CN2323017Y - Prefabricated bulkhead for hand excavated pile - Google Patents

Prefabricated bulkhead for hand excavated pile Download PDF

Info

Publication number
CN2323017Y
CN2323017Y CN 98210099 CN98210099U CN2323017Y CN 2323017 Y CN2323017 Y CN 2323017Y CN 98210099 CN98210099 CN 98210099 CN 98210099 U CN98210099 U CN 98210099U CN 2323017 Y CN2323017 Y CN 2323017Y
Authority
CN
China
Prior art keywords
prefabricated bulkhead
pile
hand excavated
cambered surface
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98210099
Other languages
Chinese (zh)
Inventor
张盛昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98210099 priority Critical patent/CN2323017Y/en
Application granted granted Critical
Publication of CN2323017Y publication Critical patent/CN2323017Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a prefabricated bulkhead for hand excavated pile. One prefabricated bulkhead for hand excavated pile is composed of a plurality of arched plates. The utility model is characterized in that the arc surface of each arched plate is provided with a small hole, the both sides are provided with convex connecting columns, the column surface is provided with a groove, and a hollow pile with holes is arranged in the arched plate. The utility model can enhance or decrease the friction force according to the different geological conditions. The prefabricated bulkhead for hand excavated pile can rapidly diminish and discharge water to guarantee the construction progress and the construction quality. The utility model can carry out the serial construction in the stratum with poor environment condition and complicated condition, such as soft soil, shoal, lake, river, and marsh. The problem that the hand excavated pile can not carry out the downward excavation in the stratum with thicker or thick sludge, running sand, and full water can be fundamentally solved.

Description

New method hand excavated pile prefabricated bulkhead
The utility model relates to a kind of prefabricated bulkhead, the prefabricated bulkhead that especially a kind of new method hand excavated pile is used.
The normal hand excavated pile that adopts in the construction work foundation construction when borehole, is the hole of avoiding the hole wall landslide from top to bottom to dig out certain altitude earlier, again along hole wall formwork erection concrete perfusion as retaining wall.But this method can only be used in the place that geological condition is better, hole depth is little.In complicated geology, place that hole depth is big, in especially thicker mud, the water saturation flowing sand layer, be easy to generate stream mud, quicksand and can't dig down.Near but also the safety of building jeopardizing because of sinking of ground all around near the borehole and position, hole easily.Chinese patent discloses the light prefabricated retaining wall of a kind of hole digging pile for No. 94226917.9, it is made up of 2-8 piece arcuation cement pre-fabricated panel, a piece is assembled into retaining wall with it during construction, but its unreasonable structure, use single, limitation more can not be used for the big dark pile driving construction of mud, quicksand and hole depth and side pressure.So although existing hand excavated pile has lot of advantages, owing to have above-mentioned these weak points, so limited its further promotion and application.
The purpose of this utility model is to overcome the deficiency of prior art, and a kind of many types of formula and can precipitation is provided, and also can improve the positive frictional force of stake or reduce the new method hand excavated pile prefabricated bulkhead of the negative skin friction of pile of stake according to geological condition.
Scheme of the present utility model is: it is made of the polylith arc, it is characterized in that the cambered surface of each arc plate is provided with aperture, and both sides are provided with the joint pin of projection, and cylinder is provided with groove, as mud jacking and sealing.The joint pin of wherein said projection is the joint pin to outer lug, perhaps inwardly protruded joint pin; Groove on the cylinder is at least one, and is located on the cylinder of the outside or on the inboard cylinder, also is provided with the hole on the cylinder, is used for being connected with its piece arc; Cambered surface is vertical cambered surface, becomes cylinder barrel after the assembling, when the geology structure is weak soil or quicksand, be coated with lubriation material at the cylinder barrel external surface, to reduce the negative skin friction of pile, makes the not downslide displacement with the consolidation settlement of weak soil or quicksand on every side of retaining wall, guarantees workmanship; Outer down oblique cambered surface in addition cambered surface can be becomes up-small and down-big drum after the assembling, when the geology structure is hardpan, and mud jacking behind top placing of concrete that can be retaining wall outside or the pile, in case raising frictional force, the assurance construction quality; Hole on the cambered surface is a hole pattern, so that as the quick precipitation of precipitation well time spent energy, is about to the outer water of retaining wall and filters in the back inflow retaining wall by aperture, with its extraction, improve construction quality, guarantee construction speed, mix glass fabric and loaded filter, then effect is more obvious.
A scheme more of the present utility model is: it is made of the polylith arc, the cambered surface that it is characterized in that each arc plate is provided with aperture, both sides are provided with the joint pin of projection, and cylinder is provided with groove, in arc, be provided with hollow pile with holes, this hollow pile is prefabricated component or on-the-spot pouring part, can draining precipitation, can keep off native antiskid again.
The utility model compared with prior art has following advantage and effect: owing to be provided with the joint pin of projection on retaining wall, be mainly used in the top power post of jack, and be convenient to install execute in, can carry out sealing and mud jacking by the hole that two cylinder grooves form, thereby can be according to different geologic structures, improve or reduce frictional force, guarantee construction speed and construction quality; In addition owing to be provided with precipitation draining hole pattern on retaining wall, the quick precipitation draining of decapacitation guarantees outside construction speed, the construction quality, can construction continuously in the stratum of geological conditions such as weak soil, shoal, lake, river, marsh and construction environment difference.Fundamentally solve the difficult problem that hand excavated pile can't dig down in stratum such as thicker or very thick mud, water saturation flowing sand and shallow water, marsh and environment, be the novel construction method of hand excavated pile.
Fig. 1 is the structural representation of the utility model;
Fig. 2 is the cross-sectional view of Fig. 1:
Fig. 3 is another structural representation of the utility model;
Fig. 4 is the cross-sectional view of Fig. 3;
Fig. 5 is a hollow pile structural profile schematic diagram.
The specific embodiment that provides below in conjunction with accompanying drawing is described further the utility model, is not limited only to this but hold within the utility model.
Among Fig. 1,1 is hole pattern, is located on the arc of retaining wall, and 2 is joint pin, be located at the both sides of arc, and inwardly protruding, 3 is groove, be located at the lateral surface of post, be used for mud jacking, 4 is groove, be located at the lateral surface of post, be used for hermetic seal, 5 is screw, be located on the lateral column, be used for being connected with its piece arc, 6 is sealed tube, be located at the end face of arc, 7 is arc, is vertical arc.
Among Fig. 2,2 is joint pin, to outer lug, and is located at the both sides of arc, and 8 is the arc wooden partition, is inclination arc outer down in last, and all the other are identical with Fig. 1.
Among Fig. 5,9 is hollow pile, and 10 is aperture, is located on the pile lining.

Claims (7)

1, a kind of new method hand excavated pile prefabricated bulkhead, it is made of the polylith arc, it is characterized in that the cambered surface of each arc plate is provided with aperture, and both sides are provided with the joint pin of projection, and cylinder is provided with groove.
2, prefabricated bulkhead according to claim 1 is characterized in that the joint pin of described projection is joint pin or inwardly protruded joint pin to outer lug.
3, prefabricated bulkhead according to claim 1 is characterized in that the groove on the cylinder is at least one, and is located on the cylinder of the outside or on the inboard cylinder.
4, prefabricated bulkhead according to claim 1 is characterized in that cambered surface is vertical cambered surface, and the aperture on the cambered surface is provided with one, and is perhaps a plurality of, and perhaps many groups perhaps make it form hole pattern.
5, prefabricated bulkhead according to claim 1, it is characterized in that cambered surface present in down outer oblique cambered surface.
6, a kind of new method hand excavated pile prefabricated bulkhead, it is made of the polylith arc, it is characterized in that the cambered surface of each arc plate is provided with aperture, and both sides are provided with the joint pin of projection, and cylinder is provided with groove, is provided with hollow pile with holes in arc.
7, prefabricated bulkhead according to claim 6 is characterized in that this hollow pile is prefabricated component or on-the-spot pouring part.
CN 98210099 1998-01-26 1998-01-26 Prefabricated bulkhead for hand excavated pile Expired - Fee Related CN2323017Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98210099 CN2323017Y (en) 1998-01-26 1998-01-26 Prefabricated bulkhead for hand excavated pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98210099 CN2323017Y (en) 1998-01-26 1998-01-26 Prefabricated bulkhead for hand excavated pile

Publications (1)

Publication Number Publication Date
CN2323017Y true CN2323017Y (en) 1999-06-09

Family

ID=33965248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98210099 Expired - Fee Related CN2323017Y (en) 1998-01-26 1998-01-26 Prefabricated bulkhead for hand excavated pile

Country Status (1)

Country Link
CN (1) CN2323017Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100507163C (en) * 2003-10-31 2009-07-01 北京万方程科技有限公司 Slope protection and greening method
CN105544559A (en) * 2016-01-29 2016-05-04 济南轨道交通集团有限公司 Structure and method for foundation pit supporting by adopting prefabricated parts
CN113266011A (en) * 2021-04-28 2021-08-17 李俊飞 Novel composite pile enclosure device
CN114929969A (en) * 2019-12-06 2022-08-19 邹胜斌 Modular intelligent retaining wall cast-in-place pile and construction process thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100507163C (en) * 2003-10-31 2009-07-01 北京万方程科技有限公司 Slope protection and greening method
CN105544559A (en) * 2016-01-29 2016-05-04 济南轨道交通集团有限公司 Structure and method for foundation pit supporting by adopting prefabricated parts
CN114929969A (en) * 2019-12-06 2022-08-19 邹胜斌 Modular intelligent retaining wall cast-in-place pile and construction process thereof
CN114929969B (en) * 2019-12-06 2023-08-18 邹胜斌 Modularized intelligent wall-protecting cast-in-place pile and construction process thereof
CN113266011A (en) * 2021-04-28 2021-08-17 李俊飞 Novel composite pile enclosure device

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN102518453B (en) Quick tunnel-entrance construction method for bias-pressure shallow-buried or single-pressure tilting arenaceous loess tunnels
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN101311421B (en) Radical anchorage and construction method thereof
CN109680691A (en) The earthwork digging method of foundation pit annular brace
CN110469341A (en) A kind of assembly of Underground Subway Station combines integrated morphology and construction method with pouring
CN103306682A (en) Long-span and high-side-wall underground space building and excavation support method thereof
CN108677926A (en) Coercion underground continuous wall and its construction method
CN109056810A (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method
CN2323017Y (en) Prefabricated bulkhead for hand excavated pile
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN208441084U (en) Coercion underground continuous wall
CN213296396U (en) Steel sheet pile cofferdam for tidal zone of sea area
CN204059460U (en) The interior river intake structure of electric power plant circulating water system
CN106245625A (en) Pass through the bored pile construction method of existing Large Underground space structure
CN210151660U (en) Embedded concrete antiskid tenon grout stone retaining wall
CN208441083U (en) Half coercion underground continuous wall structure
CN107476315A (en) A kind of prefabricated component and its construction method being directed to close to type foundation ditch
CN104074234A (en) Inland water collecting opening structure of power plant circulating water system and construction method thereof
CN201078234Y (en) Integral hydraulic pressure steel sheet piling curtain of vertical shaft construction overflowing sand bed
CN208815566U (en) The transverse direction that open cut or lid dig underground main structure below existing building digs construction
CN2469046Y (en) Prefabricated steel bar reinforced concrete bulk head for piles
CN113981948B (en) Reverse construction method adopting prefabricated underground continuous wall
CN206220121U (en) Assembled point anchor barricade
CN111980039B (en) Construction method and structure of steel sheet pile cofferdam in tidal zone of sea area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee