-09 | Swelite AB | Arrangement for joining wood-based construction elements |
FR3113293A1 (en) * | 2020-08-10 | 2022-02-11 | Gn Invest | Timber frame building and concrete floor |
WO2023164741A1 (en) * | 2022-03-04 | 2023-09-07 | Norman Gordon Pask | A construction system and method of use thereof |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105926767B (en) * | 2016-05-26 | 2018-08-17 | 沈阳建筑大学 | Cross timber structure node |
CN110374242A (en) * | 2019-07-17 | 2019-10-25 | 梁涛 | A kind of assembled laminated floor slab |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4029134A1 (en) * | 1989-11-16 | 1991-05-23 | Stadler Heerbrugg Holding Ag | Composite structure of timber beam and concrete slab - has concrete reinforcing bolts screwed into timber beam at acute angle to surface |
DE3433919C2 (en) * | 1983-09-20 | 1996-06-20 | Degut A Soc | Building, especially a house, garage or accommodation, using prefabricated elements |
DE4239057C2 (en) * | 1992-11-20 | 1997-02-13 | Eberhard Schrade | Process and prefabricated module for the production of structures and buildings |
DE19747331A1 (en) * | 1997-10-27 | 1999-07-29 | Wilhelm Nusser Gmbh & Co | Building with wood frame structure |
DE29724419U1 (en) * | 1997-10-27 | 2001-06-13 | Wilhelm Nusser Gmbh Systembau | building |
-
2003
- 2003-05-15 DE DE10321947A patent/DE10321947B4/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3433919C2 (en) * | 1983-09-20 | 1996-06-20 | Degut A Soc | Building, especially a house, garage or accommodation, using prefabricated elements |
DE4029134A1 (en) * | 1989-11-16 | 1991-05-23 | Stadler Heerbrugg Holding Ag | Composite structure of timber beam and concrete slab - has concrete reinforcing bolts screwed into timber beam at acute angle to surface |
DE4239057C2 (en) * | 1992-11-20 | 1997-02-13 | Eberhard Schrade | Process and prefabricated module for the production of structures and buildings |
DE19747331A1 (en) * | 1997-10-27 | 1999-07-29 | Wilhelm Nusser Gmbh & Co | Building with wood frame structure |
DE29724419U1 (en) * | 1997-10-27 | 2001-06-13 | Wilhelm Nusser Gmbh Systembau | building |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1953302A3 (en) * | 2007-01-26 | 2014-07-09 | Swelite AB | Arrangement for joining wood-based construction elements |
DE102011110918A1 (en) * | 2011-08-18 | 2013-02-21 | B & O Stammhaus GmbH & Co. KG | Wall construction structure for load bearing wall of multi-storey building, has vertical spacers that are mounted on upper surface of crosswise top runner, so that upper surface of top runner is set as support portion of floor board |
DE102011110918B4 (en) | 2011-08-18 | 2018-12-27 | B & O Stammhaus GmbH & Co. KG | Building construction with wall construction for load-bearing walls in a multi-storey building and method for producing a building structure |
FR3113293A1 (en) * | 2020-08-10 | 2022-02-11 | Gn Invest | Timber frame building and concrete floor |
WO2022034271A1 (en) * | 2020-08-10 | 2022-02-17 | Gn Invest | Building with wooden framework and concrete floor |
WO2023164741A1 (en) * | 2022-03-04 | 2023-09-07 | Norman Gordon Pask | A construction system and method of use thereof |
Also Published As
Publication number | Publication date |
---|---|
DE10321947B4 (en) | 2009-09-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0752033B1 (en) | Structure consisting of prefabricated components | |
DE10321947A1 (en) | Method for erecting of wooden house or building entails connecting of interior and exterior walls of two storeys to one or more floor slabs in form of solid floor/ceiling, especially as semi-finished component of concrete, for example | |
DE3432940A1 (en) | Prefabricated masonry structure | |
DE3036539A1 (en) | Prefabricated brick wall element for the full assembly of houses | |
EP0515724B1 (en) | Method and prefabricated module for the fabrication of structures and buildings | |
DE3925591C2 (en) | Kit for creating a balcony | |
DE834446C (en) | Process for the production of walls from prefabricated components | |
DE4121253A1 (en) | METHOD AND PRE-PREPARED MODULE FOR THE PRODUCTION OF CONSTRUCTIONS AND BUILDINGS | |
DE812368C (en) | Buildings (house, factory, etc.) made of prefabricated composite concrete panels | |
DE4239057C2 (en) | Process and prefabricated module for the production of structures and buildings | |
DE861464C (en) | Reinforced concrete skeleton construction | |
DE19636828C2 (en) | Method and component for the production of structural parts | |
EP0965702A1 (en) | Composite prefab slabs with wooden framework and chipped wood concret | |
DE821403C (en) | Prefabricated component and method for assembling such components | |
DE903505C (en) | Panel-shaped component | |
DE827409C (en) | Skeleton construction with a load-bearing metallic support structure and a space-enclosing infill made of insulating materials | |
DE905883C (en) | Process for the production, in particular, of exterior and intermediate walls of buildings | |
DE2636168A1 (en) | Frame integrated prefabricated component assembly building - has lost template frame for wall, ceiling and concrete type mass insertion | |
DE828440C (en) | Process for the production of building walls and building walls produced by this process | |
DE803129C (en) | Process for the production of assembly structures | |
DE9105949U1 (en) | Prefabricated module for the production of structures and buildings | |
EP0880624B1 (en) | Building kit | |
DE202020104969U1 (en) | Base for a wooden wall | |
DE657215C (en) | Wall construction panel for the production of buildings and similar structures without the use of supporting supports | |
DE968611C (en) | Wall construction with uniform shaped bricks, especially lightweight bricks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8364 | No opposition during term of opposition | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |