CN2727629Y - Gas boiler - Google Patents

Gas boiler Download PDF

Info

Publication number
CN2727629Y
CN2727629Y CN 200420011482 CN200420011482U CN2727629Y CN 2727629 Y CN2727629 Y CN 2727629Y CN 200420011482 CN200420011482 CN 200420011482 CN 200420011482 U CN200420011482 U CN 200420011482U CN 2727629 Y CN2727629 Y CN 2727629Y
Authority
CN
China
Prior art keywords
gas
boiler
coal
chamber
vaporizer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420011482
Other languages
Chinese (zh)
Inventor
李富聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420011482 priority Critical patent/CN2727629Y/en
Application granted granted Critical
Publication of CN2727629Y publication Critical patent/CN2727629Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model relates to a gas boiler, mainly comprising a base, a coal feeding opening, a secondary air outlet and a once air outlet I. The utility model is characterized in that: a boiler wall is provided among the gasification chamber, the burning chamber and the heat transfer chamber in the gas boiler, the lower part is an air cavity for communicating each other, a gas port is arranged on the boiler wall between the gasification chamber and the burning chamber, the once air outlet II is arranged on the lower part of the burning chamber, a fire grate whose upper end is connected with the boiler wall on one side of the gasification chamber, the lower end is connected with the base, is arranged on the lower part of the air cavity, and a coal push plate is arranged on the fire grate. The inner top and the lower part of the heat transfer chamber are respectively provided with horizontal barrels, and the lower side of the upper barrel and the upper side of the lower barrel are respectively provided with open boiler walls staggered each other, implementing the simultaneous high temperature complete burn of the gas and the unburned coal ball in the burning chamber. The utility model has the characteristics of no corrosiveness, the residual carbon quantity in the ash is smaller than 10 percents, thecoal can be saved larger than 15 percents, and heat efficiency is larger than 78 percents. The index of the dust removing quantity, the SO2 removing quantity and the flue gas ringelman blackness etc. are all better than the prescription of first kind zone in the GB-13271-2001, << discharge standard of contamination of boiler >>.

Description

Gas boiler
Technical field
The utility model relates to a kind of gas boiler, and relating in particular to a kind of is the gas boiler of fuel with the coal that looses.
Background technology
Coal is the gas boiler of fuel to loose, can only burning brown coal, when ventilation ignition initial stage temperature is low, the main coal gas that produces based on carbon monoxide, pass in the heat exchange boiler through burner high temperature burning after heat flue gas, the heating of the water in it is produced hot water or/and steam.After the temperature that burns away in the gasification furnace raise, the steam with boiler produces fed in the stove through gasification furnace bottom and upper lateral part, to reduce furnace temperature etc.But, after the acid gas of generation becomes acid, in 0.5-1, can cause heavy corrosion, the normal operation that influence is produced to stove.Now, some place is fuel with the moulded coal, but the cost height.
The utility model content
The purpose of this utility model is to overcome the deficiency that prior art exists, and a kind of gas boiler is provided, and prevents the corrosion of gasification furnace (chamber), alleviates simultaneously and prevents pollution to environment.
The purpose of this utility model is to be achieved by following technical solution:
A kind of gas boiler mainly comprises base, coal filling hole, and overfiren air port and primary air nozzle I is characterized in that:
Be equipped with furnace wall between the vaporizer that is provided with in this gas boiler, combustion chamber and the Heat Room, its underpart is the air cavity that communicates with each other; Furnace wall upside between vaporizer and combustion chamber is provided with gas port; The bottom, combustion chamber is provided with primary air nozzle II;
Below described air cavity, be provided with inclined grate, its upper end links to each other with vaporizer one wing furnace wall, and the lower end links to each other with base; On fire grate, be provided with the coal-pushing plate that links to each other with body of heater outer liquid press.
Above-mentioned gas boiler in its Heat Room inner top and bottom, is respectively equipped with horizontal drum.
The utility model compared with prior art has following advantage:
(1) coal in the vaporizer cooperates the down-firing burning at a wind, when the initial stage temperature is low, produces the coal gas based on carbon monoxide, enters the combustion chamber through gas port, high-temp combustion under the effect of secondary wind; Volatile matter discharges the later stage in the vaporizer coal, along with temperature raises, with the unburnt coal cinder (nuclear) that has discharged volatile matter on the fire grate of coal-pushing plate with the vaporizer bottom, be pushed on the fire grate of bottom, combustion chamber, become flexible coking coal (can add fine coal), its interior volatile matter is fully discharged, reduced the vaporizer temperature simultaneously, and, prevent that acid gas from producing without coolings such as steam; High-temp combustion under a wind effect, thus realized coal gas and unburnt charcoal in the combustion chamber synchronous high-temp combustion.The acid that no acid gas produces prolongs its service life to the corrosion of vaporizer; Carbon residue in the ash<10%, economize on coal>15%, adding a dant after 3-4 hour, operating cost is low.
(2) the hot flue gas of Chan Shenging directly enters the Heat Room heat exchange.Because Heat Room top, bottom are respectively equipped with horizontal drum, the thermal efficiency reaches more than 78%.
(3) strong to fuel tolerance, mud coal has bituminous coal, and anthracite, brown coal all can be used as fuel.
(4) environmental index all is better than the regulation in 1 class district in GB13271-2001, " the boiler pollutant atmospheric emission standard ".Test through provincial environmental monitoring central station:
Dust-exhausting quantity (mg/Nm 3) 71.8~<80
SO 2Discharge capacity (mg/Nm 3) 260~<900
Flue gas lingemann blackness<1 grade
Description of drawings
Figure be the utility model structural representation wherein,
1-coal filling hole 2-vaporizer 3-gas port 4-overfiren air port
5-combustion chamber 6-delivery port 7-drum 8-Heat Room
9-exhanst gas outlet 10-water inlet 11-base 12-basis
13-primary air nozzle II 14-primary air nozzle I 15-fire grate 16-coal-pushing plate
The specific embodiment
Now in conjunction with the accompanying drawings and embodiments, the utility model is further specified as follows:
Embodiment:
From accompanying drawing as seen, the utility model is on the basis 12 base 11, is provided with coal filling hole 1 at vaporizer 2 upsides, and the bottom is provided with primary air nozzle I14, and 5 upsides are provided with overfiren air port 4 in the combustion chamber.Between the vaporizer 2 that is provided with in body of heater, combustion chamber 5 and the Heat Room 8, be equipped with furnace wall, its underpart is the air cavity that communicates with each other; Air cavity bottom between vaporizer 2 and combustion chamber 5 is provided with inclined grate 15, and its upper end is connected with vaporizer 2 one wing furnace walls, and the lower end is connected with base 11; On fire grate 15, be provided with the coal-pushing plate 16 that links to each other with the hydraulic press of body of heater outside.In Heat Room 8 tops and bottom, be respectively equipped with horizontal drum 7, can improve its heat exchange efficiency.
As seen from the figure, coal is added on the vaporizer 2 bottom fire grates 15, leads to wind to its vaporizer 2 through primary air nozzle I14 from coal filling hole 1, the ignition initial stage, production enters in the combustion chamber 5 through gas port 3 based on the coal gas of carbon monoxide, with the secondary wind mixing high-temp combustion from overfiren air port 4; The coal volatile matter of later stage vaporizer 2 discharges latter stage, temperature is up to more than 1000 ℃, with coal-pushing plate 16 with the unburnt coal cinder (charcoal) on the fire grate 15 of vaporizer 2 bottoms, shift onto on the fire grate 15 of 5 bottoms, combustion chamber, a wind effect with from primary air nozzle II13 burns away to burnouting under the high temperature.Thereby 5 burnings of coal gas and the synchronous high temperature of unburnt charcoal have been realized in the combustion chamber.Add coal (3-4 hour add a dant) from coal filling hole 1 simultaneously, and continue step combustion process down.Ash and slag fall in the ashpit of its underpart.The hot flue gas that produces through gasification and burning, in air cavity directly enters Heat Room 8, with in the convection bank from the water heat exchange of water inlet 10, the hot water of production is delivered to the user by delivery port 6.Flue gas after the heat exchange discharges out of the furnace through Heat Room 8 upside exhanst gas outlets 9.

Claims (2)

1, a kind of gas boiler mainly comprises base (11), coal filling hole (1), and overfiren air port (3) and primary air nozzle I (14) is characterized in that:
Be equipped with furnace wall between the vaporizer (2) that is provided with in A, this gas boiler, combustion chamber (5) and the Heat Room (8), its underpart is the air cavity that communicates with each other; Furnace wall upside between vaporizer (2) and combustion chamber (5) is provided with gas port (3); The bottom, combustion chamber is provided with primary air nozzle II (13);
Below B, the air cavity between described vaporizer (2) and combustion chamber (5), be provided with inclined grate (5), its upper end links to each other with vaporizer one wing furnace wall, and the lower end links to each other with base (11), is provided with coal-pushing plate (16) on fire grate (15).
2, gas boiler according to claim 1 is characterized in that: in Heat Room (8) top and bottom, be respectively equipped with horizontal drum (7).
CN 200420011482 2004-01-14 2004-01-14 Gas boiler Expired - Fee Related CN2727629Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420011482 CN2727629Y (en) 2004-01-14 2004-01-14 Gas boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420011482 CN2727629Y (en) 2004-01-14 2004-01-14 Gas boiler

Publications (1)

Publication Number Publication Date
CN2727629Y true CN2727629Y (en) 2005-09-21

Family

ID=35043643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420011482 Expired - Fee Related CN2727629Y (en) 2004-01-14 2004-01-14 Gas boiler

Country Status (1)

Country Link
CN (1) CN2727629Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103047751A (en) * 2012-12-30 2013-04-17 吕清林 Mixed re-burning furnace and re-burning method
CN104019445A (en) * 2014-06-20 2014-09-03 卓卫民 Solid fuel combustion device with fire grate obliquely arranged and combustion method
CN109404881A (en) * 2018-11-23 2019-03-01 北京米能科技有限公司 One kind is from the vertical packaged boiler of deashing
CN109404891A (en) * 2018-11-23 2019-03-01 北京米能科技有限公司 Gasified combustion apparatus

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103047751A (en) * 2012-12-30 2013-04-17 吕清林 Mixed re-burning furnace and re-burning method
CN103047751B (en) * 2012-12-30 2016-01-06 吕清林 Mix stove and return firing method
CN104019445A (en) * 2014-06-20 2014-09-03 卓卫民 Solid fuel combustion device with fire grate obliquely arranged and combustion method
CN104019445B (en) * 2014-06-20 2016-03-30 卓卫民 A kind of solid fuel combustion apparatus of tilting fire grate and combustion method
CN109404881A (en) * 2018-11-23 2019-03-01 北京米能科技有限公司 One kind is from the vertical packaged boiler of deashing
CN109404891A (en) * 2018-11-23 2019-03-01 北京米能科技有限公司 Gasified combustion apparatus

Similar Documents

Publication Publication Date Title
CN2879022Y (en) Biomass vaporization boiler
CN2727629Y (en) Gas boiler
CN101126504B (en) Coal continuous cleaning burning device and method
CN1793720A (en) Environmental protection destructive distillation coal gasification laminar burning boiler
CN201285029Y (en) Coal gasified atmospheric boiler
CN2644901Y (en) Integral boiler for converting coal into coal gas for combustion
CN201262470Y (en) Boiler for transformation from coal into gas
CN202382251U (en) Novel waste incineration boiler
CN209511994U (en) A kind of non helping hand spontaneous combustion heat accumulating type biological particles combustion furnace
CN200940928Y (en) Forward/reverse purifying burning boiler having coal gasifying 3 chambers
CN2634296Y (en) Multiple fuel industrial boiler for double boiler
CN201225756Y (en) Spherical briquette boiler
CN110631005A (en) Biomass briquette fuel combustion device
CN2725714Y (en) Energy-saving environment protection boiler
CN205481007U (en) Waste incinerator partly gasifies
CN202915328U (en) Vertical smokeless combustion steam boiler
CN201382405Y (en) Solid fuel combustion system for split-type boiler
CN2687512Y (en) Sectional combustion apparatus
CN2699132Y (en) Bottom combustion normal pressure gas boiler
CN2476738Y (en) Machanical moving grate back blowing type coal gasification combustion environmental protection coal-fired boiler
CN212299054U (en) Hearth of combustion furnace
CN212481378U (en) Four-pass boiler
CN201289068Y (en) Coal burning coal gasification burning heating stoves
CN2651597Y (en) Assembled environmental protective gas boiler
CN2823840Y (en) Coal gasification burning boiler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee