CN2348490Y - Semiconductor packing device - Google Patents

Semiconductor packing device Download PDF

Info

Publication number
CN2348490Y
CN2348490Y CN 98241699 CN98241699U CN2348490Y CN 2348490 Y CN2348490 Y CN 2348490Y CN 98241699 CN98241699 CN 98241699 CN 98241699 U CN98241699 U CN 98241699U CN 2348490 Y CN2348490 Y CN 2348490Y
Authority
CN
China
Prior art keywords
material pipe
frame
jaw
pipe support
collecting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98241699
Other languages
Chinese (zh)
Inventor
张义昌
黄明春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIZHONG SANYANG ELECTRONICS CO Ltd
Original Assignee
TAIZHONG SANYANG ELECTRONICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIZHONG SANYANG ELECTRONICS CO Ltd filed Critical TAIZHONG SANYANG ELECTRONICS CO Ltd
Priority to CN 98241699 priority Critical patent/CN2348490Y/en
Application granted granted Critical
Publication of CN2348490Y publication Critical patent/CN2348490Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a semiconductor packing device. In every encapsulation workstation of a semiconductor, an automatic material receiving device is used for filling the semiconductor into a material pipe, and the arrangement of the material pipe is used for automatically feeding. The utility model is characterized in that the device is composed of a material pipe rack, a clamping jaw, a footstock and a transport table. Empty material pipes can be pushed and stacked onto the material pipe. The elevation of the footstock and the clamping of the matched clamping jaw are used for dropping a single empty material pipe into the transport table. The transport table can be moved by a screw rod driven by a motor. The empty material pipe is transported onto a material pipe bracket of a material receiving opening and upward supported by the matched clamping for receiving material and packing. Moreover, the device can be matched with the monitoring of a sensor, and thus, when the material pipe is fully packed, the empty material pipes can be automatically transported. Therefore, the purposes of automatically packing and collecting material are achieved.

Description

The semiconductor packages material collecting device
The utility model relates to a kind of material collecting device of automation, be particularly related to a kind of semiconductor packages rewinding setting, especially refer in the semiconductor process flow, operation post being finished the IC semiconductor of processing loads to expecting in the pipe, be transferred to next operation post, and carry out the semiconductor packages material collecting device of self-feeding processing.
Because human electronics technology is maked rapid progress, must be replaced by integrated circuit (integrated circuit is called for short IC) gradually in conjunction with the work that just can finish by many large-scale electronic circuits in the past, the outstanding feature of IC is to be that its volume ratio is little of thousands of times with the semiconductor construction that the element that separates makes, but density increases, also thereby make the electronic product volume-diminished made from IC many, conform with the human principle of using; General IC makes respectively when finishing at the lead frame of wafer and bearing wafer, must be again via in conjunction with, baking, beat procedure of processings such as bonding wire, encapsulating moulding and cutting, just can produce complete IC individuality, and an IC individuality must pass through every detection and print job again, could be complete errorless provides use.As shown in Figure 1, do in the operation of back segment package detection at IC, IC utilizes the material road to be transferred to discharging mouth 1, the below of discharging mouth 1 promptly is arranged with several rewinding tubes 2, and be accumulated in the rewinding inner core 2 IC is irregular, carry out next operation post at IC and add man-hour, then must IC be arranged pan feeding one by one in rewinding tube 2 with manpower, and this operation procedure labor intensive not only, operating personnel are also taken place most probably arrange the storing mistake, and the situation that causes equipment or IC to damage, therefore with regard to the fail safe of production efficiency and operation, this rewinding mode obviously is necessary to be improved, to increase economic efficiency.
In view of this, this creator satisfies with tool working experience for many years, through continuous research and design, grind the automatic material receiving device of creating a kind of IC eventually, and the IC proper alignment of the processing that will fulfil assignment is carried out next operation and is added man-hour in the material pipe, can be directly by material pipe feed, the carrying out of favourable processing operation, this is the design's aim.
Main purpose of the present utility model is that a kind of semiconductor packages material collecting device will be provided, it mainly is a vertical installing array material pipe support on an inclined-plane frame, put on it and several empty material pipes can be piled up, other is provided with jaw and controls and get vomit pipe, the material pipe that jaw is discharged with a footstock holds to descend and moves on the delivery platform again, this delivery platform is to be moved by a motor-driven screw, and will expect that pipe is transferred to the material pipe support of rewinding mouth position, hold rising with another footstock again, and prop up by jaw, can be positioned the rewinding mouth; When the IC that finishes the processing operation, promptly freely falls with gravity when being transferred to discharging opening through the material road, and being filled in the material pipe of marshalling in regular turn, after the material pipe is filled, sensor promptly can perception and is started this device, and transports feed pipe automatically, and reaches the purpose of automatic filling material.
The purpose of this utility model is achieved in that
A kind of semiconductor packages material collecting device is characterized in that:
Frame: be to be an inclined-plane, lock vertical with the inclined-plane is provided with array and can piles up the material pipe supports that set up several material pipes on it;
Jaw: be to be located at material pipe support below, it is driven by a cylinder pressure and makes opening and closing movement, with clamping or release vomit pipe;
Footstock: be on frame, and corresponding each group material pipe support, it drives lifting by cylinder pressure, and can hold the lifting of material pipe;
The delivery platform: be to be positioned on the frame, it moves along the frame inclined-plane with drive power source, moves with carrying material pipe;
Another jaw: be to be located at another material pipe support below, its downside has guiding incline, and links a spring, to prop up the rewinding of material pipe;
The discharging road: be that linkage frame is located on the jaw of another material pipe support, after the material pipe held with jaw, its open end was corresponding to the discharging road.
This delivery platform is to screw togather-screw rod, and by motor and belt transmission, and the delivery platform can be moved along screw rod.
The side frames of this delivery platform is provided with can guide this guide rod that delivery platform moves.
This frame opposite side is directly to tilt to set up the waste material pipe of collecting defective products.
This material pipe support is to be located on the frame with panel lock, establishes with the corresponding lock of dividing plate again, makes and forms the material pipe support between dividing plate.
This material pipe support is to offer a breach, and this breach connects a discharging road.
The utility model can utilize material Guan Laizuo automation rewinding operation, and being arranged in of IC direction unanimity expected in the pipe, and after finishing rewinding, operating personnel can directly move the material pipe to next operation post, and next operation post can be directly with the feeding of material pipe, do not need fully to arrange with manual work again, except effective saving human resources, also can effectively guarantee the correct feeding of IC, the situation that can avoid generation equipment or IC to damage, and make whole work flow more smooth, significantly improve utilization benefit.
Further specify the technical solution of the utility model and embodiment below in conjunction with accompanying drawing.
Description of drawings:
Fig. 1 is material collecting device schematic diagram commonly used;
Fig. 2 is the schematic diagram of the utility model material pipe;
Fig. 3 is a schematic diagram of the present utility model;
Fig. 4 is the schematic diagram () of the utility model fortune feed pipe;
Fig. 5 is the schematic diagram (two) of the utility model fortune feed pipe;
Fig. 6 is the schematic diagram (three) of the utility model fortune feed pipe;
Fig. 7 is the schematic diagram (four) of the utility model fortune feed pipe;
Fig. 8 is the schematic diagram (five) of the utility model fortune feed pipe;
Fig. 9 is the schematic diagram (six) of the utility model fortune feed pipe;
Figure 10 receives the schematic diagram () of material pipe for the utility model;
Figure 11 receives the schematic diagram (two) of material pipe for the utility model.
As shown in Figure 2, the employed material pipe 10 of the utility model is to be a strip, and having storage tank 101, one ends in it is open end 102, and end then has a block 103 in addition, spills from an end to prevent IC.As shown in Figure 3, the utility model mainly is to have vertical installing two panels 201,202 on the frame 20 on inclined-plane one, corresponding lock is established several dividing plates 203,204 on two panels 201,202 again, the feasible material pipe support 205,206 that every between plate, forms array, in addition a side of frame 20 is can direct oblique placement waste material pipe 104, it is in testing process, is promptly directly received by waste material pipe 104 if any the IC of fault; The material pipe support 205 of side is to place empty material pipe 10, its below is provided with a jaw 208 by cylinder pressure 207 drivings, and can do the action of folding, on inclined-plane frame 20, install a footstock 209 by the cylinder pressure driving in addition, it is the action of making vertical lift along inclined-plane frame 20, and it screws togather delivery platform 30 with screw rod 301, and also there are guide rod 302 bindings both sides, and screw rod 301 can make delivery platform 30 to move to another material pipe support 206 positions along screw rod 301 by belt 303 by the motor driven in the oblique frame 20.As Fig. 3, shown in Figure 10, material pipe support 206 its belows are to be provided with jaw 210, and these jaw 210 belows are a contra bevel, and link a spring 211, make behind jaw 210 Unscrews, can utilize spring 211 to reset, inclined-plane frame 20 is corresponding to material pipe support 206 positions, and other is provided with the footstock 212 that is driven by cylinder pressure, rise with jacking material pipe, in addition offer a breach 213 in jaw 210 tops of material pipe support 206, this breach 213 also links a discharging road 214, IC promptly thus discharging road 214 advance in the feeding pipe.As shown in Figure 4, empty material pipe 10 of the present utility model is to be stacked on the material pipe support 205, and it also utilizes jaw 208 clampings location.As shown in Figure 5, when sky material pipe 10 was desired to transport, at first footstock 209 will drive with cylinder pressure and rise to empty material pipe 10 lower positions and prepare to hold.As shown in Figure 6, after footstock 209 arrived the location, jaw 208 was promptly driven rotation and is discharged empty material pipe 10 by cylinder pressure 207, and this moment, whole row's sky material pipe 10 was promptly held by footstock 209.As shown in Figure 7, footstock 209 lattice that then descend make the 2nd empty material pipe 10 ' drop to jaw 208 height and positions.Show as Fig. 8, behind the 2nd empty material pipe 10 ' drop to jaw 208 positions, jaw 208 drive rotation by cylinder pressure again and be clamped in empty material pipe 10 ' both ends open in, and the 2nd later material pipe is positioned on the material pipe support 205.As shown in Figure 9, behind the 2nd empty material pipe 10 ' be held the location, footstock 209 promptly drops to initial point, because delivery platform 30 highly is the origin position that is higher than footstock 209, therefore after footstock 209 dropped to initial point, empty material pipe 10 promptly dropped down onto on the delivery platform 30, and breaks away from material pipe support 205, this moment, screw rod 301 promptly can rotate, and made delivery platform 30 move to the precalculated position.As shown in figure 10, after sky material pipe 10 is transferred to the position of material pipe support 206 by delivery platform 30, footstock 212 is promptly driven by cylinder pressure and rises, because jaw 210 belows are a contra bevel, when therefore footstock 212 holds 10 risings of material pipe, can its pushing tow be rotated along the contra bevel of jaw 210, and make material pipe 10 by jaw 210.As shown in figure 11, after material pipe 10 passes through, jaw 210 location of promptly can overturning back with the elastic force of spring 211, this moment, footstock 212 promptly dropped to initial point, and material pipe 10 promptly props up the location by jaw 210, and the open end 102 of the material pipe 10 behind the location is to face discharging road 214, the IC that fulfiling assignment stands processes can be by the discharging road with in the sliding feeding pipe 10 of gravity, after the IC filling of arranging in regular turn was full, delivery platform 30 will continue to transport empty material and manage to expecting pipe support 206, with the operation of proceeding to load.
In sum, the utility model utilizes the automation and the normalization of rewinding, and improves the operating efficiency of whole flow process, real dark tool practicality and advance, so not seeing has identical product and publication openly, thereby meets novel patent application important document, so file an application in accordance with the law.

Claims (6)

1, a kind of semiconductor packages material collecting device is characterized in that:
Frame: be to be an inclined-plane, lock vertical with the inclined-plane is provided with array and can piles up the material pipe supports that set up several material pipes on it;
Jaw: be to be located at material pipe support below, it is driven by a cylinder pressure and makes opening and closing movement, with clamping or release vomit pipe;
Footstock: be on frame, and corresponding each group material pipe support, it drives lifting by cylinder pressure, and can hold the lifting of material pipe;
The delivery platform: be to be positioned on the frame, it moves along the frame inclined-plane with drive power source, moves with carrying material pipe;
Another jaw: be to be located at another material pipe support below, its downside has guiding incline, and links a spring, to prop up the rewinding of material pipe;
The discharging road: be that linkage frame is located on the jaw of another material pipe support, after the material pipe held with jaw, its open end was corresponding to the discharging road.
2, semiconductor packages material collecting device as claimed in claim 1 is characterized in that: this delivery platform is to screw togather a screw rod, and by motor and belt transmission, and the delivery platform can be moved along screw rod.
3, semiconductor packages material collecting device as claimed in claim 1 is characterized in that: the side frames of this delivery platform is provided with can guide this guide rod that delivery platform moves.
4, semiconductor packages material collecting device as claimed in claim 1 is characterized in that: this frame opposite side is directly to tilt to set up the waste material pipe of collecting defective products.
5, semiconductor packages material collecting device as claimed in claim 1 is characterized in that: this material pipe support is to be located on the frame with panel lock, establishes with the corresponding lock of dividing plate again, makes and forms the material pipe support between dividing plate.
6, semiconductor packages material collecting device as claimed in claim 1 is characterized in that: this material pipe support is to offer a breach, and this breach connects a discharging road.
CN 98241699 1998-10-26 1998-10-26 Semiconductor packing device Expired - Fee Related CN2348490Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98241699 CN2348490Y (en) 1998-10-26 1998-10-26 Semiconductor packing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98241699 CN2348490Y (en) 1998-10-26 1998-10-26 Semiconductor packing device

Publications (1)

Publication Number Publication Date
CN2348490Y true CN2348490Y (en) 1999-11-10

Family

ID=33988411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98241699 Expired - Fee Related CN2348490Y (en) 1998-10-26 1998-10-26 Semiconductor packing device

Country Status (1)

Country Link
CN (1) CN2348490Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850861A (en) * 2010-04-26 2010-10-06 邱木圳 Automatic box packing machine
CN102284977A (en) * 2011-08-25 2011-12-21 铜陵三佳山田科技有限公司 Die-cutting, forming and separating die for integrated circuit without pins
CN102500556A (en) * 2011-10-26 2012-06-20 无锡圆方半导体测试有限公司 Automatic uncorking device of semi-conductor separator material pipes
CN102832157A (en) * 2012-09-11 2012-12-19 苏州均华精密机械有限公司 Automatic pipe layout mechanism for receiving pipes of integrated circuits
CN106238339A (en) * 2016-08-30 2016-12-21 福州派利德电子科技有限公司 IC chip cliff cut style testing, sorting machine feeding conveying device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101850861A (en) * 2010-04-26 2010-10-06 邱木圳 Automatic box packing machine
CN102284977A (en) * 2011-08-25 2011-12-21 铜陵三佳山田科技有限公司 Die-cutting, forming and separating die for integrated circuit without pins
CN102500556A (en) * 2011-10-26 2012-06-20 无锡圆方半导体测试有限公司 Automatic uncorking device of semi-conductor separator material pipes
CN102500556B (en) * 2011-10-26 2015-05-27 无锡圆方半导体测试有限公司 Automatic uncorking device of semi-conductor separator material pipes
CN102832157A (en) * 2012-09-11 2012-12-19 苏州均华精密机械有限公司 Automatic pipe layout mechanism for receiving pipes of integrated circuits
CN102832157B (en) * 2012-09-11 2014-09-24 苏州均华精密机械有限公司 Automatic pipe layout mechanism for receiving pipes of integrated circuits
CN106238339A (en) * 2016-08-30 2016-12-21 福州派利德电子科技有限公司 IC chip cliff cut style testing, sorting machine feeding conveying device
CN106238339B (en) * 2016-08-30 2018-09-25 福州派利德电子科技有限公司 IC chip cliff cut style testing, sorting machine feeding conveying device

Similar Documents

Publication Publication Date Title
CN102107771B (en) Automatic piece unloading device
CN205732024U (en) LED support automatic detecting machine cutting agency
CN208471015U (en) Cutting agency
CN201264722Y (en) Array machine
CN200961064Y (en) Stack layer forming and transporting mechanism for full-automatic piling machine
CN207116589U (en) A kind of soft package lithium battery PACK production lines
CN112792550A (en) Magnet assembling machine and assembling method
CN2348490Y (en) Semiconductor packing device
CN104590611A (en) Formula machine and method for dispensing medicine by using formula machine
CN206435765U (en) Robot automatic charging device
CN100438107C (en) Vertical LED feed system
CN217967270U (en) Bending platform for etching frame
CN105845611A (en) Take-up mechanism and silicon wafer loading and unloading system
CN214880061U (en) Lifting machine for capping equipment
CN203624400U (en) Iron sheet pile handling device of tank body resistance welding machine
CN108802032A (en) A kind of automatic test production line
CN112849464B (en) Solar energy component packagine machine
CN113990786A (en) Single-rail silicon wafer basket collecting machine
CN204473234U (en) Formulation machine
CN200976353Y (en) Upright type LED feeding system
CN209651849U (en) Bottle cap arranges and capping device
JPH06122415A (en) Device for packing glass tube
CN219216500U (en) Quantitative equipment is carried to granule material
CN207417910U (en) A kind of power line carrier module automates connecting device
CN110723534A (en) Automatic screen separating machine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee