CN2469046Y - Prefabricated steel bar reinforced concrete bulk head for piles - Google Patents

Prefabricated steel bar reinforced concrete bulk head for piles Download PDF

Info

Publication number
CN2469046Y
CN2469046Y CN 01214664 CN01214664U CN2469046Y CN 2469046 Y CN2469046 Y CN 2469046Y CN 01214664 CN01214664 CN 01214664 CN 01214664 U CN01214664 U CN 01214664U CN 2469046 Y CN2469046 Y CN 2469046Y
Authority
CN
China
Prior art keywords
reinforced concrete
pile
gives
give
clamp dog
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 01214664
Other languages
Chinese (zh)
Inventor
陈扬德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 01214664 priority Critical patent/CN2469046Y/en
Application granted granted Critical
Publication of CN2469046Y publication Critical patent/CN2469046Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to a manual digging pile reinforced concrete wall protection, the cast-in-place reinforced concrete wall protection is replaced by a thinning reinforced concrete precast block, the foundation round pile is an arc precast block and is bolted by en embedded angle steel, the anchor pile and the foundation square pile are plane precast blocks and are clamped and fixed at stratum by a mortar bolt, the center of the precast block is provided with grouting holes, and the back is provided with embossing, the lateral is provided with a glued layer. This digging pile wall protection can largely save the amount of wall protection concrete, the societal and economic benefit is significant; the measurement of waterproof and drainage and ensuring the stability of the wall protection is simple and reliable; in addition, the installation is convenient and construction period is short.

Description

Hole digging pile gives the system steel reinforced concrete dado
The utility model relates to a kind of hand excavated pile and gives the system steel reinforced concrete dado.
Hand excavated pile has foundation pile of building and massif antiskid anchor pile two big classes, be basic pattern and the unique pile pattern (once met a building site and use drilled pile to make massif antiskid anchor pile) of massif antiskid anchor pile that is widely used in an economic and reliable of civil works because of the unreasonable structure failure is discarded.The excavation pile construction pile does not need large and medium-sized facility, and cost is low, and the mountain region construction has more its convenient advantage.Protection wall of bored pile is a kind of stressed temporary construction of pile body of not participating in.During construction, generally be to dig out earlier a joint stake hole, reinforcing bar be installed then propped up template that placing of concrete more at last is by the joint pore-forming in the building site.Its reinforcement installation and concrete casting execution conditions are poor, and quality be difficult for to guarantee, must thickening retaining wall size, so waste raw material, time-consuming also effort poor stability in this way.
The purpose of this utility model provides a kind of hole digging pile and gives the system steel reinforced concrete dado, with the system of the giving steel concrete retaining wall replacement cast-in-situ steel reinforced concrete retaining wall of attenuate, and is aided with the relative configurations measure, saving retaining wall concrete that can be more.
The purpose of this utility model is achieved in that hole digging pile gives system steel reinforced concrete dado every joint and gives clamp dog 1 by 4-8 and form, and the back side of giving clamp dog 1 has embossing 2, mid portion to have mud jacking hole 7, the outside that glued layer 3 is arranged.
This hole digging pile gives the system steel reinforced concrete dado, can give clamp dog 1 by four arcs and form and give system ring, and the both ends of giving clamp dog 1 are respectively the convex-concave arc surface, are having connecting angle 4 and connecting bolt 5, bottom surface, top to be respectively parallel monocline face near the inboard, end.There is the hoop 6 and hang over hanger 8 on the hoop 6 of putting more energy into of putting more energy into of the band tightener 9 that recycles the inboard of giving system ring.
Another kind of hole digging pile described in the utility model gives the system steel reinforced concrete dado, gives clamp dog 1 by 4-8 planes and forms and give the system square frame, and the mid portion that gives clamp dog 1 has anchor hole 12 and anchor pole 10.There is the stiffening frame 11 that recycles the inboard of giving the system square frame and hangs over hanger 8 on the stiffening frame 11.
The utility model compared with prior art, advantage is as follows:
1. save the breast wall concrete consumption, foundation pile can save 56,1-62,8%, anchor pile is 48,0 one 69,8%, thereby can reduce its cost significantly, with the Yunnan highway is example: building foundation pile 30 ten thousand steres every year, only count 1/3 and be hole digging pile, can save more than breast wall concrete 3 ten thousand steres, building more than anchor pile 15 ten thousand steres, can save breast wall concrete 2.8~3.2 ten thousand steres, two totals surpass 6 ten thousand steres, breast wall concrete is in 400 yuan/cubic metre of highway bid prices, about 2,400 ten thousand yuan/year of cost can be saved, also retaining wall amount of reinforcement, considerable benefit can be saved;
2. easy for installation, give the clamp dog substance and hang the native ability of the hanging design of adorning by existing borehole, short construction period, every construction sections can be saved concrete pouring and conditioned time;
3. anti-draining and assurance retaining wall stabilizing measures are easy to be reliable.
Describe concrete structure of the present utility model in detail below in conjunction with accompanying drawing, but structure of the present utility model is not limited to shown in the accompanying drawing.
Fig. 1 is a structural representation of the present utility model.
Fig. 2 is a scheme of installation of the present utility model.
Fig. 3 is along the sectional view of I-I face among the utility model Fig. 2.
Fig. 4 is the structural representation of another kind of retaining wall of the present utility model.
Fig. 5 is the scheme of installation of another kind of retaining wall of the present utility model.
Fig. 6 is along the sectional view of II one II face among the utility model Fig. 5.
Among Fig. 1, every joint retaining wall gives clamp dog 1 by four arcs and forms and give system ring, give clamp dog 1 back side embossing 2 is arranged, every is given clamp dog 1 both ends is respectively that convex-concave arc surface, bottom surface, top are parallel monocline face, give near the inboard, end and to bury two connecting angles 4 and connect, give the system ring outside and fill glued layer 3 with the ground interlayer by connecting bolt 5; Among Fig. 2, when every joint is installed, give the 6 liang of groups of using when the system ring is inboard the location of hoop of temporarily putting more energy into, these hoop 6 band tighteners 9 of putting more energy into are that dismountable its gone up the hoop 6 of putting more energy into of a joint retaining wall after this joint retaining wall is finished, for saving use under it until last recovery; Among Fig. 3, giving clamp dog 1 mid portion has 5 mud jacking holes 7, hangs with hanger 8 on the hoop 6 of putting more energy into down.Its vertical, laterally contraposition is convenient on the parallel inclined-plane up and down of hanger 8 and prefabricated section.
Fig. 4 is another kind of retaining wall, and every joint gives clamp dog 1 by 4 or 6 or 8 flat boards to be formed and give the system square frame, and giving clamp dog 1 back side has embossing 2, and giving the system square frame outside has glued layer 3, anchor pole 10; Among Fig. 5 and Fig. 6, giving clamp dog 1 mid portion has the anchor hole 12 of reservation and mud jacking hole 7.Anchor pole 10 makes prefabricated section 1 and the stratum pincers is solid on every side, when every joint is installed, give system square frame inboard interim location 11 liang of groups of stiffening frame are arranged, the partial component band tightener 9 of stiffening frame 11, after this joint retaining wall was finished, the stiffening frame 11 of a dismountable last joint retaining wall was for joint use down, until last recovery, hang with hanger 8 on the following stiffening frame 11 and be convenient to give the clamp dog contraposition.This system square frame retaining wall that gives can be used for anchor pile, the stake of basis side.

Claims (5)

1, a kind of hole digging pile gives the system steel reinforced concrete dado, it is characterized in that: every joint lacks by 4-8 and gives clamp dog (1) and form, and the back side of giving clamp dog (1) has embossing (2), mid portion to have mud jacking hole (7), the outside that glued layer (3) is arranged.
2, hole digging pile as claimed in claim 1 gives the system steel reinforced concrete dado, it is characterized in that: give clamp dog (1) by four arcs and form and give system ring, the both ends of giving clamp dog (1) are respectively the convex-concave arc surface, are having connecting angle (4) and connecting bolt (5), bottom surface, top to be respectively parallel monocline face near the inboard, end.
3, hole digging pile as claimed in claim 1 or 2 gives the system steel reinforced concrete dado, it is characterized in that: there is the hoop (6) and hang over hanger (8) on the hoop (6) of putting more energy into of putting more energy into of the band tightener (9) that recycles the inboard of giving system ring.
4, hole digging pile as claimed in claim 1 gives the system steel reinforced concrete dado, it is characterized in that: give clamp dog (1) by 4-8 planes and form and give the system square frame, the mid portion that gives clamp dog (1) has anchor hole (12) and anchor pole (10).
5, give the system steel reinforced concrete dado as claim 1 or 4 described hole digging piles, it is characterized in that: there is the stiffening frame (11) that recycles the inboard of giving the system square frame and hangs over hanger (8) on the stiffening frame (11).
CN 01214664 2001-04-04 2001-04-04 Prefabricated steel bar reinforced concrete bulk head for piles Expired - Fee Related CN2469046Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 01214664 CN2469046Y (en) 2001-04-04 2001-04-04 Prefabricated steel bar reinforced concrete bulk head for piles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 01214664 CN2469046Y (en) 2001-04-04 2001-04-04 Prefabricated steel bar reinforced concrete bulk head for piles

Publications (1)

Publication Number Publication Date
CN2469046Y true CN2469046Y (en) 2002-01-02

Family

ID=33633383

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 01214664 Expired - Fee Related CN2469046Y (en) 2001-04-04 2001-04-04 Prefabricated steel bar reinforced concrete bulk head for piles

Country Status (1)

Country Link
CN (1) CN2469046Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858080A (en) * 2010-06-23 2010-10-13 中交二航局第三工程有限公司 Shock reamer and method for correcting deformed steel casing
CN103485340A (en) * 2013-09-18 2014-01-01 中交二航局第四工程有限公司 Wave-web fore-shaft steel casing device and construction method thereof
CN103758123A (en) * 2014-01-24 2014-04-30 江苏建筑职业技术学院 Method for constructing protecting wall lining of cast-in-place manual hole digging pile
CN104499479A (en) * 2014-12-19 2015-04-08 上海申元岩土工程有限公司 Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN105714771A (en) * 2016-02-18 2016-06-29 江西师范大学 Construction method of manual hole digging pile
CN111705793A (en) * 2020-05-28 2020-09-25 三明学院 Construction method for prefabricated retaining wall of manual hole digging pile
CN114929969A (en) * 2019-12-06 2022-08-19 邹胜斌 Modular intelligent retaining wall cast-in-place pile and construction process thereof

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101858080A (en) * 2010-06-23 2010-10-13 中交二航局第三工程有限公司 Shock reamer and method for correcting deformed steel casing
CN101858080B (en) * 2010-06-23 2012-01-11 中交二航局第三工程有限公司 Shock reamer and method for correcting deformed steel casing
CN103485340A (en) * 2013-09-18 2014-01-01 中交二航局第四工程有限公司 Wave-web fore-shaft steel casing device and construction method thereof
CN103485340B (en) * 2013-09-18 2016-03-30 中交二航局第四工程有限公司 A kind of antinode plate fore shaft steel pile casting device and construction method thereof
CN103758123A (en) * 2014-01-24 2014-04-30 江苏建筑职业技术学院 Method for constructing protecting wall lining of cast-in-place manual hole digging pile
CN103758123B (en) * 2014-01-24 2015-12-09 江苏建筑职业技术学院 The construction method of manually digging hole filling pile retaining wall lining
CN104499479A (en) * 2014-12-19 2015-04-08 上海申元岩土工程有限公司 Dig-hole pile construction method based on penetration of sand gravel backfilling layer
CN105714771A (en) * 2016-02-18 2016-06-29 江西师范大学 Construction method of manual hole digging pile
CN105714771B (en) * 2016-02-18 2018-01-30 江西师范大学 Construction method of manual hole digging pile
CN114929969A (en) * 2019-12-06 2022-08-19 邹胜斌 Modular intelligent retaining wall cast-in-place pile and construction process thereof
CN114929969B (en) * 2019-12-06 2023-08-18 邹胜斌 Modularized intelligent wall-protecting cast-in-place pile and construction process thereof
CN111705793A (en) * 2020-05-28 2020-09-25 三明学院 Construction method for prefabricated retaining wall of manual hole digging pile

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN109537604A (en) A method of utilizing screw pile bolt anchorage Cut Slopes of Expansive Soil
CN110528533A (en) A kind of microorganism solidification impacting steel tube for soil-nail and its construction method
CN102011410A (en) Prefabricated prestressed underground continuous wall and construction method thereof
CN2469046Y (en) Prefabricated steel bar reinforced concrete bulk head for piles
CN110820455A (en) Construction process for lapping and expanding roadbed of asphalt concrete highway
CN204662494U (en) Highway retaining wall reinforced structure
CN211689844U (en) Corrugated steel reinforcing arch utilizing high-strength grouting material
CN113668576A (en) Assembled type flaky stone slope surface protection structure and construction method
CN107401142B (en) Bank revetment heightening construction method is refuted in active service
CN219416160U (en) Fixed monitoring pile for high-diving mining area
CN202851008U (en) Tunnel boring machine in-tunnel dismounting device
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN209620049U (en) A kind of pin-connected panel anchor bolt frame girder construction
CN112012762A (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN110820756A (en) Shield well and vertical shaft deep foundation pit excavation safety construction method
CN116242310A (en) Pile distribution method for fixed monitoring piles for high-water-level mining areas
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN215563552U (en) Vertical joint construction of prefabricated wallboard based on ultra high performance concrete form
CN113235646B (en) Construction method for crossing subway station on comprehensive pipe rack
CN208455661U (en) The high barrier wall structure of the embedding rock T shape combined type column plate of overlength
CN212835499U (en) Assembled utility tunnel convenient to cast-in-place
CN209429119U (en) A kind of cast-in-place concrete pile for mortar depositing construction
CN208473890U (en) Tunnel bottom inverted arch constructing structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee