CN2856040Y - Settled cone well pile for gas collection well of garbage buried site - Google Patents

Settled cone well pile for gas collection well of garbage buried site Download PDF

Info

Publication number
CN2856040Y
CN2856040Y CNU2005201196275U CN200520119627U CN2856040Y CN 2856040 Y CN2856040 Y CN 2856040Y CN U2005201196275 U CNU2005201196275 U CN U2005201196275U CN 200520119627 U CN200520119627 U CN 200520119627U CN 2856040 Y CN2856040 Y CN 2856040Y
Authority
CN
China
Prior art keywords
pile
cone
stake
diameter
well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2005201196275U
Other languages
Chinese (zh)
Inventor
余元旗
杰瑞
陈金明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN PHASCON TECHNOLOGIES Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2005201196275U priority Critical patent/CN2856040Y/en
Application granted granted Critical
Publication of CN2856040Y publication Critical patent/CN2856040Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • Y02E50/343

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a sunk tapered well pile applied in construction of marsh gas collection well in waste landfill site, comprising a pile cover, pile cylinder and pile crown. The pile crown includes a cone, and the pile cylinder is a hollow pipe. The bottom diameter of the cone is a little bigger than that of the section of the pile cylinder, and the bottom of the cone is connected with one end of the pile cylinder. The outer diameter of the pile cover is slightly bigger than that of the pile cylinder, and the pile cover is used to cover the other end of the pile cylinder. In practical application, the sunk tapered well pile will be vertically positioned by tower frame of pile-driving machine. The pile crown will be downwards, the pile cylinder will be connected with the bottom of pile crown, and the pile cover will be located on the top of the pile cylinder. After the sunk tapered well pile is driven into the waste layer, remove the pile cover and place the collecting pipe of marsh gas at the center of pile cylinder. And then pour the filling materials into the pile cylinder to fix the collecting pipe for marsh gas, guaranteeing that the gas-guide hole is under free status. Lift away the pile cylinder from the waste layer, and make the tapered pile crown be separated from pile cylinder and remained sinking at the well bottom, completing the construction of a collection well for marsh gas.

Description

The garbage category sludge gas collection well construction settled cone well pile
[technical field]:
The utility model relates to a kind of well stake of the sludge gas collection well construction when being used for garbage category sludge gas and collecting.
[background technology]:
Along with fast development of Chinese economy, a large amount of population is leapt up into the city, and the scale in city and circle, territory constantly enlarge, and process of urbanization is at a tremendous pace.We are when enjoying prosperity, also just stand living environment and constantly worsening the consequence of bringing, urban population is increased sharply on the one hand, domestic refuse also increases severely, statistics according to State Environmental Protection Administration, the China town dweller produces about 500 kilograms of quantity of refuse per capita per year, and 2002 produce 1.36 hundred million of rubbish total amounts per year, and it is 9% that rubbish produces annual growth.The treatment process of China's municipal wastes is at present also relatively backward, its main method is a landfill, accounts for more than 95% of whole waste disposal method, burns only to account for seldom part, thereby the land resources that causes being used for landfill waste is more and more in short supply, and rubbish and people strive for that spatial contradiction more and more intensifies; On the other hand, the burying method that China adopted is the method for arbitrarily stacking basically, without harmless treatment, along with the scale and the circle, territory in city constantly enlarges, originally the refuse landfill that was in urban fringe is just becoming new down town, and the refuse landfill pollution problem is just becoming a difficult problem anxious to be solved.
Usually, contain organism such as a large amount of fruits and vegetables skins, swill, dish leaf, paper, fur in the domestic waste; The city organic substances such as the leaf branch that also contains some amount in the rubbish that produces, grass of keeping a public place clean; Therefore in entering the rubbish of landfill yard, contain quite abundant organic substance.In a single day rubbish enter landfill yard, and the decomposition course of microorganism has just begun: the first step is that oxygen consumption decomposes, and consumes the oxygen in the landfill yard, produces a large amount of heat; Second step was carried out anaerobic digestion, produced biogas.As the bio anaerobic degradation process of rubbish itself, its final product mainly is CO 2And CH 4Rubbish is by the initial stage of landfill, and it mainly is CO that organism decomposes the waste gas that produces 2, after after a while, the methane composition in the gas rises gradually, and the aerogenesis peak generally will just occur after garbage loading embeading 3~5 years, and CH in the exhaust gas discharged 4(CH in the air can set off an explosion when content is higher 4The limits of explosion scope be 5~15V%).Therefore, the collection and treatment of carrying out landfill gas is a very important job.Gaseous constituent changes with the landfill time limit and the different of component of refuse with concentration.The following direct harm of the general existence of undressed refuse landfill:
1, the foul gas (claiming biogas again) that constantly distributes of refuse tip mainly is made up of methane and other toxic and harmfuls.Methane is a kind of fuel efficiently, if but deal with improperly, discharge in nearly Residential areas, in case it is inflammable and explosive to meet with Mars, bring threat for life and property;
2, methane also is the very strong gas of a kind of Greenhouse effect (be carbonic acid gas 21 times), if in a large number to aerial directly discharging, cause Greenhouse effect easily, the atmospheric environment that causes the mankind to depend on for existence degenerates, therefore, United Nations just requires the take measures discharging of all kinds of greenhouse gases of mandatory minimizing of national governments by " Kyodo Protocol book ".
At present domestic newly-built refuse landfill is required to set up the collecting methane system, the biogas of recovery can be used as fuel and directly use, and also can be used for generating.The collecting methane system comprises sludge gas collection well, collecting pipe, gas-holder, collection and confinement of gases pumping plant etc.The construction of sludge gas collection well is the key and the difficult point of whole collecting methane system, does not have effective method at present; A kind of is to take the method excavated, excavates at landfill yard with excavator, and the rubbish that digs out needs to stack in addition, when construction, the continuous effusion biogas of meeting works the mischief to the workmen, and engineering accident also easily takes place, the thickness of landfill yard rubbish generally reaches tens of rice, along with the degree of depth strengthens, it is next increasing to excavate the construction difficulty, and therefore this method is built and collected well, difficulty of construction is big, the cycle is long, and manpower and materials have high input.Building construction problem for solve collecting well, having occurred some special garbage category sludge gas well excavating equipments abroad, but this equipment not only price is high, and because bulky, transportation inconvenience, it is very inconvenient to enter refuse landfill.Prior art also attempts building the collection well with oscillatory type stake-man method, but because refuse material is formed complexity, waste layer has certain elasticity, and the sludge gas collection well hole diameter is bigger, makes this constructional method be difficult to gather effect.
In sum, because very big to the investment cost of category sludge gas collection system, local finance are difficult to bear, and domestic local finance are difficult to bear, and are difficult at home apply.Therefore, the biogas of China's city refuse landfill is not almost collected, and harm is conspicuous, not only causes odor pollution, brings inflammable and explosive threat, and has wasted a large amount of utilizable energies source; Even there is the only a few city to handle, also be to adopt the very huge form of construction work of above-mentioned investment to handle, the economic benefit of investment is very poor.
[summary of the invention]:
The purpose of this utility model is exactly in order to overcome the above problems, and the garbage category sludge gas collection well construction that a kind of input cost is low, social benefit is high settled cone well pile is provided.
For achieving the above object, the utility model proposes a kind of garbage category sludge gas collection well construction settled cone well pile, comprise stake lid, stake tube, pile crown, described pile crown comprises cone, described stake tube is a hollow tubular, described cone bottom surface slightly larger in diameter is used for joining with an end of described stake tube in described stake tube diameter of section; Described stake lid external diameter is slightly larger than described stake tube external diameter, is used to be covered on the other end of described stake tube.
Above-mentioned settled cone well pile, described stake lid comprises circular bottom wall, sidewall, described sidewall and described diapire are perpendicular and stretch along the circumferential same direction of described diapire edge; The internal diameter of described sidewall is more than or equal to described stake tube external diameter.Or described stake lid comprises circular bottom wall, is in the diapire circumference the protruding wall of ring-type with described diapire vertical connection, and the external diameter of the protruding wall of described ring-type is less than or equal to the external diameter of described stake tube; The internal diameter of described convex annular wall is slightly less than or equals the internal diameter of described stake tube.
Or above-mentioned settled cone well pile, described stake lid comprises two sections cylinders that link to each other with one heart, and the diameter of lower cylindrical is slightly smaller than stake tube internal diameter, and the diameter tip of top cylinder is greater than the external diameter of stake tube.The cylinder boss that above-mentioned settled cone well pile, described pile crown comprise cone, join with facies basialis pyramidis, described cone diameter is slightly larger than described cylinder boss diameter, and the diameter of described cylinder boss is slightly less than or equals the internal diameter of described stake tube.
Or described pile crown comprises cone, its facies basialis pyramidis is provided with the annular recesses that the center overlaps with described cone axis, the external diameter of described annular recesses is slightly larger than or equals the external diameter of described stake tube, and the internal diameter of described annular recesses is slightly less than or equals the internal diameter of described stake tube; Described annular recesses is used for matching with described stake tube one end.Described pile crown also comprises cylinder boss, and its cross section overlaps with described annular recesses inner periphery and joins.
Or described pile crown comprises cone, the protruding wall of outer ring-like that joins with facies basialis pyramidis and in the protruding wall of ring-type, protruding wall of described outer ring-like and the interior protruding wall of ring-type surround and form an annular recess, described annular recesses external diameter is slightly larger than or equals the external diameter of described stake tube, and the internal diameter of described convex annular wall is slightly less than or equals the internal diameter of described stake tube.
Above-mentioned settled cone well pile, described stake tube are hollow cylinders that can withstand shocks power, drum length decision biogas well depth.The top of stake tube is provided with the lifting ring or colludes, and is used for a machine stake tube is proposed from landfill yard.
Use the garbage category sludge gas collection well construction method of above-mentioned garbage category sludge gas collection well construction, comprise the steps: with settled cone well pile
1) sets up collision type stake machine;
2) stake machine pylon is the settled cone well pile vertically orient, pile crown down, the stake tube joins with the pile crown bottom surface, stake is covered on a stake top;
3) start the stake machine, settled cone well pile is squeezed in the waste layer with stake machine hammer;
4) take off the stake lid, will have the biogas effuser of gas port to put into stake tube central authorities;
5) stopping composition is poured in the stake tube, fixedly the biogas effuser is in the central authorities of stake tube;
6) the stake tube is hung waste layer, cone separates with the stake tube and sinks and stay the shaft bottom, finishes the construction of a sludge gas collection well.
Above-mentioned constructional method, the rubble that the preferred maximum secting area of the stopping composition in the described step 5) is bigger slightly than gas port.
Owing to adopted above scheme, use equipment of the present utility model, its effect is: construction process need not excavate landfill yard, therefore can not cause new pollution, safe and reliable, simple efficient, the construction cost of input, equipment purchasing expense are lower than conventional treatment process widely, the workmen significantly reduces, so also reduces greatly on the running cost.The biogas well excavates and effuser is laid in conjunction with carrying out, and has accelerated the speed of application of collecting methane system building greatly, has significantly shortened the construction period.
Well stake of the present utility model, simple in structure, realize that easily cost is low.
Use the utility model preparation of construction, because input cost reduces significantly, it is the sixth that excavates the arrangement and method for construction cost, and the construction period shortens significantly, make the comprehensive regulation of refuse landfill drop into low, instant effect also can take effect as early as possible to the utilization of the renewable energy resources, to city, country, and administer and energy development has secular, immeasurable promoter action to global environment.
[description of drawings]:
Fig. 1 is the structural representation of garbage category sludge gas collection system;
Fig. 2 is the diagrammatic cross-section of the settled cone well pile of the embodiment of the invention one along axial line;
Fig. 3 is the stake lid structural representation of the settled cone well pile of the embodiment of the invention one.
Fig. 4 is the stake barrel structure synoptic diagram of the settled cone well pile of the embodiment of the invention one.
Fig. 5 is the pile crown structural representation of the settled cone well pile of the embodiment of the invention one.
Fig. 6 is the pile crown structural representation of the settled cone well pile of the embodiment of the invention two.
Fig. 7 is the pile crown structural representation of the settled cone well pile of the embodiment of the invention three.
Fig. 8 is the pile crown structural representation of the settled cone well pile of the embodiment of the invention three.
Fig. 9 is the settled cone well pile stake lid structural representation of the embodiment of the invention five.
Figure 10 is the settled cone well pile structural representation of the embodiment of the invention five.
Figure 11 is for burying sludge gas collection well structural representation behind the effuser underground.
[embodiment]:
Also the present invention is described in further detail in conjunction with the accompanying drawings below by specific embodiment.
Embodiment one: this example is a preferred embodiment.
When setting up the garbage category sludge gas collection system, at first need on the refuse tip, get the sludge gas collection well of some amount, be used for landfill biogas effuser.Please refer to shown in Figure 10ly, this collection well need go deep in the waste layer, the therefore particular case of looking landfill yard, and it is general relevant with the degree of depth of waste layer to collect well depth; Then the area with landfill yard is relevant to collect the quantity of well, generally is that the 40 meters spacings of being separated by are provided with a collection well.As shown in Figure 1, each is collected and buries vertical biogas effuser 10 in the well underground, and each vertical biogas effuser is connected with lateral transfer pipe 11, is delivered to gas-holder by fan again.
The manufacture process of sludge gas collection well: set up collision type stake machine on landfill yard, settled cone well pile adopts the garbage category sludge gas collection settled cone well pile of the present invention according to the design of landfill yard geology characteristic., be this a kind of embodiment that collects settled cone well pile please, comprise stake lid 1, stake tube 2, pile crown 3 in conjunction with Fig. 2-shown in Figure 5, as shown in Figure 3, the stake lid comprises two sections cylinders that link to each other with one heart, and the diameter of lower cylindrical is slightly smaller than stake tube internal diameter, and the diameter tip of top cylinder is greater than the external diameter of stake tube.As shown in Figure 4, the stake tube is a cylinder type hollow steel pipe, 1 meter of caliber, and the top of stake tube is provided with web member 4, and this web member can be hook or suspension ring etc., is used for a machine stake tube is hung from landfill yard landfill layer.Stake is covered on the stake tube, and it is fastening that stake lid and stake tin can adopt web member 4 to carry out, also can be fastening; The height of stake tube can be determined flexibly according to the degree of depth of landfill yard waste layer.As shown in Figure 5, pile crown integral body is arrow shaped, and the front portion is a cone 31, and facies basialis pyramidis and round platform 32 join, and the cylinder boss center of circle is on the cone axis heart line, and the facies basialis pyramidis slightly larger in diameter is in stake tube diameter, and stake tube slightly larger in diameter is in the cylinder boss diameter; The stake jacket casing is located at outside the cylinder boss of pile crown, joins with facies basialis pyramidis.During construction, with the position of mechanical manipulator restriction settled cone well pile, stake machine weight applies vertical reactive force to settled cone well pile stake lid under motor drives on the frame of stake machine, and mechanical manipulator applies guide effect to settled cone well pile, to guarantee to collect the direction of motion of settled cone well pile.Settled cone well pile is under the weight bump, under the acting in conjunction of impact force, hammer body and settled cone well pile self gravitation, the conical surface of rubbish by pile crown by to around extruding, the suffered resistance of whole settled cone well pile is reduced greatly, settled cone well pile can be fast, be deep in the waste layer effortlessly.Because the constitutional features of pile crown, the round platform of stake tube by pile crown spacing neither can break away from the two and joins, and also can not produce dislocation etc.
After the stake tube gos deep into waste layer and reaches target depth, remove the stake lid, please refer to shown in the accompanying drawing 11, on landfill yard ground, form " well " that pushes out by the stake tube this moment, the PVC effuser 8 of the gas port that gathers is put into " well " along stake tube axle center, the fixed set tracheae will be gone in the stake tube again through rubble 6 landfills that clean and select.
After effuser is fixed, adopt loop wheel machine to connect the suspension ring or the hook 4 of stake tube, the stake tube is extracted from waste layer 7, because pile crown is not to fixedly connected with the stake tube, pile crown is left on the shaft bottom.And stake tube and stake lid can reuse.The length of effuser is decided according to well depth, be covered with gas port on the length of one end 2/3rds, this section of effuser isolated by rubble and rubbish that maximum secting area is slightly larger than gas port, owing to there is abundant gap between the rubble, biogas is collected into effuser by the gap.
After pouring rubble fixed set tracheae into, remainder covered last layer sealing ply 5 by the well head of about 1/3rd well depths of rubble landfill, the sealing layer is selected the high viscosity clay for use, compacting compresses, this clay seam can make biogas can not overflow and directly sky be discharged, and improves the effective collection to biogas.
According to constructional method of the present invention, utilize preparation of construction of the present invention, built sludge gas collection well, buried vertical effuser underground after, again each effuser is connected with horizontal transfer lime, connect gas-holder more successively.
Embodiment two: as shown in Figure 6, this routine pile crown offers ring groove 33 in the bottom surface of cone 31, this ring groove external diameter is slightly larger than or equals the external diameter of stake tube, and the ring groove internal diameter is slightly less than or equals the internal diameter of stake tube, on the axis that is centered close to cone of ring groove.During construction, stake tube one end embeds in the ring groove, and under bump and action of gravity, settled cone well pile is deep in the waste layer; When hanging the stake tube after placing the biogas effuser, because the bottom surface of pile crown cone is slightly larger than the external diameter of stake tube, under drag effect, pile crown is left on the shaft bottom; And a stake tube external diameter is slightly less than pile crown, by the extruding of pile crown to waste layer, makes the stake tube go deep into being subjected to hardly after the waste layer extruding of rubbish, and therefore when hanging village's stake tube, the suffered resistance of stake tube is little, is easy to be hung waste layer.
Embodiment three: as shown in Figure 7, protruding wall 35 of outer ring-like and ring-type convex wall 34 that this routine pile crown comprises cone 31, joins with facies basialis pyramidis, protruding wall of outer ring-like and the interior protruding wall of ring-type surround and form an annular recess 33, the annular recesses external diameter is slightly larger than or equals the external diameter of stake tube, and the internal diameter of convex annular wall is slightly less than or equals the internal diameter of stake tube.During construction, stake tube one end embeds in the annular recesses 33.
Embodiment four: as shown in Figure 8, this routine pile crown is on the basis of embodiment one, and the root that joins in cylinder boss 32 and cone bottom surface encircles cylinder boss and offers an annular recesses 33, stake tube one end embeds in the annular recesses, can play better positioning action.
Embodiment five: as Fig. 9, shown in Figure 10, the difference of this example and embodiment one is, the stake lid 1 of this example comprises circular bottom wall, sidewall, and sidewall and diapire are perpendicular and stretch along the circumferential same direction of diapire edge; The internal diameter of sidewall is more than or equal to stake tube external diameter.The spacing stake lid that makes of sidewall is sheathed on the stake tube.

Claims (10)

1, a kind of garbage category sludge gas collection well construction settled cone well pile, it is characterized in that: comprise stake lid (1), stake tube (2), pile crown (3), described pile crown comprises cone, described stake tube is a hollow tubular, described cone bottom surface slightly larger in diameter is used for joining with an end of described stake tube in described stake tube diameter of section; Described stake lid external diameter is slightly larger than described stake tube external diameter, is used to be covered on the other end of described stake tube.
2, settled cone well pile as claimed in claim 1, it is characterized in that: the cylinder boss that described pile crown comprises cone, joins with facies basialis pyramidis, described cone diameter is slightly larger than described cylinder boss diameter, and the diameter of described cylinder boss is slightly less than or equals the internal diameter of described stake tube.
3, settled cone well pile as claimed in claim 1, it is characterized in that: the facies basialis pyramidis of the cone of described pile crown is provided with the annular recesses that the center overlaps with described cone axis, the external diameter of described annular recesses is slightly larger than or equals the external diameter of described stake tube, and the internal diameter of described annular recesses is slightly less than or equals the internal diameter of described stake tube; Described annular recesses is used for matching with described stake tube one end.
4, settled cone well pile as claimed in claim 1, it is characterized in that: the protruding wall of outer ring-like that described pile crown comprises cone, join with facies basialis pyramidis and in the protruding wall of ring-type, protruding wall of described outer ring-like and the interior protruding wall of ring-type surround and form an annular recess, described annular recesses external diameter is slightly larger than or equals the external diameter of described stake tube, and the internal diameter of described convex annular wall is slightly less than or equals the internal diameter of described stake tube.
5, settled cone well pile as claimed in claim 2 is characterized in that: described pile crown also comprises cylinder boss, and its cross section overlaps with described annular recesses inner periphery and joins.
6, settled cone well pile as claimed in claim 1 is characterized in that: described stake lid comprises two sections cylinders that link to each other with one heart, and the diameter of lower cylindrical is slightly smaller than stake tube internal diameter, and the slightly larger in diameter of top cylinder is in the external diameter of stake tube.
7, settled cone well pile as claimed in claim 1 is characterized in that: described stake lid comprises circular bottom wall, sidewall, and described sidewall and described diapire are perpendicular and stretch along the circumferential same direction of described diapire edge; The internal diameter of described sidewall is more than or equal to described stake tube external diameter.
8, settled cone well pile as claimed in claim 1 is characterized in that: described stake lid comprises circular bottom wall, is in the diapire circumference and the protruding wall of ring-type of described diapire vertical connection, and the external diameter of the protruding wall of described ring-type is less than or equal to the external diameter of described stake tube; The internal diameter of described convex annular wall is slightly less than or equals the internal diameter of described stake tube.
9, settled cone well pile as claimed in claim 2 is characterized in that: described stake lid comprises two sections cylinders that link to each other with one heart, and the diameter of lower cylindrical is slightly smaller than stake tube internal diameter, and the slightly larger in diameter of top cylinder is in the external diameter of stake tube.
10, as each described settled cone well pile among the claim 1-9, it is characterized in that: described stake tube is a hollow cylinder that can withstand shocks power, and the top of stake tube is provided with the lifting ring or colludes, and is used for a machine stake tube is proposed from landfill yard.
CNU2005201196275U 2005-12-07 2005-12-07 Settled cone well pile for gas collection well of garbage buried site Expired - Fee Related CN2856040Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2005201196275U CN2856040Y (en) 2005-12-07 2005-12-07 Settled cone well pile for gas collection well of garbage buried site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2005201196275U CN2856040Y (en) 2005-12-07 2005-12-07 Settled cone well pile for gas collection well of garbage buried site

Publications (1)

Publication Number Publication Date
CN2856040Y true CN2856040Y (en) 2007-01-10

Family

ID=37599346

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2005201196275U Expired - Fee Related CN2856040Y (en) 2005-12-07 2005-12-07 Settled cone well pile for gas collection well of garbage buried site

Country Status (1)

Country Link
CN (1) CN2856040Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100393865C (en) * 2005-12-07 2008-06-11 余元旗 Sunk cone well pile for garbage category sludge gas collection well construction and its construction method
CN115341529A (en) * 2022-09-19 2022-11-15 中国路桥工程有限责任公司 Cement stirring grouting reinforcement treatment method and device for deep soft soil foundation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100393865C (en) * 2005-12-07 2008-06-11 余元旗 Sunk cone well pile for garbage category sludge gas collection well construction and its construction method
CN115341529A (en) * 2022-09-19 2022-11-15 中国路桥工程有限责任公司 Cement stirring grouting reinforcement treatment method and device for deep soft soil foundation
CN115341529B (en) * 2022-09-19 2023-09-01 中国路桥工程有限责任公司 Cement stirring grouting reinforcement treatment method and device for deep soft soil foundation

Similar Documents

Publication Publication Date Title
CN100393865C (en) Sunk cone well pile for garbage category sludge gas collection well construction and its construction method
CN106424075B (en) Novel covering system for landfill gas in-situ treatment of aerobic remediation of landfill
CN102921695A (en) Water-sorting resource, harmlessness and natural-derivation recycling eco-system of municipal domestic wastes
CN102284466A (en) Method and system for integrated treatment and recycling of domestic garbage landfill
CN2856040Y (en) Settled cone well pile for gas collection well of garbage buried site
CN102501397A (en) Air pressure type garbage forming environmental protection machine
CN102442007A (en) Manual air pressure type garbage forming environmental protection machine
CN206104531U (en) Assembly line is dealt with in minimizing of stock rubbish
CN102442008A (en) Full-automatic hydraulic type garbage forming environmental protection machine
CN202741326U (en) Circular grating type rotary drum screening machine
CN202080993U (en) Town residential area biogas generating pit
CN205098817U (en) Garbage disposal station
CN207641109U (en) A kind of equipment for separating liquid from solid
CN204247668U (en) Spike formula refuse landfill landfill gas is combined pump drainage and is collected well with percolate
CN207017252U (en) The pile tube of sawtooth pile crown
CN109012957A (en) A kind of construction material grinding device
CN209468436U (en) A kind of rubbish rotary kiln degradation soiling solution floods oxygen purification combination unit
CN105170609A (en) Garbage disposal station
CN102431194A (en) Manual hydraulic type garbage molding environmental protection machine
CN208200944U (en) A kind of refuse landfill gas gathering system
CN207794058U (en) A kind of long steel sheet pile of splice type
CN202117050U (en) Bearing foundation pile for marine large wind power generator and tower
CN110206056A (en) A kind of Center stake for offshore wind farm adds negative pressure cylinder composite foundation and operating method
CN212865901U (en) Reusable collecting drill pile for landfill
CN212857080U (en) Drilled pile collecting system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: GERRY YANG JINMING

Owner name: SHENZHEN PHASCON TECHNOLOGIES CO., LTD.

Free format text: FORMER OWNER: YU YUANQI

Effective date: 20110902

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yu Yuanqi

Inventor after: Jie Rui

Inventor after: Yang Jinming

Inventor before: Yu Yuanqi

Inventor before: Jie Rui

Inventor before: Chen Jinming

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 518063 SHENZHEN, GUANGDONG PROVINCE TO: 518057 SHENZHEN, GUANGDONG PROVINCE

Free format text: CORRECT: INVENTOR; FROM: YU YUANQI GERRY CHEN JINMING TO: YU YUANQI GERRY YANG JINMING

TR01 Transfer of patent right

Effective date of registration: 20110902

Address after: 518057, Shenzhen hi tech Industrial Park, South District, Nanshan District science and technology, South Road, twelve square building, 1809-1810

Patentee after: Shenzhen PhasCon Technologies Co., Ltd.

Address before: 18 building, 518063 square building, Nanshan District hi tech park, Shenzhen, Guangdong

Co-patentee before: Jie Rui

Patentee before: Yu Yuanqi

Co-patentee before: Yang Jinming

DD01 Delivery of document by public notice

Addressee: Shenzhen PhasCon Technologies Co., Ltd.

Document name: Notification of Termination of Patent Right

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070110

Termination date: 20141207

EXPY Termination of patent right or utility model