CN219909922U - Prison manage construction with climbing hand rest - Google Patents

Prison manage construction with climbing hand rest Download PDF

Info

Publication number
CN219909922U
CN219909922U CN202223434381.3U CN202223434381U CN219909922U CN 219909922 U CN219909922 U CN 219909922U CN 202223434381 U CN202223434381 U CN 202223434381U CN 219909922 U CN219909922 U CN 219909922U
Authority
CN
China
Prior art keywords
steel pipe
pipe
fixing
fixedly sleeved
width
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223434381.3U
Other languages
Chinese (zh)
Inventor
宋金江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Construction Engineering Supervision Co ltd
Original Assignee
Hangzhou Construction Engineering Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Construction Engineering Supervision Co ltd filed Critical Hangzhou Construction Engineering Supervision Co ltd
Priority to CN202223434381.3U priority Critical patent/CN219909922U/en
Application granted granted Critical
Publication of CN219909922U publication Critical patent/CN219909922U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The utility model relates to the technical field of hand climbing frames and discloses a hand climbing frame for supervision construction, which comprises a fixing device, wherein the front surface of the fixing device is fixedly connected with a fixing rod, the front surface of the fixing rod is movably sleeved with a vertical steel pipe, the bottom of the vertical steel pipe is fixedly sleeved with a fixing pipe, the front surface of the fixing pipe is fixedly sleeved with a bracket, the front surface of the bracket fixedly sleeved with the front surface of the fixing pipe is fixedly sleeved with a fixing pipe, and the top of the fixing pipe is fixedly sleeved with a vertical steel pipe; according to the utility model, the common fixing nut is replaced by the nut with the anti-skid effect, the top of the anti-skid nut is provided with the anti-skid thread, after the anti-skid nut is fixedly connected with the steel pipe, the anti-skid thread is in contact with the surface of the steel pipe, and when the nut slides, the anti-skid thread and the surface of the steel pipe generate friction force to prevent the nut from loosening, thereby being beneficial to the fixation between the steel pipes, preventing the steel pipe from loosening and ensuring the safety of the climbing frame, and further ensuring the safety of workers.

Description

Prison manage construction with climbing hand rest
Technical Field
The utility model relates to the technical field of hand climbing frames, in particular to a hand climbing frame for supervision construction.
Background
The utility model provides a monitor construction is with climbing hand frame is applied to high-rise and super high-rise building construction, set up the device that goes up and down of certain height, along with the development of society, the high building of building is more and more, the floor also increases gradually, the workman is personnel safety of being careful in the construction, still efficiency and the quality of construction product of construction, monitor construction is with climbing the hand frame not only can improve personnel safety, can also guarantee the efficiency of construction, the quality is good climbs the hand frame and also can make the quality of engineering finished product obtain assurance, it has the efficiency of automatic promotion to climb the hand frame, can utilize the electric energy to carry out automatic shelf construction, can save workman's time of setting up the hand frame, and it is fast to climb, help workman's to carry out house construction, it can not influence oneself because the hand that the mistake led to cause is smooth, guarantee worker's safety, it is lower because of electric control, it's manufacturing cost does not need to ask the workman, only press the button just can make the frame of the frame climb, the effect of climbing, the engineering effect is fast can be reduced, the realization of the engineering is very good or the construction cost is greatly reduced, the building cost is greatly limited, the building material is greatly reduced, the construction cost is greatly is realized, the construction is greatly reduced, the construction material is can be down is greatly reduced, the construction is up down is reduced, the construction is down is required to be used to the construction is reduced.
The existing hand climbing frame for supervision construction has some problems in actual use, and is specifically as follows:
the climbing frame is used for the existing supervision construction, the climbing frame is erected around a house when workers build the house, the workers are assisted in building the house, when the house is built to the height that the workers stand on the ground and cannot conveniently work, the climbing frame is needed, the workers stand on a pavement plate of the climbing frame, the workers continue to build the high-rise position, tools and materials needed in the working process can be placed on the pavement plate, the workers can walk on the pavement plate to work, the climbing frame is formed by connecting a plurality of steel pipes, the steel pipes are fixed by screws, if the screws loosen, the climbing frame can generate safety risks, and meanwhile potential safety hazards of the workers on the climbing frame are formed.
Secondly, the existing hand climbing frame for supervision construction is fixed on a wall surface by a fixing device, a certain gap is reserved between the wall surface and the hand climbing frame, and workers can easily step in the gap if the workers do not pay attention to the gap during working, so that the personal safety of the workers is endangered to a certain extent.
Disclosure of Invention
In order to overcome the defects in the prior art, the utility model provides a hand climbing frame for supervision construction, which aims to solve the problems in the prior art.
The utility model provides the following technical scheme: the utility model provides a manage construction with climbing hand rest, includes fixing device, fixing device's positive fixedly connected with dead lever, vertical steel pipe has been cup jointed in the positive activity of dead lever, the fixed pipe that has cup jointed in the bottom of vertical steel pipe, the fixed support that has cup jointed in the positive of fixed pipe, the fixed pipe that has cup jointed in the positive of fixed support, vertical steel pipe has been cup jointed in the top of fixed pipe, the fixed horizontal steel pipe that has cup jointed in one side of fixed pipe, the top of horizontal steel pipe is equipped with the pavement board, horizontal steel pipe swing joint has the pole setting, the positive fixed protection network that has cup jointed in pole setting top, the tensile area has been cup jointed in the middle part activity of horizontal steel pipe, above every layer of structure is the same.
Further, the fixed pipe comprises branch pipes, each branch of each branch pipe is fixedly sleeved with a fixed bolt, the bottom of each fixed bolt is fixedly sleeved with an anti-skid nut, and the top of each anti-skid nut is fixedly connected with an anti-skid thread.
Further, the pole setting includes the connecting rod, the positive activity of connecting rod has cup jointed last draw-in groove, the bottom fixedly connected with lower draw-in groove of going up the draw-in groove.
Further, a plurality of the tension bands are positioned on each of the divided horizontal steel pipes, and the tension bands are made of non-elastic materials.
Further, the diameter of the branch on the branch pipe is two millimeters larger than the diameters of the horizontal steel pipe and the vertical steel pipe, the diameters of the horizontal steel pipe and the vertical steel pipe are the same, and the fixed pipe selects different branch numbers according to the installed positions.
Further, the width of seting up the groove on the connecting rod is greater than the width of last draw-in groove by one centimetre, the width of going up the draw-in groove is the same with the width of protection network, the height of draw-in groove is the same with the width around the protection network front down, the width of draw-in groove bottom is the same with the width in the protection network front inslot down, the pole setting is horizontal during installation.
The utility model has the technical effects and advantages that:
1. according to the utility model, the common fixing nut is replaced by the nut with the anti-skid effect, the top of the anti-skid nut is provided with the anti-skid thread, after the anti-skid nut is fixedly connected with the steel pipe, the anti-skid thread is in contact with the surface of the steel pipe, and when the nut slides, the anti-skid thread and the surface of the steel pipe generate friction force to prevent the nut from loosening, thereby being beneficial to the fixation between the steel pipes, preventing the steel pipe from loosening and ensuring the safety of the climbing frame, and further ensuring the safety of workers.
2. According to the utility model, the tension band is added on each blocked horizontal steel pipe, when a worker needs to approach the wall surface, the tension band can be pulled, stepping into a gap between the hand climbing frame and the wall surface is prevented, the safety of the worker is ensured, the tension band can move on the horizontal steel pipes without being limited by the position of the worker, and each blocked part is provided with the tension band, so that the worker can have protection facilities when working at any place.
Drawings
Fig. 1 is a schematic diagram of the overall structure of the present utility model.
Fig. 2 is a schematic view of the structure of the fixing tube of the present utility model.
Fig. 3 is a schematic diagram of the overall front structure of the present utility model.
Fig. 4 is a schematic view of the structure of the anti-slip nut of the present utility model.
Fig. 5 is a schematic structural diagram of a protection net according to the present utility model.
Fig. 6 is a schematic view of the structure of the upright of the present utility model.
The reference numerals are: 1. a fixing device; 2. a fixed rod; 3. a horizontal steel pipe; 4. a tension belt; 5. a walkway plate; 6. a vertical rod; 601. a connecting rod; 602. an upper clamping groove; 603. a lower clamping groove; 7. a fixed tube; 701. a branch pipe; 702. an anti-slip nut; 7021. an anti-skid thread; 703. a fixing bolt; 8. a protective net; 9. and (5) vertical steel pipes.
Detailed Description
The following description will be made in detail, with reference to the drawings, of the present utility model, wherein the configurations of the structures described in the following embodiments are merely examples, and the climbing frame according to the present utility model is not limited to the configurations described in the following embodiments, and all other embodiments obtained by a person skilled in the art without making any creative effort are within the scope of protection of the present utility model.
Referring to fig. 1 to 6, the utility model provides a hand climbing frame for supervision construction, which comprises a fixing device 1, in a preferred embodiment, the front of the fixing device 1 is fixedly connected with a fixing rod 2, the front of the fixing rod 2 is movably sleeved with a vertical steel pipe 9, the bottom of the vertical steel pipe 9 is fixedly sleeved with a fixing pipe 7, the front of the fixing pipe 7 is fixedly sleeved with a bracket, the front of the bracket fixedly sleeved with the front of the fixing pipe 7 is fixedly sleeved with the fixing pipe 7, the top of the fixing pipe 7 is fixedly sleeved with the vertical steel pipe 9, one side of the fixing pipe 7 is fixedly sleeved with a horizontal steel pipe 3, the top of the horizontal steel pipe 3 is provided with a pavement slab 5, the horizontal steel pipe 3 is movably connected with a vertical rod 6, the front of the top of the vertical rod 6 is fixedly sleeved with a protective net 8, the middle of the horizontal steel pipe 3 is movably sleeved with a tension belt 4, each layer of the structure is the same, the hand climbing frame for supervision construction is arranged on the periphery of a building, workers work is assisted, the hand climbing frame uses electric control, the cost is lower, the hand climbing frame can move up and down on the periphery of the building to work, the periphery is not limited by building height, the construction efficiency is facilitated to be improved, meanwhile, accidents can be reduced in the work process are avoided.
In a preferred embodiment, the fixing pipe 7 comprises a branch pipe 701, each branch of the branch pipe 701 is fixedly sleeved with a fixing bolt 703, the bottom of the fixing bolt 703 is fixedly sleeved with an anti-skid nut 702, the top of the anti-skid nut 702 is fixedly connected with an anti-skid thread 7021, the fixing pipe 7 is used for fixedly connecting separated steel pipes, the steel pipes are sleeved on each branch of the branch pipe 701 to form a complete structure, and the fixing bolt 703 and the anti-skid nut 702 are used for fixing, so that the operation is simple.
In a preferred embodiment, the pole setting 6 includes connecting rod 601, and the positive activity of connecting rod 601 has cup jointed draw-in groove 602, and the bottom fixedly connected with of going up draw-in groove 602 goes down draw-in groove 603, and pole setting 6 is fixed protection network 8 and shelf, goes up draw-in groove 602 and is fixed protection network 8's bottom, and lower draw-in groove 603 is fixed protection network 8's top, and the fixed mode is simple, and protection network 8 brings the guard action to workman's safety.
In a preferred embodiment, a plurality of tension bands 4 are positioned on each of the divided horizontal steel pipes 3, and the materials of the tension bands 4 are not elastic, so that the tension bands 4 are ensured to be positioned at each position separated by the vertical steel pipes 9, and the length of the tension bands 4 is ensured not to be changed along with the gravity brought by workers, so that the safety of the workers is better protected.
In a preferred embodiment, the diameter of the branch on the branch pipe 701 is two millimeters larger than the diameters of the horizontal steel pipe 3 and the vertical steel pipe 9, the diameters of the horizontal steel pipe 3 and the vertical steel pipe 9 are the same, the number of the branches is different according to the installed position, and the fixed pipe 7 ensures that the steel pipe is smoothly installed in the branch near the branch pipe 701 and does not shake.
In a preferred embodiment, the width of the slot formed in the connecting rod 601 is one centimeter greater than the width of the upper clamping slot 602, the width of the upper clamping slot 602 is the same as the width of the protective screen 8, the height of the lower clamping slot 603 is the same as the width of the periphery of the front face of the protective screen 8, the width of the bottom of the lower clamping slot 603 is the same as the width of the front face of the protective screen 8, the vertical rod 6 is horizontal during installation, the protective screen 8 is ensured to be fixed by the vertical rod 6 and not to shake, the protective screen 8 is ensured to be installed horizontally, the quality of the climbing frame erection is guaranteed, and therefore workers are protected better.
The working principle of the utility model is as follows: firstly, the bottom of a hand climbing frame is built on a horizontal plane, a required number of fixing pipes 7 are installed on a horizontal steel pipe 3, fixing pipes 7 of different branches are selected according to branches of different installation positions, then shorter steel pipes are installed in branches of the front faces of the branch pipes 701, the fixing pipes are combined into a frame, anti-slip nuts 702 and fixing bolts 703 fix the steel pipes, friction between anti-slip threads 7021 and the surfaces of the steel pipes is increased, the situation that the steel pipes cannot loosen is guaranteed, a pavement plate 5 is placed on two horizontal steel pipes 3 after the combination is completed, the pavement plate 5 cannot shake, a tension belt 4 is installed on each horizontal steel pipe 3 separated by the vertical steel pipes 9, vertical rods 6 are installed on the horizontal steel pipes 3 far away from a wall surface, the vertical rods 6 are guaranteed to be installed horizontally, a protection net 8 is placed on an upper clamping groove 602, the width of the upper clamping groove 602 is identical to the width of the protection net 8, then the vertical steel pipes 9 are installed on the branches of the top of the branch pipes 701, the vertical steel pipes 9 are installed according to the height of the protection net 8, a layer of the upper clamping groove 6 is installed on the upper steel pipes 8, the upper protection net 2 is further installed on the lower steel pipes 2, the lower protection net 2 is installed on the lower protection net 2 in a fixed mode, the upper protection net 2 is fixedly connected to the upper protection net 2, and the upper protection net 2 is fixed in a fixed mode.

Claims (6)

1. The utility model provides a manage construction with climbing hand rest, includes fixing device (1), its characterized in that: the front surface of the fixing device (1) is fixedly connected with a fixing rod (2), the front surface of the fixing rod (2) is movably sleeved with a vertical steel pipe (9), the bottom of the vertical steel pipe (9) is fixedly sleeved with a fixing pipe (7), the front surface of the fixing pipe (7) is fixedly sleeved with a bracket, the front surface of the bracket fixedly sleeved with the front surface of the fixing pipe (7) is fixedly sleeved with the fixing pipe (7), the utility model discloses a steel pipe, including fixed pipe (7), fixed steel pipe (9) have been cup jointed at the top of fixed pipe (7), fixed steel pipe (3) have been cup jointed in one side of fixed pipe (7), the top of steel pipe (3) is equipped with pavement board (5), steel pipe (3) swing joint has pole setting (6), the positive fixed protection network (8) that has cup jointed at pole setting (6) top, tensile area (4) have been cup jointed in the middle part activity of steel pipe (3), above every layer structure is the same.
2. The hand climbing frame for supervision construction according to claim 1, wherein: the fixing pipe (7) comprises branch pipes (701), fixing bolts (703) are fixedly sleeved on each branch of the branch pipes (701), anti-slip nuts (702) are fixedly sleeved at the bottoms of the fixing bolts (703), and anti-slip threads (7021) are fixedly connected to the tops of the anti-slip nuts (702).
3. The hand climbing frame for supervision construction according to claim 1, wherein: the upright rod (6) comprises a connecting rod (601), an upper clamping groove (602) is movably sleeved on the front face of the connecting rod (601), and a lower clamping groove (603) is fixedly connected to the bottom of the upper clamping groove (602).
4. The hand climbing frame for supervision construction according to claim 1, wherein: a plurality of tension bands (4) are positioned on each separated horizontal steel pipe (3), and the materials of the tension bands (4) are not elastic.
5. The hand climbing frame for supervision construction according to claim 2, wherein: the diameter of the branch on the branch pipe (701) is two millimeters larger than the diameters of the horizontal steel pipe (3) and the vertical steel pipe (9), the diameters of the horizontal steel pipe (3) and the vertical steel pipe (9) are the same, and the number of the branches of the fixed pipe (7) is different according to the installed positions.
6. A hand climbing frame for supervision construction according to claim 3, wherein: the width of seting up the groove on connecting rod (601) is greater than the width of last draw-in groove (602) by one centimetre, the width of going up draw-in groove (602) is the same with the width of protection network (8), the height of draw-in groove (603) is the same with the width around protection network (8) openly down, the width of draw-in groove (603) bottom is the same with the width in protection network (8) openly inslot down, pole setting (6) are horizontal during installation.
CN202223434381.3U 2022-12-21 2022-12-21 Prison manage construction with climbing hand rest Active CN219909922U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223434381.3U CN219909922U (en) 2022-12-21 2022-12-21 Prison manage construction with climbing hand rest

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223434381.3U CN219909922U (en) 2022-12-21 2022-12-21 Prison manage construction with climbing hand rest

Publications (1)

Publication Number Publication Date
CN219909922U true CN219909922U (en) 2023-10-27

Family

ID=88421932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223434381.3U Active CN219909922U (en) 2022-12-21 2022-12-21 Prison manage construction with climbing hand rest

Country Status (1)

Country Link
CN (1) CN219909922U (en)

Similar Documents

Publication Publication Date Title
CN202227701U (en) Spliced type horizontal channel device
CN116136122A (en) Integrated attached type inclined lifting climbing frame system and use method thereof
CN219909922U (en) Prison manage construction with climbing hand rest
CN207003981U (en) A kind of movable altitude operation protective frame with safety supports
CN202416823U (en) Aerial work platform
CN112267661B (en) Climbing frame convenient to adjust for construction industry
CN213268820U (en) Pull rod type I-steel cantilever beam
CN207813067U (en) A kind of column two pass safety rope high-altitude working safety protective device
CN112065013A (en) Outer wall scaffold reinforcing mechanism for construction
CN211817832U (en) Self-locking movable operating platform
CN215671267U (en) Telescopic edge protection device
CN212561213U (en) Railway pier top surrounding hanging basket safe operation platform
CN212802412U (en) Tower type scaffold for artificial passage
CN215254409U (en) Scaffold for elevator well
CN211499867U (en) Safety anti-falling net for constructional engineering
CN211499681U (en) Movable overhanging working frame
CN203393628U (en) Ground basket device
CN219431319U (en) Lightweight climbing frame
CN106088638A (en) A kind of special building method for high-voltage line protection safety frame
CN213297093U (en) Anti-falling device for building scaffold
CN218842867U (en) Movable bridge arch rib support frame
CN203878962U (en) Independent supporting device for high-place operation hanging basket cantilever
CN211873912U (en) High altitude protector for construction
CN215167838U (en) Movable overhung suspension type operating platform
CN212962428U (en) Fractionating tower structure in air separation equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant