CN106245625A - Pass through the bored pile construction method of existing Large Underground space structure - Google Patents

Pass through the bored pile construction method of existing Large Underground space structure Download PDF

Info

Publication number
CN106245625A
CN106245625A CN201610624426.3A CN201610624426A CN106245625A CN 106245625 A CN106245625 A CN 106245625A CN 201610624426 A CN201610624426 A CN 201610624426A CN 106245625 A CN106245625 A CN 106245625A
Authority
CN
China
Prior art keywords
existing
construction
bored pile
base plate
perform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610624426.3A
Other languages
Chinese (zh)
Inventor
邢振兴
凌健
侯世锋
张贺南
江宁
林晋华
兴安
敖土根巴依尔
郑蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201610624426.3A priority Critical patent/CN106245625A/en
Publication of CN106245625A publication Critical patent/CN106245625A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Abstract

The invention discloses a kind of bored pile construction method passing through existing Large Underground space structure, use following steps: one) earthing on existing underground structure top board is excavated in bored pile construction region, and abolish top board and the base plate of existing underground structure;Two) inside existing structure, perform armored concrete block wall and lead wall base plate;Three) reach after design requires, to perform and lead wall sidewall, formed by the rectangle hole leading wall and block wall surrounds wait leading wall base plate strength;Four) backfill rendzinas in rectangle hole interior laminate layer and tamp;Five) use churning driven pore-forming, perform cast-in-situ bored pile.The pressure in wall and block wall carrying construction from all directions is led in present invention utilization, and stability is strong, and safety coefficient is high;Speed of application is fast, and efficiency is high;Lead wall and block wall construction cost be low, labor and materials saving, and can AT STATION excavation of foundation pit time together abolish recovery with existing structure in foundation ditch, it is possible to save resource, promote the recycling of resource.

Description

Pass through the bored pile construction method of existing Large Underground space structure
Technical field
The present invention relates to the construction method of a kind of cast-in-situ bored pile, particularly relate to one and pass through existing Large Underground space The bored pile construction method of structure.
Background technology
Along with developing rapidly of urban construction, plot ratio increases increasingly, for protection urban ground environment, alleviates urban ground Traffic pressure, Urban Underground Space Excavation rises therewith.After entering 21st century, China starts to plan energetically, develop underground Space, subway construction is especially pronounced.Can be affected by the existing underground space unavoidably when subway is built in urban center territory, that It is accomplished by passing through the existing underground space when constructing station fender post.The existing boring passing through existing Large Underground space structure The construction method of bored concrete pile is: one) when going along with sb. to guard him drilled pile and passing through existing structure, and rotary drilling rig uses rotation to dig pick alloy bit Carry out creeping into passing through.Two) it is drilled into 1m under existing structure base plate, uses whole steel pile casting to carry out retaining wall installation place whole cavity section Reason.Three) use bucket tooth churning driven head to replace pick tubular alloy bit after passing through existing structure and carry out creeping into of soil layer section Construction, finally creeps into absolute altitude hole at end at the bottom of design stake.Existing construction method there is problems in that one) use steel pile casting retaining wall, after Phase can not recycle and reuse, and construction cost is high, causes waste of material.Two) pick bores construction efficiency slowly, and the construction period is long.
Summary of the invention
The present invention solves that technical problem present in known technology provides one to pass through existing Large Underground space knot The bored pile construction method of structure, the method construction cost is low, and efficiency of construction is high.
The present invention solves that technical problem is adopted the technical scheme that present in known technology: one pass through existing greatly The bored pile construction method of type underground space structure, employing following steps :) both excavate in bored pile construction region There is the earthing on underground structure top board, and abolish top board and the base plate of existing underground structure;Two) inside existing structure, steel is performed Reinforced concrete block wall and lead wall base plate, leads wall base plate and performs on the top board of existing underground structure and be positioned at block wall top; Three) reach after design requires, to perform and lead wall sidewall, formed by the rectangular opening leading wall and block wall surrounds wait leading wall base plate strength Hole;Four) backfill rendzinas in rectangle hole interior laminate layer and tamp;Five) use churning driven pore-forming, perform cast-in-situ bored pile.
In construction procedure one) the most first divide construction flowing water section.
The present invention has the advantage that with good effect: utilizes and leads in wall and block wall carrying construction from all directions Pressure, stability is strong, and safety coefficient is high;Speed of application is fast, and efficiency is high;Lead wall and block wall construction cost is low, labor and materials saving, and And can AT STATION excavation of foundation pit time together abolish recovery with existing structure in foundation ditch, it is possible to save resource, promote resource circulation Utilize.
Accompanying drawing explanation
Fig. 1 is present invention profile when applying;
Fig. 2 is present invention plane graph when applying.
In figure: 1, lead wall sidewall, 2, top board, 3, lead wall base plate, 4, block wall, 5, base plate, 6, rendzinas, 7, earthing.
Detailed description of the invention
For the summary of the invention of the present invention, feature and effect can be further appreciated that, hereby enumerate following example, and coordinate accompanying drawing Describe in detail as follows:
Refer to Fig. 1~Fig. 2, a kind of bored pile construction method passing through existing Large Underground space structure, use Following steps:
One) excavate the earthing 7 on existing underground structure top board in bored pile construction region, and abolish existing underground knot The top board 2 of structure and base plate 5.
Two) inside existing structure, perform armored concrete block wall 4 and lead wall base plate 3, leading wall base plate 3 and perform existing On the top board 2 of underground structure and be positioned at block wall 4 top.
Three) after leading wall base plate 3 intensity and reaching design requirement, perform and lead wall sidewall 1, lead end face and the ground of wall sidewall 1 Concordant, formed by the rectangle hole leading wall and block wall 4 surrounds.
Four) backfill rendzinas 6 in rectangle hole interior laminate layer and tamp.
Five) use churning driven pore-forming, perform cast-in-situ bored pile.
Above-mentioned cast-in-situ bored pile is typically the fender post of foundation pit structure.
When existing underground structure size is relatively big, and the cast-in-situ bored pile of needs construction is more, generally in construction procedure one) it Front first divide construction flowing water section, by the construction of construction flowing water section tissue cast-in-situ bored pile, with convenient construction tissue, quickening construct into Degree, reduces construction cost.
Although the preferred embodiments of the present invention being described above in conjunction with accompanying drawing, but the invention is not limited in The detailed description of the invention stated, above-mentioned detailed description of the invention is only schematically, is not restrictive, this area common Technical staff is under the enlightenment of the present invention, in the case of without departing from present inventive concept and scope of the claimed protection, also Can be to make a lot of form, within these belong to protection scope of the present invention.

Claims (2)

1. the bored pile construction method passing through existing Large Underground space structure, it is characterised in that use following step Rapid:
One) excavate the earthing on existing underground structure top board in bored pile construction region, and abolish existing underground structure Top board and base plate;
Two) inside existing structure, perform armored concrete block wall and lead wall base plate, leading wall base plate and perform and tie in existing underground On the top board of structure and be positioned at block wall top;
Three) reach after design requires, to perform and lead wall sidewall, formed by the rectangle leading wall and block wall surrounds wait leading wall base plate strength Hole;
Four) backfill rendzinas in rectangle hole interior laminate layer and tamp;
Five) use churning driven pore-forming, perform cast-in-situ bored pile.
The bored pile construction method passing through existing Large Underground space structure the most according to claim 1, its feature It is, in construction procedure one) the most first divide construction flowing water section.
CN201610624426.3A 2016-07-28 2016-07-28 Pass through the bored pile construction method of existing Large Underground space structure Pending CN106245625A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610624426.3A CN106245625A (en) 2016-07-28 2016-07-28 Pass through the bored pile construction method of existing Large Underground space structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610624426.3A CN106245625A (en) 2016-07-28 2016-07-28 Pass through the bored pile construction method of existing Large Underground space structure

Publications (1)

Publication Number Publication Date
CN106245625A true CN106245625A (en) 2016-12-21

Family

ID=57605774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610624426.3A Pending CN106245625A (en) 2016-07-28 2016-07-28 Pass through the bored pile construction method of existing Large Underground space structure

Country Status (1)

Country Link
CN (1) CN106245625A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120798A (en) * 2016-06-27 2016-11-16 中铁第四勘察设计院集团有限公司 Cast-in-place pile construction method for underground engineering structure
CN109440763A (en) * 2018-12-19 2019-03-08 上海市基础工程集团有限公司 Bored pile construction method below existing building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5530039A (en) * 1978-08-23 1980-03-03 Kajima Corp Method for constructing underground structures
CN1193675A (en) * 1997-03-19 1998-09-23 沈海晏 Underground walls for cast-in-situ concrete piles and constructioning process therefor
CN101550693A (en) * 2009-05-06 2009-10-07 中国土木工程集团有限公司 Method for reinforcing base with bored pile in the underground structure of high groundwater level

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5530039A (en) * 1978-08-23 1980-03-03 Kajima Corp Method for constructing underground structures
CN1193675A (en) * 1997-03-19 1998-09-23 沈海晏 Underground walls for cast-in-situ concrete piles and constructioning process therefor
CN101550693A (en) * 2009-05-06 2009-10-07 中国土木工程集团有限公司 Method for reinforcing base with bored pile in the underground structure of high groundwater level

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
林良: "福州长乐国际机场航站楼地下室承台补桩施工技术", 《福建建材》 *
贺小强: "地下连续墙直穿既有地下人防工程施工", 《山西建筑》 *
郭剑勇: "北京地下直径线前三门隧道上跨地铁联络通道及电力隧道设计方案研究", 《隧道建设》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106120798A (en) * 2016-06-27 2016-11-16 中铁第四勘察设计院集团有限公司 Cast-in-place pile construction method for underground engineering structure
CN106120798B (en) * 2016-06-27 2018-07-24 中铁第四勘察设计院集团有限公司 Cast-in-place pile construction method for underground engineering structure
CN109440763A (en) * 2018-12-19 2019-03-08 上海市基础工程集团有限公司 Bored pile construction method below existing building

Similar Documents

Publication Publication Date Title
CN101139838B (en) Construction method for high artesian area ultra-deep foundation pit
US10267008B2 (en) Offshore non-driven-in large-diameter monopile foundation structure and construction method
CN201089893Y (en) Foundation pit circle shield prefabricated driven pile
CN107190752B (en) The design and construction method of rectangular section Row Piles Supporting Structure can be recycled in a kind of flexible compound antiseepage assembled
CN105735322A (en) Design and construction method of rigid-flexible composite anti-seepage recoverable supporting structure
CN103114857A (en) Shield tunnel construction method
CN105780763B (en) Mesoporous vibrates the construction method of casing retaining wall long auger guncreting pile
CN103726496A (en) Circular deep foundation pit bored secant pile wall supporting construction method
CN103321244A (en) Construction method for additionally arranged basement in existing building on sand foundation
CN106245625A (en) Pass through the bored pile construction method of existing Large Underground space structure
CN107130611A (en) A kind of design and construction method of the recyclable circular section Row Piles Supporting Structure of flexible compound antiseepage assembled
CN104818713A (en) Profile steel cement soil pile construction method adaptive to various stratums
CN104563126A (en) Rotary drill drilling cast-in-place pile construction method
CN105672323A (en) Compound soil nail wall supporting structure system with steel pipe piles and construction method of compound soil nail wall supporting structure system
CN105714832B (en) A kind of large size prefabricated building enclosure of deep basal pit and construction method
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN102235152A (en) Hole-forming construction method for bored pile on high-strength stabilized soil layer
CN205875211U (en) Pass through drilling bored concrete pile construction structures of existing large -scale underground space structure
CN105507338A (en) Campshed and inserted piled slab combined supporting water-plugging continuous wall forming construction method
CN101725147A (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN204626439U (en) A kind of ruggedized construction of existing sole plate
CN105464079A (en) Forming construction method of long-spiral pore-forming pile-slab-pile supporting and anti-seepage continuous wall
CN106050239A (en) Construction method for retaining structure of deep and large vertical shaft in water-abundant upper-soft lower-hard stratum
CN107023021B (en) A kind of design and construction method of flexible compound Diaphragm Wall Support Structure
CN207878472U (en) Solid matter step type rotary digging pile supporting system

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161221