DE102007040263B3 - Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements - Google Patents

Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements Download PDF

Info

Publication number
DE102007040263B3
DE102007040263B3 DE200710040263 DE102007040263A DE102007040263B3 DE 102007040263 B3 DE102007040263 B3 DE 102007040263B3 DE 200710040263 DE200710040263 DE 200710040263 DE 102007040263 A DE102007040263 A DE 102007040263A DE 102007040263 B3 DE102007040263 B3 DE 102007040263B3
Authority
DE
Germany
Prior art keywords
mandrels
elements
concrete
mold
formwork panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
DE200710040263
Other languages
German (de)
Inventor
Werner Simon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
COWATEC AG
Original Assignee
COWATEC AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by COWATEC AG filed Critical COWATEC AG
Priority to DE200710040263 priority Critical patent/DE102007040263B3/en
Priority to PCT/EP2008/061046 priority patent/WO2009027352A2/en
Priority to EP08787441A priority patent/EP2183083A2/en
Application granted granted Critical
Publication of DE102007040263B3 publication Critical patent/DE102007040263B3/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
    • B28B7/186Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article for plates, panels or similar sheet- or disc-shaped objects, also flat oblong moulded articles with lateral openings, e.g. panels with openings for doors or windows, grated girders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/02Feeding the unshaped material to moulds or apparatus for producing shaped articles
    • B28B13/0215Feeding the moulding material in measured quantities from a container or silo
    • B28B13/026Feeding the moulding material in measured quantities from a container or silo by using a movable hopper transferring the moulding material to the moulding cavities
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • B28B7/0032Moulding tables or similar mainly horizontal moulding surfaces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels
    • B28B7/285Core puller

Abstract

The method involves applying reinforcement frames (2) for carrier elements (3b) on a base (1) such that the frames are aligned parallel to each other in a horizontal direction. Passage surfaces are arranged in a row of the frames. Mold cores (4a, 4b) are retracted into another horizontal direction through the passage surfaces where the latter horizontal direction runs transverse to the former horizontal direction. Mold elements (8) are arranged in gaps formed between the frames. A concrete is casted longitudinally to extend mold cavities formed between the mold elements. An independent claim is also included for a device for producing a concrete floor component, comprising a concrete shuttering plate.

Description

Die Erfindung betrifft ein Verfahren und eine Vorrichtung zur Herstellung eines Beton-Deckenelements.The The invention relates to a method and an apparatus for the production a concrete ceiling element.

Aus der EP 1 146 180 A1 ist ein Verfahren zur Herstellung eines Beton-Deckenelements mit biegesteifen Trägerelementen bekannt. Dabei werden zunächst die biegesteifen Trägerelemente durch Umgießen eines Armierungsgerüsts mit Beton hergestellt. Durchbrüche im Trägerelement werden durch das Einfahren und anschließende Herausziehen von Formkernen gebildet. An so hergestellte Trägerelemente wird anschließend eine Beton-Schalungsplatte angegossen. – Das bekannte Verfahren ist relativ aufwändig. Zur Herstellung des Beton-Deckenelements müssen die vorgefertigten Trägerelemente in paralleler Ausrichtung in eine Schalung eingesetzt werden. Beim Angießen der Beton-Schalungsplatte kann es zu einer Dejustierung der Trägerelemente kommen.From the EP 1 146 180 A1 is a method for producing a concrete ceiling element with rigid support elements known. Initially, the rigid support elements are produced by casting a reinforcing framework with concrete. Breakthroughs in the support element are formed by the retraction and subsequent extraction of mandrels. On a support elements produced in this way a concrete formwork panel is then cast. - The known method is relatively expensive. To produce the concrete ceiling element, the prefabricated support elements must be used in parallel alignment in a formwork. When casting the concrete formwork panel can lead to a misalignment of the support elements.

Aufgabe der Erfindung ist es, ein Verfahren und eine Vorrichtung anzugeben, mit denen die Nachteile nach dem Stand der Technik beseitigt werden. Es soll insbesondere ein Verfahren zur möglichst raschen und effizienten Herstellung von biegesteifen Beton-Deckenelementen angegeben werden, mit denen eine unterjochungsfreie Herstellung von Betondecken möglich ist.task the invention is to provide a method and a device, with which the disadvantages of the prior art are eliminated. In particular, it should provide a method for the fastest possible and efficient Manufacture of rigid concrete ceiling elements to be specified with where a unterjochungsfreie production of concrete ceilings is possible.

Diese Aufgabe wird durch die Merkmale der Ansprüche 1 und 13 gelöst. Zweckmäßige Ausgestaltungen ergeben sich aus den Merkmalen der Ansprüche 2 bis 12 und 14 bis 23.These The object is solved by the features of claims 1 and 13. Advantageous embodiments result from the features of claims 2 to 12 and 14 to 23.

Nach Maßgabe der Erfindung ist ein Verfahren zur Herstellung eines Beton-Deckenelements vorgesehen, bei dem eine Beton- Schalungsplatte mit biegesteifen Trägerelementen versehen ist, mit folgenden Schritten:
Bereitstellen einer zur Herstellung der Beton-Schalungsplatte geeigneten Unterlage,
Auflegen von Armierungsgerüsten für die Trägerelemente auf die Unterlage, so dass die Armierungsgerüste parallel zueinander in einer ersten horizontalen Richtung ausgerichtet und darin vorgesehene Durchgriffsflächen in einer Flucht angeordneten sind,
Einfahren von Formkernen in eine quer zur ersten horizontalen Richtung verlaufenden zweiten horizontalen Richtung durch die Durchgriffsflächen,
Anordnen von Formelementen in zwischen den Armierungsgerüsten gebildeten Zwischenräumen und
Eingießen von Beton in zwischen den Formelementen gebildeten lang gestreckten Formhohlräumen.
According to the invention, a method for producing a concrete ceiling element is provided, in which a concrete formwork panel is provided with rigid support elements, with the following steps:
Providing a base suitable for producing the concrete shuttering panel,
Placing reinforcement frames for the support elements on the base, so that the reinforcement frames are aligned parallel to one another in a first horizontal direction and passage areas provided therein are aligned,
Retracting cores in a transversely to the first horizontal direction extending second horizontal direction through the passage areas,
Arranging of form elements in spaces formed between the Armierungsgerüsten and
Potting concrete in elongated mold cavities formed between the mold elements.

Das vorgeschlagene Verfahren lässt sich einfach und kostengünstig durchführen. Es kann von einer herkömmlichen Unterlage bzw. einem Schalungstisch zur Herstellung einer Beton-Schalungsplatte ausgegangen werden. Auf die Unterlage werden in Abweichung vom Stand der Technik Armierungsgerüste für die Trägerelemente aufgelegt, und zwar derart, dass darin gebildete Durchgriffsflächen in einer Flucht angeordnet sind, so dass Formkerne durch die Durchgriffsflächen hindurch gefahren werden können. Zwischen den Armierungsgerüsten werden außerdem Formelemente angeordnet. Anschließend wird zur Herstellung des Beton-Deckenelements Beton in die zwischen den Formelementen gebildeten lang gestreckten Formhohlräume gegossen. Der eingegossene Beton verteilt sich über die Unterlage und bildet die Beton-Schalungsplatte sowie die Trägerelemente. Das Verfahren erfordert keinen hohen Zeitaufwand. Es kann relativ kostengünstig durchgeführt werden.The proposed method easy and inexpensive carry out. It can be from a conventional one Base or a formwork table for producing a concrete formwork panel assumed become. On the pad are in deviation from the prior art Armierungsgerüste for the support elements placed in such a way that formed therein penetration areas in an escape are arranged so that mandrels through the pass-through surfaces can be driven. Between the Armierungsgerüsten Beyond that Form elements arranged. Subsequently, for the production of the Concrete ceiling element concrete in the formed between the mold elements elongated mold cavities cast. The poured concrete spreads over the base and forms the concrete formwork panel and the support elements. The procedure does not require a lot of time. It can be done relatively inexpensively.

Vorteilhafterweise wird vor dem Auflegen der Armierungsgerüste eine Armierung für die Beton-Schalungsplatte auf die Unterlage gelegt. Damit ist es möglich, in einem Schritt ein vollständig armiertes Beton-Deckenelement herzustellen.advantageously, is a reinforcement for the concrete formwork panel before placing the Armierungsgerüste placed on the surface. This makes it possible to enter in one step Completely to produce reinforced concrete ceiling element.

Nach einer weiteren Ausgestaltung wird vor dem Anordnen der Formelemente die Beton-Schalungsplatte gegossen. Insbesondere beim Vorsehen einer Armierung ermöglicht das eine besonders schnelle und gleichmäßige Verteilung des Betons auf der Unterlage. Die Herstellung des Beton-Deckenelements kann so nochmals beschleunigt werden.To A further embodiment is prior to arranging the mold elements poured the concrete formwork panel. In particular, when providing a Reinforcement allows This is a particularly fast and even distribution of the concrete on the pad. The production of the concrete ceiling element can be accelerated again.

Nach einer weiteren Ausgestaltung werden die Formkerne von zwei einander gegenüberliegenden Seiten der Form durch die Durchgriffsflächen eingefahren. Das ermöglicht insbesondere ein Ziehen der Formkerne in entgegengesetzte Richtungen. Das erleichtert das Entformen. Das gilt insbesondere dann, wenn die von einander gegenüberliegenden Seiten eingefahrenen Formkerne versetzt angeordnet sind, so dass zwei benachbarte Formkerne jeweils in die entgegengesetzte Richtung gezogen werden können.To In another embodiment, the mandrels of two are each other opposite Sides of the form retracted through the passage surfaces. This makes it possible in particular pulling the mandrels in opposite directions. That makes it easier demolding. This is especially true when they are different from each other opposite sides retracted form cores are arranged offset, so that two adjacent Form cores are pulled in each case in the opposite direction can.

Es hat sich als zweckmäßig erwiesen, dass die Formelemente auf die eingefahrenen Formkerne aufgesetzt werden. Die Form elemente können beispielsweise mit einem Kran auf die Formkerne herabgelassen werden. Vorteilhafterweise werden die Formelemente so auf die Formkerne aufgesetzt, dass zum Profil der Formkerne korrespondierende Ausnehmungen an deren der Unterlage zugewandten Unterseiten formschlüssig auf den Formkernen aufliegen. Damit werden sowohl die Formelemente als auch die Formkerne in eine ordnungsgemäße Anordnung gezwun gen. Damit wird auf einfache Weise eine besonders genaue Herstellung der Beton-Deckenelemente ermöglicht.It has proved to be useful that the form elements placed on the retracted mandrels become. The form elements can be lowered for example with a crane on the mandrels. Advantageously, the mold elements are so on the mandrels placed on the profile of the cores corresponding recesses on whose underside facing the pad form-fitting manner rest on the mold cores. This will both the form elements as well the mandrels in a proper arrangement gezwun gene. So becomes a simple way a particularly accurate production of concrete ceiling elements allows.

Nach einer weiteren Ausgestaltung wird überschüssiger Beton auf einer durch eine Oberseite der Formelemente gebildeten Abziehfläche abgezogen. Damit kann der Oberseite der Trägerelemente eine gewünschte Kontur verliehen werden. Insbesondere kann die Abziehfläche in regelmäßigen Abständen angeordnete Eintiefungen aufweisen. Solche Eintiefungen können zum Einlegen eines Bewehrungsgitters dienen.According to another embodiment excess concrete peeled off on a peel surface formed by an upper surface of the mold elements. Thus, the top of the support elements can be given a desired contour. In particular, the Abziehfläche may have arranged at regular intervals recesses. Such recesses can be used to insert a reinforcing grid.

Zum Entformen werden Formkerne zweckmäßigerweise gezogen und gleichzeitig gerüttelt. Sofern die Formkerne an zwei einander gegenüberliegenden Seiten der Unterlage angeordnet sind, erfolgt ein Ziehen der Formkerne in entgegengesetzte Richtungen unter gleichzeitigem Rütteln.To the Shaping cores are conveniently pulled and simultaneously shaken. If the mandrels on two opposite sides of the pad are arranged, pulling the mandrels takes place in opposite directions Directions under simultaneous shaking.

Als besonders vorteilhaft hat es sich erwiesen, dass während des Ziehens der Formkerne auch die Formelemente von der Unterlage entfernt, vorzugsweise gehoben, werden. Dabei wird der Umstand genutzt, dass die Rüttelbewegung der Formkerne auf den gegossenen Beton einwirkt und somit auch ein Entfernen der Formelemente erleichtert. Auf ein gesondertes Rütteln der Formelemente kann in diesem Fall verzichtet werden.When It has proven to be particularly advantageous that during the Pulling the mandrels also removes the form elements from the base, preferably lifted. It uses the fact that the shaking motion The mold cores acting on the poured concrete and thus a Removing the mold elements easier. On a separate shaking the Moldings can be dispensed with in this case.

Nach weitere Maßgabe der Erfindung ist eine Vorrichtung zur Herstellung eines Beton-Deckenelements vorgesehen, bei dem eine Beton-Schalungsplatte mit biegesteifen Trägerelementen versehen ist, mit
einer zur Herstellung der Beton-Schalungsplatte geeigneten Unterlage,
bei der an mindestens einer Seite eine Einrichtung zum Einfahren parallel ausgerichteter Formkerne in einer parallel zur Unterlage verlaufenden Ebene vorgesehen ist und
wobei eine Einrichtung zum Anordnen parallel ausgerichteter Formelemente quer zu den Formkernen vorgesehen ist.
According to another aspect of the invention, an apparatus for producing a concrete ceiling element is provided in which a concrete formwork panel is provided with rigid support members, with
a substrate suitable for the production of the concrete shuttering panel,
in which at least one side of a device for retracting parallel aligned mandrels is provided in a plane parallel to the base plane and
wherein means are provided for arranging parallel aligned form elements transversely of the mandrels.

Die vorgeschlagene Vorrichtung ermöglicht eine vereinfachte und effiziente Herstellung biegesteifer Beton-Deckenelemente. Die vorgeschlagene Vorrichtung ist einfach aufgebaut. Sie lässt sich durch einfache Erweiterungen herkömmlicher Schalungstische zur Herstellung von Beton-Schalungsplatten realisieren.The proposed device allows a simplified and efficient production of rigid concrete ceiling elements. The proposed device is simple. She lets herself by simple extensions of conventional formwork tables for Realization of concrete formwork panels.

Nach einer vorteilhaften Ausgestaltung ist an einer Seite der Unterlage eine erste und an der gegenüberliegenden anderen Seite der Unterlage eine zweite Einrichtung zum Bewegen von Formkernen vorgesehen. Dabei sind die Formkerne vorteilhafterweise so angeordnet, dass im eingefahrenen Zustand jeweils ein Formkern der ersten Einrichtung benachbart zu einem Formkern der zweiten Einrichtung angeordnet ist. Infolgedessen werden jeweils benachbarte Formkerne in entgegengesetzter Richtung über die Unterlage bewegt. Vorteile ergeben sich insbesondere beim Ziehen der Formkerne. Es kommt dabei nicht zu einer Verformung der Trägerelemente.To an advantageous embodiment is on one side of the pad a first and on the opposite other side of the pad a second means of moving provided by cores. The mandrels are advantageously arranged so that in the retracted state in each case a mold core the first device adjacent to a mandrel of the second Device is arranged. As a result, each adjacent Form cores moved in opposite directions over the pad. advantages arise especially when pulling the mandrels. It comes here not to a deformation of the support elements.

Zweckmäßigerweise sind die Formkerne in einer horizontalen Ebene angebracht. D. h. sie befinden sich in derselben Höhe über der Unterlage.Conveniently, the mandrels are mounted in a horizontal plane. Ie. they are at the same height above the Document.

Nach einer weiteren zweckmäßigen Ausgestaltung sind die Formelemente balkenartig ausgebildet. Sie erstrecken sich über die gesamte Länge der Armierungsgerüste. Die Formelemente können an einer der Unterlage zugewandten Unterseite zum Profil der Formkerne korrespondierende Ausnehmungen zum Eingriff in die Formkerne aufweisen. Die Ausnehmungen können beispielsweise V-förmig ausgebildet sein. Ferner können die Formelemente an einer der Form abgewandten Oberseite in regelmäßigen Abständen vorgesehene Eintiefungen aufweisen. Solche Eintiefungen dienen der Herstellung von Eintiefungen in den Trägerelementen, die zum Einlegen von Bewehrungsgittern dienen.To a further advantageous embodiment the mold elements are bar-shaped. They extend over the whole length the Armierungsgerüste. The form elements can on one of the pad facing bottom to the profile of the mold cores have corresponding recesses for engagement in the mandrels. The recesses can for example, V-shaped be educated. Furthermore, can the mold elements provided on a top side facing away from the mold at regular intervals Have recesses. Such recesses are used to manufacture of recesses in the support elements, which serve for the insertion of reinforcing bars.

Nach einer besonders vorteilhaften Ausgestaltung weisen die Formelemente an ihren Enden von der Unterseite sich erstrekkende Fortsätze auf, so dass damit ein Beton-Deckenelement herstellbar ist, bei dem die Trägerelemente sich über eine Seitenwand der Beton-Schalungsplatte hinaus erstrecken. Der Überstand der Trägerelemente beträgt zweckmäßigerweise 2 bis 10 cm, vorzugsweise 3 bis 8 cm.To a particularly advantageous embodiment, the mold elements at its ends from the bottom extending extensions, so that thus a concrete ceiling element can be produced, in which the support elements over extending a side wall of the concrete shuttering panel addition. The supernatant the support elements is expediently 2 to 10 cm, preferably 3 to 8 cm.

Nach einer weiteren Ausgestaltung ist eine Einrichtung zum Rütteln der Formkerne vorgesehen. Das ermöglicht ein erleichtertes Entformen. Des Weiteren kann eine Einrichtung zur automatischen Durchführung einer Ziehbewegung der Formkerne und einer gleichzeitigen Bewegung, vorzugsweise Abhebebewegung, der Formelemente vorgesehen werden. Eine gleichzeitige und automatisch koordinierte Bewegung der Formkerne und der Formelemente ermöglicht ein besonders schonendes Entformen. Eine unerwünschte Verformung, insbesondere der Trägerelemente, wird vermieden.To a further embodiment is a device for shaking the Form cores provided. This allows a relieved demolding. Furthermore, a device for automatic execution a pulling movement of the mold cores and a simultaneous movement, preferably lift-off, the form elements are provided. A simultaneous and automatically coordinated movement of the cores and the mold elements allows a particularly gentle demolding. An undesirable deformation, in particular the Support elements, is avoided.

Nach einer weiteren Ausgestaltung ist eine Einrichtung zum Befüllen der zwischen den Formelementen gebildeten langgestreckten Zwischenräume mit Beton vorgesehen. Mit einer solchen Einrichtung kann der gesamte zur Herstellung des Beton-Deckenelements erforderliche Beton vergossen werden. Es ist aber auch möglich, mit dieser Vorrichtung zunächst die Beton-Schalungsplatte zu gießen und anschließend zur Herstellung der Trägerelemente die Zwischenräume mit Beton zu vergießen.To A further embodiment is a device for filling the along with the elongated spaces formed between the mold elements Concrete provided. With such a device, the entire for the production of the concrete ceiling element required concrete to be poured. But it is also possible with this device first the concrete formwork panel to pour and subsequently for the production of the carrier elements the gaps to shed with concrete.

Des Weiteren kann eine Einrichtung zum Abziehen überschüssigen Betons auf einer durch die Oberseiten der Formelemente gebildeten Abziehfläche vorgesehen sein. Eine solche Einrichtung ermöglicht das Einbringen vorgegebener Konturen in die Oberseite der Trägerelemente.Furthermore, means for removing excess concrete may be provided on a peel surface formed by the tops of the mold elements. Such a device he allows the introduction of predetermined contours in the top of the support elements.

Nachfolgend wird ein Ausführungsbeispiel der Erfindung anhand der Zeichnung näher erläutert. Es zeigen:following is an embodiment of Invention with reference to the drawing explained. It demonstrate:

1 eine erste Seitenansicht der Vorrichtung, 1 a first side view of the device,

2 eine zweite Seitenansicht gemäß 1, 2 a second side view according to 1 .

3 eine Draufsicht auf die Vorrichtung, wobei die Armierung weggelassen worden ist und 3 a plan view of the device, wherein the reinforcement has been omitted and

4 eine Seitenansicht eines Formelements. 4 a side view of a formula element.

Bei der in den 1 bis 3 gezeigten Vorrichtung ist mit 1 eine Unterlage bzw. ein Schalungstisch zur Herstellung einer Beton-Schalungsplatte 3a mit daran angegossenen Trägerelementen 3b bezeichnet. In den 1 und 2 sind auf der Unterlage 1 Armierungsgerüste 2 für die Trägerelemente 3b abgestützt. Lanzenartig ausgebildete Formkerne 4, welche vorzugsweise ein dreieckiges Profil aufweisen, sind auf horizontal verfahrbaren Schlitten 5 abgebracht. Jeder der Formkerne 4 ist mit einer Rüttelvorrichtung 6 verbunden.In the in the 1 to 3 shown device is with 1 a pad or a formwork table for producing a concrete formwork panel 3a with cast-on support elements 3b designated. In the 1 and 2 are on the pad 1 Armierungsgerüste 2 for the support elements 3b supported. Lancet-shaped mandrels 4 , which preferably have a triangular profile, are on horizontally movable carriage 5 dissuaded. Each of the mandrels 4 is with a vibrating device 6 connected.

Bei der in 1 bis 3 gezeigten Vorrichtung sind auf der einen Seite der Unterlage 1 nebeneinander eine Vielzahl erster Formkerne 4a und auf einer gegenüberliegenden anderen Seite der Unterlage 1 eine Vielzahl zweiter Formkerne 4b vorgesehen. Die ersten 4a und die zweiten Formkerne 4b sind etwa gleich lang ausgebildet. Ihre Länge entspricht etwa einer Breite B der Unterlage 1. Die ersten 4a und die zweiten Formkerne 4b sind versetzt angeordnet, so dass die ersten Formkerne 4a in die zwischen den zweiten Formkernen 4b gebildeten Lücken einfahrbar sind. Der Versatz entspricht jeweils dem halben Abstand A zwischen den ersten 4a oder den zweiten Formkernen 4b.At the in 1 to 3 shown device are on one side of the pad 1 next to each other a variety of first cores 4a and on an opposite other side of the pad 1 a variety of second cores 4b intended. The first 4a and the second mandrels 4b are about the same length. Its length corresponds approximately to a width B of the pad 1 , The first 4a and the second mandrels 4b are staggered so that the first cores 4a in between the second cores 4b formed gaps are retractable. The offset corresponds to half the distance A between the first 4a or the second cores 4b ,

Wie insbesondere aus 1 ersichtlich ist, sind die die ersten 4a und die zweiten Formkerne 4b aufnehmenden Schlitten 5 über eine umlaufend geführte Kette oder dgl. 7 kinematisch miteinander so verbunden, dass die ersten 4a und die zweiten Formkerne 4b jeweils in entgegengesetzter Richtung bewegbar sind. Dazu sind die die ersten Formkerne 4a aufnehmenden ersten Schlitten 5a an einem Obertrum der Kette 7 und die die zweiten Formkerne 4b aufnehmenden zweiten Schlitten 5b an einem Untertrum der Kette 7 befestigt.As in particular from 1 it can be seen that they are the first 4a and the second mandrels 4b receiving sled 5 via a circulating guided chain or the like. 7 kinematically connected with each other so that the first 4a and the second mandrels 4b are each movable in the opposite direction. These are the first cores 4a receiving the first sled 5a on an upper strand of the chain 7 and the second cores 4b receiving second carriage 5b on a lower strand of the chain 7 attached.

Mit dem Bezugszeichen 8 sind balkenartig ausgebildete Formelemente bezeichnet, welche an einem Trägergerüst 9 angebracht sind. Das Trägergerüst 9 ist mittels eines Krans 10 vertikal bewegbar. Mit 11 ist eine bezüglich der Ünterlage 1 horizontal verfahrbare Beton-Zuführvorrichtung bezeichnet. Dabei kann es sich um eine herkömmliche Beton-Zuführvorrichtung 11 zur Herstellung von Beton-Schalungsplatten 3a handeln.With the reference number 8th are bar-like design features called, which on a support frame 9 are attached. The scaffold 9 is by means of a crane 10 vertically movable. With 11 is one concerning the thesis 1 horizontally movable concrete feeding device called. This can be a conventional concrete feeder 11 for the production of concrete formwork panels 3a act.

In 4 ist ein Formelement 8 im Detail dargestellt. Das Formelement 8 weist an einer der Unterlage 1 zugewandten Unterseite U V-förmige Ausnehmungen 12 auf, welche zur Form der Formkerne 4a und 4b korrespondieren. An einer der Unterseite U gegenüberliegenden Oberseite O sind Eintiefungen 13 vorgesehen, welche zur Herstellung korrespondierender Eintiefungen 13 in den Trägerelementen 3b dienen. Derartige Eintiefungen 13 dienen in den Trägerelementen 3b zur Aufnahme von Bewehrungsgittern. Ferner weisen die Formelemente 8 an ihren Sei tenwänden sowie an der Oberseite O eine Wellung 14 auf, die einer innigen Verbindung mit einer auf das Beton-Deckenelement aufzugießenden Ortbeton-Schicht dient. An den Enden sich von der Unterseite U erstreckende Fortsätze 15 dienen dazu, einen Überstand der herzustellenden Trägerelemente 3b über eine Seitenwand der Beton-Schalungsplatte 3a hinaus zu realisieren. Zur Herstellung der in 4 gezeigten weiteren Ausnehmungen 16 können in ähnlicher Weise wie die Formkerne 4a und 4b weitere Formkerne vorgesehen sein.In 4 is a form element 8th shown in detail. The form element 8th points to one of the underlay 1 facing underside U V-shaped recesses 12 on which to the shape of the cores 4a and 4b correspond. At one of the bottom U opposite top O are recesses 13 provided, which for producing corresponding recesses 13 in the carrier elements 3b serve. Such recesses 13 serve in the carrier elements 3b for receiving reinforcing bars. Furthermore, the form elements 8th at their Be tenwänden and at the top O a corrugation 14 on, which serves an intimate connection with an in-situ concrete layer aufzuschießenden on the concrete ceiling element. At the ends extending from the bottom U extensions 15 serve to a supernatant of the carrier elements to be produced 3b over a side wall of the concrete formwork panel 3a to realize. For the production of in 4 shown further recesses 16 can work in a similar way as the mandrels 4a and 4b be provided further mandrels.

Die Funktion der Vorrichtung ist folgende:
Zunächst wird auf die Unterlage 1 in herkömmlicher Weise eine Armierung für die Beton-Schalungsplatte 3a aufgelegt. Auf die Armierung werden dann in paralleler Anordnung und parallel zu einer Längsseite der Unterlage 1 Armierungsgerüste 2 für die Trägerelemente 3b aufgelegt. Die Armierungsgerüste 2 sind beispielsweise aus einem Ober- und zwei Untergurten gebildet, die durch V-förmige Diagonalen miteinander verbunden sind. Durch die Untergurte und die Diagonalen werden dreieckige Durchgriffsflächen gebildet. Die Armierungsgerüste 2 werden so auf der Unterlage 1 angeordnet, dass die Durchgriffsflächen sich in einer Flucht mit der Bewegungsrichtung der Formkerne 4a und 4b befinden.
The function of the device is as follows:
First, on the pad 1 in a conventional manner, a reinforcement for the concrete formwork panel 3a hung up. On the reinforcement are then in parallel arrangement and parallel to a longitudinal side of the pad 1 Armierungsgerüste 2 for the support elements 3b hung up. The armor scaffolding 2 are formed, for example, of one upper and two lower straps which are interconnected by V-shaped diagonals. The lower chords and the diagonals form triangular penetration areas. The armor scaffolding 2 so be on the pad 1 arranged that the passage areas are in alignment with the direction of movement of the mandrels 4a and 4b are located.

Nach einer ersten Verfahrensvariante wird nach dem Auflegen der Armierung und der Armierungsgerüste 2 auf die Unterlage 1 mittels der Beton-Zuführvorrichtung 11 zunächst die Beton-Schalungsplatte 3a gegossen. Anschließend werden dann durch eine gegenläufige Bewegung der ersten 5a und zweiten Schlitten 5b die ersten 4a und die zweiten Formkerne 4b in einer Ebene parallel zur Unterlage 1 eingefahren. Dabei durchgreifen die Formkerne 4a und 4b die Durchgriffsflächen sämtlicher parallel nebeneinander angeordneter Armierungsgerüste 2. Anschließend werden mittels des Krans 10 die Formelemente 8 in die zwischen die Armierungsgerüste 2 verbliebenen Zwischenräume abgesenkt. Dabei greifen die Ausnehmungen 12 in die Formkerne 4a und 4b ein. Infolge des Formschlusses zwischen den Ausnehmungen 12 und dem Profil der Formkerne 4a und 4b richten sich die Formkerne 4a und 4b und die Formelemente 8 rechtwinklig zueinander aus. Anschließend wird mittels der Beton-Zuführvorrichtung 11 Beton in die zwischen die Formelemente 8 gebildeten langgestreckten Zwischenräume gefüllt. Überschüssiger Beton wird mittels einer (hier nicht gezeigten) Abziehvorrichtung auf den Oberseiten O Formelemente 8 abgezogen. Infolgedessen wird die auf der Oberseite O der Formelemente 8 gebildete Oberflächenkontur auf die Oberfläche O der Trägerelemente 3b übertragen.After a first process variant is after placing the reinforcement and Armierungsgerüste 2 on the pad 1 by means of the concrete feeder 11 First, the concrete formwork panel 3a cast. Subsequently, then by an opposite movement of the first 5a and second sled 5b the first 4a and the second mandrels 4b in a plane parallel to the surface 1 retracted. The mandrels reach through this 4a and 4b the pass-through surfaces of all parallel juxtaposed Armierungsgerüste 2 , Subsequently, by means of the crane 10 the form elements 8th into the between the Armierungsgerüste 2 lowered remaining spaces. The recesses grip 12 into the mold cores 4a and 4b one. Due to the positive connection between the recesses 12 and the profile of the mandrels 4a and 4b the mandrels are aligned 4a and 4b and the form elements 8th at right angles to each other. Subsequently, by means of the concrete feeder 11 Concrete in between the form elements 8th filled formed elongated spaces. Excess concrete is by means of a (not shown here) puller on the tops O form elements 8th deducted. As a result, the on the top O of the mold elements 8th formed surface contour on the surface O of the support elements 3b transfer.

Nach einer zweiten Verfahrensvariante ist es auch möglich, nach dem Abstützen der Armierung und der Armierungsgerüste 2 zunächst die ersten 4a und die zweiten Formkerne 4b über die Unterlage 1 einzufahren und anschließend darauf die Formelemente 8 abzusenken. Anschließend kann dann mittels der Beton-Zuführvorrichtung 11 Beton in die zwischen den Formelementen 8 gebildeten Zwischenräume gefüllt werden. In diesen Fall ist die Konsistenz des Betons geeignet einzustellen, damit sichergestellt ist, dass sämtliche Formhohlräume verfüllt werden.After a second process variant, it is also possible after supporting the reinforcement and the Armierungsgerüste 2 first the first 4a and the second mandrels 4b over the pad 1 retract and then on the form elements 8th lower. Then then by means of the concrete feeder 11 Concrete in between the form elements 8th filled spaces are filled. In this case, the consistency of the concrete should be adjusted to ensure that all mold cavities are filled.

Nach dem Vergießen und einer teilweisen Verfestigung des Betons werden die Rüttelvorrichtungen 6 in Betrieb gesetzt und die ersten 4a und die zweiten Formkerne 4b gleichzeitig in entgegengesetzte Richtungen von der Unterlage 1 horizontal weggezogen. Die in das teilweise verfestigte Beton-Deckenelement eingekoppelte Vibration wird vorteilhafterweise gleichzeitig dazu verwendet, auch die Formelemente 8 abzuheben. Auf diese Weise kann ohne eine Verformung des Beton-Deckenelements schnell und einfach ein Entfernen der Formkerne 4a und 4b sowie der Formelemente 8 erfolgen.After casting and partial solidification of the concrete, the vibrators become 6 put into operation and the first 4a and the second mandrels 4b simultaneously in opposite directions from the pad 1 pulled away horizontally. The coupled into the partially solidified concrete ceiling element vibration is advantageously used simultaneously, including the mold elements 8th withdraw. In this way, without deformation of the concrete ceiling element quickly and easily removing the mandrels 4a and 4b as well as the form elements 8th respectively.

Das vorgeschlagene Verfahren ermöglicht auf schnelle und einfache Weise die Herstellung biegesteifer Beton-Deckenelemente. Die vorgeschlagenen Beton-Deckenelemente können ohne das Vorsehen einer Unterjochung zur Herstellung von Betondecken verwendet werden. Dabei können Spannweiten von bis zu 8,50 m überbrückt werden.The proposed method allows on quick and easy way to produce rigid concrete ceiling elements. The proposed concrete ceiling elements can without the provision of a Unterjochung be used for the production of concrete ceilings. there can Spans of up to 8.50 m are bridged.

11
Unterlagedocument
22
ArmierungsgerüstArmierungsgerüst
3a3a
Beton-SchalungsplatteConcrete formwork panel
3b3b
Trägerelementsupport element
4, 4a, 4b4, 4a, 4b
Formkern, erster Formkern, zweiter FormkernMandrel first mold core, second mold core
5, 5a, 5b5, 5a, 5b
Schlitten, erster Schlitten, zweiter SchlittenCarriage, first sleigh, second sleigh
66
Rüttelvorrichtungshaker
77
KetteChain
88th
Formelementforming element
99
Trägergerüstsupporting framework
1010
Krancrane
1111
Beton-ZuführvorrichtungConcrete feeder
1212
Ausnehmungrecess
1313
Eintiefungdepression
1414
Wellungcurl
1515
Fortsatzextension
1616
weitere AusnehmungFurther recess
UU
Unterseitebottom
OO
Oberseitetop
AA
Abstanddistance
BB
Breitewidth

Claims (23)

Verfahren zur Herstellung eines Beton-Deckenelements, bei dem eine Beton-Schalungsplatte (3a) mit biegesteifen Trägerelementen (3b) versehenen ist, mit folgenden Schritten: Bereitstellen einer zur Herstellung der Beton-Schalungsplatte (3a) geeigneten Unterlage (1), Auflegen von Armierungsgerüsten (2) für die Trägerelemente (3b) auf die Unterlage (1), so dass die Armierungsgerüste (2) parallel zueinander in einer ersten horizontalen Richtung ausgerichtet und darin vorgesehene Durchgriffsflächen in einer Flucht angeordnet sind, Einfahren von Formkernen (4a, 4b) in eine quer zur ersten horizontalen Richtung verlaufenden zweiten horizontalen Richtung durch die Durchgriffsflächen, Anordnen von Formelementen (8) in zwischen den Armierungsgerüsten (2) gebildeten Zwischenräumen und Eingießen von Beton in zwischen den Formelementen (8) gebildeten lang gestreckten Formhohlräumen.Method for producing a concrete ceiling element, in which a concrete formwork panel ( 3a ) with rigid support elements ( 3b ), comprising the following steps: providing one for producing the concrete formwork panel ( 3a ) suitable substrate ( 1 ), Placing of armor frameworks ( 2 ) for the support elements ( 3b ) on the base ( 1 ), so that the Armierungsgerüste ( 2 ) are aligned parallel to each other in a first horizontal direction and provided therein Durchgriffsflächen are aligned, retraction of mandrels ( 4a . 4b ) in a transversely to the first horizontal direction extending second horizontal direction through the Durchgriffsflächen, arranging form elements ( 8th ) in between the Armierungsgerüsten ( 2 ) and pouring concrete in between the mold elements ( 8th ) formed elongate mold cavities. Verfahren nach Anspruch 1, wobei vor dem Auflegen der Armierungsgerüste (2) eine Armierung für die Beton-Schalungsplatte (3a) in die Unterlage (1) eingelegt wird.Method according to claim 1, wherein prior to laying the reinforcing frameworks ( 2 ) a reinforcement for the concrete formwork panel ( 3a ) in the pad ( 1 ) is inserted. Verfahren nach einem der vorhergehenden Ansprüche, wobei vor dem Anordnen der Formelemente (8) die Beton-Schalungsplatte (3a) gegossen wird.Method according to one of the preceding claims, wherein prior to arranging the molded elements ( 8th ) the concrete formwork panel ( 3a ) is poured. Verfahren nach einem der vorhergehenden Ansprüche, wobei die Formkerne (4a, 4b) von zwei einander gegenüberliegenden Seiten der Unterlage (1) durch die Durchgriffsflächen eingefahren werden.Method according to one of the preceding claims, wherein the mandrels ( 4a . 4b ) from two opposite sides of the pad ( 1 ) are retracted through the pass-through surfaces. Verfahren nach einem der vorhergehenden Ansprüche, wobei erste Formkerne (4a) in Lücken zwischen zweiten Formkernen (4b) bewegt werden.Method according to one of the preceding claims, wherein first mandrels ( 4a ) in gaps between second cores ( 4b ) are moved. Verfahren nach einem der vorhergehenden Ansprüche, wobei die Formelemente (8) auf die eingefahrenen Formkerne (4a, 4b) aufgesetzt werden.Method according to one of the preceding claims, wherein the shaped elements ( 8th ) on the one driven mandrels ( 4a . 4b ). Verfahren nach einem der vorhergehenden Ansprüche, wobei die Formelemente (8) so auf die Formkerne (4a, 4b) aufgesetzt werden, dass zum Profil der Formkerne (4a, 4b) korrespondierende Ausnehmungen (12) an deren der Unterlage (1) zugewandten Unterseiten (U) formschlüssig auf den Formkernen (4a, 4b) aufliegen.Method according to one of the preceding claims, wherein the shaped elements ( 8th ) so on the mandrels ( 4a . 4b ), that the profile of the cores ( 4a . 4b ) corresponding recesses ( 12 ) at whose base ( 1 ) facing lower sides (U) positively on the mandrels ( 4a . 4b ) rest. Verfahren nach einem der vorhergehenden Ansprüche, wobei überschüssiger Beton auf einer durch eine Oberseite (O) der Formelemente (8) gebildeten Abziehfläche abgezogen wird.Method according to one of the preceding claims, wherein excess concrete on a through a top (O) of the form elements ( 8th ) Abziehfläche is subtracted. Verfahren nach einem der vorhergehenden Ansprüche, wobei die Abziehfläche in regelmäßigen Abständen angeordnete Eintiefungen (13) aufweist.Method according to one of the preceding claims, wherein the peeling surface is arranged at regular intervals recesses ( 13 ) having. Verfahren nach einem der vorhergehenden Ansprüche, wobei zum Entformen die Formkerne (4a, 4b) gezogen und gleichzeitig gerüttelt werden.Method according to one of the preceding claims, wherein for demolding the mandrels ( 4a . 4b ) and shaken at the same time. Verfahren nach einem der vorhergehenden Ansprüche, wobei im eingefahrenen Zustand benachbarte erste (4a) und zweite Formkerne (4b) in entgegengesetzte Richtungen gezogen werden.Method according to one of the preceding claims, wherein in the retracted state adjacent first ( 4a ) and second mandrels ( 4b ) are pulled in opposite directions. Verfahren nach einem der vorhergehenden Ansprüche, wobei während des Ziehens der Formkerne (4a, 4b) die Formelemente (8) von der Unterlage (1) entfernt, vorzugsweise gehoben, werden.Method according to one of the preceding claims, wherein during the drawing of the mandrels ( 4a . 4b ) the form elements ( 8th ) from the base ( 1 ) are removed, preferably lifted. Vorrichtung zur Herstellung eines Beton-Deckenelements, bei dem eine Beton-Schalungsplatte (3a) mit biegesteifen Trägerelementen (3b) versehen ist, mit einer zur Herstellung der Beton-Schalungsplatte (3a) geeigneten Unterlage (1), bei der an mindestens einer Seite eine Einrichtung zum Bewegen parallel ausgerichteter Formkerne (4a, 4b) in einer parallel zur Unterlage (1) verlaufenden Ebene vorgesehen ist und wobei eine Einrichtung zum Anordnen parallel ausgerichteter Formelemente (8) quer zu den Formkernen (4a, 4b) vorgesehen ist.Device for producing a concrete ceiling element, in which a concrete formwork panel ( 3a ) with rigid support elements ( 3b ), with one for producing the concrete formwork panel ( 3a ) suitable substrate ( 1 ), on at least one side of a device for moving parallel aligned mandrels ( 4a . 4b ) in a parallel to the pad ( 1 ) extending level and wherein a device for arranging parallel aligned form elements ( 8th ) transversely to the cores ( 4a . 4b ) is provided. Vorrichtung nach Anspruch 13, wobei an der einen Seite der Unterlage (1) eine erste (5a) und an der gegenüberliegenden anderen Seite der Unterlage (1) eine zweite Einrichtung (5b) zum Bewegen von Formkernen (4a, 4b) vorgesehen ist.Device according to claim 13, wherein on one side of the support ( 1 ) a first ( 5a ) and on the opposite other side of the pad ( 1 ) a second device ( 5b ) for moving mandrels ( 4a . 4b ) is provided. Vorrichtung nach Anspruch 13 oder 14, wobei die Formkerne (4a, 4b) in einer horizontalen Ebene angebracht sind.Apparatus according to claim 13 or 14, wherein the mandrels ( 4a . 4b ) are mounted in a horizontal plane. Vorrichtung nach einem der Ansprüche 13 bis 15, wobei die Formelemente (8) balkenartig ausgebildet sind.Device according to one of claims 13 to 15, wherein the shaped elements ( 8th ) are formed bar-like. Vorrichtung nach einem der Ansprüche 13 bis 16, wobei die Formelemente (8) an einer der Unterlage (1) zugewandten Unterseite (U) zum Profil der Formkerne (4a, 4b) korrespon dierende Ausnehmungen (12) zum Eingriff in die Formkerne (4a, 4b) aufweisen.Device according to one of claims 13 to 16, wherein the shaped elements ( 8th ) on one of the substrates ( 1 ) facing the underside (U) to the profile of the mold cores ( 4a . 4b ) Corresponding recesses ( 12 ) for engagement in the mandrels ( 4a . 4b ) exhibit. Vorrichtung nach einem der Ansprüche 13 bis 17, wobei die Formelemente (8) an einer der Unterlage (1) abgewandten Oberseite (O) in regelmäßigen Abständen vorgesehene Eintiefungen (13) aufweisen.Device according to one of claims 13 to 17, wherein the shaped elements ( 8th ) on one of the substrates ( 1 ) facing away from the top (O) provided at regular intervals recesses ( 13 ) exhibit. Vorrichtung nach einem der Ansprüche 13 bis 18, wobei die Formelemente (8) an ihren Enden von der Unterseite (U) sich erstreckende Fortsätze (15) aufweisen, so dass damit hergestellte Trägerelemente (3b) sich über eine Seitenwand der Beton-Schalungsplatte (3a) hinaus erstrecken.Device according to one of claims 13 to 18, wherein the shaped elements ( 8th ) extending at their ends from the bottom (U) extensions ( 15 ), so that carrier elements produced therewith ( 3b ) over a side wall of the concrete formwork panel ( 3a ). Vorrichtung nach einem der Ansprüche 13 bis 19, wobei eine Einrichtung (6) zum Rütteln der Formkerne (4a, 4b) vorgesehen ist.Device according to one of claims 13 to 19, wherein a device ( 6 ) for shaking the mandrels ( 4a . 4b ) is provided. Vorrichtung nach einem der Ansprüche 13 bis 20, wobei eine Einrichtung zur automatischen Durchführung einer Ziehbewegung der Formkerne (4a, 4b) und einer gleichzeitigen Bewegung, vorzugsweise Abhebebewegung, der Formelemente (8) vorgesehen ist.Device according to one of claims 13 to 20, wherein a device for automatically performing a pulling movement of the mandrels ( 4a . 4b ) and a simultaneous movement, preferably lift-off, of the form elements ( 8th ) is provided. Vorrichtung nach einem der Ansprüche 13 bis 21, wobei eine Einrichtung (11) zum Befüllen der zwischen den Formelementen (8) gebildeten langgestreckten Zwischenräume mit Beton vorgesehen ist.Device according to one of claims 13 to 21, wherein a device ( 11 ) for filling the between the form elements ( 8th ) formed elongated spaces is provided with concrete. Vorrichtung nach einem der Ansprüche 13 bis 22, wobei eine Einrichtung zum Abziehen überschüssigen Betons auf einer durch die Oberseiten (O) der Formelemente (8) gebildeten Abziehfläche vorgesehen ist.Apparatus according to any one of claims 13 to 22, wherein means for extracting excess concrete on a through the tops (O) of the form elements ( 8th ) Abziehfläche is provided.
DE200710040263 2007-08-24 2007-08-24 Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements Expired - Fee Related DE102007040263B3 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
DE200710040263 DE102007040263B3 (en) 2007-08-24 2007-08-24 Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements
PCT/EP2008/061046 WO2009027352A2 (en) 2007-08-24 2008-08-22 Method and device for the production of a concrete ceiling element
EP08787441A EP2183083A2 (en) 2007-08-24 2008-08-22 Method and device for the production of a concrete ceiling element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE200710040263 DE102007040263B3 (en) 2007-08-24 2007-08-24 Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements

Publications (1)

Publication Number Publication Date
DE102007040263B3 true DE102007040263B3 (en) 2008-11-13

Family

ID=39829672

Family Applications (1)

Application Number Title Priority Date Filing Date
DE200710040263 Expired - Fee Related DE102007040263B3 (en) 2007-08-24 2007-08-24 Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements

Country Status (3)

Country Link
EP (1) EP2183083A2 (en)
DE (1) DE102007040263B3 (en)
WO (1) WO2009027352A2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101596740B (en) * 2009-07-15 2012-03-28 甘昌成 Socket type pore-forming mold, socket type pore-forming device and method for preparing porous brick thereof
CN107553696A (en) * 2017-09-13 2018-01-09 长沙远大住宅工业集团股份有限公司 It is a kind of go out muscle prefabricated components mould and forming method
CN114102818A (en) * 2020-08-27 2022-03-01 周兆弟 Production method of variable cross-section precast pile and production equipment of variable cross-section precast pile

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1146180A1 (en) * 2000-04-12 2001-10-17 Ute Huk Process for constructing a concrete floor element and concrete floor element

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH442116A (en) * 1966-05-06 1967-08-15 Nayagam Suzanne Process for the continuous manufacture of molded construction elements in hardenable material, installation for carrying out this process and element obtained using this process
IN154307B (en) * 1979-05-15 1984-10-13 Tharma Nayagam Kandiah
NL8503109A (en) * 1985-11-12 1987-06-01 Ind Bouwmaatschappij Elementum Reinforced-concrete floor production method - uses gas pressure supplied to passages as cores are withdrawn

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1146180A1 (en) * 2000-04-12 2001-10-17 Ute Huk Process for constructing a concrete floor element and concrete floor element

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101596740B (en) * 2009-07-15 2012-03-28 甘昌成 Socket type pore-forming mold, socket type pore-forming device and method for preparing porous brick thereof
CN107553696A (en) * 2017-09-13 2018-01-09 长沙远大住宅工业集团股份有限公司 It is a kind of go out muscle prefabricated components mould and forming method
CN114102818A (en) * 2020-08-27 2022-03-01 周兆弟 Production method of variable cross-section precast pile and production equipment of variable cross-section precast pile

Also Published As

Publication number Publication date
WO2009027352A2 (en) 2009-03-05
WO2009027352A3 (en) 2009-07-09
EP2183083A2 (en) 2010-05-12

Similar Documents

Publication Publication Date Title
DE10018212B4 (en) Process for producing a concrete ceiling element with rigid concrete support elements, ceiling element and device for carrying out the method
EP2189262B1 (en) Method and device for cutting cut-resistant lightweight concrete cakes in lightweight concrete blocks and method and device for producing lightweight concrete blocks
DE102008050955A1 (en) Forming device for finished concrete floor slabs, has plate-shaped forming cavity which forms forming table with side walls, where core tubes are arranged in forming cavity in extendable manner, and vibration unit is provided for core tubes
DE839468C (en) Method and device for pouring concrete moldings
DE102007040263B3 (en) Concrete floor component i.e. bending-resistant concrete floor component, producing method, involves arranging mold elements in gaps formed between frames, and casting concrete in mold cavities formed between mold elements
DE10107531A1 (en) Molded brick producing process involves producing adjacent bricks with axes in longitudinal direction deviating from that of row
DE102017127283A1 (en) Process and plant for the production of hollow concrete elements
DE2759530C3 (en) Device for the manufacture of concrete beams
CH640774A5 (en) Shaping table for prefabricated concrete slabs
EP0896866B1 (en) Process and device for the production of moulded articles
DE10063278C5 (en) Device for separating adhering layers of an aerated concrete block
DE2935726A1 (en) DEVICE FOR MOLDING CONCRETE WALLS
DE3203107A1 (en) Apparatus and process for producing angle elements from concrete
DE19704771C2 (en) Method and device for inserting a reinforcement mat into a mold
DE2812145C2 (en)
DE2166661A1 (en) Box for gas concrete blocks prodn - has liftable frame , with walls engaged by U-shaped plates
DE102016106732B4 (en) Shuttering device for concrete parts
DE3700159A1 (en) Method and apparatus for constructing a main drain
DE102021133597A1 (en) Process and production system for the automated production of a thin-walled concrete component using a shotcrete process and formwork tool
EP0139215A1 (en) Mould with movable parts for precast concrete units
DE161872C (en)
AT243663B (en) Method and device for the mechanical production of reinforced concrete slats
DE290547C (en)
DE10147572B4 (en) Method and device for producing stone moldings and stone molding
DE3344034A1 (en) Installation for assembly-line production of precast concrete parts, in particular of large panels

Legal Events

Date Code Title Description
8364 No opposition during term of opposition
R119 Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee

Effective date: 20120301