CN211873912U - High altitude protector for construction - Google Patents

High altitude protector for construction Download PDF

Info

Publication number
CN211873912U
CN211873912U CN201922160009.XU CN201922160009U CN211873912U CN 211873912 U CN211873912 U CN 211873912U CN 201922160009 U CN201922160009 U CN 201922160009U CN 211873912 U CN211873912 U CN 211873912U
Authority
CN
China
Prior art keywords
columns
symmetrically
bracket
fixedly mounted
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922160009.XU
Other languages
Chinese (zh)
Inventor
相福荣
臧运波
步盼稳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Desheng Petroleum Machinery Co ltd
Original Assignee
Xuzhou Desheng Petroleum Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Desheng Petroleum Machinery Co ltd filed Critical Xuzhou Desheng Petroleum Machinery Co ltd
Priority to CN201922160009.XU priority Critical patent/CN211873912U/en
Application granted granted Critical
Publication of CN211873912U publication Critical patent/CN211873912U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a high-altitude protective device for building construction, which comprises a bottom plate, wherein four support columns are symmetrically and fixedly arranged at the top end of the bottom plate, a bracket is fixedly arranged at the top end of the four support columns together, two steel plates which are obliquely arranged are fixedly welded at one end of the bracket, which is far away from the bottom plate, four guardrail columns are symmetrically and fixedly arranged at the top end of the bottom plate and below the bracket, a transverse connecting pipe is fixedly arranged between the two adjacent guardrail columns, a plurality of longitudinal connecting pipes are symmetrically and fixedly arranged between the four transverse connecting pipes and the bottom plate, four cylindrical slide bars are fixedly arranged between the four guardrail columns, and four arc-shaped buckles are symmetrically and fixedly arranged at the bottom end of the bottom plate, the steel plate can prevent the falling object from smashing and injuring the operator, and the protective performance of the steel plate is greatly improved.

Description

High altitude protector for construction
Technical Field
The utility model relates to a protector, in particular to high altitude protector for construction belongs to protector technical field.
Background
The building construction refers to production activities in the engineering construction implementation stage, and is the construction process of various buildings, especially in the construction process of a construction site, along with the increase of the height of the buildings, operators need to stand on the high-altitude supports to complete synchronous operation, and in order to ensure the life safety of the operators, a protection device needs to be used to ensure that the operators cannot fall off to cause casualties during high-altitude operation.
Traditional high altitude protector for construction is in actual use, simple structure only is provided with the guardrail structure, can't prevent that the object that falls from the high altitude from causing the casualties, greatly reduced its barrier propterty, to this, need design a high altitude protector for construction.
SUMMERY OF THE UTILITY MODEL
The utility model provides a high altitude protector for construction to only adopt the guardrail structure to mention in solving above-mentioned background art, can't prevent that the falling object from causing the injures and deaths to the operation personnel, greatly reduced its barrier propterty's problem.
In order to solve the technical problem, the utility model provides a following technical scheme:
a high-altitude protection device for building construction comprises a bottom plate, four support columns are symmetrically and fixedly arranged at the top end of the bottom plate, a bracket is fixedly arranged at the top ends of the four support columns together, two steel plates which are obliquely arranged are fixedly welded at one end of the bracket far away from the bottom plate, four guardrail posts are symmetrically and fixedly arranged at the top end of the bottom plate and below the bracket, a transverse connecting pipe is fixedly arranged between two adjacent guardrail columns, a plurality of longitudinal connecting pipes are symmetrically and fixedly arranged between four transverse connecting pipes and the bottom plate, four cylindrical sliding rods are fixedly arranged between the four guardrail columns and above the four transverse connecting pipes, and four cylinder slide bars all are parallel arrangement with the transverse connection pipe of corresponding setting, the bottom symmetry fixed mounting of bottom plate has four arc buckles.
As a preferred technical scheme of the utility model, the bracket includes square frame, just square frame fixed mounting is in the top of four support columns, the top symmetry fixed mounting of square frame has six stands.
As a preferred technical scheme of the utility model, be located two stands of square frame intermediate position highly are higher than the height of all the other four stands, and per two are corresponding bracing piece, three of the equal common fixedly connected with in stand top the common fixed mounting in top of bracing piece has two steel sheets that are the slope setting.
As an optimal technical scheme of the utility model, four a lantern ring, and four have all been cup jointed in the activity on the cylinder slide bar the lantern ring all is located the position between two guardrail posts that correspond the setting.
As an optimal technical scheme of the utility model, four equal fixed mounting has a safety rope, four on the lantern ring outer wall the safety rope is kept away from the equal fixed mounting of one end that corresponds the lantern ring that sets up and is had a latch closure.
As an optimal technical scheme of the utility model, four equal threaded mounting has a fastening screw on the arc buckle, is located homonymy and adjacent two all be crossing form fixed mounting has two cable wires between the vertical connecting pipe.
The utility model has the advantages that: the utility model provides a high altitude protector for construction has the characteristics that barrier propterty is good, in specific use, compares with traditional high altitude protector for construction:
1. the protective guard is provided with the protective guard which is formed by combining the protective guard columns, the transverse connecting pipes and the longitudinal connecting pipes, so that the operating personnel can be prevented from falling off from the bottom plate, and the two steel plates which are obliquely arranged are arranged above the protective guard, so that the operating personnel can be prevented from hitting the protective guard from falling off from the air, and the protective performance of the protective guard is greatly improved.
2. This protector has two steel sheets that the slope set up at bottom plate top fixed mounting, when the operation personnel stood in the middle of the rail guard, can shelter from the highlight through the steel sheet of rail guard top, avoids sunshine direct irradiation operation personnel eyes and influences going on of its high altitude construction, has effectively guaranteed operation personnel's work efficiency.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention.
In the drawings:
fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic top view of the guardrail posts and the cylindrical sliding rod of the present invention;
fig. 3 is a schematic view of the bracket structure of the present invention.
In the figure: 1. a base plate; 2. a guardrail post; 3. a support pillar; 4. a bracket; 41. a square frame; 42. a column; 43. a support bar; 5. a steel plate; 6. a cylindrical slide bar; 61. a safety rope; 62. looping; 63. a collar; 7. a transverse connecting pipe; 8. an arc-shaped buckle; 81. fastening screws; 9. a longitudinal connecting pipe; 91. a steel cord.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
Examples
As shown in figures 1-3, the utility model relates to a high altitude protection device for building construction, which comprises a bottom plate 1, four support columns 3 are symmetrically and fixedly installed at the top end of the bottom plate 1, a bracket 4 is fixedly installed at the top end of the four support columns 3 together, two steel plates 5 which are obliquely arranged are fixedly welded at one end of the bracket 4 far away from the bottom plate 1, four guardrail columns 2 are symmetrically and fixedly installed at the top end of the bottom plate 1 and below the bracket 4, a transverse connecting pipe 7 is fixedly installed between two adjacent guardrail columns 2, a plurality of longitudinal connecting pipes 9 are symmetrically and fixedly installed between the four transverse connecting pipes 7 and the bottom plate 1, four cylindrical slide bars 6 are fixedly installed between the four guardrail columns 2 and above the four transverse connecting pipes 7, and the four cylindrical slide bars 6 are all arranged in parallel with the transverse connecting pipes 7 which are correspondingly arranged, bottom symmetry fixed mounting of bottom plate 1 has four arc buckles 8, can cup joint bottom plate 1 block in the top of high altitude mixture control support through four arc buckles 8, and consolidate it through fastening screw 81, through four guardrail posts 2, the rail guard that four transverse connection pipe 7 and a plurality of vertical connecting pipe 9 make up, can restrict high altitude mixture control personnel's range of movement, avoid it to fall carelessly on the bottom plate 1 of standing, ensure carrying out high altitude construction of operation personnel safety, and bracket 4 is installed to the top of rail guard, can effectively support two steel sheet 5 that are the slope setting through bracket 4, if the high altitude mixture control in-process, the thing that falls of operation personnel top drops to the top of steel sheet 5, can prevent through steel sheet 5 that the thing that falls from injuring the operation personnel, greatly improved its barrier propterty.
The four cylindrical sliding rods 6 are movably sleeved with a lantern ring 63, after an operator stands in the protective guard, any one of the four ring buckles 62 is sleeved with a bandage worn on the body of the operator, the four ring buckles 62 are fixedly connected with the lantern ring 63 correspondingly arranged through the safety rope 61, the safety of the operator can be further enhanced through the safety rope 61, and the operator can move in a small range, when the protective device is installed, the four arc-shaped buckles 8 can be tightly installed on the steel pipe on the high-altitude support through the four fastening screws 81, the bracket 4 comprises a square frame 41, six upright posts 42 and three supporting rods 43, the square frame 41 is fixedly installed at the top ends of the four supporting columns 3, three supporting rods 43 which are arranged in parallel are fixedly installed above the square frame 41 through the six upright posts 42, and two steel plates 5 which are arranged in an inclined manner are fixedly welded at the top ends of the three supporting rods 43, can prevent through two steel sheets 5 that the object that falls from the high altitude from pounding well operation personnel, it is a plurality of moreover all be forked form fixed mounting between the vertical connecting pipe 9 have two cable wires 91, effectively increase the fastness of protector structure, improved its barrier propterty.
Specifically, when the utility model is used, firstly, four arc-shaped buckles 8 are sleeved on a steel pipe on an overhead support and are reinforced by four fastening screws 81, so as to ensure that the arc-shaped buckles 8 are firmly connected on the overhead support, thereby improving the connection firmness of the protective device and the overhead support, when working aloft, an operator stands on the top end of the bottom plate 1, and a protective guard is formed by combining four protective fence columns 2, four transverse connecting pipes 7 and a plurality of longitudinal connecting pipes 9, so that the moving range of the operator can be limited, the operator can not fall from the top end of the bottom plate 1, moreover, a lantern ring 63 is movably sleeved on four cylindrical sliding rods 6 fixedly arranged between the four protective fence columns 2, after the operator stands in the middle of the protective guard, the lantern ring 62 arranged at one end of the safety rope 61 can be connected with the safety rope tied on the body into a whole, because lantern ring 63 can carry out horizontal migration along cylinder slide bar 6, then just can not hinder the operation personnel small-scale removal when guaranteeing operation personnel's personal safety, two steel sheets 5 through the installation of bracket 4 top, can prevent that the object that falls from high altitude from pounding well operation personnel, its barrier propterty has been improved greatly, and two steel sheets 5 that are the slope setting erect the top of rail guard through four support columns 3 and bracket 4, when sunshine shines, can shelter from the highlight, avoid sunshine direct irradiation operation personnel eyes and influence going on of its high altitude construction, operation personnel's work efficiency has effectively been guaranteed.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The high-altitude protection device for building construction comprises a base plate (1) and is characterized in that four support columns (3) are symmetrically and fixedly mounted at the top end of the base plate (1), a bracket (4) is fixedly mounted at the top end of the support columns (3) jointly, two steel plates (5) which are obliquely arranged are fixedly welded at one end, far away from the base plate (1), of the bracket (4), four guardrail columns (2) are symmetrically and fixedly mounted at the top end of the base plate (1) and below the bracket (4), a transverse connecting pipe (7) is fixedly mounted between every two adjacent guardrail columns (2), a plurality of longitudinal connecting pipes (9) are symmetrically and fixedly mounted between every two transverse connecting pipes (7) and the base plate (1), and four cylindrical sliding rods (6) are fixedly mounted between every two guardrail columns (2) and above the four transverse connecting pipes (7), and the four cylindrical sliding rods (6) are arranged in parallel with the corresponding transverse connecting pipes (7), and four arc-shaped buckles (8) are symmetrically and fixedly installed at the bottom end of the bottom plate (1).
2. The high-altitude protection device for building construction as claimed in claim 1, wherein the bracket (4) comprises a square frame (41), the square frame (41) is fixedly installed at the top ends of four supporting columns (3), and six upright posts (42) are symmetrically and fixedly installed at the top ends of the square frame (41).
3. The high-altitude protection device for building construction as claimed in claim 2, wherein the height of two upright columns (42) located in the middle of the square frame (41) is higher than the height of the other four upright columns (42), each two corresponding upright columns (42) are fixedly connected with a support rod (43) at the top end, and two steel plates (5) which are obliquely arranged are fixedly installed at the top ends of the three support rods (43) at the same time.
4. The high-altitude protection device for building construction as claimed in claim 1, wherein a lantern ring (63) is movably sleeved on each of the four cylindrical sliding rods (6), and each of the four lantern rings (63) is located between two correspondingly arranged guardrail posts (2).
5. The high-altitude protection device for building construction as claimed in claim 4, wherein a safety rope (61) is fixedly mounted on the outer wall of each of the four lantern rings (63), and a buckle (62) is fixedly mounted at one end of each of the four safety ropes (61) far away from the corresponding lantern ring (63).
6. The high-altitude protection device for building construction as claimed in claim 1, wherein four arc-shaped buckles (8) are respectively provided with a fastening screw (81) in a threaded manner, and two steel cables (91) are fixedly arranged between two adjacent longitudinal connecting pipes (9) on the same side in a crossed manner.
CN201922160009.XU 2019-12-05 2019-12-05 High altitude protector for construction Active CN211873912U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922160009.XU CN211873912U (en) 2019-12-05 2019-12-05 High altitude protector for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922160009.XU CN211873912U (en) 2019-12-05 2019-12-05 High altitude protector for construction

Publications (1)

Publication Number Publication Date
CN211873912U true CN211873912U (en) 2020-11-06

Family

ID=73244398

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922160009.XU Active CN211873912U (en) 2019-12-05 2019-12-05 High altitude protector for construction

Country Status (1)

Country Link
CN (1) CN211873912U (en)

Similar Documents

Publication Publication Date Title
CN206513004U (en) A kind of movable hanger for being easy to roof inner slab to install
CN207079828U (en) A kind of oblique outer reverse erecting device of eaves panel of large cantilever
CN204391605U (en) A kind of helicopter live line working plug-in type hanging basket
CN211873912U (en) High altitude protector for construction
CN212054063U (en) Novel high-voltage line protection device
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
CN209873572U (en) Interim navigation lifting station of adjustable vertical lift height
CN209975993U (en) Suspension cage
CN107059689A (en) The electronic fence of telescopic lifting
CN212715875U (en) Adjustable guardrail based on door type scaffold
CN212453369U (en) Steel bent frame structure for roof outlet of hydropower house
CN212897912U (en) Remove isolated enclosure net
CN211899163U (en) Construction structure of roof steel structure platform slope glass curtain wall
CN205472340U (en) People's passageway on instrument formula tower crane
CN209568382U (en) A kind of building warning Fencing system
CN210066527U (en) Bridge construction is with good basket of hanging of security
CN113889916A (en) Multifunctional wire tightening operation platform for distribution line
CN113047592A (en) High-rise building engineering construction protector
CN217205755U (en) Anti-climbing mechanism of electric power tower
CN203393628U (en) Ground basket device
CN216379165U (en) Assembled adjustable support base stone construction protector
CN210848979U (en) Special bracket for high-altitude on-site welding of bracket
CN212561213U (en) Railway pier top surrounding hanging basket safe operation platform
CN215291809U (en) Safety barrier of water stabilizing hopper
CN205297010U (en) Novel portable electric power equipment protective guardrail

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant