CN2751072Y - 塔吊基础就位框 - Google Patents

塔吊基础就位框 Download PDF

Info

Publication number
CN2751072Y
CN2751072Y CN 200420115928 CN200420115928U CN2751072Y CN 2751072 Y CN2751072 Y CN 2751072Y CN 200420115928 CN200420115928 CN 200420115928 CN 200420115928 U CN200420115928 U CN 200420115928U CN 2751072 Y CN2751072 Y CN 2751072Y
Authority
CN
China
Prior art keywords
steel
positioning
steel plate
tower crane
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420115928
Other languages
English (en)
Inventor
沈宏志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CITY CONSTRUCTION GROUP FIFTH CONSTRUCTION ENGINEERING Co Ltd
Original Assignee
BEIJING CITY CONSTRUCTION GROUP FIFTH CONSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CITY CONSTRUCTION GROUP FIFTH CONSTRUCTION ENGINEERING Co Ltd filed Critical BEIJING CITY CONSTRUCTION GROUP FIFTH CONSTRUCTION ENGINEERING Co Ltd
Priority to CN 200420115928 priority Critical patent/CN2751072Y/zh
Application granted granted Critical
Publication of CN2751072Y publication Critical patent/CN2751072Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

一种塔吊基础就位框,该就位框为矩形,在四角是四块定位钢板,四边是四根定位钢梁,定位钢板与定位钢梁固定连接成钢框,在定位钢板和定位钢梁的连接部位穿有定位销孔,定位钢板上分布有地脚螺栓孔。上述定位钢梁与定位钢板之间垫有矩形钢垫片或C字形钢垫片,上述定位钢梁是槽钢、角钢或钢管。本实用新型大大节省了机械安装时间,提高了塔式起重机的利用率,节省汽车吊和半挂车的机械费用,并保证地脚螺栓准确的固定于钢筋混凝土中,使塔式起重机迅速精确就位。

Description

塔吊基础就位框
(一)技术领域
本实用新型涉及一种建筑安装用的预制基础构件。
(二)背景技术
现有塔式起重机是在固定式塔基上就位,这个过程首先需要用汽车吊将四个地脚与一标准节相连,以保证各地脚之间的相对位置;然后放到上层钢筋网上,用水准仪逐一调整地脚的水平度,要求偏差不得大于2mm。通常四个地脚装有32条高强度螺栓,需要调整很长时间,地脚水平度调整完后,最后灌入钢筋混凝土,将32条高强度螺栓埋入里面,固定式塔基制作即完成。上述过程复杂而缓慢,在工期紧急时,还容易出现定位不精确的问题,急需改进。
(三)实用新型内容
本实用新型的目的是提供一种塔吊基础就位框,解决塔吊基础迅速精确就位的技术问题。
本实用新型的技术方案:这种塔吊基础就位框,其特征在于:该就位框为矩形,在四角是四块定位钢板,四边是四根定位钢梁,定位钢板与定位钢梁固定连接成钢框,在定位钢板和定位钢梁的连接部位穿有定位销孔,定位钢板上分布有地脚螺栓孔。
上述定位钢梁与定位钢板之间垫有矩形钢垫片或C字形钢垫片。
上述定位钢梁与定位钢板由螺栓连接或焊接。
上述定位钢板为正方形钢板或长方形钢板。
上述定位钢梁是槽钢、角钢或钢管。
本实用新型的有益效果:在施工中,直接将塔吊基础就位框放在基础的钢筋笼上,将地脚螺栓穿过定位钢板上的地脚螺栓孔,然后灌注混凝土。大大节省了机械安装时间,提高了塔式起重机的利用率,节省汽车吊和半挂车的机械费用,并保证地脚螺栓准确的固定于钢筋混凝土中,使塔式起重机迅速精确就位。
(四)附图说明
图1是本实用新型的塔吊基础就位框结构示意图;
图2是图1的侧视图。
图中:1-定位钢板、2-定位钢梁、3-连接螺栓、4-定位销孔、5-地脚螺栓孔、6-钢垫片。
(五)具体实施方式
实施例参见图1、2,这种塔吊基础就位框为矩形,在四角有四块正方形的定位钢板1,四边是四根定位钢梁2,定位钢板1与定位钢梁2之间垫有C形钢垫片6,固定连接成矩形钢框。定位钢梁2与C形钢垫片6焊接,C形钢垫片6与定位钢板1之间由连接螺栓3连接,钢垫片6的两边各开有一个定位销孔4,每块定位钢板上分布有八个地脚螺栓5。上述定位钢梁选择槽钢、角钢或钢管均可。

Claims (7)

1、一种塔吊基础就位框,其特征在于:该就位框为矩形,在四角是四块定位钢板,四边是四根定位钢梁,定位钢板与定位钢梁固定连接成钢框,在定位钢板和定位钢梁的连接部位穿有定位销孔,定位钢板上分布有地脚螺栓孔。
2、根据权利要求1所述的塔吊基础就位框,其特征在于:上述定位钢梁与定位钢板之间垫有矩形钢垫片或C字形钢垫片。
3、根据权利要求1所述的塔吊基础就位框,其特征在于:上述定位钢梁与定位钢板由螺栓连接或焊接。
4、根据权利要求2所述的塔吊基础就位框,其特征在于:上述定位钢梁与定位钢板由螺栓连接或焊接。
5、根据权利要求1所述的塔吊基础就位框,其特征在于:上述定位钢板为正方形钢板或长方形钢板。
6、根据权利要求2或3或4所述的塔吊基础就位框,其特征在于:上述定位钢板为正方形钢板或长方形钢板。
7、根据权利要求1或2或3或4或5所述的塔吊基础就位框,其特征在于:上述定位钢梁是槽钢、角钢或钢管。
CN 200420115928 2004-11-29 2004-11-29 塔吊基础就位框 Expired - Fee Related CN2751072Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420115928 CN2751072Y (zh) 2004-11-29 2004-11-29 塔吊基础就位框

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420115928 CN2751072Y (zh) 2004-11-29 2004-11-29 塔吊基础就位框

Publications (1)

Publication Number Publication Date
CN2751072Y true CN2751072Y (zh) 2006-01-11

Family

ID=35932249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420115928 Expired - Fee Related CN2751072Y (zh) 2004-11-29 2004-11-29 塔吊基础就位框

Country Status (1)

Country Link
CN (1) CN2751072Y (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413271B (zh) * 2006-06-09 2011-03-16 赵正义 桅杆式机械设备组合基础的垂直定位连接构造
CN101413272B (zh) * 2006-06-09 2011-03-16 赵正义 桅杆式机械设备组合基础的垂直定位连接构造
CN102561383A (zh) * 2011-06-23 2012-07-11 中冶建工集团有限公司 塔吊底座安装方法
CN103967040A (zh) * 2014-05-19 2014-08-06 中国建筑第八工程局有限公司 塔吊基础结构及其施工方法
CN105317052A (zh) * 2014-07-15 2016-02-10 五冶集团上海有限公司 一种塔吊基础螺栓固定方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413271B (zh) * 2006-06-09 2011-03-16 赵正义 桅杆式机械设备组合基础的垂直定位连接构造
CN101413272B (zh) * 2006-06-09 2011-03-16 赵正义 桅杆式机械设备组合基础的垂直定位连接构造
CN102561383A (zh) * 2011-06-23 2012-07-11 中冶建工集团有限公司 塔吊底座安装方法
CN102561383B (zh) * 2011-06-23 2015-02-18 中冶建工集团有限公司 塔吊底座安装方法
CN103967040A (zh) * 2014-05-19 2014-08-06 中国建筑第八工程局有限公司 塔吊基础结构及其施工方法
CN103967040B (zh) * 2014-05-19 2015-12-02 中国建筑第八工程局有限公司 塔吊基础结构及其施工方法
CN105317052A (zh) * 2014-07-15 2016-02-10 五冶集团上海有限公司 一种塔吊基础螺栓固定方法
CN105317052B (zh) * 2014-07-15 2017-04-19 五冶集团上海有限公司 一种塔吊基础螺栓固定方法

Similar Documents

Publication Publication Date Title
CN201943191U (zh) 新型冷弯矩形钢管柱装配式柱脚
CN102127966B (zh) 一种现浇钢筋混凝土柱模板固定装置
CN209114332U (zh) 一种长悬挑大截面盖梁托架体系
CN111663449A (zh) 一种组合式现浇箱梁支架系统及施工方法
CN206204766U (zh) 独柱墩桥梁抗倾覆斜撑加固装置
CN2751072Y (zh) 塔吊基础就位框
CN202787512U (zh) 一种h型钢柱柱脚连接结构
CN205171381U (zh) 预制装配桥梁盖梁定位装置
CN202265906U (zh) 埋入式钢管混凝土柱脚锚栓固定装置
CN202266034U (zh) 埋入式菱形钢骨混凝土柱脚锚栓固定装置
CN217975378U (zh) 简支梁装配式现浇板模板支撑装置
CN208934394U (zh) 一种可周转式液压爬模附墙装置
CN211947965U (zh) 现浇连续箱梁内模
CN209585427U (zh) 一种装配式钢管束预应力混凝土组合梁
CN202007527U (zh) 一种现浇钢筋混凝土柱模板固定装置
CN203113908U (zh) 围墙与广告牌合一全装配结构
CN206846097U (zh) 一种门刚与框架分装式管道支架结构
CN220504613U (zh) 一种砌体建筑物构造柱加固结构
CN214462572U (zh) 一种混凝土施工用支撑架
CN220301881U (zh) 一种bipv光伏车棚
CN210736042U (zh) 一种新型塔吊基础结构
CN114607152B (zh) 钢结构调整柱网间距的施工方法
CN219045304U (zh) 一种装配式立柱通用底膜板
CN220927943U (zh) 一种地下车站型钢柱锚固支座结构
CN216787420U (zh) 一种钢结构支撑用立柱

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee