CN2823840Y - Coal gasification burning boiler - Google Patents

Coal gasification burning boiler Download PDF

Info

Publication number
CN2823840Y
CN2823840Y CNU2005201043265U CN200520104326U CN2823840Y CN 2823840 Y CN2823840 Y CN 2823840Y CN U2005201043265 U CNU2005201043265 U CN U2005201043265U CN 200520104326 U CN200520104326 U CN 200520104326U CN 2823840 Y CN2823840 Y CN 2823840Y
Authority
CN
China
Prior art keywords
boiler
furnace
ignition furnace
main burner
ignition
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2005201043265U
Other languages
Chinese (zh)
Inventor
郭科新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2005201043265U priority Critical patent/CN2823840Y/en
Application granted granted Critical
Publication of CN2823840Y publication Critical patent/CN2823840Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Combustion Of Fluid Fuel (AREA)

Abstract

The utility model relates to a coal gasification burning boiler, which has the purpose for providing a coal gasification burning boiler with quick temperate rise of ignition, smoke and dust elimination, environmental protection and energy saving. The utility model is mainly provided with a primary combustion boiler which is the existing ordinary boiler. The utility model is characterized in that the outside wall of a boiler shell of the primary combustion boiler is fixedly connected with an igniting furnace, and a fire grate, a coal throwing port and an ash removing port are arranged in the igniting furnace; a combustion chamber A of the primary combustion boiler is communicated with the combustion chamber B of the ignite furnace through two communicating pipes, a furnace arch A is arranged in the primary combustion boiler and is arranged between the two communicating pipes, and thus, two hearths which are not directly communicated are formed in the primary combustion boiler; the primary combustion boiler, the lower part of a grate of the igniting furnace and the communicating pipe B of the ignition furnace are correspondingly arranged on the boiler shell, and are respectively provided with a wind supply pipe. The furnace wall of the igniting furnace is composed of a supporting tube which is composed of a plurality of convection banks which are communicated and a fire-proof wall. The utility model has the advantages of easy ignition, quick temperature raise, large power, sufficient combustion of fuels, smoke and dust elimination, energy saving and environment protection.

Description

The coal gasification combustion boiler
Affiliated technical field
The utility model belongs to a kind of burning boiler, particularly a kind of coal gasification combustion boiler with main burner and ignition furnace.
Background technology
Conventional boiler makes the exhaust gas temperature height because fuel combustion is insufficient, over-emitting black exhaust reduces the thermal efficiency, wastes energy, and the dust concentration height causes environmental pollution in the flue gas.Particularly in the incipient stage of ignition of the boiler and a large amount of coals, because temperature is low in the stove, make fuel combustion insufficient, over-emitting black exhaust contains a large amount of fuel gas in the cigarette of discharge, and it is slow to heat up.
Summary of the invention
The purpose of this utility model provide a kind of firing up rapidly, the coal gasification combustion boiler of smoke abatement and dust control, environmental protection and energy saving.
The purpose of utility model is realized by following technical scheme: a kind of coal gasification combustion boiler, has main burner, just common existing boiler, be characterized in: on the shell lateral wall of main burner, be fixedly connected with ignition furnace, the ignition furnace middle part is provided with fire grate, with the fire grate is the boundary, the shell first half at ignition furnace is provided with coal feeding hole, Lower Half is provided with cleaning door, the combustion chamber A of main burner and the combustion chamber B of ignition furnace were connected by two communicating pipes, in main burner, be provided with chimney arch A, chimney arch A placed between two communicating pipes, make and form two burner hearths that directly do not communicate, main burner in the main burner, the fire grate below of ignition furnace and the communicating pipe B corresponding position of ignition furnace are respectively equipped with the air feed pipe on shell.
Between two communicating pipe of ignition furnace, be provided with overshooting shape chimney arch B.
Stay pipe and refractory wall that the furnace wall of ignition furnace is made up of the convection bank of some connections constitute, and refractory wall outside.
The course of work and the principle thereof of present technique are: the coke of lighting ignition furnace earlier, after the interior temperature of ignition furnace is raise rapidly, light the coal of main burner, coal is drying in the A of the combustion chamber of main burner, destructive distillation produces flue gas, enter the combustion chamber B of ignition furnace through communicating pipe A, the flue gas of main burner further decomposes gasification under the high temperature of ignition furnace, obtain abundant, thorough after-flame, get back to the convection tube place of main burner then through another communicating pipe B, behind the convection tube dust-collecting and heat exchanging, discharge, the interior water of convection tube is heated up rapidly.When the coal after-flame, a part of charcoal fire of getting main burner makes it keep high temperature to ignition furnace combustion chamber B, and the flue gas that main then burner stoking produces enters ignition furnace combustion chamber B, and process circulates repeatedly like this.
The purpose of establishing overshooting shape chimney arch B between two communicating pipe of ignition furnace is to make that temperature remains on the condition of high temperature in the ignition furnace, the burning of the inner flue gas of the stove that helps igniting, through the designer repeatedly long period of experiments obtain.The effect of the stay pipe in the ignition furnace is for strengthening ignition furnace intensity and making heat exchange more abundant.
The utility model has the advantages that: 1, because the flue gas of main burner enters ignition furnace, flue gas has at high temperature obtained fully, thoroughly burning, boiler thermal output is significantly improved, can save more than 50% than moulded coal stove, can save more than 70% than oil oven, steam stove and electric furnace, for the user has saved fund greatly.2, behind the full combustion of fuel again through convection tube smoke abatement and dust control voluntarily, so it is colourless to discharge fume, the smoke evacuation lingemann blackness be the 0-1 level, dust concentration reaches discharging standards in the flue gas.3, because gas-fired, make ignition of the boiler easy, on fire fast, heat up rapidly, power is big.4, the ignition furnace structure is little, cost is low, manufacturing process is simple.
Description of drawings
Fig. 1 is the structural representation of a kind of embodiment of the utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the vertical view of Fig. 1.
1 airducts, 2 refractory walls, 3 secondary air channels, 4 stay pipes, 5 combustion chamber B, 6 tertiary-air pipe, 7 ignition furnaces, 8 fire grates, 9 coal feeding holes, 10 cleaning doors, 11 combustion chamber A, 12 main burners, 13 communicating pipe A, 14 chimney arch A, 15 chimney arch B, 16 communicating pipe B, flue among the figure.
The specific embodiment
The utility model is described in further detail below in conjunction with the accompanying drawing illustrated embodiment.
As Fig. 1, Fig. 2, shown in Figure 3, the applicant has implemented a kind of horizontal coal gasification combustion boiler, it is by having main burner 12, just common existing traditional horizontal boiler, its structure is a prior art, fire grate is also arranged, cleaning door, coal feeding hole, see the burner door, convection tube, flue, structures such as tank, on the shell lateral wall of main burner 12, be fixedly connected with ignition furnace 7, the ignition furnace middle part is provided with fire grate 8, with the fire grate is the boundary, the shell first half at ignition furnace is provided with coal feeding hole 9, Lower Half is provided with cleaning door 10, the combustion chamber A11 of main burner and the combustion chamber B5 of ignition furnace being connected communicating pipe by two horizontal parallel, be respectively communicating pipe A13, communicating pipe B16, communicating pipe A13 is a smoke inlet, communicating pipe B16 is an exhanst gas outlet, in main burner 12, be provided with chimney arch A14, chimney arch A14 placed between two communicating pipes, make and form two chambeies that directly do not communicate in the main burner, main burner, the fire grate below of ignition furnace and the communicating pipe B corresponding position of ignition furnace are respectively equipped with the air feed pipe on shell, be respectively airduct 1 one time, secondary air channel 3, tertiary air 6.Be provided with overshooting shape chimney arch B15 between two communicating pipe of ignition furnace, chimney arch A14 and chimney arch B15 are respectively fixed on the flue 17.Stay pipe 4 and refractory wall 2 that the furnace wall of ignition furnace is made up of the convection bank of some connections constitute, refractory wall 2 outside, stay pipe 4 has supporting role heat exchange action is arranged again.
When main burner was used vertical boiler, just communicating pipe A and communicating pipe B became plumbness up and down by level, and other technology is constant, makes it to become vertical coal gasification combustion boiler.

Claims (3)

1, a kind of coal gasification combustion boiler, has main burner, just common existing boiler, it is characterized in that: on the shell lateral wall of main burner, be fixedly connected with ignition furnace, the ignition furnace middle part is provided with fire grate, with the fire grate is the boundary, the shell first half at ignition furnace is provided with coal feeding hole, Lower Half is provided with cleaning door, the combustion chamber A of main burner and the combustion chamber B of ignition furnace were connected by two communicating pipes, were provided with chimney arch A in main burner, and chimney arch A placed between two communicating pipes, make and form two burner hearths that directly do not communicate, main burner in the main burner, the fire grate below of ignition furnace and the communicating pipe B corresponding position of ignition furnace are respectively equipped with the air feed pipe on shell.
2, coal gasification combustion boiler as claimed in claim 1 is characterized in that: be provided with overshooting shape chimney arch B between two communicating pipe of ignition furnace.
3, as claim 1,2 described coal gasification combustion boilers, it is characterized in that: stay pipe and refractory wall that the furnace wall of ignition furnace is made up of the convection bank of some connections constitute, and refractory wall outside.
CNU2005201043265U 2005-07-26 2005-07-26 Coal gasification burning boiler Expired - Fee Related CN2823840Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2005201043265U CN2823840Y (en) 2005-07-26 2005-07-26 Coal gasification burning boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2005201043265U CN2823840Y (en) 2005-07-26 2005-07-26 Coal gasification burning boiler

Publications (1)

Publication Number Publication Date
CN2823840Y true CN2823840Y (en) 2006-10-04

Family

ID=37032956

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2005201043265U Expired - Fee Related CN2823840Y (en) 2005-07-26 2005-07-26 Coal gasification burning boiler

Country Status (1)

Country Link
CN (1) CN2823840Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110237789A (en) * 2019-06-28 2019-09-17 李敏 A kind of consersion unit cooling to cooling water using liquid gasification principle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110237789A (en) * 2019-06-28 2019-09-17 李敏 A kind of consersion unit cooling to cooling water using liquid gasification principle
CN110237789B (en) * 2019-06-28 2021-09-14 统一石油化工有限公司 Reaction equipment for cooling water by utilizing liquid gasification principle

Similar Documents

Publication Publication Date Title
CN2864378Y (en) Multistage multi-room gas boiler for coal gasification
CN2879022Y (en) Biomass vaporization boiler
CN2847051Y (en) Single boiler tube longitudinal by-path flue pipe sectioned burning constant pressure water heating boiler
CN212339224U (en) High-temperature oxygen-deficient combustion device for solid fuel
CN204165038U (en) A kind of U-shaped flame pulverized coal firing boiler
CN201066195Y (en) Horizontal type reverse-combusting coal-firing boiler
CN2823840Y (en) Coal gasification burning boiler
CN201513880U (en) Integral gasifying combination burning boiler
CN201262470Y (en) Boiler for transformation from coal into gas
CN101526263A (en) High-pressure combustion environmental-friendly energy-saving boiler
CN203464323U (en) Novel environmental protection boiler with boiler internal smoke and dust abatement clean burning
CN2872196Y (en) Constant-pressure gasified hot-water boiler of vertical fired coal
CN2752613Y (en) Biomass forming fuel boiler
CN201225756Y (en) Spherical briquette boiler
CN202382251U (en) Novel waste incineration boiler
CN201909310U (en) Combined boiler of coal-burning and oil/ gas-burning boilers with double boiler barrel
CN204665229U (en) The horizontal coal-fired steam boiler of modified list drum
CN201382552Y (en) High-pressure combustion environment-friendly and energy-saving boiler
CN201302187Y (en) Coal secondary combustion furnace
CN207922281U (en) Left and right header Natural Circulation water cooling foldede flame wall encircles gasification direct-combustion energy-saving, environmental protection boiler
CN201811221U (en) Coal-fired and oil/gas-fired combination boiler
CN201310876Y (en) Gas-making compound combustion chain furnace
CN102330965B (en) Efficient, energy-saving and environment-friendly coal dust industrial boiler
CN101413658B (en) Gas making compound combustion chain furnace
CN2536955Y (en) Unpressurized energy-saving environmental protection boiler

Legal Events

Date Code Title Description
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Ma Zhiyong

Document name: Notification of acceptance

C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee