DE102011120120A1 - Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit - Google Patents

Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit Download PDF

Info

Publication number
DE102011120120A1
DE102011120120A1 DE201110120120 DE102011120120A DE102011120120A1 DE 102011120120 A1 DE102011120120 A1 DE 102011120120A1 DE 201110120120 DE201110120120 DE 201110120120 DE 102011120120 A DE102011120120 A DE 102011120120A DE 102011120120 A1 DE102011120120 A1 DE 102011120120A1
Authority
DE
Germany
Prior art keywords
segment
insert
change
continuous casting
scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE201110120120
Other languages
German (de)
Inventor
Anmelder Gleich
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to DE201110120120 priority Critical patent/DE102011120120A1/en
Publication of DE102011120120A1 publication Critical patent/DE102011120120A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/12Accessories for subsequent treating or working cast stock in situ
    • B22D11/128Accessories for subsequent treating or working cast stock in situ for removing
    • B22D11/1285Segment changing devices for supporting or guiding frames
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/14Plants for continuous casting
    • B22D11/142Plants for continuous casting for curved casting

Abstract

The method involves providing three steel segments (1-3) which are arranged at predetermined angle and are clamped by pivots (4,5). The scaffolds are arranged on segments and hydraulic clamping elements are arranged between base portion and insert portion of the segments. A rotation device is provided to transversely move the trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit. The scaffold is returned to the exchange site and scaffolds arranged in trolley are reloaded to parking space. The insert portion is removed from the base portion. Several stands are attached in inclined position with respect to the insert portion. A pair of fixed stops is arranged at the left and right sides of the insert portions. The insert portion is connected with the plate using screws. The rollers and scaffold are exchanged from the casting line to exchange site. The scaffolds are loosened from the insert portion by hoist. An independent claim is included for continuous casting installation.

Description

Einleitungintroduction

Weil während des Wechsels der Segmente wegen Verschleiß oder Formatwechsel nicht produziert werden kann, hängt eine gute Ausbringung von einer vorteilhaften Methode des Segmentwechsels ab, um eine möglichst kurze Verlustzeit für die Produktion zu erreichen.Because can not be produced during the change of segments due to wear or format change, a good application depends on a favorable method of segment change in order to achieve the shortest possible loss time for production.

In der Regel erreicht man heute Zeiten zwischen 15 und 25 Minuten für den Segmentwechsel.As a rule, today you can reach times between 15 and 25 minutes for the segment change.

Die angewendeten Methoden sind bei den verschiedenen Anlagenbauern leicht unterschiedlich.The methods used are slightly different for the different plant manufacturers.

Folgende Anmeldungen haben ebenfalls Segment-Wechseleinrichtungen zum Thema:The following applications also have segment changing facilities:

1. DE 2908 476 A1:1. DE 2908 476 A1:

Die Segmente werden in ortsfesten geraden Führungen gelagert, und jeweils ein Segment kann über ein Zugorgan aus der ortsfesten Führung nach oben herausgezogen werden.The segments are mounted in stationary, straight guides, and one segment each can be pulled out of the stationary guide via a pulling member.

Ein Ersatz-Segment ist auf umgekehrtem Wege einführbar.A replacement segment can be inserted in the opposite way.

Die Wege sind für eine kurze Zeit sehr lang.The paths are very long for a short time.

2. DE 35 24 554 C2:2. DE 35 24 554 C2:

Die Segmente werden an einem Schwenkarm befestigt und in eine Übergabestellung gebracht, von wo sie zur Reparaturwerkstatt gefahren und ausgetauscht werden.The segments are attached to a swivel arm and brought into a transfer position, from where they are driven to the repair shop and replaced.

Die Wege sind für eine kurze Zeit sehr lang.The paths are very long for a short time.

3. DE 10 21 0988 A1:3. DE 10 21 0988 A1:

Die Segmente sind in Segmentträgern lösbar befestigt. Ein gelöstes Segment kann in einer Führung mittels Kette, Traverse und Kran bis auf die Gießbühne transportiert werden.The segments are releasably secured in segment carriers. A loosened segment can be transported in a guideway by means of chain, traverse and crane up to the casting platform.

Die Wege sind für eine kurze Zeit sehr lang.The paths are very long for a short time.

Die Aufgabe besteht darin, eine Lösung zu finden, die mit kurzen Wegen (und damit einer kurzen Zeit) auskommt.The task is to find a solution that manages with short paths (and thus a short time).

Bei der hier vorgeschlagenen Lösung liegt die relevante Entfernung in der Größenordnung der Länge eines Segmenteinsatzes, die mit Eilganggeschwindigkeit horizontal durchfahren werden kann. Damit kann man eine kurze Hauptzeit in der Größenordnung von 1 Minute erreichen.In the solution proposed here, the relevant distance is of the order of magnitude of the length of a segment insert, which can be traversed horizontally at rapid traverse speed. With that you can achieve a short main time of the order of 1 minute.

In der hier vorliegenden Ausarbeitung wird beschrieben, wie ein Segmentwechsel mit kurzer Wechselzeit funktionieren könnte. Diese Lösung kann sowohl für eine Strangführung mit beidseitig gelagerten Rollen als auch für eine solche mit fliegend gelagerten Rollen angewendet werden.This article describes how a segment change with a short changeover time could work. This solution can be used both for a strand guide with rollers mounted on both sides as well as for those with cantilevered rollers.

Ein kurz durchgeführter Segmentwechsel bietet beste Voraussetzungen für eine höhere Ausbringung, weil längere Zeit produziert werden kann.A short change of segment provides the best conditions for a higher output, because a longer time can be produced.

Ein schneller Segmentwechsel ist auch vorteilhaft, wenn man mit Drehkokille ( DE 10 2010 035 723.5 ) oder mit neuer Kaltstrangtechnik ( DE 10 2010 045 223.8 ) arbeiten will, um einen schnellen Formatwechsel beim Strangquerschnitt zu realisieren und die Nebenzeiten zu verkürzen.A fast segment change is also advantageous when using a rotary mold ( DE 10 2010 035 723.5 ) or with new cold-rod technology ( DE 10 2010 045 223.8 ) wants to work to realize a quick format change in the strand cross-section and to reduce the non-productive time.

Lösungsolution

Es wird vorgeschlagen, Montagearbeiten und Transportaufgaben zu trennen und Kippsegmente mit Grundsegment und Segmenteinsatz zu verwenden. Die Segmenteinsätze tragen Führungsgerüste. Der Wechsel der Gerüste erfolgt außerhalb der Gießlinie an 2 entfernten Wechselplätzen. Von dort startet der Transport zur Reparaturwerkstatt, wo die Gerüste aufbereitet werden.It is proposed to separate assembly work and transport tasks and to use tilting segments with base segment and segment insert. The segment inserts carry guide frames. Of the Change of scaffolding takes place outside the casting line at 2 distant changing places. From there, the transport starts to the repair workshop, where the scaffolding is processed.

Es soll beispielhaft von einer Knüppelgießanlage mit 3 Segmenten ausgegangen werden, wobei in jedem Segmenteinsatz 3 Gerüste zur Strangführung vorhanden sind. 1 Gerüst besteht aus 3 Rollen unter 120°. Man kann beidseitig gelagerte Rollen oder fliegend gelagerte Rollen verwenden.By way of example, it will be assumed that a billet caster with 3 segments is used, whereby in each segment insert 3 stands for strand guidance are present. 1 scaffold consists of 3 rolls under 120 °. You can use both sides mounted rollers or cantilevered rollers.

Zum Gießen befinden sich die 3 Segmente mit ihren Segmenteinsätzen in einer schrägen Stellung (geklemmt) entsprechend ihrer Position in der 90 Bogenstranggieß-Anlage. Zum Segmenteinsatz-Wechsel wird jedes Segment in eine Position mit horizontaler Fahrbahn geschwenkt und der Segmenteinsatz verfahren. Die 3 Gerüste jedes Segmenteinsatzes können später am Wechselplatz manuell gekippt und demontiert werden.For casting, the 3 segments with their segment inserts are in an oblique position (clamped) according to their position in the 90 Bogenstranggieß plant. To change the segment insert, each segment is swiveled to a horizontal carriageway position and the segment insert is moved. The 3 frames of each segment insert can later be tilted and dismantled manually at the change location.

In der Gerüstwechselstellung können durch eine Drehvorrichtung mit Hebezeug in Ebene Null die Gerüste gepackt und über Löcher in der Geschossdecke nach oben gehoben werden. Das alte Gerüst wird auf Transportwagen abgelegt und ein neues Gerüst wird nach unten herabgelassen und wieder im Segmenteinsatz befestigt.In the frame change position, the frameworks can be packed by means of a turning device with hoist in level zero and raised above holes in the floor slab. The old scaffolding is placed on trolleys and a new scaffold is lowered down and fixed again in the segment insert.

Die Transportwagen und die Drehvorrichtung sind verfahrbar und können für jede Ader verwendet werden. – Die Lösung wird in 15 Bildern beschrieben.The trolleys and the turning device are movable and can be used for each wire. - The solution is described in 15 pictures.

In Bild 1 ist beispielhaft eine Bogenstranggießanlage mit 3 Segmenten mit jeweils 3 Rolleneinheiten pro Segment dargestellt.Figure 1 shows an example of a continuous caster with 3 segments, each with 3 roller units per segment.

Man erkennt, dass hier 3 Segmente (1, 2, 3) mit einem Zentriwinkel von 28 Grad gewählt wurden. Danach schließt sich hinter dem Segment III der Rückbiegetreiber (51) an, bei dem wegen der größeren Kräfte keine fliegenden Verformungswalzen eingesetzt werden können.It can be seen that here are 3 segments ( 1 . 2 . 3 ) were selected with a central angle of 28 degrees. Thereafter, the backbend driver (behind the segment III) closes ( 51 ), in which due to the larger forces no flying deformation rollers can be used.

Die 3 Segmente sind bei dieser Variante bis auf das Gelenk gleich und können motorisch um fest in der Anlage verankere Drehpunkte (4, 5) geschwenkt und dann geklemmt werden. In dieser Darstellung ist die Gießposition der 3 Segmente dargestellt.The 3 segments are the same in this variant except for the joint and can be motor-driven to pivot points firmly anchored in the system ( 4 . 5 ) and then clamped. In this illustration, the casting position of the 3 segments is shown.

Bild 2 zeigt in der Seitenansicht die 3 Segmente (6, 7, 8) in die Waagerechte geklappt in der Wechselstellung.Figure 2 shows in side view the 3 segments ( 6 . 7 . 8th ) in the horizontal worked in the change position.

Der Spalt zwischen den Fahrbahnen kann durch versetzte Einzelradlagerung der Laufräder an den Segmenteinsätzen gemildert werden.The gap between the lanes can be mitigated by staggered Einzelradlagerung the wheels on the segment inserts.

Segment I befindet sich in der obersten waagerechten Ebene I.Segment I is in the uppermost horizontal plane I.

Segment II ist in einer mittleren waagerechten Ebene II.Segment II is in a middle horizontal plane II.

Segment III befindet sich in einer unteren waagerechten Ebene III oberhalb des Rückbiegetreibers.Segment III is in a lower horizontal plane III above the rebound driver.

Die 3 Ebenen liegen auf unterschiedlichen Höhen. In jedem Segment sind die Gerüste (12) mit Rollenführung für den Strang auf einer Bogenstruktur angeordnet.The 3 levels are at different heights. In each segment, the scaffolds ( 12 ) arranged with roller guide for the strand on a bow structure.

In Bild 3 sieht man, dass jedes Segment besteht aus Grundsegment (10) und Segmenteinsatz (11). Das Grundsegment (10) bleibt immer in der Anlage, der Segmenteinsatz (11) ist im Segment in 2 Ebenen zentriert und geklemmt, und kann in der horizontalen Stellung des Grundsegmentes auf einer Fahrbahn waagerecht verfahren werden, die ihre Fortsetzung im Bereich der Struktur findet und bis zum Gerüstwechselplatz führt. Außerdem sieht man die 3 Gerüste (12).In picture 3 one sees that each segment consists of basic segment ( 10 ) and segment use ( 11 ). The basic segment ( 10 ) always stays in the system, the segment insert ( 11 ) is centered in the segment in 2 levels and clamped, and can be moved horizontally in the horizontal position of the base segment on a carriageway, which finds its continuation in the area of the structure and leads to the framework exchange place. You can also see the 3 scaffolding ( 12 ).

Bild 4A zeigt beispielhaft die hydraulischen Klemmelemente (14) zwischen Grundsegment (10) und Segmenteinsatz (11) in der 1. Ebene. Die Klemmung in der 2. Ebene ist nicht dargestellt.Figure 4A shows an example of the hydraulic clamping elements ( 14 ) between basic segment ( 10 ) and segment use ( 11 ) in the 1st level. The clamping in the 2nd level is not shown.

Ferner erkennt man, dass der Segmenteinsatz (11) von einer Lok (17) aus dem Grundsegment (10) herausgezogen werden kann.Furthermore, it can be seen that the segment insert ( 11 ) of a locomotive ( 17 ) from the basic segment ( 10 ) can be pulled out.

Im Segmenteinsatz (11) befinden sich die 3 Gerüste (26), die in dieser Position zueinander geneigt stehen; das mittlere Gerüst bleibt immer gerade.In segment use ( 11 ) are the 3 scaffolding ( 26 ), which are inclined in this position to each other; the middle frame always stays straight.

Im Bild sieht man das Grundsegment (10) und den Segmenteinsatz (11) übereinander angeordnet. In the picture you can see the basic segment ( 10 ) and the segment insert ( 11 ) arranged one above the other.

Man kann auch erkennen, wie insgesamt 5 stationäre Hydrozylinder die Klemmung ausführen. Der zentrale Zylinder (15) hat einen Kolben mit T-Profil, der in eine T-Nute hineingreift und den Segmenteinsatzwagen zur Klemmung nach unten ziehen kann. Dabei stützt sich der Segmenteinsatzwagen nicht auf den Rädern (16), sondern auf den nach oben gefahrenen 4 Gewichtszylindern ab. Die Räder (16) stehen dann ca. 1 mm in der Luft.It can also be seen how a total of 5 stationary hydraulic cylinders perform the clamping. The central cylinder ( 15 ) has a T-section piston that engages a T-slot and can pull down the segment insert cart for clamping. The segmented insert car does not support itself on the wheels ( 16 ), but on the upwards driven 4 weight cylinders. The wheels ( 16 ) are then about 1 mm in the air.

In Bild 4B wird ein Vorschlag zur Lagepositionierung der 2 Segmenteinsätze (11A, 11B) im Grundsegment gemacht. Dargestellt ist links im Bild die Stellung und Bewegung von (11A) und rechts im Bild die Stellung und Bewegung von (11B).In Figure 4B, a proposal for the position positioning of the 2 segment inserts ( 11A . 11B ) in the basic segment. Shown is the left of the picture the position and movement of ( 11A ) and on the right in the picture the position and movement of ( 11B ).

Die rechte Endlage für die genaue Horizontalposition des Segmenteinsatzes links (11A) soll durch einen stat. Festanschlag (58) am rechten Ende des Grundsegments (10) gebildet werden.The right end position for the exact horizontal position of the segment insert left ( 11A ) should by a stat. Fixed stop ( 58 ) at the right end of the basic segment ( 10 ) are formed.

Die linke Endlage für die genaue Horizontalposition des Segmenteinsatzes rechts (11B) soll durch einen station. Festanschlag (59) am linken Ende des Grundsegments (10) gebildet werden.The left end position for the exact horizontal position of the segment insert right ( 11B ) should by a station. Fixed stop ( 59 ) at the left end of the basic segment ( 10 ) are formed.

Die beiden Festanschläge sind in der Lage gegeneinander versetzt, behindern aber nicht die Durchfahrt des anderen Segmenteinsatzes (Einzelradlagerung). Im Gießbetrieb, wenn das Grundsegment in eine schräge Lage gedreht ist und wenn die Lok abgekoppelt ist, muss zur Klemmung in dieser Ebene eine Gegenkraft zum stat. Festanschlag durch je einen hydraulisch einschwenkbaren Hebel (60, 61) aufgebracht werden, der in der gleichen Ebene wie der stat. Festanschlag wirkt und so den jeweiligen Segmenteinsatz auch in schräger Betriebsstellung des Grundsegments klemmt.The two hard stops are able to offset each other, but do not hinder the passage of the other segment use (Einzelradlagerung). In the casting operation, when the base segment is rotated in an oblique position and when the locomotive is decoupled, must for clamping in this plane a counterforce to stat. Fixed stop by a hydraulic lever ( 60 . 61 ), which are in the same plane as the stat. Fixed stop acts and so the respective segment use also stuck in oblique operating position of the basic segment.

Bild 5 zeigt am Beispiel eines kleinen Quadrats eine Führung mit drei Rollen, von denen die 2 seitlichen Rollen (18) mit fliegenden Stützscheiben mit Kalibrierung ausgestattet sind. Die untere Festrolle (19) ist beidseitig gelagert. Man erkennt in einem Schnitt das Grundsegment (10), den Segmenteinsatz (11) und das mittlere Gerüst (12).Figure 5 shows the example of a small square a guide with three rollers, of which the 2 side rollers ( 18 ) are equipped with flying support discs with calibration. The bottom fixed roller ( 19 ) is mounted on both sides. One recognizes in a section the basic segment ( 10 ), the segment usage ( 11 ) and the middle framework ( 12 ).

Jedes der 3 Gerüste eines Segmentes ist auf einer Platte (20) montiert, die mit dem Segmenteinsatz (11) durch Schrauben oder durch Keile (21) verbunden sind.Each of the 3 frameworks of a segment is on a plate ( 20 ) fitted with the segment insert ( 11 ) by screws or wedges ( 21 ) are connected.

An den Wechselplätzen (34, 35) werden die 3 alten Gerüste jedes Segmentes nacheinander mit Monteurhilfe vom Segmenteinsatz gelöst und in das Hebezeug der in Ebene Null fahrenden 180-Grad-Drehvorrichtung (37) geladen.At the changing places ( 34 . 35 ), the 3 old scaffolds of each segment are successively detached from the segment insert with the aid of a mechanic and inserted into the lifting gear of the level-zero 180-degree rotating device ( 37 ).

Man erkennt auch gut die Gelenke (22) für das Kippen des Grundsegmentes (10). Die Grundsegmente bleiben immer stationär in der Anlage.You can also see the joints well ( 22 ) for the tilting of the basic segment ( 10 ). The basic segments always remain stationary in the system.

In Bild 6 ist am Beispiel eines großen Quadrats (24) eine 3-Rollenführung dargestellt. Man erkennt, dass in der Reparaturwerkstatt durch einige Wechselteile (23) mit den gleichen Rollengehäusen eine Strangführung für das große Quadrat (24) zusammengestellt werden kann.In Fig. 6, the example of a large square ( 24 ) a 3-roller guide shown. One recognizes that in the repair workshop by some change parts ( 23 ) with the same roller housings a strand guide for the large square ( 24 ) can be put together.

Die Stützrollen in den Gerüsten werden nur ausgetauscht, wenn sie verschlissen oder beschädigt sind.The support rollers in the scaffolds are only replaced if they are worn or damaged.

In Bild 7 wird eine verstellbare Quadrat-Führung mit 2 balligen, fliegend gelagerten Seitenrollen (25) und einer beidseitig gelagerten Unterrolle (19) gezeigt.In Figure 7, an adjustable square guide with 2 crowned, cantilevered side rollers ( 25 ) and a sub-roll mounted on both sides ( 19 ).

Durch eine Schwingenführung für die Rollengehäuse kann man die seitlichen Führungsrollen (25) stufenlos vom kleinsten zum größten Quadrat einstellen. Die Untersetzung vom Antriebsmotor (55) zur Stützrolle soll durch ein Harmonic-Drive-Getriebe (54) erfolgen. Wieder sind alle Gerüste auf einer Platte (20) montiert, so dass an den Wechselplätzen (34, 35) vom Monteur der Aufbau von dem Segmenteinsatz (11) gelöst werden kann.By a swing guide for the roller housing you can see the lateral guide rollers ( 25 ) infinitely adjustable from the smallest to the largest square. The reduction of the drive motor ( 55 ) to the support roller is to be controlled by a harmonic drive ( 54 ) respectively. Again, all the scaffolding on a plate ( 20 ), so that at the changing places ( 34 . 35 ) from the fitter the structure of the segment insert ( 11 ) can be solved.

Bei dieser Führungsart sollte man zweimal pro Segment eine zusätzliche 4. Rolle zur Führung des Strangs an der Losseite vorsehen.With this type of guidance, you should provide an additional 4th roll per segment twice to guide the strand on the loose side.

In Bild 8 ist eine Montagehilfe dargestellt, wie man die beiden äußeren Gerüste eines Segmentes manuell schwenken kann mit Hilfe von 2 Gewindespindeln (29, 30), die auch motorisch betätigt werden können. Jedes der 2 kippbaren Gerüste (mit 3 Rollen) ist mit dem Segmenteinsatz über die Gewindespindeln (29, 30) verklemmt und zusätzlich verschraubt.Figure 8 shows an assembly aid how to manually swing the two outer frameworks of a segment by means of 2 threaded spindles ( 29 . 30 ), which can also be operated by motor. Each of the 2 tiltable scaffolds (with 3 rollers) is connected to the segment insert via the threaded spindles ( 29 . 30 ) and additionally screwed.

In der Wechselstellung stehen alle 3 Gerüste senkrecht zur Ebene des Gerüsteinsatzes (11), so dass sie vom Hebezeug gut erfasst und durch Löcher (41) in den Geschossdecken nach oben transportiert werden können.In the change position, all 3 stands are perpendicular to the level of the scaffold insert ( 11 ) so that they are well grasped by the hoist and passed through holes ( 41 ) can be transported upwards in the floor slabs.

In Bild 9 ist dargestellt, wie die Führung eines Rundquerschnitts für große und kleine Abmessung im 3-Rollen-Design unter 120°-Kontaktwinkel aussehen könnte, wenn man Wert legt auf eine schnelle Umstellung der Formatgröße während des Gießbetriebs.Figure 9 shows what it would look like to maintain a large and small size 3-roll design at 120 ° contact angle, given the fast changeover in format size during the casting operation.

Dabei benutzt man für die Führung von Rundquerschnitten ballige Rollen mit Punktkontakt, eine sehr einfache Lösung.It uses spherical rollers with point contact for the guidance of round sections, a very simple solution.

In Bild 9 unten ist gezeigt, dass man für diese Art der Verstellführung vorteilhaft Schwingengehäuse (52) mit hydraulischer Verstellung einsetzen kann, so dass man die Formatgröße ohne Ausbau der Gerüste wechseln kann.In Figure 9 below it is shown that for this type of adjustment advantageous swing housing ( 52 ) can be used with hydraulic adjustment, so that you can change the format size without removing the scaffolding.

Für den Fall, dass fliegend gelagerte Rollen gewählt werden, ist der Einsatz von Hartmetall-Rollen besonders vorteilhaft, weil die hohe Warmhärte von Hartmetall eine lange Standzeit verspricht.In the event that floating rollers are selected, the use of carbide rollers is particularly advantageous because the high thermal hardness of carbide promises a long service life.

Bild 10 zeigt in einem Vertikalschnitt (33) die verschiedenen Ebenen (I, II, III, IV) der Anlage und die 5 Geschossdecken A, B, C, D, E. Der Verlauf des 90°-Bogens der Gießanlage (36) ist gekennzeichnet.Figure 10 shows in a vertical section ( 33 ) the various levels (I, II, III, IV) of the plant and the 5 storey ceilings A, B, C, D, E. The course of the 90 ° arc of the casting plant ( 36 ) is marked.

Man erkennt, dass in den 3 Ebenen I, II und III die Grundsegmente sich in horizontaler Stellung befinden. Die zum Schwenken der Grund-Segmente benötigten Hydrozylinder (9) bleiben immer in der Anlage.It can be seen that in the 3 levels I, II and III the basic segments are in a horizontal position. The hydraulic cylinders required for pivoting the basic segments ( 9 ) always stay in the plant.

Im Bild befinden sich 3 fahrbare Segmenteinsätze mit verschlissenen Rollen in den Ebenen I, II und II kurz vor dem waagerechten Wegtransport aus dem Grundsegment durch eine Lok. – Jeder Segmenteinsatz (11) kann seitlich verfahren werden zu einer rechten Wechselposition (35), die ca. 6 m–20 m von der Gießlinie (in der gleichen Ebene) entfernt ist, so dass dort Monteure arbeiten können.In the picture are 3 mobile segment inserts with worn roles in the levels I, II and II shortly before the horizontal wegtransport from the basic segment by a locomotive. - Each segment insert ( 11 ) can be moved laterally to a right change position ( 35 ), which is about 6 m-20 m away from the casting line (in the same plane), so that fitters can work there.

Gleichzeitig startet aus der linken Warteposition (56) ein weiterer, mit neuen Gerüsten bestückter Segmenteinsatzwagen, ebenfalls von einer Lok geschoben. Nach ca. 1 Minute hat er die Zielposition im Grundsegment (10) erreicht, wo er zentriert und geklemmt wird. Außerdem wird das Grundsegment gekippt und es werden die Kühlmittelschläuche mittels Schnellverschlusskupplung verbunden. Die Anlage ist jetzt wieder gießbereit.At the same time, starting from the left waiting position ( 56 ) Another, equipped with new scaffolding segment insert car, also pushed by a locomotive. After about 1 minute, he has the target position in the basic segment ( 10 ), where it is centered and clamped. In addition, the base segment is tilted and the coolant hoses are connected by means of a quick-release coupling. The plant is ready to pour again.

Der beschriebene Wechsel der Segmenteinsätze kann in allen 3 Ebenen nach demselben Prinzip durchgeführt werden.The described change of the segment inserts can be carried out in all 3 levels according to the same principle.

Man erkennt außerdem, dass sich das Loch (44) in der Geschossdecke in der rechten Wechselstellung z. Zt. genau über dem mittleren Gerüst befindet. Durch Verfahren des Segmenteinsatzwagens (11) können auch die beiden äußeren Gerüste nacheinander in die Wechselposition gebracht werden.It can also be seen that the hole ( 44 ) in the floor ceiling in the right exchange position z. At the moment it is located exactly above the middle frame. By moving the segment wagon ( 11 ), the two outer frameworks can be successively brought into the interchangeable position.

Das betrifft beide Wechselpositionen links und rechts (34, 35).This applies to both change positions left and right ( 34 . 35 ).

Außerdem ist gut zu erkennen, dass in Ebene III das Grundsegment (10) so in eine horizontale Stellung geschwenkt werden kann, dass der Abtransport des Segmenteinsatzwagens (11) über dem Rückbiegetreiber möglich ist.In addition, it is easy to see that in level III the basic segment ( 10 ) can be pivoted so in a horizontal position that the removal of the segment wagon ( 11 ) is possible over the backbend driver.

In Bild 11 ist der Wechsel der Segmenteinsätze noch einmal in einem Schema dargestellt.Figure 11 shows the change of segment inserts once again in a diagram.

Es wird klar, dass die Gerüste abwechselnd einmal in der rechten Stellung, dann einmal in der linken Stellung gewechselt werden.It becomes clear that the scaffolds are changed alternately once in the right position, then once in the left position.

Dargestellt ist immer beispielhaft ein Segmenteinsatz mit 3 Gerüsten.Shown is always an example of a segment insert with 3 stands.

Zum Wechsel der Segmenteinsätze wird aus den Wartenpositionen (56, 57) gestartet.To change the segment inserts, the wait positions ( 56 . 57 ) started.

Bild 12 zeigt in einer Draufsicht, mit welchen Maschinen die ausgebauten Gerüste transportiert werden, und zwar aus den verschiedenen Ebenen I, II und III hin zur Ebene Null (0), durch Vertikaltransport, und innerhalb der Ebene Null (0) mit waagerechtem Transport. Figure 12 shows in a plan view, with which machines the dismantled scaffolds are transported, from the various planes I, II and III to the plane zero (0), by vertical transport, and within the plane zero (0) with horizontal transport.

Für den Vertikaltransport wird eine 180-Grad-Drehvorrichtung (37) benutzt, die quer verfahrbar ist und so auf jede Ader eingestellt werden kann. – Zum Horizontaltransport der Gerüste verwendet man Transportwagen (39), die ebenfalls verfahrbar sind und die verschiedene Adern der Gießanlage erreichen können.For vertical transport, a 180 degree rotating device ( 37 ) used, which is transversely movable and can be adjusted to each vein. - For horizontal transport of scaffolding one uses transport trolleys ( 39 ), which are also movable and can reach the various veins of the casting plant.

In Bild 13 ist die 180-Grad-Drehvorrichtung (44) in einem Vertikalschnitt durch die Anlage dargestellt. Der linke Arm holt mit seinen Hebezeugen nacheinander Gerüste aus den Ebenen I, II und III nach oben.Picture 13 shows the 180 degree turning device ( 44 ) is shown in a vertical section through the system. The left arm with its hoists one after the other brings scaffolds from the levels I, II and III upwards.

Dann schwenkt die Drehvorrichtung um 180 Grad und lässt das gepackte alte Gerüst in einen Transportwagen auf Ebene Null hinab.Then the turntable pivots 180 degrees and drops the packed old scaffold into a zero-level dolly.

Das Greifen eines neuen Gerüstes mit dem rechten Arm und der Rücktransport auf die Segmenteinsatzwagen erfolgen sinngemäß, nur umgekehrt. Eine Automatisierung der beschriebenen Operationen ist gut möglich.The gripping of a new scaffolding with the right arm and the return transport to the segment insert wagons take place analogously, only vice versa. Automation of the described operations is well possible.

Bild 14 zeigt in einer verkleinerten Ausführung noch einmal einen Vertikalschnitt durch die Anlage, dieses Mal so, dass die beiden Wechselplätze (34, 35) links und rechts der Gießlinie dargestellt werden. Außerdem erkennt man, dass der Rückbiegetreiber in einer untersten Ebene angeordnet ist.Figure 14 shows in a reduced version again a vertical section through the system, this time so that the two changing places ( 34 . 35 ) to the left and right of the pouring line. In addition, it can be seen that the backbend driver is located at a lowest level.

In Bild 15 wird eine Draufsicht mit den wichtigen Maschinen in der Ebene Null gezeigt. Dabei ist auch der Tundishwagen (48) dargestellt. Man erkennt, dass sein Gleis (49) nicht mit den Verfahrwegen der Drehvorrichtungen kollidiert.Figure 15 shows a plan view with the important machines in the plane zero. This is also the Tundishwagen ( 48 ). It can be seen that its track ( 49 ) does not collide with the travel paths of the rotary devices.

Als Endpunkte für die Transportwagen (39) gibt es 2 Parkplätze (50) für die Gerüste. Von dort können die Gerüste per Hallenkran zur Reparaturwerkstatt gebracht werden.As endpoints for the trolleys ( 39 ) there are 2 parking spaces ( 50 ) for the scaffolding. From there, the scaffolding can be brought to the repair workshop by hall crane.

Kurzfassung (Bild 11)Short version (picture 11)

Im Schema ist das Prinzip des Segmenteinsatzwechsels mit einfachen Symbolen dargestellt. Es wird vorgeschlagen, motorisch schwenkbare Segmente zu verwenden. Jedes Segment soll aus Grundsegment und Segmenteinsatz bestehen. Der Segmenteinsatz (11) ist im Grundsegment (10) zentriert und geklemmt und kann bei gelöster Klemmung mit seinen Rädern auf einer waagerechten Führung aus dem Grundsegment herausgefahren werden zu 2 Wechselplätzen auf jeder Ebene, von denen einer links und ein zweiter rechts angeordnet ist. Dort werden die Gerüste des Segmenteinsatzes gewechselt und mit Hilfe einer 180-Grad-Drehvorrichtung (37) in Ebene Null nach oben transportiert. In Ebene Null werden die Gerüste mit einem Transportwagen zu einem Parkplatz (50) gebracht. Von dort können sie per Hallenkran zur Reparaturwerkstatt transportiert werden.In the diagram, the principle of segment replacement is shown with simple symbols. It is proposed to use motorized pivoting segments. Each segment should consist of a basic segment and segment usage. The segment insert ( 11 ) is in the basic segment ( 10 ) centered and clamped and can be moved out of the basic segment with its wheels on a horizontal guide with loosened clamping to 2 changing places on each level, one of which is located on the left and a second on the right. There, the frames of the segment insert are changed and with the help of a 180-degree turning device ( 37 ) is transported up in level zero. At level zero, the scaffolding is transported to a parking lot by a trolley ( 50 ) brought. From there, they can be transported to the repair workshop by hall crane.

Die aufgearbeiteten Gerüste (mit fliegender oder beidseitiger Lagerung) werden auf umgekehrtem Weg wieder zum Segmenteinsatz gebracht und dort manuell montiert. Später wird der neu aufbereitete Segmenteinsatz wieder ins Grundsegment gebracht.The reconditioned scaffoldings (with flying or double-sided storage) are brought back to the segment use in the opposite way and assembled there manually. Later, the newly prepared segment segment will be returned to the basic segment.

Für die manuellen Montageoperationen zum Wechseln der Gerüste steht genügend Zeit zur Verfügung. Der Tausch der zwei Segmenteinsätze ist automatisiert und kann in kurzer Zeit vorgenommen werden. Es gibt 2 Segmenteinsätze pro Segment, die wahlweise zum Gießeinsatz kommen.Enough time is available for manual assembly operations to change scaffolding. The exchange of the two segment inserts is automated and can be done in a short time. There are 2 segment inserts per segment, which can be used for casting.

Außerdem werden mehrere vorteilhafte Strangführungen für das Gießen von Quadrat und Rund beschrieben, die mit fliegend gelagerten Rollen arbeiten.In addition, several advantageous strand guides for the casting of square and round are described, working with cantilevered rollers.

Bilder-VerzeichnisPictures directory

Bild 1: Seitenansicht Bogen-Stranggießanlage mit 3 Segmenten in GießstellungFig. 1: Side view Continuous arc casting plant with 3 segments in casting position

Bild 2: Seitenansicht mit 3 gekippten Segmenten in der WechselstellungFigure 2: Side view with 3 tilted segments in the change position

Bild 3: Grundsegment und SegmenteinsatzFig. 3: Basic segment and segment insert

Bild 4A: Klemmung Segmenteinsatz im Grundsegment Figure 4A: Clamping segment insert in the base segment

Bild 4B: Lagepositionierung Segmenteinsatz im GrundsegmentFig. 4B: Position positioning Segment insert in the basic segment

Bild 5: Führung Quadrat KleinImage 5: Leadership square Klein

Bild 6: Führung Quadrat GroßPicture 6: Leadership Square Great

Bild 7: Verstellführung für QuadratFigure 7: Adjustment guide for square

Bild 8: Segmenteinsatz mit 3 GerüstenFigure 8: Segment insert with 3 stands

Bild 9: 3-Rollen-Design für Rund-QuerschnitteFigure 9: 3-roller design for round cross sections

Bild 10: Vertikalschnitt Gießanlage mit Wechselplatz links und rechtsFigure 10: Vertical section Casting plant with changing place left and right

Bild 11: Schema Segmenteinsatz-WechselFigure 11: Scheme of segment insert change

Bild 12: Draufsicht 4-adrige GießanlageFigure 12: Top view of a 4-core casting plant

Bild 13: Schnitt Gießanlage mit 1 Drehvorrichtung und Transportwagen für GerüstPicture 13: Cut casting machine with 1 turning device and trolley for scaffolding

Bild 14: Schnitt Gießanlage mit 2 DrehvorrichtungenPicture 14: Cut casting machine with 2 turning devices

Bild 15: Draufsicht 6-adrige Gießanlage mit verfahrbarem Tundishwagen mit 2 Drehvorrichtungen Bezugsziffern-Verzeichnis

Figure 00140001
Figure 00150001
Figure 00160001
Fig. 15: Top view of a 6-core caster with movable tundish cart with 2 rotating devices Reference numeral directory
Figure 00140001
Figure 00150001
Figure 00160001

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • DE 102010035723 [0016] DE 102010035723 [0016]
  • DE 102010045223 [0016] DE 102010045223 [0016]

Claims (9)

Verfahren und Vorrichtung für das Stahlstranggießen von Rund- und Vierkant-Querschnitten mit oszillierender Senkrechtkokille und nachfolgender Sekundärkühlung bzw. Strangführung in Form einer Kreisbogen- oder Ovalbogen-Anlage, bestehend aus verschiedenen (hier 3) Segmenten mit je 3 Stützstellen (Gerüsten) pro Segment im 3-Rollen-Design, dadurch gekennzeichnet, dass ein mechanisierter Segmenteinsatzwechsel mit kurzer Wechselzeit vorgeschlagen wird, der aus 6 Maßnahmen besteht, von denen die 1. Maßnahme nach Bild 3 darin besteht, dass jedes Segment aus Grundsegment und Segmenteinsatz besteht, die miteinander lösbar durch kraftbetätigte Klemmelemente verbunden sind, und von denen die 2. Maßnahme nach Bild 2 darin besteht, dass jedes Segment kraftbetätigt kippbar ist, wobei die Arbeitstellung beim Gießen geneigt ist und wobei die Wechselstellung eine horizontale Lage des Segmentes bedeutet, in welcher der mit Rädern versehene alte Segmenteinsatz (11) bei gelöster Klemmung in kurzer Zeit aus dem Grundsegment (10) herausgefahren werden und gegen einen Segmenteinsatz mit neuen Stützrollen ausgetauscht werden kann, und von denen die 3. Maßnahme nach Bild 10 darin besteht, dass für jedes Segment 2 Wechselplätze (34, 35) vorgesehen sind, an denen die Gerüste (12) aus dem Segmenteinsatz (11) gelöst und nach oben wegtransportiert werden, und wobei der erste (34) der 2 Wechselplätze sich links vom Grundsegment (10) befindet, und wobei der zweite Wechselplatz (35) rechts vom Grundsegment angeordnet ist, und wobei beide Segmenteinsätze durch eine Lok (17) oder durch Eigenantrieb vom ersten Wechselplatz (34) zum Grundsegment oder umgekehrt fahren können, wobei die Stoßstelle der Fahrbahnschienen durch eine versetzte Einzelradlagerung der Laufräder des S.-Einsatzwagens gemildert wird. von denen die 4. Maßnahme darin besteht, dass es nach Bild 10 und 11 zwei Segmenteinsätze (11) pro Segment gibt, einen alten in der Betriebsstellung zum Gießen und einen neuen in der Wartestellung (56, 57) und dass diese beiden Segmenteinsätze gleichzeitig in gleicher Richtung mit eigenem Antrieb verfahren werden, wobei nach dem Verfahren der neue Segmenteinsatz jetzt im Grundsegment sich befindet, während der alte Segmenteinsatz weiterfährt in eine Wechselposition, in der die alten Gerüste gegen neue Gerüste ausgetauscht werden, und dass der neue Segmenteinsatz im Grundsegment eine kraftbetätigte Lagepositionierung durch Festanschlag (58, 59) und Klemmhebel (60, 61) erfährt, bevor die kraftbetätigte Klemmung über einen hydraulischen Zentralzylinder (15) und 4 hydraulische Gewichtszylinder (14) aktiviert wird, und dass jetzt nur noch die Lok vom Segmenteinsatz gelöst und das Grundsegment in die Gießstellung geschwenkt werden muss, so dass dann das Gießen fortgesetzt werden kann, und von denen die 5. Maßnahme nach Bild 10, 12, 13, 14 darin besteht, dass der Austausch der Gerüste (12) an den Wechselplätzen (34, 35) in aller Ruhe manuell in gutem Abstand zur Gießlinie vorgenommen werden kann, wobei mit Hilfe von zwei 180-Grad-Drehvorrichtungen (37) mit Hebezeugen (46) an 2 Armen in Ebene Null und unter Benutzung verschiedener Löcher (41) in den Geschossdecken die aus dem Segmenteinsatz (11) gelösten alten Gerüste (12) nach oben per Hebezeug gefördert werden, von wo sie nach 180-Grad-Drehung der Drehvorrichtung (37) auf einem Transportwagen (39) in Ebene Null abgelegt werden, und wobei Drehvorrichtung und Transportwagen auf Führungsbahnen (38, 40) senkrecht zu den Gießadern bewegbar sind, so dass sie für alle Adern der Gießanlage nacheinander zu benutzen sind, und wobei die neuen, in der Werkstatt aufbereiteten Gerüste (12) auf dem umgekehrten Wege wie auf dem Hinweg zurücktransportiert werden zu dem jeweiligen Wechselplatz (34, 35), wo sie von Monteuren in den Segmenteinsätzen (11) ausgerichtet und befestigt werden, bevor der jetzt neu bestückte Segmenteinsatz in die Warteposition (56, 57) fährt und auf den nächsten Segmenteinsatzwechsel wartet, und von denen die 6. Maßnahme nach Bild 15 darin besteht, dass die Transportwagen (39) mit den Gerüsten (12) zu 2 Parkplätzen (50) gebracht werden, von denen die Gerüste auf den Hallenkran umgeladen und dann in die Reparaturwerkstatt gebracht werden, wo sie aufgearbeitet werden.Method and device for steel continuous casting of round and square cross-sections with oscillating vertical mold and subsequent secondary cooling or strand guidance in the form of a circular arc or oval arc plant, consisting of different (here 3) segments with 3 interpolation points (scaffolding) per segment in the 3-roller design, characterized in that a mechanized segment insert change is proposed with short change time, which consists of 6 measures, of which the first measure according to Figure 3 is that each segment consists of base segment and segment insert, the releasable by each other power-operated clamping elements are connected, and of which the 2nd measure according to Figure 2 is that each segment is power-tilted, the working position is inclined during casting and wherein the change position means a horizontal position of the segment in which the wheeled old Segment insert ( 11 ) with released clamping in a short time from the basic segment ( 10 ) and can be exchanged for a segment insert with new support rollers, and of which the third measure according to Figure 10 consists in that for each segment 2 change places ( 34 . 35 ), on which the scaffolds ( 12 ) from the segment application ( 11 ) and carried away upwards, and wherein the first ( 34 ) of the 2 change slots to the left of the basic segment ( 10 ), and wherein the second change location ( 35 ) is arranged to the right of the basic segment, and wherein both segment inserts by a locomotive ( 17 ) or by self-propelled from the first slot ( 34 ) to the base segment or vice versa, wherein the joint of the road rails is mitigated by a staggered Einzelradlagerung the wheels of the S.-Einsatzwagen. of which the fourth measure is that according to figures 10 and 11, two segment inserts ( 11 ) per segment, an old one in the operating position for casting and a new one in the waiting position ( 56 . 57 ) and that these two segment inserts are simultaneously moved in the same direction with their own drive, the method according to which the new segment insert is now in the base segment, while the old segment insert continues into a change position, in which the old frameworks are exchanged for new scaffolding, and that the new segment insert in the basic segment is a power-operated position positioning by fixed stop ( 58 . 59 ) and clamping levers ( 60 . 61 ) before the power-operated clamping via a hydraulic central cylinder ( 15 ) and 4 hydraulic weight cylinders ( 14 ) is activated, and that now only the locomotive must be released from the segment insert and the base segment must be pivoted to the casting position, so that then the casting can be continued, and of which the 5th measure according to Figure 10, 12, 13, 14 therein that the exchange of scaffolding ( 12 ) at the changing places ( 34 . 35 ) can be done manually at a good distance from the casting line, with the aid of two 180-degree rotating devices ( 37 ) with hoists ( 46 ) at 2 arms in level zero and using different holes ( 41 ) in the floor slabs from the segment insert ( 11 ) dissolved old scaffolds ( 12 ) are conveyed upwards by hoisting gear, from where, after 180-degree rotation of the rotary device ( 37 ) on a trolley ( 39 ) are placed in plane zero, and wherein turning device and transport carriage on guideways ( 38 . 40 ) are movable perpendicular to the Gießadern so that they are to be used for all wires of the casting plant in succession, and wherein the new, processed in the workshop scaffolding ( 12 ) are transported back in the opposite way as on the way to the respective change place ( 34 . 35 ), where they are used by fitters in the segment missions ( 11 ) and fastened before the newly refitted segment insert into the waiting position ( 56 . 57 ) and waiting for the next segment replacement, and the sixth measure according to Figure 15 is that the transport vehicles ( 39 ) with the scaffolding ( 12 ) to 2 parking spaces ( 50 ), from which the frameworks are reloaded onto the hall crane and then taken to the repair workshop, where they are reconditioned. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet, dass das beschriebene Verfahren sowohl für 3-Rollen-Gerüste zur Strangführung mit beidseitig gelagerten mittigen Stützrollen als auch für fliegend gelagerte Stützrollen zur Seitenführung des Strangs gelten soll.Continuous casting plant according to claim 1, characterized in that the described method is intended to apply both to 3-roller stands for strand guidance with both sides mounted central support rollers as well as cantilevered support rollers for lateral guidance of the strand. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet, dass bei Verwendung von Strangführungsrollen mit fliegender Lagerung Rollen aus Hartmetall eingesetzt werden für die Stützung von Rund- und Quadratquerschnitten. Continuous casting plant according to claim 1, characterized in that when using strand guide rollers with flying bearings rollers made of hard metal are used for the support of round and square sections. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet, dass das beschriebene Verfahren auch zum Schnellwechsel von Segmenten für Stranggießanlagen für große Rundquerschnittes, für Vorblockformate und für Vorformate für Profile gelten soll.Continuous casting plant according to claim 1, characterized in that the method described also applies to the quick change of segments for continuous casting for large round cross-section, for Vorblockformate and for preforms for profiles. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet, dass das beschriebene Verfahren mit modifizierter Mechanik auch zum Wechsel von fliegend gelagerten Stützrollen statt Gerüsten eines Segments dienen kann, der dann ebenfalls an den 2 Wechselplätzen durchgeführt wird, so dass dann nicht 3 Gerüste, sondern nacheinander 3 × 3 = 9 Stützrollen zur Nacharbeit in die Reparaturwerkstatt transportiert werden, die dann durch 9 aufbereitete Stützrollen aus der Reparaturwerkstatt mittels Monteurarbeit ersetzt werden.Continuous casting plant according to claim 1, characterized in that the described method with modified mechanics can also serve for the exchange of cantilevered support rollers instead of scaffolding of a segment, which is then also carried out at the 2 changing places, so that then not 3 scaffolding, but successively 3 × 3 = 9 support rollers are transported to the repair workshop for rework, which are then replaced by 9 prepared support rollers from the repair workshop by means of assembly work. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet (nach Bild 5 und 6), dass zur Führung eines Quadratquerschnitts eine 3-Rollenführung eingesetzt wird, wobei 2 seitliche Rollen unter 90 Grad mit fliegenden Stützscheiben verwendet werden, während die untere mittige Festrolle beidseitig gelagert ist, und wobei die fliegend gelagerten Stützscheiben (18) kalibriert sind, so dass sie das Quadrat auch seitlich führen können, und wobei der Wechsel von kleinem Quadrat zu großem Quadrat durch einige Wechselteile (23) mit den gleichen Rollengehäusen sehr einfach in der Reparaturwerkstatt durchgeführt werden kann, wobei der Segmenteinsatzwechsel in kurzer Zeit wie im Hauptanspruch beschrieben durchgeführt wird.Continuous casting plant according to claim 1, characterized in that (Figure 5 and 6) that a 3-roller guide is used to guide a square cross section, with 2 lateral rollers are used at 90 degrees with flying support discs, while the lower central fixed roller is mounted on both sides, and wherein the cantilevered support discs ( 18 ) are calibrated so that they can also lead the square laterally, and wherein the change from small square to large square by some removable parts ( 23 ) can be performed very easily in the repair shop with the same roller housings, the segment replacement is performed in a short time as described in the main claim. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet (nach Bild 7), dass zur Führung eines Quadratquerschnitts eine Verstellführung mit 2 balligen, fliegend gelagerten Stützrollen (25) und 1 beidseitig gelagerter Unterrolle (19) benutzt wird, wobei die Drehzahlreduzierung in den Rollengehäusen durch ein Harmonic-Drive-Getriebe (54) erzeugt wird, und wobei die beschriebene Mechanik auf einer Platte (20) montiert ist, die mit Schrauben oder Keilen (21) auf dem Segmenteinsatz befestigt ist, und wobei durch eine Schwingenführung für die 2 seitlichen Rollengehäuse die Strangführung bei Formatwechsel stufenlos über zwei Hydro-Zylinder eingestellt werden kann, und wobei zweimal pro Segment eine zusätzliche 4. Rolle zur Führung des Strangs auf der Losseite vorgesehen wird.Continuous casting plant according to claim 1, characterized (according to FIG. 7), that for guiding a square cross-section an adjustment guide with 2 convex, cantilevered support rollers (FIG. 25 ) and 1 on both sides mounted lower roll ( 19 ), whereby the speed reduction in the roller housings by a harmonic drive gear ( 54 ) is generated, and wherein the described mechanism on a plate ( 20 ) mounted with screws or wedges ( 21 ) is attached to the segment insert, and wherein by a swing guide for the 2 side roller housing, the strand guide can be adjusted in size change continuously over two hydro-cylinder, and wherein twice per segment an additional 4th role for guiding the strand is provided on the lot side , Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet (nach Bild 8), dass als Montagehilfe für das Wechseln der 2 seitlichen geneigten Gerüste (26) aus dem Segmenteinsatzwagen (11) an jeder Seite eine Vorrichtung mit 2 Gewindespindeln (29, 30) verwendet wird, wobei jede Gewindespindel in einer schwenkbaren Mutter gehalten wird, die in einem Gehäuse (28) gelagert ist, das am Segmenteinsatzwagen befestigt ist, und dass statt der Handbetätigung für die Gewindespindeln (29, 30) auch eine motorische Betätigung durch Hydraulikmotoren eingesetzt werden kann, die von fest verlegten Hydraulikleitungen über Schnellverschlusskupplungen an den 2 Wechselplätzen mit Energie versorgt werden können.Continuous casting plant according to claim 1, characterized (according to Figure 8), that as an assembly aid for changing the 2 side inclined scaffolds ( 26 ) from the segment insert car ( 11 ) on each side a device with 2 threaded spindles ( 29 . 30 ) is used, wherein each threaded spindle is held in a pivotable nut, which in a housing ( 28 ), which is attached to the segment insert car, and that instead of the manual operation for the threaded spindles ( 29 . 30 ) can also be a motorized operation by hydraulic motors can be used, which can be supplied by permanently installed hydraulic lines via quick-release couplings at the 2 changing places with energy. Stranggießanlage nach Anspruch 1, dadurch gekennzeichnet, dass man auch Anlagen mit größerem Gießbogenradius mit mehr als 3 Segmenten und 9 Gerüsten mit dem beschriebenen Segmentwechsel ausrüsten kann, indem man z. B. eine Anlage mit 4–6 Segmenten konzipiert, wobei in jedem Segment wieder 3 Gerüste zur Strangführung vorgesehen sind, so dass das Prinzip des schnellen Segmenteinsatzwechsels und die Manipulation der Gerüste an 2 Wechselplätzen erhalten bleibt.Continuous casting plant according to claim 1, characterized, that it is also possible to equip systems with a larger casting arc radius with more than 3 segments and 9 stands with the described segment change, by z. B. a system designed with 4-6 segments, wherein in each segment again 3 scaffolds are provided for strand guidance, so that the principle of rapid segment replacement and the manipulation of the scaffolding at 2 changing places is maintained.
DE201110120120 2011-12-03 2011-12-03 Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit Withdrawn DE102011120120A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE201110120120 DE102011120120A1 (en) 2011-12-03 2011-12-03 Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE201110120120 DE102011120120A1 (en) 2011-12-03 2011-12-03 Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit

Publications (1)

Publication Number Publication Date
DE102011120120A1 true DE102011120120A1 (en) 2013-06-06

Family

ID=48431343

Family Applications (1)

Application Number Title Priority Date Filing Date
DE201110120120 Withdrawn DE102011120120A1 (en) 2011-12-03 2011-12-03 Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit

Country Status (1)

Country Link
DE (1) DE102011120120A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013143845A3 (en) * 2012-03-29 2013-12-12 Siemens Vai Metals Technologies Gmbh Strand guiding element

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010035723A1 (en) 2010-08-28 2012-03-01 Dieter Figge Method and apparatus for steel continuous casting of square and circular cross-sections, comprises oscillating a vertical mold, and carrying out subsequent secondary cooling and strand guiding of the mold in the form of arc-shaped plant
DE102010045223A1 (en) 2010-09-13 2012-03-15 Dieter Figge Method and device for continuous steel casting of square- and circular cross-sections, comprises oscillating perpendicular permanent mold, secondary cooling and vent pipes in the form of modified arc system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102010035723A1 (en) 2010-08-28 2012-03-01 Dieter Figge Method and apparatus for steel continuous casting of square and circular cross-sections, comprises oscillating a vertical mold, and carrying out subsequent secondary cooling and strand guiding of the mold in the form of arc-shaped plant
DE102010045223A1 (en) 2010-09-13 2012-03-15 Dieter Figge Method and device for continuous steel casting of square- and circular cross-sections, comprises oscillating perpendicular permanent mold, secondary cooling and vent pipes in the form of modified arc system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013143845A3 (en) * 2012-03-29 2013-12-12 Siemens Vai Metals Technologies Gmbh Strand guiding element

Similar Documents

Publication Publication Date Title
EP1715967B1 (en) Method and device for exchanging sets of rolls in rolling frames of a rolling mill
DE1527659C3 (en) Stand changing device for continuous rolling mills
EP1572386B1 (en) Rolling mill comprising means for the change of rolls
DE102011120120A1 (en) Method for continuous casting square/round steel segment with oscillating mold, involves providing rotation device to transversely move trolley used for transporting scaffold on guide tracks which are arranged vertical to casting unit
DE202023100934U1 (en) Device for synchronous lifting and traversing for long rail replacement
DE102019006264A1 (en) Conveyor system for transporting objects in the body shop of the motor vehicle industry, method for transporting multi-axis robots and components and the use of a turntable and a magazine or holding station for robots in connection with such conveyor devices and control for carrying out such a method
EP0432532B2 (en) High performance bar or wire rolling mill
DE102011113171A1 (en) Apparatus, useful for continuous casting of steel by round- or square cross-sections, comprises segments with a roller guide and water cooling for a strand, where the segments are equipped with cantilever-housings in a swing execution
EP2563532B1 (en) Device for handling and/or transporting back-up rolls and/or work rolls of a roll stand, at least in pairs
DE3941374A1 (en) METHOD AND DEVICE FOR REPLACING THE ROLLS OF A ROLLING MILL
DE6932012U (en) ROLL CHANGER FOR ROLLER LEVELING MACHINES OR THE SAME
EP1005924A2 (en) Method and device for changing the rolls of rolling stands of different sizes
EP0394776B1 (en) Arc-type plant for continuously casting steel strands, with an oscillatory continuous casting mould
DE2200639A1 (en) Infeed guide device for a rolling mill
DE2817635C2 (en)
DE3601258C2 (en)
DE3838556C2 (en) Device for the replacement of a universal rolling stand in a universal tandem mill of a section steel rolling mill
DE3507528C2 (en)
DE1602115B2 (en) ROLLER FRAMEWORK WITH DEVICE FOR SWASHING ROLLERS
DE4428611A1 (en) Thermal cutting of metallic workpieces
DE102017220340A1 (en) Apparatus and method for replacing a segment of a continuous casting plant
DE2533056C3 (en)
DE1261469B (en) Method and device for changing the vertical rolls of universal rolling mills with their chocks
DE1602084C3 (en) Arrangement for installing and removing work rolls in or out of the rolling stands of a rolling mill
DE3713008A1 (en) Dismantling aid

Legal Events

Date Code Title Description
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20140701