CN2765352Y - 双柱组合悬索式跨越架 - Google Patents
双柱组合悬索式跨越架 Download PDFInfo
- Publication number
- CN2765352Y CN2765352Y CN 200520095051 CN200520095051U CN2765352Y CN 2765352 Y CN2765352 Y CN 2765352Y CN 200520095051 CN200520095051 CN 200520095051 CN 200520095051 U CN200520095051 U CN 200520095051U CN 2765352 Y CN2765352 Y CN 2765352Y
- Authority
- CN
- China
- Prior art keywords
- insulation
- rope
- principal post
- steel wire
- crossing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型公开了一种应用于不停电架设线路的双柱组合悬索式跨越架,该跨越架包括主柱1、绝缘拉线及绝缘封顶网,主柱的铝合金段间设有环氧树脂绝缘段3,主柱顶部之间使用由尼龙滚筒7与钢丝绳8组合而成的带尼龙滚筒钢丝绳悬索连接。由承载索的迪尼玛绳4与锦纶绳编织的跨越封顶网5组合成绝缘封顶网。固定主柱顶端的迪尼玛绝缘拉线由与主柱上端连接的迪尼玛绝缘绳9和与地面固定的钢丝绳10连接构成绝缘拉线。所述跨越架提高了封网宽度,提升了安全度,使用现有的抱杆工具就可组建,并且造价低廉、装拆方便,适用于各种复杂地形。
Description
技术领域
本实用新型涉及高压输电线路建设的一种不停电跨越架线作业工艺装置,特别是涉及一种用于不停电架设线路的跨越架。
技术背景
随着电网建设的发展,送电线路施工也从原先的完全停电跨越架线、不停电跨越架线向完全不停电跨越架线升级和发展。以往常用的格构式跨越架是以每相线双柱,每柱带有越线横担,各相线的跨越架是独立支撑,跨越架有三组共六根立柱。如中国专利02224747“带电跨越架”采用了护线横担,由于横担的宽度是比较窄且固定的,限制了封网的范围;专利号01131121“跨越架或组竖立方法”设计了专用的金属梯形片状架体,增加了额外的成本;专利号00226069的“四柱桥式带电作业跨越架”公开了一种四根立柱的跨越架,其通过桥臂对接后形成桥架,在桥架上铺设绝缘网,由于桥架的长度是受到限制和固定的,限制了封网范围,同时跨越架的头重脚轻不利于架体的安全。
发明内容
本实用新型提供了一种解决封网保护宽度小、安装不方便、使用不灵活的双柱组合悬索式跨越架,其技术内容如下:
一种双柱组合悬索式跨越架,包括四根中部具有绝缘段的铝合金主柱及固定主柱上端的迪尼玛绝缘拉线、固定在主柱顶部的绝缘封顶网、用于固定主柱的底座。主柱分段连接之间有绝缘段。主柱顶部之间使用带尼龙滚筒钢丝绳悬索连接。作为承载索的迪尼玛绳与锦纶绳网组合成绝缘封顶网,从而更轻便,保护范围更广。
所述的带尼龙滚筒钢丝绳悬索由尼龙滚筒套在钢丝绳上,可自由转动,其中的钢丝绳悬索连接到主柱的顶部并延长连接至地锚上。
所述的迪尼玛绝缘拉线由主柱上端连接的迪尼玛绝缘绳和与地面固定的钢丝绳连接构成;所述的主柱可以是抱杆,只要在普通的抱杆分段连接处加上绝缘段即可,绝缘段为环氧树脂绝缘段,从而使跨越架具备了“双绝缘”结构,为靠近带电体组立创造了条件。
由于跨越架主柱具有“双绝缘”配置,组立时可以不受安全距离的限制,扩大了跨越架的适用性;封网宽度的增大提高了跨越架不停电跨越架线的可靠性;用悬索代替顶部羊角横担,避免了跨越架的头重脚轻,提高了架体组立的安全性;悬索是由钢丝绳和尼龙滚筒组装而成,可以根据需要设计成不同长度而适用于不同电压等级线路的系列产品,拓宽了使用范围;使用同样用于输电线路铁塔组立的抱杆,成本及安装工作均有减少,有利于不停电跨越架线的快速施工。
附图说明
图1是本实用新型一侧封网安装布置图;
图2是本实用新型主柱及拉线示意图;
图3是本实用新型尼龙滚筒钢绳悬索越线装置示意图。
具体实施方式
如图1所示,作为承载索的迪尼玛绳4与锦纶绳编织的跨越封顶网5组合成绝缘封顶网,封网承载滑道绳通过滑车延伸至地面,用1t双钩调节收紧,可共用一组锚桩。迪尼玛承载绳的弛度应控制在0.1~0.2m之间。当跨距100m,封顶网的综合弛度应控制在4.0m。保持封顶网与带电线路的架空地线距离大于1.5m(220kV电压等级)。封顶网的保护宽度为8m,中间部分的封顶网宽度宜选用保护宽度为7m的彩色绝缘网。不停电跨越架线的方式有两种,第一种方式:停电搭设跨越架,不停电跨越架线;第二种方式:跨越架的搭设,跨越架线完全不停电。应尽可能选择第一种方式。
如图2所示,跨越架为铝合金主柱1,截面口600×600mm,最大高度为50m,底部锥段与底座板铰2固定。跨越架的最大设置高度(在100m跨距时)应能满足被跨电力线路架空地线对地距离为43m以下(考虑封顶网系统的综合弛度和最小安全间距,跨越架约高出被跨电力线路架空地线7m)。跨越架高为50m至39m时,安装三层拉线;跨越架高38m至24m时,安装二层拉线;跨越架高小于24m时,安装一层接线。拉线为十字交叉,平面夹角互成45°。主柱上层拉线紧固使用60kN手板葫芦,中下层使用30kN双钩,上层拉线的对地夹角45~60°,同向的拉线共用一个地锚,地锚的规格为Φ230×1600,埋深要求:坚土不小于1.8m,软土不小于2m。
当跨越架主柱与带电线路的距离达不到倒杆距离或跨越架组立完成后安全距离不满足要求时,应有“双绝缘”配置,在距离带电线路下方5m的跨越架相应位置安装环氧树脂绝缘段3,跨越架主柱段与绝缘段之间用M16×55(6.8级)螺栓相连;迪尼玛绝缘拉线由与主柱上端连接的迪尼玛绝缘绳9和与地面固定的钢丝绳10连接构成,上层拉线与主柱连接端必须使用φ14×30m迪尼玛绝缘绳9。
如图3所示,尼龙滚筒钢绳悬索式越线系统是跨越架重要的承力系统,其中的带尼龙滚筒的钢丝绳悬索越线装置由尼龙滚筒8与钢丝绳7分段连接而成。每相滚筒钢绳悬索保护范围的中心均应对准在建线路相应的各相线。双联钢丝绳(φ15)悬索两端分别穿过两根主柱顶部两侧挂环上的开口滑车,连接5t平衡滑车,再通过φ17钢丝绳连接延长,通过手扳葫芦与地锚相连收紧,对地夹角应不大于45°,地锚埋深要求不少于2m。悬索安装后,悬索中间段最低点的弛度应控制在2.0~2.5m之间。
绝缘段、绝缘绳、封顶网应参照《电业安全工作规程(电力线路部分)》DL 409-91进行保管与试验。
跨越架主要技术性能参数:
1)正常情况:垂直荷载15kN;网绳张力5.0kN;最大风速30m/s。
2)事故情况:垂直荷载15kN;水平荷载4.5kN。
3)主柱容许中心承载为80kN。
4)跨越距离40m~100m;最大设计高度50m(配3层拉线)。
5)封网宽度8m~7m。封顶网尺寸:8m×20m;7m×20m(花色)。
6)跨越架主柱与抱杆通用,容许受压力根据使用长度而确定。
Claims (5)
1、一种双柱组合悬索式跨越架,包括四根中部具有绝缘段的铝合金主柱及固定主柱的迪尼玛绝缘拉线,安装在主柱顶部带尼龙滚筒的钢丝绳悬索越线装置、绝缘封顶网、用于固定主柱的底座,其特征在于:铝合金主柱(1)分段连接之间有绝缘段(3),主柱采用迪尼玛绝缘拉线(9),主柱顶部之间安装连接带尼龙滚筒的钢丝绳悬索越线装置,作为承载索的迪尼玛绳(4)与锦纶绳编织的跨越封顶网(5)组合成绝缘封顶网。
2、根据权利要求1所述的双柱组合悬索式跨越架,其特征在于:所述的带尼龙滚筒的钢丝绳悬索越线装置由尼龙滚筒(8)与钢丝绳(7)分段连接而成。
3、根据权利要求1所述的双柱组合悬索式跨越架,其特征在于:所述的带有迪尼玛绝缘拉线和绝缘段绝缘配置的跨越架主柱,由主柱上端连接的迪尼玛绝缘绳(9)和与地面固定的钢丝绳(10)连接构成拉线;主柱分段连接之间有绝缘段(3)。
4、根据权利要求1所述的双柱组合悬索式跨越架,其特征在于:所述的绝缘段(3)为环氧树脂绝缘段,环氧树脂绝缘段与主柱连接。
5、根据权利要求1所述的双柱组合悬索式跨越架,其特征在于:作为承载索的迪尼玛绳(4)与锦纶绳编跨越封顶网(5)组合成绝缘封顶网。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520095051 CN2765352Y (zh) | 2005-01-22 | 2005-01-22 | 双柱组合悬索式跨越架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520095051 CN2765352Y (zh) | 2005-01-22 | 2005-01-22 | 双柱组合悬索式跨越架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2765352Y true CN2765352Y (zh) | 2006-03-15 |
Family
ID=36168266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520095051 Expired - Fee Related CN2765352Y (zh) | 2005-01-22 | 2005-01-22 | 双柱组合悬索式跨越架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2765352Y (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101949117A (zh) * | 2010-08-23 | 2011-01-19 | 江苏省电力公司宜兴市供电公司 | 高速公路的安全绝缘网结构 |
CN101966823A (zh) * | 2010-09-25 | 2011-02-09 | 河南省电力公司南阳供电公司 | 一种承力索跨越架及其架设方法 |
CN103138206A (zh) * | 2013-03-19 | 2013-06-05 | 黑河电业局 | 利用ppr管垂吊进行高压架空送电线路更换架空地线装置及方法 |
CN103236656A (zh) * | 2013-04-08 | 2013-08-07 | 国家电网公司 | 一种立柱悬索式跨越架及其作业方法 |
CN103840396A (zh) * | 2014-02-24 | 2014-06-04 | 国网重庆云阳县供电有限责任公司 | 一种高压铁塔更换避雷线的方法 |
CN104410005B (zh) * | 2014-10-24 | 2017-08-04 | 国家电网公司 | 一种更换架空导线、地线的作业方法 |
-
2005
- 2005-01-22 CN CN 200520095051 patent/CN2765352Y/zh not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101949117A (zh) * | 2010-08-23 | 2011-01-19 | 江苏省电力公司宜兴市供电公司 | 高速公路的安全绝缘网结构 |
CN101966823A (zh) * | 2010-09-25 | 2011-02-09 | 河南省电力公司南阳供电公司 | 一种承力索跨越架及其架设方法 |
CN101966823B (zh) * | 2010-09-25 | 2013-11-20 | 河南省电力公司南阳供电公司 | 一种承力索跨越架及其架设方法 |
CN103138206A (zh) * | 2013-03-19 | 2013-06-05 | 黑河电业局 | 利用ppr管垂吊进行高压架空送电线路更换架空地线装置及方法 |
CN103236656A (zh) * | 2013-04-08 | 2013-08-07 | 国家电网公司 | 一种立柱悬索式跨越架及其作业方法 |
CN103236656B (zh) * | 2013-04-08 | 2017-02-08 | 国家电网公司 | 一种立柱悬索式跨越架及其作业方法 |
CN103840396A (zh) * | 2014-02-24 | 2014-06-04 | 国网重庆云阳县供电有限责任公司 | 一种高压铁塔更换避雷线的方法 |
CN104410005B (zh) * | 2014-10-24 | 2017-08-04 | 国家电网公司 | 一种更换架空导线、地线的作业方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2765352Y (zh) | 双柱组合悬索式跨越架 | |
CN203377546U (zh) | 跨越高速铁路施工装置 | |
CN104110086B (zh) | 弦支穹顶与平面预应力组合结构、张拉工装及施工方法 | |
CN2412028Y (zh) | 一种桥梁拉索结构 | |
CN103821075B (zh) | 大跨径斜拉装配式公路钢桥 | |
CN102324712A (zh) | 一种高压输变电线路带电跨越施工方法 | |
CN102290742A (zh) | 张力架线施工工艺 | |
CN111355187B (zh) | 一种利用旧导线封网跨越高铁更换导地线的方法 | |
CN103603536A (zh) | 多回路十字交跨钢管杆 | |
CN103397597A (zh) | 一种适用于陡岩边坡的大吨位组合锚固体系及方法 | |
CN209443357U (zh) | 一种中小跨径桥梁用碳纤维绳连接结构 | |
CN104577875A (zh) | 一种电力线路的封网跨越架线施工方法 | |
CN203603572U (zh) | 多回路十字交跨钢管杆 | |
CN205329550U (zh) | 悬索桥猫道系统 | |
CN104775365B (zh) | 一种斜拉桥施工方法 | |
CN111431089B (zh) | 输电线路带电跨越施工封网方法 | |
KR20070049777A (ko) | 합성케이블을 이용한 교량시공방법 | |
CN114006309A (zh) | 一种新型装配式跨越设备 | |
CN205591115U (zh) | 悬挂式猫道面网安装系统 | |
CN206752288U (zh) | 一种内悬索组合截面桥梁 | |
CN203230214U (zh) | 双回路无关联双柱换位塔 | |
CN114945491A (zh) | 一种不利地形处接触网临时定位的施工方法 | |
KR101104807B1 (ko) | 루프방식 가선공법 | |
CN219972934U (zh) | 猫道承重索变位架 | |
CN216251945U (zh) | 一种新型装配式跨越设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |