CN214880061U - Lifting machine for capping equipment - Google Patents

Lifting machine for capping equipment Download PDF

Info

Publication number
CN214880061U
CN214880061U CN202120979307.6U CN202120979307U CN214880061U CN 214880061 U CN214880061 U CN 214880061U CN 202120979307 U CN202120979307 U CN 202120979307U CN 214880061 U CN214880061 U CN 214880061U
Authority
CN
China
Prior art keywords
layer
rack
placing
bottom plate
worm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120979307.6U
Other languages
Chinese (zh)
Inventor
陶善方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Avic Packaging Materials Co ltd
Original Assignee
Shanghai Avic Packaging Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Avic Packaging Materials Co ltd filed Critical Shanghai Avic Packaging Materials Co ltd
Priority to CN202120979307.6U priority Critical patent/CN214880061U/en
Application granted granted Critical
Publication of CN214880061U publication Critical patent/CN214880061U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The application discloses gland equipment lifting machine relates to the technical field of lifting machine, has solved and has received the workbin and collect when full at the bottle lid, needs to shut down the lifting machine is whole, and its process of shutting down the operation can influence the problem of the production efficiency of whole assembly line, and it includes storage case, transport rail and unloading frame, the transport rail includes the perpendicular part that sets up perpendicularly with the storage case and the horizontal part of being connected perpendicularly with the perpendicular part, the downside of horizontal part is provided with the rack, the rack includes that first place the layer and the layer is placed to the second, first place layer and second and place the in situ and all can dismantle and be connected with and receive the workbin, first place layer and second and place and be provided with the loading board that is used for bearing the second and places the receipts workbin on the layer between the layer, the loading board is in the state of moving towards or keeping away from the center of rack. This application has the effect of the change of not shutting down of the workbin of realizing receiving.

Description

Lifting machine for capping equipment
Technical Field
The application relates to the technical field of lifting machines, in particular to a lifting machine of gland equipment.
Background
Along with the development of production technology, when carrying out being connected of plastic bottle and bottle lid in large-scale production factory, in order to improve production efficiency, use the assembly line to carry out being connected between bottle lid and the bottle at present more, move to the position in-process of being connected with the bottle at the bottle lid, need use the lifting machine to transport the inside bottle lid of storage case to the delivery track on, realize the transportation to the bottle lid through delivery track's promotion.
As shown in fig. 5, the elevator comprises a conveying rail 2 extending into the storage bin 1, the conveying rail 2 comprises a vertical part 21 vertically embedded in the storage bin 1 and a horizontal part 22 connected with the vertical part 21, a discharging frame 3 is arranged at one end of the horizontal part 22 far away from the vertical part 21, a feeding rail 4 arranged along the track of the conveying rail 2 is arranged in the conveying rail 2, a plurality of hoppers 5 are uniformly connected to the feeding rail 4 at intervals, when the feeding rail 4 moves along the conveying rail 2, the hopper 5 can move the bottle caps in the storage box 1 to one end of the discharging frame 3, since the bottle caps may be stuck on the hopper 5 during transportation, when the feeding rail 4 moves to the lower side of the horizontal portion 22, there may be a case where the bottle caps fall from the hopper 5, a collecting bin 7 is normally placed under the horizontal portion 22 of the conveyor track 2 to collect the caps that have fallen during the movement of the feed track 4.
In view of the above related technologies, the inventor believes that the above material receiving box needs to be stopped integrally by the elevator when the bottle caps are fully collected, and then the bottle caps in the material receiving box are put back into the material storage box, and the stopping operation process of the material receiving box affects the production efficiency of the whole production line.
SUMMERY OF THE UTILITY MODEL
In order to realize the change of receiving the workbin not shutting down, this application provides a gland equipment lifting machine.
The application provides a gland equipment lifting machine adopts following technical scheme:
the utility model provides a gland equipment lifting machine, includes storage case, transport rail and unloading frame, carry the rail to include the vertical part that sets up perpendicularly with the storage case and the horizontal part of being connected perpendicularly with the vertical part, the downside of horizontal part is provided with the rack, the rack includes that first layer and the second of placing are placed the layer, first layer and the second of placing all can be dismantled in placing the layer and be connected with and receive the workbin, first layer and the second of placing are placed and are provided with between the layer and be used for bearing the second and place the loading board of receiving the workbin on the layer, the loading board is in the state that the center of orientation or keeping away from the rack removed.
By adopting the technical scheme, when the bottle caps are collected, a receiving box is placed at the position of the first placing layer at the lower layer of the placing frame, so that the dropped bottle caps fall into the receiving box, when the receiving box at the first placing layer is full of the bottle caps required to be poured back into the storage box, the bearing plate is moved towards the direction close to the center of the placing frame, the second receiving box is placed on the second placing layer, so that the subsequently dropped bottle caps fall into the receiving box at the upper layer, then the receiving box at the lower layer is taken out, after the receiving box at the lower layer is taken out, the bearing plate is moved towards the direction far away from the center of the placing frame, so that the bearing plate does not bear the receiving box at the upper layer any more, the receiving box at the upper layer falls to the position of the first placing layer, the steps are repeated after the receiving box is replaced, and the receiving box is placed at the end below the horizontal part of the conveying rail, thereby realizing the replacement of the material receiving box under the condition of no shutdown.
Optionally, a mounting plate is connected between the first placing layer and the second placing layer, a containing groove used for containing the bearing plate is formed in one side, facing the center of the placing frame, of the mounting plate, a push rod is connected to one side, far away from the center of the placing frame, of the bearing plate, and the push rod penetrates through the mounting plate.
Through adopting above-mentioned technical scheme, when needs use the loading board to bear and receive the workbin, promote the outside removal of loading board to the storage tank through the push rod to make the loading board play the effect of bearing and receiving the workbin.
Optionally, one side of the vertical part of the rack far away from the conveying rail is provided with an opening for the material receiving box to take and place, and one side of the rack near the vertical part of the conveying rail is provided with a limiting plate for limiting the material receiving box.
Through adopting above-mentioned technical scheme, through the setting of limiting plate, be convenient for fix a position the position of receiving the workbin.
Optionally, a bottom plate is arranged below the bearing plate, one side, close to the limiting plate, of the bottom plate is attached to the limiting plate, and a driving assembly for driving the bottom plate to move up and down relative to the placing frame is arranged on the bottom plate.
Through adopting above-mentioned technical scheme, when the second was placed the receipts workbin on the layer and is removed to the first layer of placing, removed the loading board to the inside of storage tank, later receive the workbin and drop to the bottom plate on, realize through drive assembly that the bottom plate drives the descending operation of receiving the workbin.
Optionally, the driving assembly comprises a connecting block fixedly connected to one side of the bottom plate and a screw rod in threaded connection with the connecting block, and the lower end of the placing frame is provided with an installation block for the screw rod to be connected in a rotating mode.
Through adopting above-mentioned technical scheme, when the rotatory screw rod of relative installation piece, the one side butt that the bottom plate is close to the limiting plate is on the lateral wall of limiting plate to realize that the installation piece drives the bottom plate and realizes reciprocating of relative rack.
Optionally, the connecting block and the screws are symmetrically arranged on the left side and the right side of the bottom plate, and a transmission assembly enabling the two screws to synchronously rotate is arranged between the two screws.
Through adopting above-mentioned technical scheme, because the screw rod is provided with two in the left and right sides symmetry of bottom plate to can effectively improve the stationarity of bottom plate lift in-process.
Optionally, the transmission assembly comprises a worm wheel fixedly connected to the bottom end of the screw rod and a worm rod which is meshed with the worm wheel of the screw rods on the left side and the right side, a bearing seat for connecting the worm rod is arranged at the position where the placing frame contacts with the worm rod, and a handle for driving the worm rod to rotate is arranged at one end of the worm rod.
By adopting the technical scheme, the synchronous rotation operation of the screws on the left side and the right side of the bottom plate is realized through the arrangement of the worm wheel and the worm.
Optionally, the upper end of rack is provided with the funnel, the funnel is including connecting the guide board all around the rack, the guide board all sets up to the position slope that is close to the rack from the position of keeping away from the rack and sets up downwards.
Through adopting above-mentioned technical scheme, through the setting of funnel, can guide the bottle lid that drops from the delivery rail, reduce the bottle lid and drop to the outside possibility of receiving the workbin.
In summary, the present application includes at least one of the following benefits:
1. when the bottle caps are collected, a receiving box is placed at the position of a first placing layer at the lower layer of the placing frame, so that the dropped bottle caps fall into the receiving box, when the receiving box at the first placing layer is full of bottle caps to be poured back into the storage box, the bearing plate is moved towards the direction close to the center of the placing frame, a second receiving box is placed on a second placing layer, so that the subsequent dropped bottle caps fall into the receiving box at the upper layer, then the receiving box at the lower layer is taken out, after the receiving box at the lower layer is taken out, the bearing plate is moved towards the direction far away from the center of the placing frame, so that the bearing plate does not bear the receiving box at the upper layer, the receiving box at the upper layer falls to the position of the first receiving layer, the steps are repeated for the subsequent replacement of the receiving boxes, and the receiving boxes are placed at all times below the horizontal part of the conveying rail, therefore, the material receiving box can be replaced without stopping the machine;
2. when the screw rod is rotated relative to the mounting block, one side of the bottom plate, which is close to the limiting plate, abuts against the side wall of the limiting plate, so that the mounting block drives the bottom plate to move up and down relative to the placing frame.
Drawings
FIG. 1 is a schematic structural view of the overall structure of the present embodiment;
FIG. 2 is a schematic structural view of the rack of the present embodiment;
FIG. 3 is a schematic structural view of the highlighting rack of the present embodiment;
FIG. 4 is a schematic structural diagram of the highlighting driving assembly of the present embodiment.
Fig. 5 is a schematic structural view of the related art.
Description of reference numerals: 1. a material storage box; 2. a conveying rail; 21. a vertical portion; 22. a horizontal portion; 3. discharging the material frame; 4. a feeding rail; 5. a hopper; 6. placing a rack; 61. mounting blocks; 7. a material receiving box; 71. a first placement layer; 72. a second placement layer; 73. an opening; 74. a limiting plate; 8. mounting a plate; 81. a containing groove; 82. a jack; 9. a carrier plate; 11. a push rod; 12. pulling a handle; 13. a base plate; 14. a drive assembly; 141. connecting blocks; 142. a screw; 15. a transmission assembly; 151. a turbine; 152. a worm; 16. a bearing seat; 17. a handle; 18. a funnel; 181. a guide plate.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses gland equipment lifting machine. Referring to fig. 1 and 2, the capping device elevator includes a storage bin 1, a conveying rail 2 and a discharging frame 3, the conveying rail 2 includes a vertical portion 21 and a horizontal portion 22, one end of the vertical portion 21 close to the storage bin 1 extends into the storage bin 1, the horizontal portion 22 is connected to one end of the vertical portion 21 far away from the storage bin 1 and is perpendicular to the vertical portion 21, one end of the horizontal portion 22 far away from the vertical portion 21 is welded and fixed with the discharging frame 3, a feeding rail 4 is disposed inside the conveying rail 2, the feeding rail 4 extends along the vertical portion 21 and the horizontal portion 22 of the conveying rail 2, hoppers 5 are uniformly connected to the feeding rail 4 at intervals, during the use of the elevator, the hoppers 5 on the feeding rail 4 lift bottle caps inside the storage bin 1 to the position of the discharging frame 3, when bottle caps are clamped on the hoppers 5, the hoppers 5 drive the bottle caps to move to the lower portion of the horizontal portion 22, a placing rack 6 is disposed below the horizontal portion 22, a material receiving box 7 for accommodating the bottle caps is arranged on the placing frame 6.
Referring to fig. 3, the placing frame 6 is integrally welded by using a steel rod to form a frame-shaped structure, the placing frame 6 is partitioned to form a first placing layer 71 and a second placing layer 72, the first placing layer 71 is located at one end close to the ground, the second placing layer 72 is arranged above the first placing layer 71, the first placing layer 71 and the second placing layer 72 are welded and fixed with a mounting plate 8, the mounting plate 8 is symmetrically welded at the left side and the right side of the placing frame 6, a containing groove 81 is formed in the mounting plate 8, a bearing plate 9 is placed in the containing groove 81, and the bearing plate 9 is located in a state of moving towards or away from the middle of the placing frame 6. When the carrier 9 moves to the middle of the placing frame 6, the first placing layer 71 and the second placing layer 72 are separated by the carrier 9. A material receiving box 7 can be arranged on the bearing plate 9, and a material receiving box 7 can also be arranged at the position of the second arrangement layer 72.
Referring to fig. 3 and 4, one side welded fastening of loading board 9 towards mounting panel 8 has push rod 11, jack 82 that supplies push rod 11 to peg graft is seted up to the position that corresponds push rod 11 on the mounting panel 8, the one end of push rod 11 is pegged graft to the outside of mounting panel 8, push rod 11 is arranged in the outside one end welded fastening of mounting panel 8 and is had pull handle 12, the operation to loading board 9 can be realized to the operation through pull handle 12, the realization is with loading board 9 to the direction pulling that is close to storage tank 81, or push loading board 9 to the outside of storage tank 81, when pull handle 12 is close to one side laminating in mounting panel 8's lateral wall of mounting panel 8, the one end that loading board 9 is close to mounting panel 8 still overlap joint on mounting panel 8, be convenient for improve the bearing effect of loading board 9 to material receiving box 7.
Referring to fig. 2 and 3, one side of the placing frame 6 is provided with an opening 73 for placing the material receiving box 7 on the first placing layer 71 or the second placing layer 72, the opening 73 of the placing frame 6 faces the side far away from the vertical part 21 of the conveying rail 2, a limiting plate 74 for limiting the material receiving box 7 is welded on the side, close to the vertical part 21, of the placing frame 6, and when the material receiving box 7 is placed from the position of the opening 73 to enter the first placing layer 71 or the second placing layer 72, one end of the material receiving box 7 facing the limiting plate 74 abuts against the limiting plate 74, so that the position of the material receiving box 7 can be effectively located.
Referring to fig. 3 and 4, the placing frame 6 is provided with a bottom plate 13 below the bearing plate 9, one side of the bottom plate 13 close to the limiting plate 74 is attached to the limiting plate 74, the bottom plate 13 moves up and down relative to the placing frame 6, the bottom plate 13 is connected with a driving assembly 14 for driving the bottom plate 13 to move up and down, the driving assembly 14 in this embodiment comprises a connecting block 141 welded on the side wall of the bottom plate 13 and a screw 142 in threaded connection with the connecting block 141, a mounting block 61 for rotatably connecting the screw 142 is welded at the bottom of the placing frame 6 corresponding to the position of the screw 142, the position of the screw 142 close to the mounting block 61 is rotatably connected with the mounting block 61, when the screw 142 rotates relative to the mounting block 61, the connecting block 141 drives the bottom plate 13 to move up and down along the screw 142, when the material receiving boxes 7 on the second placing layer 72 are placed on the bottom plate 13, the bottom plate 13 drives the material receiving boxes 7 to move downwards to the position of the first placing layer 71.
Referring to fig. 4, in order to improve the stability of the bottom plate 13 in the descending process, the connecting blocks 141, the screws 142 and the mounting blocks 61 of the present application are symmetrically disposed on the left and right sides of the bottom plate 13. A transmission assembly 15 for synchronously rotating the two screw rods 142 is provided between the adjacent screw rods 142. The transmission assembly 15 includes a worm wheel 151 welded and fixed at the lower end of the screw 142 and a worm 152 engaged with the worm wheels 151 on the two screw 142, the worm wheel 151 is disposed at a position above the mounting block 61, a bearing seat 16 is disposed between the worm wheel 152 and the placement frame 6, the bearing seat 16 in this embodiment uses the bearing seat 16 which is connected in a vertically buckled manner, so that the connection between the worm wheel 152 and the bearing seat 16 is conveniently realized.
Referring to fig. 4, a handle 17 is welded to one end of the worm 152, and the worm 152 is rotated by the handle 17. The two worm gears 151 engaged with the worm 152 realize synchronous rotation of the two screw rods 142, thereby realizing smooth elevation of the base plate 13.
Referring to fig. 2 and 4, the funnel 18 is welded above the placing frame 6, the funnel 18 comprises guide plates 181 welded to four sides above the placing frame 6, and the guide plates 181 are arranged to be inclined downwards from one side far away from the placing frame 6 to one side close to the placing frame 6, so that bottle caps falling from the horizontal portion 22 can fall into the material receiving box 7 along the inclined plane of the guide plates 181.
The implementation principle of the capping equipment hoister in the embodiment of the application is as follows:
when the elevator is in use, the material receiving box 7 is placed at the position of the first placing layer 71 of the placing frame 6, so that bottle caps falling from the horizontal part 22 fall to the inside of the material receiving box 7 along the hopper 18, when the material receiving box 7 of the first placing layer 71 is fully collected and needs to move and dump the bottle caps to the inside of the material storage box 1, the push rod 11 is pushed to push the bearing plate 9 to the outside of the containing groove 81, then the second material receiving box 7 is placed on the second placing layer 72, and the bearing plate 9 provides an upward supporting effect for the material receiving box 7. Afterwards, the material receiving box 7 filled with bottle caps in the first placing layer 71 is pulled towards the outside of the first placing layer 71, at the moment, the bearing plate 9 is pulled towards the inside of the containing groove 81, the material receiving box 7 above the bearing plate 9 is made to fall onto the bottom plate 13, the worm 152 is rotated relative to the bearing seat 16, the worm 152 drives the screw 142 to rotate through the worm wheel 151, the bottom plate 13 drives the material receiving box 7 to move towards the first placing layer 71, in the process that the material receiving box 7 moves towards the first placing layer 71 from the second placing layer 72, the material receiving box 7 is always positioned under the horizontal part 22, and therefore the material receiving box 7 can be replaced without stopping.
After the material receiving box 7 of the second placing layer 72 is placed, the material receiving box 7 of the first placing layer 71 is taken out, the worm 152 is driven to rotate reversely, the reverse rotation of the screw 142 is realized, the screw 142 conveys the bottom plate 13 to a position close to the bearing plate 9, and the subsequent material receiving box 7 is replaced repeatedly in the previous operation steps, so that the material receiving box 7 is placed all the time below the horizontal part 22, and the material receiving box 7 can be replaced without stopping in the working process of the elevator.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a gland equipment lifting machine, includes storage case (1), carries rail (2) and ejection of compact frame (3), carry rail (2) including with vertical portion (21) of storage case (1) perpendicular setting and with horizontal part (22) that vertical portion (21) are connected perpendicularly, its characterized in that: the downside of horizontal part (22) is provided with rack (6), rack (6) are including first layer (71) and the second of placing and place layer (72), first layer (71) and the second of placing all can be dismantled in placing layer (72) and be connected with receipts workbin (7), first layer (71) and the second of placing are provided with between layer (72) and are used for bearing the weight of the second and place bearing board (9) of receiving workbin (7) on layer (72), bearing board (9) are in the state of moving towards or keeping away from the center of rack (6).
2. The capping equipment hoist of claim 1, wherein: first place layer (71) and second and place and be connected with mounting panel (8) between layer (72), mounting panel (8) are offered towards one side at rack (6) center and are used for holding storage tank (81) of holding loading board (9), one side that rack (6) center was kept away from in loading board (9) is connected with push rod (11), push rod (11) run through mounting panel (8) and set up.
3. The capping equipment hoist of claim 1, wherein: one side of the vertical part (21) of the conveying rail (2) far away from the placing frame (6) is provided with an opening (73) for taking and placing the material receiving box (7), and one side of the vertical part (21) of the conveying rail (2) close to the placing frame (6) is provided with a limiting plate (74) for limiting the material receiving box (7).
4. The capping equipment hoist as claimed in claim 3, wherein: the bearing plate is characterized in that a bottom plate (13) is arranged below the bearing plate (9), one side, close to the limiting plate (74), of the bottom plate (13) is attached to the limiting plate (74), and a driving assembly (14) for driving the bottom plate (13) to move up and down relative to the placing frame (6) is arranged on the bottom plate (13).
5. The capping equipment hoist as claimed in claim 4, wherein: the driving assembly (14) comprises a connecting block (141) fixedly connected to one side of the bottom plate (13) and a screw rod (142) in threaded connection with the connecting block (141), and the lower end of the placing frame (6) is provided with an installation block (61) for the screw rod (142) to be connected in a rotating mode.
6. The capping equipment hoist as claimed in claim 5, wherein: the connecting blocks (141) and the screw rods (142) are symmetrically arranged on the left side and the right side of the bottom plate (13), and a transmission assembly (15) enabling the two screw rods (142) to synchronously rotate is arranged between the two screw rods (142).
7. The capping equipment elevator as claimed in claim 6, wherein: the drive assembly (15) include worm (152) that worm wheel (151) and the worm wheel (151) with the left and right sides screw rod (142) of fixed connection in screw rod (142) bottom all meshed, the position that rack (6) contact worm (152) is provided with bearing frame (16) that supply worm (152) to connect, the one end of worm (152) is provided with rotatory handle (17) of drive worm (152).
8. The capping equipment hoist of claim 1, wherein: the upper end of rack (6) is provided with funnel (18), funnel (18) are including connecting guide board (181) all around rack (6), guide board (181) all set up to the position slope that is close to rack (6) from the position of keeping away from rack (6) and set up downwards.
CN202120979307.6U 2021-05-08 2021-05-08 Lifting machine for capping equipment Expired - Fee Related CN214880061U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120979307.6U CN214880061U (en) 2021-05-08 2021-05-08 Lifting machine for capping equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120979307.6U CN214880061U (en) 2021-05-08 2021-05-08 Lifting machine for capping equipment

Publications (1)

Publication Number Publication Date
CN214880061U true CN214880061U (en) 2021-11-26

Family

ID=78946238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120979307.6U Expired - Fee Related CN214880061U (en) 2021-05-08 2021-05-08 Lifting machine for capping equipment

Country Status (1)

Country Link
CN (1) CN214880061U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117735166A (en) * 2024-02-20 2024-03-22 云南浩翔包装制品有限公司 Milk bottle cap conveying device with conveying rail anti-blocking function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117735166A (en) * 2024-02-20 2024-03-22 云南浩翔包装制品有限公司 Milk bottle cap conveying device with conveying rail anti-blocking function
CN117735166B (en) * 2024-02-20 2024-04-19 云南浩翔包装制品有限公司 Milk bottle cap conveying device with conveying rail anti-blocking function

Similar Documents

Publication Publication Date Title
CN214880061U (en) Lifting machine for capping equipment
CN211329788U (en) Feeding device of waste aluminum crusher
CN109305507B (en) Conveying device
CN216544904U (en) Feeding device for carton processing
CN114131790B (en) Crushing device for barrel-shaped plastic waste
CN214268213U (en) Automatic bagging device for short paper tubes
CN212863027U (en) Automatic collect product and trade case equipment
CN209600858U (en) Rail division type strawberry storage device
CN210029290U (en) Energy-saving elevator bucket device
CN113184539A (en) Glass panels pushing mechanism, conveyor and go up unloading equipment
CN2348490Y (en) Semiconductor packing device
CN214149550U (en) Raw materials material loading machine with quantitative weighing structure
CN217626428U (en) Material conveying device for catalytic reduction of complex biological pollutants
CN113481515B (en) Pickling treatment equipment for seamless steel pipe and pickling method thereof
CN220077037U (en) Knob type polar plate turnover box and battery production equipment
CN219949479U (en) Derailment prevention mechanism based on push plate elevator
CN214986360U (en) Supplementary case mechanism of going up of oral liquid packing carton
CN112895104B (en) Automatic weighing, feeding and brick taking system of numerical control electric spiral brick press
CN211803506U (en) Material collecting device is used in saddle production
CN220362672U (en) Material receiving device of rib cutting system
CN214452312U (en) Go up feed bin mechanism
CN218506244U (en) High-efficient iron drum packing plant
CN216736578U (en) Tar residue collection device
CN216189445U (en) Blast furnace hearth clearance conveyer
CN216067728U (en) Plate separator feed arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211126