DE102009040940A1 - Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction - Google Patents

Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction Download PDF

Info

Publication number
DE102009040940A1
DE102009040940A1 DE200910040940 DE102009040940A DE102009040940A1 DE 102009040940 A1 DE102009040940 A1 DE 102009040940A1 DE 200910040940 DE200910040940 DE 200910040940 DE 102009040940 A DE102009040940 A DE 102009040940A DE 102009040940 A1 DE102009040940 A1 DE 102009040940A1
Authority
DE
Germany
Prior art keywords
conveyor
conveyor belt
continuous conveyor
segments
continuous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE200910040940
Other languages
German (de)
Inventor
Fabian Schulze
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RWE Power AG
Original Assignee
RWE Power AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RWE Power AG filed Critical RWE Power AG
Priority to DE200910040940 priority Critical patent/DE102009040940A1/en
Publication of DE102009040940A1 publication Critical patent/DE102009040940A1/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G47/00Article or material-handling devices associated with conveyors; Methods employing such devices
    • B65G47/74Feeding, transfer, or discharging devices of particular kinds or types
    • B65G47/94Devices for flexing or tilting travelling structures; Throw-off carriages
    • B65G47/945Devices for flexing or tilting travelling structures; Throw-off carriages tilting endless surfaces, e.g. belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G21/00Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors
    • B65G21/02Supporting or protective framework or housings for endless load-carriers or traction elements of belt or chain conveyors consisting essentially of struts, ties, or like structural elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G39/00Rollers, e.g. drive rollers, or arrangements thereof incorporated in roller-ways or other types of mechanical conveyors 
    • B65G39/10Arrangements of rollers
    • B65G39/20Arrangements of rollers attached to moving belts or chains

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Structure Of Belt Conveyors (AREA)

Abstract

The continuous conveyor (1) has an endless circumferential conveyor belt (2) whose each end side of the conveyor path is deflected and forms an upper run and a lower run. The conveyor belt has multiple supports extending transverse to conveyor direction. Rollers (10) are mounted at the ends of the supports. The supporting structure has frame segments (6) which are supported by a sliding base opposite to the ground. A unit for attaching a mobile rear device is provided at the frame segments.

Description

Die Erfindung betrifft einen Stetigförderer mit wenigstens einem endlos umlaufenden Förderband, welches jeweils endseitig des Förderweges umgelenkt ist und ein Obertrum sowie ein Untertrum bildet, wobei das Förderband eine Vielzahl sich quer zur Förderrichtung erstreckende Träger aufweist, an deren Ende jeweils Laufrollen gelagert sind, die auf Trageinrichtungen abrollen, wobei die Trageinrichtungen Führungssegmente umfassen, die zumindest teilweise von einer Tragkonstruktion aufgenommen werden.The invention relates to a continuous conveyor with at least one endless circulating conveyor belt, which is deflected at each end of the conveying path and forms an upper strand and a lower strand, wherein the conveyor belt has a plurality of transversely to the conveying direction extending carrier, at the end of each rollers are mounted on the Rolling support means, wherein the support means comprise guide segments, which are at least partially received by a supporting structure.

Ein solcher Stetigförderer ist beispielsweise aus der EP 0 949 163 A1 bekannt.Such a continuous conveyor is for example from the EP 0 949 163 A1 known.

Im Gegensatz zu Stetigförderern mit einem umlaufenden, gemuldeten Fördergurt bzw. Förderband, welcher von Gurtrollen unterfasst wird, ist der Fördergurt des zuvor beschriebenen Stetigförderers über die sich quer zum Fördergurt erstreckenden Träger und an deren Enden jeweils vorgesehenen Laufrollen auf der Trageinrichtung abgestützt, sodass der Fördergurt keine Walkarbeit auf den diesen unterstützenden Gurtrollen verrichtet. Hierdurch verringern sich insbesondere die spezifischen Bewegungswiderstände des Fördergurtes bzw. Förderbandes erheblich, was sich positiv im Hinblick auf Verschleiß und im Hinblick auf elektrische Leistungsaufnahme der Gurtbandförderanlage auswirkt.In contrast to continuous conveyors with a circumferential, gebuldeten conveyor belt or conveyor belt, which is underlined by belt rollers, the conveyor belt of the above-described continuous conveyor is supported on the transverse to the conveyor belt extending support and at the ends of each provided rollers on the support means, so that the conveyor belt no flexing work performed on these supporting belt rollers. As a result, in particular, the specific resistance to movement of the conveyor belt or conveyor belt reduce significantly, which has a positive effect in terms of wear and in terms of electrical power consumption of the belt conveyor.

Eine anderer gattungsgemäßer Stetigförderer ist beispielsweise auch aus der DE 1 925 673 A bekannt.Another generic continuous conveyor is, for example, from the DE 1 925 673 A known.

Die bekannten Stetigförderer sind konstruktiv für die Überbrückung kleinerer bis mittlerer Entfernungen ausgelegt und erfordern im Falle der aus der EP 0 949 163 A1 bekannten Anlage stationäre Abspanneinrichtungen, insbesondere wenn größere Entfernungen mittels Tragseilen überbrückt werden sollen. Diese müssen in Praxis über mit Fundamenten versehene Abspannmasten gespannt werden, da die Tragseile die gesamte Last des Förderbandes zuzüglich Träger, Laufrollen und Schüttgut aufnehmen.The known continuous conveyors are designed for bridging smaller to medium distances and require in the case of the EP 0 949 163 A1 known system stationary guying equipment, especially when larger distances are to be bridged by means of supporting cables. These have to be stretched in practice over foundered guy masts, since the supporting cables take up the entire load of the conveyor belt plus beams, rollers and bulk material.

Für den Einsatz in Festgesteinstagebauen, Steine- und Erdenbetrieben sowie in industriellen Anlagen sind die zuvor erwähnten Stetigförderer eine Alternative zu einem von Gurtrollen unterfangenen, endlos umlaufenden Fördergurt.For use in hard stone mining, stone and earth operations as well as in industrial plants, the aforementioned continuous conveyors are an alternative to a belt reel undercuts endless belt conveyor.

