DE102004010043A1 - Method and device for producing a watertight connection between a crosscut and a tunnel with segmental lining - Google Patents

Method and device for producing a watertight connection between a crosscut and a tunnel with segmental lining Download PDF

Info

Publication number
DE102004010043A1
DE102004010043A1 DE102004010043A DE102004010043A DE102004010043A1 DE 102004010043 A1 DE102004010043 A1 DE 102004010043A1 DE 102004010043 A DE102004010043 A DE 102004010043A DE 102004010043 A DE102004010043 A DE 102004010043A DE 102004010043 A1 DE102004010043 A1 DE 102004010043A1
Authority
DE
Germany
Prior art keywords
segments
recess
frame
tunnel
crosscut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE102004010043A
Other languages
German (de)
Inventor
Stephan Mayer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ed Zueblin AG
Original Assignee
Ed Zueblin AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=34745338&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=DE102004010043(A1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Ed Zueblin AG filed Critical Ed Zueblin AG
Priority to DE102004010043A priority Critical patent/DE102004010043A1/en
Priority to DE502005003260T priority patent/DE502005003260D1/en
Priority to AT05002751T priority patent/ATE389782T1/en
Priority to EP05002751A priority patent/EP1571293B1/en
Publication of DE102004010043A1 publication Critical patent/DE102004010043A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/36Linings or supports specially shaped for tunnels or galleries of irregular cross-section
    • E21D11/365Linings or supports specially shaped for tunnels or galleries of irregular cross-section for intersecting galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Cable Accessories (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

The tunnel is clad with a multitude of curved concrete segments (6) forming a tube. Before an opening for a branch is created several steel segments are arranged around the planned opening and supported with a temporary frame (7, 8). The segments are taken out in a second step and the soil and rock behind them removed in order to form a branch of the tunnel. Sealing elements (1) are attached to the edges of the curved segments (6) and a concrete lining (11) inserted into the branch embedding the lips of the sealing elements (1).

Description

Technisches GebietTechnical area

Die Erfindung betrifft die Herstellung von Querschlägen bei Tunneln mit Tübbingausbau.The The invention relates to the production of cross passages in tunnels with segmental lining.

Stand der TechnikState of the art

Es ist bekannt, Aussparungen im Tübbingausbau von Tunneln dadurch herzustellen, daß nachträglich nach dem Auffahren der Röhre, der Herstellung der Auskleidung und dem Passieren der Vortriebsmaschine eine Öffnung in die Auskleidung gebrochen bzw. gesägt wird. Es ist auch bekannt, im Aussparungsbereich vereinfachte und mit geringer Festigkeit hergestellte Tübbings anzuordnen.It is known, recesses in the segmental lining Tunnels thereby produce that subsequently after the start of the Tube, the production of the lining and the passage of the tunneling machine an opening is broken or sawn into the lining. It is also known in the recess area simplified and manufactured with low strength tubbing to arrange.

Die in der Auskleidung auszubrechende Öffnung muß die Fläche der gewünschten Aussparung zuzüglich dem Flächenbedarf der dauernden tragfähi gen Einfassung der Aussparung umfassen.The in the lining auszubrechende opening must the surface of the desired recess plus the space requirements the lasting viable conditions Cover the recess.

In die ausgebrochene Öffnung wird dann örtlich untertage ein geschlossener Rahmen eingebaut, der innen die Öffnung der Aussparung freihält.In the broken opening then becomes local Underground a built in a closed frame, the inside of the opening of the Recess free.

Die in die Auskleidung gebrochene Öffnung stört das Gleichgewichtssystem der Tunnelröhre, das sich mit der allseitigen Stützung der geschlossenen Tübbingringe durch das Erdreich aufgebaut hat. Ein Tübbingring verliert bereits durch Herausnehmen eines einzelnen Tübbingelements seine Stabilität. Auf Abtragung größerer Lasten zum Nachbarring über Scherbeanspruchungen ist das Tragsystem in der Regel nicht eingerichtet. Im Bereich der geplanten Öffnung muß deshalb eine aufwendige örtliche Aussteifung in die Tunnelröhre eingebaut werden, die in der Lage ist, die Wirkungen eines veränderten Kräftespiels in einer einseitig geschwächten Tunnelröhre auszugleichen.The Broken opening in the lining disturbs the balance system the tunnel tube, that with the all-round support the closed tubbing rings has built up through the soil. A tubbing ring is already losing by removing a single tubbing element its stability. On removal larger loads to the neighboring ring over shear stresses the support system is usually not set up. Around planned opening must therefore an elaborate local Reinforcement in the tunnel tube be built in, which is able to change the effects of a power play in a one-sided weakened Balance the tunnel tube.

Nachteilig an dieser Vorgehensweise sind die sehr lohnintensiven untertage auszuführenden Arbeiten des Aussteifens der Röhre, des Ausbrechens der Aussparung und des Einbauens des die Aussparung einfassenden Tragrahmens.adversely In this approach are the very wage-intensive underground to be carried out stiffening the tube, the breaking out of the recess and the installation of the recess enclosing support frame.

Die DE 3628607 C2 beschreibt daher einen schon im Zuge der Auffahrung hergestellten, die spätere Aussparung umziehenden geschlossenen Rahmen, bevorzugt aus Stahlelementen zusammengesetzt und statisch tragfähig. Innerhalb des Rahmens befinden sich entfernbare Fülltübbinge.The DE 3628607 C2 describes therefore a already produced in the course of the experience, the subsequent recess moving closed frame, preferably composed of steel elements and static load-bearing. Within the frame are removable filling segments.

Nachteilig bei dieser Konstruktion ist, daß am Übergang des Rahmens zum Ortbeton des Querschlages ein Spalt entsteht, der nur schwer gegen Wasser zutritt abzudichten ist. Nachteilig ist auch, daß der Tragrahmen dauerhaft im Bauwerk verbleibt.adversely in this construction is that at the transition of the frame to the in-situ concrete of the cross-section creates a gap, the it is difficult to seal against access to water. Another disadvantage is that the support frame permanently in the building remains.

Aufgabe der ErfindungObject of the invention

Aufgabe der Erfindung ist es, ein Verfahren anzugeben, mit Hilfe dessen die Herstellung einer wasserdichten Verbindung zwischen Querschlag und Tunnel mit Tübbingausbau, bevorzugt bei einschaliger Bauweise, möglich ist, ohne daß Tragelemente aus Stahl im Bauwerk verbleiben. Aufgabe der Erfindung ist auch die Bereitstellung einer geeigneten Vorrichtung.task The invention is to provide a method by means of which the production of a watertight connection between cross pass and tunnels with segmental lining, preferred in a single-shell design, is possible without any support elements Steel remain in the structure. The object of the invention is also the Providing a suitable device.

Darstellung der Erfindung Die Aufgabe wird durch die im Kennzeichen des Anspruchs 1 und des Vorrichtungsanspruchs 4 angegebenen Merkmale gelöst.presentation The object is achieved by that in the characterizing part of claim 1 and the device claim 4 specified features solved.

Die Erfindung sieht hierzu vor, zwischen die Regeltübbinge an der Stelle der geplanten Aussparung in die Tunnelwand ein oder mehrere entfernbare Segmente, bevorzugt aus Stahl, einzubauen. Die Tübbinge werden dann um die geplante Aussparung herum mittels eines nur temporären Abfangrahmens gestützt, bevor die Stahlsegmente entfernt werden. Die Normalkräfte in den Tübbingringen werden zum Beispiel über Konsolen auf diese Abfangung übertragen. Die Konsolen greifen hierzu bevorzugt in speziell angeordnete Ausnehmungen in den die Querschlagöffnung umgebenden Stahlbetontübbingen ein. Die Anzahl und die Breite der Ausnehmungen ist von der zulässigen Betonpressung und der Tiefe abhängig. Die Tiefe der Ausnehmung reicht bevorzugt maximal bis zur Hälfte der Tübbingstärke.The For this purpose, the invention provides, between the control segments at the point of the planned Recess in the tunnel wall one or more removable segments, preferably made of steel, to be installed. The segments will then be around the planned Recess around supported by means of a temporary catch frame before the steel segments are removed. The normal forces in the tubbing rings for example, over Transfer consoles to this interception. For this purpose, the brackets preferably engage in specially arranged recesses in the cross-pass opening surrounding reinforced concrete segments. The number and the width of the recesses is of the permissible concrete pressure and the depth depends. The depth of the recess preferably ranges up to a maximum of half Lining thickness.

Das durch den exzentrischen Lastangriff entstehende Torsionsmoment auf die Querträger wird bevorzugt über eine Verschraubung in die Tübbinge zurückgehängt, so dass in der Abfangkonstruktion bevorzugt keine oder wenig Momentenbelastung entsteht. Die Tübbingbewehrung muss für diese Belastung ausgelegt sein.The due to the eccentric load attack resulting torsional moment the crossbeams is preferred over a screwed back in the tubbings, so that in the interception preferably no or little moment load arises. The tubing reinforcement must for be designed this load.

In der Kontaktfläche zwischen Stahlkonsole und Beton wird zur gleichmäßigen Lasteinleitung und zur Verhinderung von Betonabplatzungen bevorzugt ein Elastomerlager eingelegt.In the contact surface between steel console and concrete is used for uniform load transfer and Prevention of concrete spalling prefers an elastomeric bearing inserted.

Alternativ zu Konsolen, die in Ausnehmungen im Tübbing eingreifen, ist es auch möglich, daß die Tübbinge, die die Aussparung umgeben, nach außen gerichtete Fortsätze aufweisen, die der Abfangrahmen greifen kann. Prinzipiell ist es auch möglich, daß der Abfangrahmen die Tübbinge an ihren Kanten greift, wobei allerdings die Flächen, auf denen später Dichtungsprofile/Fugenbänder angebracht werden, nicht bedeckt sein dürfen.alternative To consoles that intervene in recesses in the tubbing, it is possible, that the tubbing, which surround the recess, have outward extensions, which the intercepting frame can grip. In principle, it is also possible that the intercepting frame the segments engages at their edges, although the surfaces on which later sealing profiles / waterstops attached are not allowed to be covered.

Eine weitere Möglichkeit zur Lastübertragung auf den Abfangrahmen besteht auch in einer Kraftschlüssigen Verschraubung zwischen Tübbing und Abfangrahmen.A another possibility for load transfer on the interception frame is also in a force-fitting screwing between tubbing and Abfangrahmen.

Der erfindungsgemäße Abfangrahmen ist sinnvollerweise und daher bevorzugt so gestaltet, daß eine Vorspannung des Rahmens möglich ist, z.B. über Pressen.Of the Scraper frame according to the invention is useful and therefore preferably designed so that a bias of the frame possible is, e.g. above Press.

Die Tübbinge, die die vorgesehene Aussparung/Öffnung umgeben, sind so gestaltet, dass nach dem Ausbau der Stahlelemente in der Öffnungsleibung umlaufend die Tübbingdichtungsrahmen freiliegen.The tubbing, the intended recess / opening surrounded, are designed so that after the expansion of the steel elements in the opening reveal surrounding the tubing sealing frame exposed.

Die Seitenflächen der Stahlelemente zu den Stahlbetontübbingen müssen derart gestaltet sein, daß ein Ausbau der Stahlelemente ohne die Zerstörung oder Beschädigung der in der Öffnungsleibung umlaufenden Tübbingdichtungsrahmen möglich ist.The faces The steel elements to the reinforced concrete tubbing must be designed so that an expansion the steel elements without the destruction or damage the circulating in the Öffnungslegibung Segment Gaskets possible is.

An den nun freiliegenden Seiten der Tübbinge werden Dichtungsprofile/Fugenbänder befestigt (z.B. angeflanscht) und diese bei Erstellung des Querschlages in Ortbeton (bevorzugt wasserundurchlässiger Beton) in diesen eingebettet. Auf diese Weise wird eine die Aussparung umgebende wasserdichte Verbindung zwischen Tunnel und Querschlag erreicht.At Sealing profiles / joint tapes are attached to the now exposed sides of the segments (e.g. flange-mounted) and this when creating the cross-section in cast-in-situ concrete (preferably water-impermeable Concrete) embedded in these. In this way, one becomes the recess surrounding watertight connection between tunnel and cross pass reached.

In die freiliegenden Seiten der Tübbinge können z.B. Schraubenanker, bevorzugt bereits bei der Tübbingfertigung, eingebaut werden. Der Einbau eines Festflansches ist ebenso möglich wie die Verwendung von Verbundankern.In the exposed sides of the segments can e.g. Screw anchors, preferably already in the tubbing, be installed. The installation of a fixed flange is just as possible as the use of Anchors.

In den Ecken der Öffnung ist es sinnvoll, die Verschraubung der Flanschkonstruktion in der Winkelhalbierenden anzuordnen, um die erforderliche Pressung der Dichtprofile in den Ecken der Querschlagöffnung zu erzielen.In the corners of the opening it makes sense to screw the flange construction in the Angle bisecting to order the required pressure of the To achieve sealing profiles in the corners of the crosscut opening.

Der Anpreßdruck des Dichtungsprofils auf den Tübbingdichtungsrahmen entspricht dem Kompressionsdruck der Dichtungsrahmen zwischen den Regeltübbingen. Der Anpressdruck des Dichtungsprofils auf den Beton ist entsprechend den Anforderungen nach den üblichen Berechnungsmethoden zu ermitteln.Of the Contact pressure the sealing profile on the Tübbingdichtungsrahmen corresponds to the compression pressure of the sealing frame between the Regeleltübbingen. The contact pressure of the sealing profile on the concrete is corresponding the requirements of the usual Calculation methods to determine.

Zur Abdichtung bei eventuellern Undichtigkeiten kann entlang des Dichtungsprofils/Fugenbandes ein Verpreßschlauch angeordnet sein, um nachträglich noch eine Dichtinjektion durchführen zu können, wie es aus dem Stand der Technik bekannt ist.to Sealing with possible leaks can along the sealing profile / joint tape an injection tube be arranged to be retrofitted still perform a Dichtinjektion to be able to as is known in the art.

Die Figuren illustrieren die Erfindung beispielhaft.The Figures illustrate the invention by way of example.

1 zeigt eine mögliche Anordnung der Dichtungsprofile (Fugenband, Dichtungsrahmen). Das Fugenband ist an der Flanke eines Tübbings angeflanscht, der sich am Rande einer Aussparung in der Tunnelwand befindet. 1 shows a possible arrangement of the sealing profiles (joint tape, sealing frame). The joint tape is flanged to the flank of a tubbing, which is located at the edge of a recess in the tunnel wall.

2 zeigt eine mögliche Anordnung der Verankerung in den Ecken der Querschlagöffnung mit einem Dichtungsprofil (Fugenband, Fugenprofil). 2 shows a possible arrangement of anchoring in the corners of the crosscut opening with a sealing profile (joint tape, joint profile).

3a zeigt im Querschnitt einen möglichen temporären Abfangrahmen, der die Tübbinge um eine Aussparung herum statisch sicher hält, nachdem die Stahlsegmente in der Aussparung entfernt wurden. Der temporäre Rahmen verfügt zusätzlich über Pressen, die es gestatten, die Abfangung unter Vorspannung zu setzen, um eine Entspannung in den Tübbingringen zu verhindern. 3a shows in cross section a possible temporary intercepting frame, which holds the segments statically secure around a recess after the steel segments have been removed in the recess. The temporary frame also has presses that allow the interception to be prestressed to prevent relaxation in the tubbing rings.

3b zeigt einen solchen möglichen temporären Abfangrahmen von vorne (aus dem Tunnelinneren) betrachtet. 3b shows such a possible temporary intercepting frame viewed from the front (inside the tunnel).

3c zeigt denselben Rahmen von hinten betrachtet. 3c shows the same frame viewed from behind.

4 zeigt eine Konsole eines temporären Abfangrahmens ähnlich dem in den 3, welche die Normalkräfte der Tübbingringe in die Abfangkonstruktion aufnimmt. 4 shows a console of a temporary intercepting frame similar to that in the 3 , which receives the normal forces of the tubbing rings in the interception construction.

5 zeigt im Querschnitt einen Querschlag, der von einer Aussparung im Tunnel ausgeht. Das Dichtungsprofil (Fugenband) von 1 ist in den Ortbeton des Querschlages eingebettet. 5 shows in cross-section a cross-section, emanating from a recess in the tunnel. The sealing profile (joint tape) of 1 is embedded in the in-situ concrete of the crosscut.

11
Fugenbandjoint tape
22
LosflanschLosflansch
33
Dichtungsrahmensealing frame
44
Verankerunganchoring
55
Schraubenankerscrew anchor
66
Tübbingtubbing
77
Querträgercrossbeam
88th
Hauptstützemainstay
99
Zusatzstützeadditional support
1010
PressePress
1111
Spritzbetonsicherung QuerschlagShotcrete crosscut
1212
Konsoleconsole
1313
Aussparung im Tübbingrecess in the tubbing
1414
Elastomerlagerelastomeric bearings
1515
Verschraubung des Querträgers am Tübbing für Momentenscrew of the crossbeam on the tub for moments
aufnahmeadmission
1616
Ortbeton Querschlagsitu concrete crosscut

Claims (8)

Verfahren zur Herstellung einer wasserdichten Verbindung zwischen dem Querschlag und einem Tunnel mit Tübbingausbau, dadurch gekennzeichnet, daß der Tunnel an der Stelle der Aussparung zum Querschlag mit entfernbaren Segmenten versehen wird, die an die Aussparung angrenzenden Tübbinge durch einen temporären Abfangrahmen statisch sicher gehalten werden, die entfernbaren Segmente der Aussparung entfernt werden, die Bodenaushebungen zur Herstellung des Querschlages ausgeführt werden, an den die Aussparung umgebenden Flanken der Tübbinge Dichtungsprofile/Fugenbänder befestigt werden, und schließlich der Querschlag in Ortbetonbauweise mittels Schalungen hergestellt wird, wobei die Lippen der Dichtungsprofile/Fugenbänder im Ortbeton eingebettet werden.A method for making a watertight connection between the crosscut and a tunnel with segmental lining, characterized in that the tunnel is provided at the location of the recess for cross-pass with removable segments, which are held statically secure to the recess adjacent segments by a temporary interception frame, the Removable segments of the recess are removed, carried out the Bodenaushebungen for making the crosscut, are secured to the recess surrounding edges of the tubing sealing profiles / waterstops, and finally the cross pass in situ concrete construction is made by formwork, the lips of the sealing profiles / joint tapes in situ concrete be embedded. Verfahren nach Anspruch 1, dadurch gekennzeichnet, daß die Dichtungsprofile/Fugenbänder auf die in der Öffnung umlaufenden Dichtungsrahmen der Tübbinge angeflanscht werden.Method according to claim 1, characterized in that that the Sealing sections / joint strips on the one in the opening be flanged around the circumferential sealing frame of the segments. Verfahren nach mindestens einem der Ansprüche 1 und 2, dadurch gekennzeichnet, daß der Querschlag aus wasserundurchlässigem Beton hergestellt wird.Method according to at least one of claims 1 and 2, characterized in that the Cross passage made of impermeable water Concrete is made. Abfangrahmen zur Durchführung des Verfahrens nach mindestens einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß er die Tübbinge, die die Aussparung umgeben, dergestalt greift, daß an den die Aussparung umgebenden Flanken der Tübbinge genug Platz verbleibt, um dort die Dichtungsprofile/Fugenbänder anzubringen, und daß er eine Öffnung aufweist, durch die der Querschlag zugänglich ist.Interception frame for carrying out the method after at least one of the claims 1 to 3, characterized in that it the tubbing, which the recess surrounded, engages in such a way that to the the recess surrounding flanks of the segments remains enough space, there to install the sealing profiles / waterstops, and that he has an opening, accessible by the cross pass is. Abfangrahmen nach Anspruch 4, dadurch gekennzeichnet, daß der Abfangrahmen zur statischen Sicherung der Tübbinge Fortsätze aufweist, die in Vertiefungen/Ausnehmungen der Tübbinge eingreifen.Trap frame according to claim 4, characterized in that that the Has a support frame for the static securing of the segments which engage in recesses / recesses of the segments. Abfangrahmen nach mindestens einem der Ansprüche 4 und 5, dadurch gekennzeichnet, daß er zur statischen Sicherung der Tübbinge Fortsätze aufweist, die die Kanten der Tübbinge greifen, die die Aussparung umgeben.Trap frame according to at least one of claims 4 and 5, characterized in that it is for static securing of the segments projections which has the edges of the segments grab, which surround the recess. Abfangrahmen nach mindestens einem der Ansprüche 4 bis 6, dadurch gekennzeichnet, daß er zur statischen Sicherung der Tübbinge Mittel aufweist, welche Fortsätze greifen, die aus den Tübbingen herausragen, die die Aussparung umgeben.Intercepting frame according to at least one of claims 4 to 6, characterized in that it static securing of the segments Has means which extensions grab those from the tubbing protrude, which surround the recess. Abfangrahmen nach mindestens einem der Ansprüche 4 bis 7, dadurch gekennzeichnet, daß er in Teilen des Rahmens Pressen aufweist, die es gestatten, die statisch gehaltenen Tübbinge noch vor Entfernung der Segmente der Aussparung unter Vorspannung zu setzen.Intercepting frame according to at least one of claims 4 to 7, characterized in that it Parts of the frame has presses that allow it to be static held segments even before removal of the segments of the recess under bias to put.
DE102004010043A 2004-03-02 2004-03-02 Method and device for producing a watertight connection between a crosscut and a tunnel with segmental lining Withdrawn DE102004010043A1 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE102004010043A DE102004010043A1 (en) 2004-03-02 2004-03-02 Method and device for producing a watertight connection between a crosscut and a tunnel with segmental lining
DE502005003260T DE502005003260D1 (en) 2004-03-02 2005-02-10 Waterproof connection between a crosscut and a tunnel
AT05002751T ATE389782T1 (en) 2004-03-02 2005-02-10 WATERTIGHT CONNECTION BETWEEN A CROSS PASSAGE AND A TUNNEL
EP05002751A EP1571293B1 (en) 2004-03-02 2005-02-10 Waterproof junction between a lateral gallery and a tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE102004010043A DE102004010043A1 (en) 2004-03-02 2004-03-02 Method and device for producing a watertight connection between a crosscut and a tunnel with segmental lining

Publications (1)

Publication Number Publication Date
DE102004010043A1 true DE102004010043A1 (en) 2005-09-15

Family

ID=34745338

Family Applications (2)

Application Number Title Priority Date Filing Date
DE102004010043A Withdrawn DE102004010043A1 (en) 2004-03-02 2004-03-02 Method and device for producing a watertight connection between a crosscut and a tunnel with segmental lining
DE502005003260T Active DE502005003260D1 (en) 2004-03-02 2005-02-10 Waterproof connection between a crosscut and a tunnel

Family Applications After (1)

Application Number Title Priority Date Filing Date
DE502005003260T Active DE502005003260D1 (en) 2004-03-02 2005-02-10 Waterproof connection between a crosscut and a tunnel

Country Status (3)

Country Link
EP (1) EP1571293B1 (en)
AT (1) ATE389782T1 (en)
DE (2) DE102004010043A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2193960A1 (en) 2008-12-05 2010-06-09 Peguform GmbH Modular structured internal cladding component with a bullet channel module for an airbag

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101672187B (en) * 2009-08-13 2012-05-30 重庆市十八土鑫诚灌浆防水工程有限公司 Anti-seepage water treatment method
CN108691546B (en) * 2018-05-29 2019-10-22 中铁十四局集团第二工程有限公司 A kind of Large Span Variable Cross Section tunnel cross section constructing method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3628607A1 (en) * 1986-08-22 1988-02-25 Wayss & Freytag Ag Method of producing recesses of large area in the tubbing support of tunnel or shaft tubes and apparatus for carrying out the method
JP3061586B2 (en) * 1997-02-20 2000-07-10 西松建設株式会社 Segment with water stop device and method of assembling the same
JPH11117686A (en) * 1997-10-14 1999-04-27 Kajima Corp Segment corresponding to opening covered with resin on inner surface
JP3882572B2 (en) * 2001-10-24 2007-02-21 鹿島建設株式会社 Shield tunnel connection structure
JP3964233B2 (en) * 2002-03-06 2007-08-22 三井住友建設株式会社 Shield tunnel structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2193960A1 (en) 2008-12-05 2010-06-09 Peguform GmbH Modular structured internal cladding component with a bullet channel module for an airbag

Also Published As

Publication number Publication date
ATE389782T1 (en) 2008-04-15
DE502005003260D1 (en) 2008-04-30
EP1571293B1 (en) 2008-03-19
EP1571293A1 (en) 2005-09-07

Similar Documents

Publication Publication Date Title
EP3521557B1 (en) Multi-function frame for tubular structures
EP0413693B1 (en) Reinforced concrete construction for road tunnels
EP1571293B1 (en) Waterproof junction between a lateral gallery and a tunnel
DE6753086U (en) STEEL RING CARRIER
DE4412880A1 (en) Process for digging underground cavity
EP1426495A2 (en) Method and device for the construction of a tunnel or a trench
EP0794318B1 (en) Tunnel lining
DE3524253C1 (en) Method and apparatus for producing a shaft, in particular for mining
DE102018119213B4 (en) Method of making a building
DE102012223184A1 (en) Method for mounting light wells on concrete wall, involves embedding two mounting rails in concrete on side of window cut in wall and screwing prefabricated light well to mounting rails, where each mounting rail has multiple anchor elements
DE102009047048B3 (en) Steel tubbing next to a crosscut with a design for a direction-free through hole for the implementation of drill pipes
DE2829712B1 (en) Process for the production of underground structures
DE19808020A1 (en) Procedure for the renovation of retaining walls
DE19518066C1 (en) Method of reconstructing borehole pile with at least one gap in concrete
EP1108855B1 (en) Self-supporting waterproof vault for tunnel lining
DE3404074A1 (en) Method of making a concrete trench wall
DE10342280B4 (en) Construction method for tunnel structures in lid construction under compressed air and building sole for carrying out the construction process
DE202006001989U1 (en) Pit lining reinforcement for restoration of old mining pits, has variable casing body for preparation of inner lining reinforcement, which is adaptable to pit geometry in its geometrical form
DE1041894B (en) Assembly process and formation of a steel-concrete composite structure for shafts
DE3033487C2 (en) Single-layer route extension for mining and tunneling
DE19935315B4 (en) Process for the rehabilitation of a dam
DE8809764U1 (en) Platform kit
AT366472B (en) FLEXIBLE FOLDED GASKET FOR RING JOINTS OF CONCRETE LINING OF CAVITY BUILDINGS AND METHOD FOR THEIR INSTALLATION
DE1534667A1 (en) Process for the construction of tunnels in the ground and for the expansion of routes by means of shield driving
DE10334730A1 (en) Construction of water-proof inner shell and ceiling edges of building constructed in under-cover method with cover being without contact to excavation walls in areas where vertical wall sections contact each other

Legal Events

Date Code Title Description
8139 Disposal/non-payment of the annual fee