Die Stetigförderer eignen sich insbesondere nicht für den Betrieb auf den Sohlen in Braunkohlentagebauen, bei welchen die Bandanlagen, beispielsweise die Strossenbänder, dem stetigen Abbaufortschritt folgen müssen. Hier wären etwa benötigte Streckenbauwerke und Abspannbauwerke hinderlich. In einem Tagebauschwenkbetrieb, wie er beispielsweise im rheinischen Braunkohlenrevier betrieben wird, wird eine mobile Bandstraße ca. 1 Mal pro Monat gerückt, d. h. um einen relativ kleinen Winkel um die Kopfstation gedreht. Da die mobilen Bandstraßen oft mehrere Kilometer überbrücken, kann der Bogen an der Heckstation der Bandanlage beim Rücken etwa 100 m betragen. Bei Entspannung des Fördergurtes ist diese Rückarbeit verhältnismäßig einfach mittels auf der Tagebausohle verfahrbaren Gerätschaften durchzuführen.In particular, the continuous conveyors are not suitable for operation on the soles in lignite opencast mines, in which the strip systems, for example the bump tapes, must follow the steady progress of the mining operation. Here would be obstructed about required track structures and anchoring structures. In a open-pit swiveling operation, such as operated in the Rhenish lignite mining area, a mobile conveyor belt is moved about 1 time per month, d. H. rotated by a relatively small angle around the headend. Since the mobile conveyor belts often span several kilometers, the bow at the rear station of the conveyor system at the back can be about 100 m. With relaxation of the conveyor belt, this back work is relatively easy to perform by means of movable on the pit floor equipment.

Insbesondere wegen der zuvor erwähnten Vorzüge des gattungsgemäßen Stetigförderers liegt der Erfindung die Aufgabe zugrunde, einen solchen Stetigförderer dahingehend zu verbessern, dass dieser auch für den mobilen Einsatz in modernen Großtagebauen mit dynamischer Abbauführung geeignet ist.In particular, because of the aforementioned advantages of the generic continuous conveyor, the invention has the object to improve such a continuous conveyor to the effect that this is also suitable for mobile use in modern large opencast mining with dynamic Abbauführung.

Die der Erfindung zugrundeliegende Aufgabe wird gelöst mit einem Stetigförderer mit wenigstens einem endlos umlaufenden Förderband, welches jeweils endseitig des Förderweges umgelenkt ist und ein Obertrum sowie ein Untertrum bildet, wobei das Förderband eine Vielzahl sich quer zur Förderrichtung erstreckende Träger aufweist, an deren Enden jeweils Laufrollen gelagert sind, die auf Trageinrichtungen abrollen, wobei die Trageinrichtungen Führungssegmente umfassen, die zumindest teilweise von einer Tragkonstruktion aufgenommen werden, wobei sich der Stetigförderer gemäß der Erfindung dadurch auszeichnet, dass die Tragkonstruktion Gerüstsegmente umfasst, die jeweils über wenigstens eine Gleitunterlage gegen den Untergrund abgestützt sind und dass an den Gerüstsegmenten Mittel zum Anschlagen einer vorzugsweise mobilen Rückeinrichtung vorgesehen sind.The object underlying the invention is achieved with a continuous conveyor with at least one endless circulating conveyor belt, which is deflected at each end of the conveying path and forms an upper strand and a lower strand, wherein the conveyor belt has a plurality extending transversely to the conveying direction carrier at the ends of each rollers are stored, which roll on support means, wherein the support means comprise guide segments, which are at least partially received by a support structure, wherein the continuous conveyor according to the invention is characterized in that the support structure comprises scaffolding segments, which are each supported via at least one slide pad against the ground and in that means are provided on the framework segments for striking a preferably mobile return device.

Unter Führungssegmenten im Sinne der Erfindung sind Elemente zu verstehend, auf denen die Laufrollen so abrollen können, dass die Träger und mit diesen das Förderband geführt sind. Als Führungssegmente können sowohl Schienen bzw. Schienenprofile als auch verlegte und/oder gespannte Seile vorgesehen sein.Under guide segments in the context of the invention elements to be understood, on which the rollers can roll so that the carrier and are guided with these the conveyor belt. As guide segments both rails or rail profiles as well as laid and / or tensioned cables can be provided.

Die Erfindung lässt sich dahingehend zusammenfassen, dass auf eine durchgehende und/oder hängende Seilkonstruktion, die besondere Abspannmaßnahmen erfordern würde, verzichtet wird. Anstelle dessen ist eine Vielzahl von Gerüstsegmenten vorgesehen, wobei der Abstand zwischen den Gerüstsegmenten so klein ist, dass ein Durchhängen etwa erforderlicher Abspann- und/oder Verbindungsseile zwischen den Gerüstsegmenten nicht relevant ist. Eine Verankerung bzw. Abspannung des Stetigförderers gegen den Untergrund ist erfindungsgemäß nur im Bereich von Umlenkstationen des Stetigförderers erforderlich, insbesondere auch deshalb weil dort die für den Umlauf des Förderbandes erforderlichen Zugkräfte in das Förderband eingeleitet werden. Damit wird allerdings nicht ausgeschlossen, dass je nach Länge und Konfiguration des Stetigförderers vorgesehen ist, das eine oder andere Gerüstsegment zwischen einer Kopf- und Heckstation gegen den Untergrund zu verspannen.The invention can be summarized to the effect that is dispensed with a continuous and / or hanging rope construction, which would require special bracing measures. Instead, a plurality of scaffold segments is provided, wherein the distance between the scaffold segments is so small that a sagging about necessary bracing and / or connecting cables between the scaffold segments is not relevant. Anchoring or bracing the continuous conveyor against the ground is according to the invention only in the range of deflection of the continuous conveyor required, in particular also because there the necessary for the circulation of the conveyor belt Tensile forces are introduced into the conveyor belt. However, this does not exclude that, depending on the length and configuration of the continuous conveyor, it is intended to brace one or other scaffolding segment between a head and tail station against the ground.

Das Förderband kann beispielsweise als ein an und für sich bekanntes Wellkantenförderband ausgebildet sein, welches längsseitig jeweils durchgehende Wellkanten aufweist, die zusammen mit den sich quer zur Förderrichtung erstreckenden Trägern jeweils Fächer zur Aufnahme des Fördergutes bilden.The conveyor belt may be formed, for example, as a known per se Wellkantenförderband which longitudinally each having continuous corrugated edges, which together with the transverse to the conveying direction extending carriers each form compartments for receiving the conveyed material.

Bei einer vorteilhaften Ausgestaltung des Stetigförderers können als Gleitunterlage Gleitkufen vorgesehen sein.In an advantageous embodiment of the continuous conveyor can be provided as sliding pad skids.

Als Gleitunterlage kann beispielsweise ein Ponton-Sockel vorgesehen sein, auf dem die Gerüstsegmente jeweils aufgestellt sind. Dieser Ponton-Sockel kann in Form einer Wanne oder eines Hohlkörpers ausgebildet sein.As a sliding pad, for example, a pontoon base may be provided, on which the scaffolding segments are respectively placed. This pontoon base may be in the form of a tub or a hollow body.

Vorzugsweise ist als Mittel zum Anschlagen der Rückeinrichtung wenigstens ein Rückschienenprofil vorgesehen, welches sich vorzugsweise durchgängig über etwa die gesamte Länge des Förderweges an wenigstens einer Seite des Stetigförderers erstreckt. Ein solches Rückschienenprofil kann beispielsweise zur Führung eines komplementär zu dem Rückschienenprofil ausgebildeten Gleitschuhs oder Rollenschuhs vorgesehen sein, der an einem auf Raupen und/oder Rädern verfahrbaren Fahrzeug an einem dort vorgesehenen Ausleger befestigt ist. Mittels des am Ausleger befestigten Gleitschuhs lässt sich die Gleitunterlage auf dem Tagebauplanum entlang ziehen, wobei bei dem Rückvorgang üblicherweise das hierfür vorgesehene Fahrzeug parallel und mit Abstand zum Stetigförderer verfährt.Preferably, at least one return rail profile is provided as a means for striking the return device, which preferably extends continuously over at least the entire length of the conveying path on at least one side of the continuous conveyor. Such a return rail profile can be provided, for example, for guiding a sliding shoe or roller shoe designed to be complementary to the return rail profile, which is fastened to a vehicle which can be moved on caterpillars and / or wheels to a boom provided there. By means of the sliding shoe attached to the boom, the sliding pad can be pulled along the opencast mine, wherein in the return operation usually the vehicle provided for this purpose moves in parallel and at a distance from the continuous conveyor.

Zweckmäßigerweise sind die Gerüstsegmente des Stetigförderers in Förderrichtung jeweils mit Abstand zueinander angeordnet. Diese können beispielsweise über sich in Förderrichtung erstreckende Tragseile miteinander verbunden sein, wobei die Tragseile sich nur jeweils zwischen zwei Gerüstsegmenten erstrecken.Conveniently, the framework segments of the continuous conveyor are arranged in the conveying direction in each case at a distance from each other. These can, for example, be connected to one another via carrying cables extending in the conveying direction, the carrying cables only extending between two frame segments in each case.

Alternativ können sich die Tragseile durchgängig über mehrere Gerüstsegmente erstrecken, wobei eine Abspannung gegebenenfalls nur zwischen jeweils benachbarten Gerüstsegmenten vorgesehen sein kann.Alternatively, the support cables may extend continuously over a plurality of scaffolding segments, wherein a bracing may optionally be provided only between adjacent scaffolding segments.

Bei einer bevorzugten Ausführungsform des Stetigförderers gemäß der Erfindung ist vorgesehen, dass zumindest einige der Gerüstsegmente, zumindest diejenigen vor Kopf des Stetigförderers, mittels Abspanneinrichtungen gegen den Untergrund verspannt sind.In a preferred embodiment of the continuous conveyor according to the invention, it is provided that at least some of the frame segments, at least those in front of the head conveyor, are braced against the ground by means of bracing devices.

Bei einer besonders bevorzugten Ausführungsform der Erfindung ist vorgesehen, dass als Trageinrichtungen auf den Gerüstsegmenten Laufschienen vorgesehen sind, wobei die Laufschienen benachbarter Gerüstsegmente mittels Tragseilen verbunden sind. Damit die Laufrollen an den Trägern mit den Laufschienen und den Tragseilen zusammenwirken können, können diese jeweils mit einer zylindrischen Lauffläche mit Spurkranz sowie mit einer umlaufenden Laufrille versehen sein, deren Durchmesser dem Durchmesser des Tragseils angepasst ist.In a particularly preferred embodiment of the invention, provision is made for running rails to be provided on the framework segments as carrying means, the running rails of adjacent stand segments being connected by means of carrying cables. Thus, the rollers can interact on the carriers with the rails and the support cables, these can each be provided with a cylindrical tread with flange and with a circumferential groove whose diameter is adapted to the diameter of the support cable.

Bei einer bevorzugten Variante des Stetigförderers gemäß der Erfindung ist im Obertrum wenigstens eine Förderbandwendeeinrichtung vorgesehen, die beispielsweise als Materialabwurf auf der Strecke, d. h. zwischen Heck- und Kopfstation vorgesehen sein kann.In a preferred variant of the continuous conveyor according to the invention, at least one conveyor belt turning device is provided in the upper run, which, for example, as material discharge on the route, d. H. can be provided between the rear and head station.

Bei einer anderen bevorzugten Variante des Stetigförderers gemäß der Erfindung ist im Untertrum wenigstens eine Förderbandwendeeinrichtung vorgesehen, die dazu vorgesehen ist, das Förderband im Untertrum mit der Tragseite nach oben zu drehen, so dass auf der Strecke kein Restmaterial aus dem Förderband herausfallen kann. Dadurch wird insbesondere in vorteilhafter Art und Weise erreicht, dass sich unterhalb des Untertrums keine größeren Verschmutzungen ansammeln.In another preferred variant of the continuous conveyor according to the invention at least one Förderbandwendeeinrichtung is provided in the lower strand, which is intended to rotate the conveyor belt in the lower strand with the support side up so that no residual material can fall out of the conveyor belt on the route. This is achieved in particular in an advantageous manner that accumulate below the lower run no major pollution.

Darüber hinaus ist es auf diese Art und Weise möglich, einen Mehrtrommelantrieb zu realisieren. Der Stetigförderer kann im Untertrum mit einer oder mehreren zusätzlichen Antriebstrommeln versehen sein, die mit der dann nach unten gekehrten Laufseite des Förderbandes in Eingriff sind.In addition, it is possible in this way to realize a multi-drum drive. The continuous conveyor may be provided in the lower run with one or more additional drive drums, which are then engaged with the then turned down running side of the conveyor belt.

Die Erfindung wird nachstehend anhand eines in den Zeichnungen dargestellten Ausführungsbeispiels erläutert.The invention will be explained below with reference to an embodiment shown in the drawings.

Es zeigen:Show it:

1: eine schematische Draufsicht auf einen Stetigförderer gemäß der Erfindung, 1 FIG. 2 is a schematic plan view of a continuous conveyor according to the invention, FIG.

2: eine Draufsicht auf den in 1 dargestellten Stetigförderer während des Rückvorgangs, 2 : a top view of the in 1 shown continuous conveyor during the return process,

3: eine vergrößerte Detailansicht entsprechend dem Ausschnitt III in 1, 3 : an enlarged detail view corresponding to the section III in 1 .

4: eine Seitenansicht eines Abschnitts eines Stetigförderers gemäß der Erfindung, 4 FIG. 2: a side view of a section of a continuous conveyor according to the invention, FIG.

5: eine Schnittansicht entlang der Linien V-V in 4, 5 a sectional view along the lines VV in 4 .

6: eine Schnittansicht entlang der Linien VI-VI in 4, 6 A sectional view taken along lines VI-VI in FIG 4 .

7: eine schematische Ansicht einer Kopfstation des Stetigförderers gemäß der Erfindung, 7 FIG. 2 is a schematic view of a head-end station of the continuous conveyor according to the invention, FIG.

8: eine schematische Seitenansicht einer Förderbandwendeeinrichtung, die Teil des erfindungsgemäßen Stetigförderers ist und 8th a schematic side view of a conveyor belt turning device, which is part of the continuous conveyor according to the invention and

9: einen Schnitt entlang der Linie IX-IX in 8 und 9 a section along the line IX-IX in 8th and

10: eine Schnittansicht entsprechend derjenigen in 8 in einem Bereich des Stetigförderers mit gewendetem Untertrum. 10 a sectional view corresponding to that in FIG 8th in one area of the continuous conveyor with turned lower strand.

Der Stetigförderer 1 gemäß der Erfindung umfasst ein endlos umlaufendes Förderband 2, welches jeweils endseitig des Förderweges über Umlenktrommeln 3 umgelenkt und angetrieben ist. Bezogen auf die Förderrichtung des Förderbandes 2 wird ein Umlenkbereich als Kopfstation, der andere hingegen als Heckstation bezeichnet. Eine Kopfstation 4 des Stetigförderers 1 gemäß der Erfindung ist in 7 dargestellt. Über die im vorliegenden Fall angetriebene Umlenktrommel 3 der Kopfstation 4 wird die für die Bewegung des Förderbandes 2 erforderliche Zugkraft in das Förderband 2 eingeleitet.The continuous conveyor 1 According to the invention comprises an endless circulating conveyor belt 2 , Which each end of the conveying path over deflection drums 3 deflected and driven. Relative to the conveying direction of the conveyor belt 2 one deflection area is called the head station, while the other is called the rear station. A headend 4 of the continuous conveyor 1 according to the invention is in 7 shown. About the driven in this case tail pulley 3 the headend 4 will be responsible for the movement of the conveyor belt 2 required tensile force in the conveyor belt 2 initiated.

Das Förderband 2 bildet ein Obertrumm 5a und ein Untertrumm 5b und ist, wie nachstehend noch beschrieben, auf Trageinrichtungen abgestützt, die von einer Tragkonstruktion aufgenommen werden. Die Tragkonstruktion umfasst im vorliegenden Fall einzelne Gerüstsegmente 6, die jeweils als rahmenartige gegebenenfalls quer verstrebte Stahlbausegmente ausgebildet sind.The conveyor belt 2 makes a top run 5a and a bottom run 5b and is, as described below, supported on support means which are received by a supporting structure. The supporting structure in the present case comprises individual scaffolding segments 6 , which are each designed as a frame-like cross braced possibly steel structural segments.

Das Förderband 2 ist aus einem gummielastischen Material mit in diesem eingebetteten Zugträgern in Form von Stahlseilen ausgebildet und an den Längsrändern 7 mit einer sogenannten Wellkante 8 eingefasst. Bei der Wellkante 8 handelt es sich um eine in Zugrichtung des Förderbandes 2 elastische Einfassung, die sich etwa im rechten Winkel zur Erstreckungsebene des Förderbandes 2 erstreckt und mit dem Förderband 2 einen Füllquerschnitt definiert.The conveyor belt 2 is made of a rubber-elastic material with embedded in this tensile carriers in the form of steel cables and at the longitudinal edges 7 with a so-called corrugated edge 8th edged. At the corrugated edge 8th it is a in the pulling direction of the conveyor belt 2 elastic edging, which is approximately at right angles to the plane of extension of the conveyor belt 2 extends and with the conveyor belt 2 defines a filling cross section.

Anders, als bei herkömmlichen Gurtbandförderanlagen, ist das Förderband 2 nicht gemuldet, so dass die Wellkante 8 das Herabfallen von Schüttgut von dem Förderband 2 verhindert und gleichzeitig den Füllquerschnitt des Förderbandes 2 definiert.Unlike conventional belt conveyors, the conveyor belt is different 2 not tolerated, so the corrugated edge 8th the falling of bulk material from the conveyor belt 2 prevents and at the same time the filling cross section of the conveyor belt 2 Are defined.

Die Wellkante 8 besteht aus einzelnen gummielastischen Rohrsegmenten, die an ihrem Umfang linienförmig miteinander verbunden sind und deren Querschnitt auf das gummielastische Förderband aufvulkanisiert ist, derart, dass die Wellkante 8 hinreichend flexibel ist, um einen Umlauf um eine Umlenktrommel 3 mitzumachen.The corrugated edge 8th consists of individual rubber-elastic pipe segments, which are connected at their periphery linearly with each other and whose cross-section is vulcanized onto the rubber-elastic conveyor belt, such that the corrugated edge 8th is sufficiently flexible to circulate around a tail pulley 3 participate.

Das Förderband 2 ist in Längsrichtung mit im Abstand voneinander vorgesehenen Trägern 9 versehen, an deren Enden jeweils Laufrollen 10 gelagert sind, die sich über Trageinrichtungen auf den Gerüstsegmenten 6 abstützen. Die Träger 8 sind zweckmäßigerweise auf der dem Schüttgut zugewandten Oberseite des Förderbandes 2 mit diesem verbunden, alternativ wäre denkbar, dass die Träger 9 in das Förderband 2 einvulkanisiert sind.The conveyor belt 2 is in the longitudinal direction with spaced supports 9 provided at the ends of each rollers 10 are stored, which are supported on the framework segments 6 support. The carriers 8th are expediently on the bulk material facing the top of the conveyor belt 2 connected with this, alternatively it would be conceivable that the carrier 9 in the conveyor belt 2 vulcanized.

Die Laufrollen stützen sich wiederum auf Laufschienen 11 ab, und zwar sowohl im Obertrumm 5a, als auch im Untertrum 5b.The rollers are in turn supported on rails 11 off, both in the upper run 5a , as well as in the bottom strand 5b ,

Die Laufschienen 11 erstrecken sich jeweils nur innerhalb eines Gerüstsegments 6, und zwar auf dort vorgesehenen Querstreben 12, die sich zwischen Stützprofilen 13 der Gerüstsegmente 6 erstrecken.The rails 11 each extend only within a framework segment 6 , and on there provided cross struts 12 extending between support profiles 13 the scaffolding segments 6 extend.

Bei dem beschriebenen Ausführungsbeispiel ist vorgesehen, dass jedes der Gerüstsegmente 6 sowohl im Obertrumm 5a als auch im Untertrumm 5b über Tragseil 14 miteinander verbunden sind.In the described embodiment, it is provided that each of the frame segments 6 both in the upper run 5a as well as in the bottom strand 5b over carrying rope 14 connected to each other.

Wie dies insbesondere in den 1 bis 3 zu entnehmen ist, sind die Gerüstsegmente 6 jeweils mit Abstand zueinander angeordnet, der dazwischen entstehende Freiraum 15 wird mittels der Tragseile 14 überbrückt. Diese segmentweise Ausbildung des Stetigförderers 1 und die flexible Verbindung der Gerüstsegmente 6 untereinander mittels Tragseilen 14 ermöglicht eine in 2 andeutungsweise dargestellte Rückbewegung des Stetigförderers 1, wie dies nachstehend im Einzelnen noch beschrieben wird.As this particular in the 1 to 3 it can be seen, are the framework segments 6 each spaced from each other, the space created between them 15 is by means of the suspension cables 14 bridged. This segmental design of the continuous conveyor 1 and the flexible connection of the framework segments 6 with each other by means of suspension cables 14 allows an in 2 hinted return movement of the continuous conveyor 1 , as will be described in detail below.

Die Tragseile erstrecken sich im Wesentlichen parallel zu den Laufschienen 11 und sind idealerweise um eine Spurweite versetzt zu den Laufschienen 11 angeordnet.The support cables extend substantially parallel to the rails 11 and are ideally offset by a track width to the rails 11 arranged.

Mittel zum Spannen der Tragseile 14 sind bei dem beschriebenen Ausführungsbeispiel nicht vorgesehen, da das Verhältnis der Länge der einzelnen Gerüstsegmente 6 zur lichten Weite des Freiraums 15 bzw. zur Länge der Tragseile 14 so günstig ist, dass es nicht erforderlich ist, die Tragseile 14 zu spannen. Sollte ein größerer Abstand überbrückt werden müssen, ist es zweckmäßig, auf den Gerüstsegmenten 6 jeweils Spanneinrichtungen für die Tragseile 14 vorzusehen.Means for tensioning the suspension cables 14 are not provided in the described embodiment, since the ratio of the length of the individual scaffolding segments 6 to the clear width of the open space 15 or to the length of the suspension cables 14 so cheap is that it does not require the suspension ropes 14 to stretch. If a larger distance must be bridged, it is useful on the scaffolding segments 6 each clamping devices for the suspension cables 14 provided.

Alternativ können die Tragseile 14 sich auch durchgängig über die gesamte Länge des Stetigförderers 1 erstrecken. Alternatively, the suspension cables 14 also throughout the entire length of the continuous conveyor 1 extend.

Die Laufrolle 10, die endseitig der Träger 9 vorgesehen sind, sind jeweils mit einer konkaven Laufrille 16 und einer daneben angeordneten zylindrischen Lauffläche 17 versehen, wobei eine Wange der Laufrille 16 auch als Spurkranz für die zylindrische Lauffläche 17 dienen kann.The roller 10 , the end of the carrier 9 are provided, each with a concave groove 16 and a cylindrical tread disposed adjacent thereto 17 provided with a cheek of the track groove 16 also as wheel flange for the cylindrical tread 17 can serve.

Wie dies ohne Weiteres vorstellbar ist, stützt sich so ein Träger 9 des sich bewegenden Förderbandes 2 abwechselnd über die Laufrollen 10 auf den Laufschienen 11 sowie auf den Tragseilen 14 ab.As can easily be imagined, such a carrier is supported 9 of the moving conveyor belt 2 alternately over the rollers 10 on the rails 11 as well as on the suspension ropes 14 from.

Jeweils zwei Stützprofile 13 eines Gerüstsegments 6 stützten sich auf einer Gleitkufe 18 ab, die das Gewicht des Stetigförderers 1 auf die Sohle 19 des Tagebaus überträgt. Anstelle der Gleitkufen 18 (insgesamt vier je Gerüstsegment) können auch als Gleitunterlage jeweils durchgehende Pontons oder Wannen vorgesehen sein.Two support profiles each 13 a scaffolding segment 6 leaning on a skid 18 off, which is the weight of the continuous conveyor 1 on the sole 19 of the opencast mine. Instead of the skids 18 (Four in total per scaffolding segment) may also be provided as a sliding pad each continuous pontoons or trays.

An wenigstens einer Längsseite des Stetigförderers 1 ist an den Gleitkufen 18 als Mittel zum Anschlagen einer mobilen Rückeinrichtung ein Rückschienenprofil 23 vorgesehen, welches mit einem komplementär ausgebildeten Gleitschuh einer mobilen Rückeinrichtung in Form eines Krans mit Ausleger zusammenwirken kann. Das Rückschienenprofil 23 erstreckt sich durchgängig über die gesamte Länge des Stetigförderers, sodass ein kontinuierliches Rücken der Einrichtung möglich ist.On at least one longitudinal side of the continuous conveyor 1 is on the skids 18 as a means for striking a mobile rear device a back rail profile 23 provided, which can interact with a complementarily shaped shoe of a mobile rear device in the form of a crane with boom. The back rail profile 23 extends consistently over the entire length of the continuous conveyor, so that a continuous back of the device is possible.

In 8 ist ein Teil des Stetigförderers 1 in Form eines einzigen Gerüstsegments als Förderbandwendeeinrichtung 20 ausgebildet. Innerhalb des in 8 dargestellten Gerüstsegments sind die Laufschienen 11 als Kurvensegmente 21 ausgebildet, die, wie dies in 9 dargestellt ist, ein Kippen des Förderbandes 2 um die durch die Förderrichtung definierte Längsachse bewirken. Der Winkel, um welchen das Förderband 2 im vorliegenden Falle gewendet bzw. gekippt wird, beträgt hier etwa zwischen 60° und 70°. Die Förderbandwendeeinrichtung 20 ist an einer Stelle des Förderweges angeordnet, wo ein Materialabwurf auf der Strecke gewünscht ist, beispielsweise auf ein quer zu dem hier beschriebenen Stetigförderer 1 verlaufendes Fördermittel. Der Abwurf des Schüttguts erfolgt hierbei im Wesentlichen über die Rutsche 22.In 8th is part of the continuous conveyor 1 in the form of a single frame segment as a conveyor belt turning device 20 educated. Within the in 8th shown framework segments are the rails 11 as curve segments 21 trained, like this in 9 is shown, a tilting of the conveyor belt 2 to cause the longitudinal axis defined by the conveying direction. The angle around which the conveyor belt 2 is turned or tilted in the present case, here is approximately between 60 ° and 70 °. The conveyor belt turning device 20 is located at a location of the conveying path where a material discharge on the track is desired, for example, a transverse to the continuous conveyor described here 1 running subsidy. The discharge of the bulk material takes place here essentially via the chute 22 ,

Im Rahmen der erfindungsgemäßen Konstruktion ist es auch möglich, das Förderband im Obertrum 5a und/oder im Untertrum 5b um einen Winkel von 180° zu wenden, beispielsweise zu Reinigungszwecken oder um einen Mehrtrommelantrieb zu realisieren und um Verschmutzungen im Untertrum 5b zu vermeiden. In diesem Falle ist es erforderlich, die Laufrollen 10 an zwei diametral gegenüberliegenden Seiten zu führen.As part of the construction according to the invention, it is also possible, the conveyor belt in the upper strand 5a and / or in the lower strand 5b to turn through an angle of 180 °, for example, for cleaning purposes or to realize a multi-drum drive and dirt in the lower strand 5b to avoid. In this case it is necessary to use the rollers 10 to lead on two diametrically opposite sides.

10 zeigt eine Schnittansicht des Stetigförderers 1 auf der Strecke in Laufrichtung hinter einer Förderbandwendeeinrichtung 20 im Untertrum 5b. Aus Gründen der Einfachheit ist auf die Darstellung der Förderbandwendeeinrichtung 20 im Untertrum 5b verzichtet worden, wie zuvor anhand der Förderbandwendeeinrichtung 20 im Obertrum 5a ist es hierzu lediglich erforderlich, die Laufrollen 10 an zwei diametral gegenüberliegenden Seiten zu führen und diese in den betreffenden Bereichen wendelförmig parallel verlaufend auszubilden. Das im Untertrum 5b gewendete Förderband 2 ist mit seiner Tragfläche so angeordnet, dass sich die Wellkanten 8 auf der der Sohle 19 des Tagebaus abgekehrten Seite erstrecken. 10 shows a sectional view of the continuous conveyor 1 on the track in the running direction behind a conveyor belt turning device 20 in the lower strand 5b , For reasons of simplicity, reference is made to the illustration of the conveyor belt turning device 20 in the lower strand 5b has been omitted, as previously with reference to the conveyor belt turning device 20 in the upper run 5a it is only necessary, the rollers 10 To lead on two diametrically opposite sides and these form parallel helically in the respective areas. That in the bottom strand 5b turned conveyor belt 2 is arranged with its wing so that the corrugated edges 8th on the sole 19 of the open pit side.

BezugszeichenlisteLIST OF REFERENCE NUMBERS

11
StetigfördererContinuous conveyors
22
Förderbandconveyor belt
33
UmlenktrommelUmlenktrommel
44
Kopfstationheadend
5a5a
Obertrumobertrum
5b5b
Untertrumstrand
66
Gerüstsegmenterack segments
77
Längsränderlongitudinal edges
88th
WellkanteWell edge
99
Trägercarrier
1010
Laufrollencastors
1111
Laufschienenrails
1212
Querstrebencrossbars
1313
Stützprofilesupport profiles
1414
Tragseilesupporting cables
1515
Freiraumfree space
1616
Laufrillegroove
1717
zylindrische Laufflächecylindrical tread
1818
Gleitkufeskid
1919
Sohlesole
2020
FörderbandwendeeinrichtungConveyor belt turning device
2121
Kurvensegmentcurve segment
2222
Rutscheslide
2323
RückschienenprofilRear rail profile

ZITATE ENTHALTEN IN DER BESCHREIBUNG QUOTES INCLUDE IN THE DESCRIPTION

Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list of the documents listed by the applicant has been generated automatically and is included solely for the better information of the reader. The list is not part of the German patent or utility model application. The DPMA assumes no liability for any errors or omissions.

Zitierte PatentliteraturCited patent literature

  • EP 0949163 A1 [0002, 0005] EP 0949163 A1 [0002, 0005]
  • DE 1925673 A [0004] DE 1925673 A [0004]

Claims (13)

Stetigförderer (1) mit wenigstens einem endlos umlaufenden Förderband (2), welches jeweils endseitig des Förderweges umgelenkt ist und ein Obertrum (5a) sowie ein Untertrum (5b) bildet, wobei das Förderband (2) eine Vielzahl sich quer zur Förderrichtung erstreckende Träger (9) aufweist, an deren Enden jeweils Laufrollen (10) gelagert sind, die auf Trageinrichtungen abrollen, wobei die Trageinrichtungen Führungssegmente umfassen, die zumindest teilweise von einer Tragkonstruktion aufgenommen werden, dadurch gekennzeichnet, dass die Tragkonstruktion Gerüstsegmente (6) umfasst, die jeweils über wenigstens eine Gleitunterlage gegen den Untergrund abgestützt sind, und dass an den Gerüstsegmenten (6) Mittel zum Anschlagen einer mobilen Rückeinrichtung vorgesehen sind.Continuous conveyor ( 1 ) with at least one endless circulating conveyor belt ( 2 ), which is in each case deflected at the end of the conveying path and an upper strand ( 5a ) as well as a lower strand ( 5b ), wherein the conveyor belt ( 2 ) a plurality of transversely extending to the conveying direction carrier ( 9 ), at whose ends in each case rollers ( 10 ), which roll on support means, wherein the support means comprise guide segments, which are at least partially received by a supporting structure, characterized in that the supporting structure scaffolding segments ( 6 ), which are each supported by at least one slide pad against the ground, and that at the scaffold segments ( 6 ) Means are provided for striking a mobile return device. Stetigförderer nach Anspruch 1, dadurch gekennzeichnet, dass als Gleitunterlage Gleitkufen (18) vorgesehen sind.Continuous conveyor according to claim 1, characterized in that as sliding surface skids ( 18 ) are provided. Stetigförderer nach einem der Ansprüche 1 oder 2, dadurch gekennzeichnet, dass als Gleitunterlage wenigstens ein Ponton-Sockel vorgesehen ist, auf dem die Gerüstsegmente (6) jeweils aufgestellt sind.Continuous conveyor according to one of claims 1 or 2, characterized in that at least one pontoon base is provided as a sliding support on which the framework segments ( 6 ) are each set up. Stetigförderer nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass als Mittel zum Anschlagen der Rückeinrichtung wenigstens ein Rückschienenprofil (23) vorgesehen ist, welches sich durchgängig, vorzugsweise etwa über die gesamte Länge des Förderweges erstreckt.Continuous conveyor according to one of claims 1 to 3, characterized in that as means for abutment of the rear device at least one return rail profile ( 23 ) is provided, which extends continuously, preferably approximately over the entire length of the conveying path. Stetigförderer nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, dass die Gerüstsegmente (6) in Förderrichtung jeweils mit Abstand zueinander angeordnet sind.Continuous conveyor according to one of claims 1 to 4, characterized in that the framework segments ( 6 ) are arranged in the conveying direction in each case at a distance from each other. Stetigförderer nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass die Gerüstsegmente (6) über sich in Förderrichtung erstreckende Tragseile (14) miteinander verbunden sind.Continuous conveyor according to one of claims 1 to 5, characterized in that the framework segments ( 6 ) extending in the conveying direction supporting cables ( 14 ) are interconnected. Stetigförderer nach Anspruch 6, dadurch gekennzeichnet, dass die Tragseile (14) sich nur jeweils zwischen zwei Gerüstsegmenten (6) erstrecken.Continuous conveyor according to claim 6, characterized in that the supporting cables ( 14 ) only between two framework segments ( 6 ). Stetigförderer nach einem der Ansprüche 1 bis 7, gekennzeichnet durch Spanneinrichtungen für die Tragseile.Continuous conveyor according to one of claims 1 to 7, characterized by clamping devices for the suspension cables. Stetigförderer nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass zumindest einige der Gerüstsegmente (6) mittels Abspanneinrichtungen gegen den Untergrund verspannt sind.Continuous conveyor according to one of claims 1 to 8, characterized in that at least some of the framework segments ( 6 ) are clamped by means of guying fixtures against the ground. Stetigförderer nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass als Führungssegment auf den Gerüstsegmenten (6) Laufschienen (11) vorgesehen sind, wobei die Laufschienen (11) benachbarter Gerüstsegmente (6) mittels Tragseilen (14) verbunden sind.Continuous conveyor according to one of claims 1 to 9, characterized in that as a guide segment on the framework segments ( 6 ) Rails ( 11 ) are provided, wherein the rails ( 11 ) of adjacent scaffolding segments ( 6 ) by means of suspension cables ( 14 ) are connected. Stetigförderer nach einem der Ansprüche 1 bis 10, dadurch gekennzeichnet, dass im Obertrum (5a) wenigstens eine Förderbandwendeeinrichtung (20) vorgesehen ist.Continuous conveyor according to one of claims 1 to 10, characterized in that in the upper strand ( 5a ) at least one conveyor belt turning device ( 20 ) is provided. Stetigförderer nach Anspruch 11, dadurch gekennzeichnet, dass die Förderbandwendeeinrichtung (20) als Materialabwurf ausgebildet ist.Continuous conveyor according to claim 11, characterized in that the conveyor belt turning device ( 20 ) is designed as a material discharge. Stetigförderer nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, dass im Untertrum (5b) wenigstens eine Förderbandwendeeinrichtung (20) vorgesehen ist.Continuous conveyor according to one of claims 1 to 12, characterized in that in the lower strand ( 5b ) at least one conveyor belt turning device ( 20 ) is provided.
DE200910040940 2009-09-11 2009-09-11 Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction Withdrawn DE102009040940A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE200910040940 DE102009040940A1 (en) 2009-09-11 2009-09-11 Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200910040940 DE102009040940A1 (en) 2009-09-11 2009-09-11 Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction

Publications (1)

Publication Number Publication Date
DE102009040940A1 true DE102009040940A1 (en) 2011-03-17

Family

ID=43571118

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200910040940 Withdrawn DE102009040940A1 (en) 2009-09-11 2009-09-11 Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction

Country Status (1)

Country Link
DE (1) DE102009040940A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291070A (en) * 2014-09-30 2015-01-21 黄石市华天自动化设备有限公司 Movement transporter for automobile production line
CN108483059A (en) * 2018-04-28 2018-09-04 平安煤炭开采工程技术研究院有限责任公司 Device for discharging and conveyer

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE918494C (en) * 1951-08-03 1954-09-27 Hauhinco Maschf Support frame for an endless link conveyor belt
DE967670C (en) * 1954-06-01 1957-12-05 Erboe Maschb Erley & Boenninge Endless conveyor, especially retractable conveyor
DE1770186U (en) * 1957-11-13 1958-07-10 Eickhoff Maschinenfabrik U Ein FOERDERBANDSTRASSE.
DE1806980U (en) * 1958-12-05 1960-02-25 Beteiligungs & Patentverw Gmbh CONVEYOR STRUCTURE OF A RETURNABLE CONVEYOR LINE.
DE1078938B (en) * 1958-04-02 1960-03-31 Erboe Maschb Erley & Boenninge Support structure for retractable, endless conveyors
DE1925673A1 (en) 1968-05-18 1969-11-27 Kurashiki Rayon Co Conveyor
DE3203177C1 (en) * 1982-01-30 1983-02-24 Friedrich Wilhelm 4230 Wesel Paurat Closed belt conveyor for underground mining operations
GB2163121A (en) * 1984-08-15 1986-02-19 Dowty Meco Ltd Troughed belt conveyor support
DD256491A1 (en) * 1986-12-30 1988-05-11 Senftenberg Braunkohle Belt conveyors
EP0949163A1 (en) 1998-04-07 1999-10-13 KONRAD DOPPELMAYR & SOHN MASCHINENFABRIK GESELLSCHAFT M.B.H. & CO. KG. Installation for conveying goods by means of an endless conveyor belt or similar

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE918494C (en) * 1951-08-03 1954-09-27 Hauhinco Maschf Support frame for an endless link conveyor belt
DE967670C (en) * 1954-06-01 1957-12-05 Erboe Maschb Erley & Boenninge Endless conveyor, especially retractable conveyor
DE1770186U (en) * 1957-11-13 1958-07-10 Eickhoff Maschinenfabrik U Ein FOERDERBANDSTRASSE.
DE1078938B (en) * 1958-04-02 1960-03-31 Erboe Maschb Erley & Boenninge Support structure for retractable, endless conveyors
DE1806980U (en) * 1958-12-05 1960-02-25 Beteiligungs & Patentverw Gmbh CONVEYOR STRUCTURE OF A RETURNABLE CONVEYOR LINE.
DE1925673A1 (en) 1968-05-18 1969-11-27 Kurashiki Rayon Co Conveyor
DE3203177C1 (en) * 1982-01-30 1983-02-24 Friedrich Wilhelm 4230 Wesel Paurat Closed belt conveyor for underground mining operations
GB2163121A (en) * 1984-08-15 1986-02-19 Dowty Meco Ltd Troughed belt conveyor support
DD256491A1 (en) * 1986-12-30 1988-05-11 Senftenberg Braunkohle Belt conveyors
EP0949163A1 (en) 1998-04-07 1999-10-13 KONRAD DOPPELMAYR & SOHN MASCHINENFABRIK GESELLSCHAFT M.B.H. & CO. KG. Installation for conveying goods by means of an endless conveyor belt or similar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291070A (en) * 2014-09-30 2015-01-21 黄石市华天自动化设备有限公司 Movement transporter for automobile production line
CN108483059A (en) * 2018-04-28 2018-09-04 平安煤炭开采工程技术研究院有限责任公司 Device for discharging and conveyer

Similar Documents

Publication Publication Date Title
DE102013214913B4 (en) Service vehicle for replacing carrier rollers of a belt conveyor
DE202012100777U1 (en) Plate belt conveyor for extraction plants and transport plates for this
EP2265521B1 (en) Belt conveyor for long-distance conveyor system having longitudinally extending lateral walls
DE2634104A1 (en) Cable trolley suspended from rail - has spring loaded guide rollers to inhibit lateral movement
DE3426106C2 (en) Belt conveyor
EP2484607B1 (en) Conveyor and conveying equipment with such conveyor
DE102009040940A1 (en) Continuous conveyor has endless circumferential conveyor belt whose each end side of conveyor path is deflected and forms upper run and lower run, where conveyor belt has multiple supports extending transverse to conveyor direction
AT511795B1 (en) CONVEYOR SYSTEM FOR THE TRANSPORT OF BULBS
DE102008059711A1 (en) Device for transferring objects and conveyor systems with such a device
DE102013223536B4 (en) Tilting system and method for dislocating the same
DE4219097A1 (en) Conveyor for transporting coal in underground mine - includes flexible belt to enable it to follow curved path
DE3504995C1 (en) Belt conveyor
DE19917368C2 (en) Continuous conveyor
DE2633799C2 (en) Progressive shield expansion
DE3017637A1 (en) TENSIONING DEVICE
WO2017162636A1 (en) Dip treatment installation and method for operating a dip treatment installation
DE3123005A1 (en) CONVEYOR SYSTEM
DE102005010319A1 (en) Transporting vehicle and rail system especially for robots operated on assembly lines has transporting vehicle and load supported on wheels rolling over level floor track, with two parallel rails absorbing lateral forces of vehicle
DE4009052C2 (en)
DE10127161B4 (en) Park facility
DE908596C (en) Conveyor device, especially for brown coal opencast mining, consisting of a conveyor belt which is supported by means of a suspension cable spun over the opencast mine
DE102012002506A1 (en) Method for driving through narrow curves using belt conveyors designed as hose belt conveyors, involves attaching guide bars and guide rollers on both edge areas of conveyor belt to enable change of direction towards both sides
DE831216C (en) Space-moving conveyor device
DE1756916C (en) Transport roller conveyor
DE873676C (en) Link conveyor belt with two side link chains and rollers

Legal Events

Date Code Title Description
OM8 Search report available as to paragraph 43 lit. 1 sentence 1 patent law
R082 Change of representative

Representative=s name: FLEISCHER, GODEMEYER, KIERDORF & PARTNER, PATE, DE

R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20130403