CN106088638A - A kind of special building method for high-voltage line protection safety frame - Google Patents

A kind of special building method for high-voltage line protection safety frame Download PDF

Info

Publication number
CN106088638A
CN106088638A CN201610677451.8A CN201610677451A CN106088638A CN 106088638 A CN106088638 A CN 106088638A CN 201610677451 A CN201610677451 A CN 201610677451A CN 106088638 A CN106088638 A CN 106088638A
Authority
CN
China
Prior art keywords
voltage line
meters
colligation
vertical rod
cross bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610677451.8A
Other languages
Chinese (zh)
Inventor
吴晶
杨智英
阮洁
管飞吉
刘梦星
吴叔于
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Aerospace Construction Group Co Ltd
Original Assignee
China Aerospace Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Aerospace Construction Group Co Ltd filed Critical China Aerospace Construction Group Co Ltd
Priority to CN201610677451.8A priority Critical patent/CN106088638A/en
Publication of CN106088638A publication Critical patent/CN106088638A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32Safety or protective measures for persons during the construction of buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/24Safety or protective measures preventing damage to building parts or finishing work during construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

A kind of special building method for high-voltage line protection safety frame is first to arrange vertical rod at ad-hoc location, then leger and little cross bar are set at ad-hoc location, and outside protective frame, set up bridging, and after bridging is arranged, all standing safety net and Dense mesh screen in protective frame.Having the beneficial effects that of technical scheme of the present invention: use high-voltage line protective frame building method of the present invention, it is achieved that to 360 degree of dispositions of high-voltage line, it is to avoid the potential safety hazard that unilateral protection may bring;On the other hand, the present invention propose protective frame building method solve prior art exist build defect lack of standardization, that potential safety hazard is many;Secondly, protective frame building method of the present invention is applied widely, is particularly suited for little space utilization security protection;Finally, technical scheme of the present invention has feature simple and practical, that can be recycled.

Description

A kind of special building method for high-voltage line protection safety frame
Technical field
The invention belongs to building safety protection field, particularly relate to a kind of special building for high-voltage line protection safety frame Method.
Background technology
In China's construction safety standard, " job site temporary electricity technical specification of security " (JGJ46-2005) Part I has special regulation to high-voltage line protection, must between outer ledge and the sideline of dispatch from foreign news agency overhead transmission line of project under construction Safety operation distance must be kept.Minimum safe operating distance should be not less than 6m.It addition, 4.1.4 regulation, turning arm posture rises The overhead transmission line sideline minimum horizontal distance of any position of heavy-duty machine or suspended object edge and below 10KV cannot be less than 2m.
In daily construction, inevitably run near high-voltage line, carry out construction, execute to build The safety of work, the protection of prior art high-voltage line proposes some resolving ideas.Practicality such as Authorization Notice No. CN204266607 is new Type patent, which discloses a kind of high-voltage line protective frame, and this protective frame includes steel pipe floor stand and Phyllostachys pubescens Mazei ex H.de Lebaie protective frame, described steel The lower end of pipe floor stand and pre-buried bar planting are fixing to be connected, the lower end overlap joint of its upper end and Phyllostachys pubescens Mazei ex H.de Lebaie protective frame, at steel pipe floor stand and It is provided with for withstanding the steel tube fastener bottom Phyllostachys pubescens Mazei ex H.de Lebaie protective frame in the lap segment of Phyllostachys pubescens Mazei ex H.de Lebaie protective frame, at the top of Phyllostachys pubescens Mazei ex H.de Lebaie protective frame Being provided with bamboo basketry sheet, high-voltage line passes bottom bamboo basketry sheet.The and for example utility model patent of Authorization Notice No. CN 202658942, Which disclosing a kind of below 10KV overhead high voltage line preventer, this preventer includes being arranged on overhead high voltage line And the pylon between building, exceed in the upper end on pylon top height of high-voltage line, vertically arranged closely-knitted safety net prevent Protect barrier.
Prior art proposes and builds protective frame for high-voltage line is all monolateral protection, and the most specifically builds mode, separately Outward, there is certain particularity for the totally-enclosed protective frame of building of high-voltage line, security protection requires height, careless slightly, easily sends out Raw security incident.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, it is proposed that a kind of special side of building for high-voltage line protection safety frame Method, this method solves prior art and can not realize high-voltage line totally enclosed type and build the technological deficiency of protective frame.
A kind of special building method for high-voltage line protection safety frame of the present invention includes:
Step one: material prepares;Safety protection frame use second-class peeling Lignum seu Ramulus Cunninghamiae Lanceolatae as strut, described strut any 150mm length On along girth all knaurs size summation less than surveyed position log girth 1/3, the maximum chi of each knaur on described strut Very little less than the 1/6 of surveyed position log girth;The length of described strut circumference is more than 80mm but less than 180mm;
With safety protection frame all standing as standard, prepare safe Dense mesh screen and big eye net;
Step 2: tamp smooth to the ground surface under high-voltage line, arranges discharge conduit, and removes place foreign material;
Step 3: protective frame is built, building step is: establish vertical rod position, vertical rod, colligation longitudinal sweep the floor bar, the big horizontal stroke of colligation Support, colligation bridging, colligation safety net and Dense mesh screen are thrown in bar, the little cross bar of colligation, colligation temporarily;
Specifically build step as follows:
Described protective frame vertical rod employing 8 meters and 6 meters of Lignum seu Ramulus Cunninghamiae Lanceolataes are intervally arranged, and vertical rod transfer is 1.5 meters, advance 1.8 meters, all vertical rods The buried degree of depth is unified and the buried degree of depth of vertical rod is more than 0.6 meter;
8 meters of Lignum seu Ramulus Cunninghamiae Lanceolatae colligations are used longitudinally to sweep the floor bar in vertical rod;
Using 8 meters of Lignum seu Ramulus Cunninghamiae Lanceolatae colligation legers, for making the surface holding level of leger, the joint of leger answers size to overlap, little Head is placed on major part, and the lap of splice is 1.5 meters, uses the three bursts of colligations of No. 8 galvanized wires, and colligation button quantity is more than three roads, colligation Button be smaller than 0.75 meter, joint location is staggered inside and outside up and down, in same step frame, the joint of two legers not same across In;
Use 6 meters of little cross bars of Lignum seu Ramulus Cunninghamiae Lanceolatae colligation, little cross bar together with leger cross colligation, little cross bar spacing be 0.2 meter to 0.5 Rice, little cross bar major part is outer, and by little cross bar and the vertical rod colligation of vertical rod, the length of leger is stretched out more than 0.3 in little cross bar termination Rice;The little cross bar of orlop is 3.2m from bottom surface, from the beginning of the second layer, the distance apart from next layer little cross bar be 1.5 meters to 1.8 Rice;
Overlap vertical vertical rod, during upper and lower two vertical rods overlap joint, above a vertical rod little upside down, the most head-up, and upper and lower two The lap of splice of root vertical rod joint is more than or equal to 1.5m, and uses the three bursts of colligations of No. 8 galvanized wires, and colligation quantity is more than three Road;The joint of adjacent vertical rod mutually staggers;Colligation leger and little cross bar again;So repeatedly build to high-voltage line;
Being positioned at the rod end Distance High Voltage Electricity Transfer immediately below high-voltage line and more than 1.7 meters but be less than 2 meters, arrange below high-voltage line is big Cross bar and little cross bar are more than 1.7 meters from high-voltage line vertical dimension;
High-voltage line is arranged above two-layer leger, and top leger arranges and is spaced apart 0.5 meter to 1.5 meters;
Outside high-voltage line, nearest vertical rod and the distance of high-voltage line are more than 1.7 meters;
Described outside high-voltage line the outside of nearest vertical rod at least provided with row's vertical rod;
At the described every three stride continuous of protective frame horizontal direction, two-way bridging is set;
Arranging continuous way bridging outside protective frame, bridging uses 8 meters and 6 meters of Lignum seu Ramulus Cunninghamiae Lanceolataes settings;Every pair of bridging major part water Mean place is less than bridging microcephaly's horizontal level;
The safe Dense mesh screen of all standing and big eye net outside the protective frame that colligation is good, by 1 meter of spacing, by safe Dense mesh screen and big eye Net is tied up in protective frame.
Further, colligation near the little cross bar of high-voltage line line bar time, can be little cross bar colligation on high-voltage line line bar.
Further, move towards direction at interval of 12 meters along high-voltage line, cable wind rope is set in protective frame both sides.
Having the beneficial effects that of technical scheme of the present invention: use high-voltage line protective frame building method of the present invention, Achieve 360 degree of dispositions of high-voltage line, it is to avoid the potential safety hazard that unilateral protection may bring;On the other hand, the present invention Propose protective frame building method solve prior art exist build defect lack of standardization, that potential safety hazard is many;Next, this Bright described protective frame building method is applied widely, is particularly suited for little space utilization security protection;Finally, of the present invention Technical scheme has feature simple and practical, that can be recycled.
Accompanying drawing explanation
Fig. 1 one is used for high-voltage line protection safety shelf structure schematic diagram;
In figure: 1 vertical rod, 2 legers, 3 little cross bars, 4 bridgings, 5 safety nets and Dense mesh screen.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that technical scheme, below in conjunction with specific embodiment to this Invention is described in further detail.
The present invention proposes a kind of special building method for high-voltage line protection safety frame, utilizes the height that the method is built The structure of line ball protective frame roll-over protective structure, as it is shown in figure 1, first arrange vertical rod 1 at ad-hoc location, then arranges big horizontal stroke at ad-hoc location Bar 2 and little cross bar 3, and outside protective frame, set up bridging 4, after bridging is arranged, in protective frame all standing safety net and Dense mesh screen 5.
The safety of high-voltage line during for guaranteeing pedestrian and tower crane unloading, high-voltage line protective frame should be set up in time.Setting up the date should Carried out before tower crane installs;The protection date is after tower crane supporting is accomplished to remove;The dismounting time is after tower crane is removed.
A kind of special building method for high-voltage line protection safety frame of the present invention particularly as follows:
Establish the longitudinal bar → little cross bar → colligation of colligation leger → colligation of sweeping the floor of vertical rod position → vertical rod → colligation to throw temporarily Support → colligation bridging → colligation safety net and Dense mesh screen.
Described protective frame vertical rod 1 uses 8 meters and 6 meters of Lignum seu Ramulus Cunninghamiae Lanceolataes are intervally arranged, and vertical rod transfer is 1.5 meters, advance 1.8 meters, institute There is the buried degree of depth of vertical rod unified and the buried degree of depth of vertical rod is more than 0.6 meter;
8 meters of Lignum seu Ramulus Cunninghamiae Lanceolatae colligations are used longitudinally to sweep the floor bar in vertical rod;
Using 8 meters of Lignum seu Ramulus Cunninghamiae Lanceolatae colligation legers, for making the surface holding level of leger, the joint of leger answers size to overlap, little Head is placed on major part, and the lap of splice is 1.5 meters, uses the three bursts of colligations of No. 8 galvanized wires, and colligation button quantity is more than three roads, colligation Button be smaller than 0.75 meter, joint location is staggered inside and outside up and down, in same step frame, the joint of two legers not same across In;
Use 6 meters of little cross bars of Lignum seu Ramulus Cunninghamiae Lanceolatae colligation, little cross bar together with leger cross colligation, little cross bar spacing be 0.2 meter to 0.5 Rice, little cross bar major part is outer, and by little cross bar and the vertical rod colligation of vertical rod, the length of leger is stretched out more than 0.3 in little cross bar termination Rice;The little cross bar of orlop is 3.2m from bottom surface, from the beginning of the second layer, the distance apart from next layer little cross bar be 1.5 meters to 1.8 Rice;
Overlap vertical vertical rod, during upper and lower two vertical rods overlap joint, above a vertical rod little upside down, the most head-up, and upper and lower two The lap of splice of root vertical rod joint is more than or equal to 1.5m, and uses the three bursts of colligations of No. 8 galvanized wires, and colligation quantity is more than three Road;The joint of adjacent vertical rod mutually staggers;Colligation leger and little cross bar again;So repeatedly build to high-voltage line;
Being positioned at the rod end Distance High Voltage Electricity Transfer immediately below high-voltage line and more than 1.7 meters but be less than 2 meters, arrange below high-voltage line is big Cross bar and little cross bar are more than 1.7 meters from high-voltage line vertical dimension;
High-voltage line is arranged above two-layer leger, and top leger arranges and is spaced apart 0.5 meter to 1.5 meters;
Outside high-voltage line, nearest vertical rod and the distance of high-voltage line are more than 1.7 meters;
Described outside high-voltage line the outside of nearest vertical rod at least provided with row's vertical rod;
At the described every three stride continuous of protective frame horizontal direction, two-way bridging is set;
Arranging continuous way bridging outside protective frame, bridging uses 8 meters and 6 meters of Lignum seu Ramulus Cunninghamiae Lanceolataes settings;Every pair of bridging major part water Mean place is less than bridging microcephaly's horizontal level;
The safe Dense mesh screen of all standing and big eye net outside the protective frame that colligation is good, by 1 meter of spacing, by safe Dense mesh screen and big eye Net is tied up in protective frame.
In actual build process, should be noted that following safety event: undesirable cedar is forbidden to use;Rod member Joint location, method of attachment should meet detailing requiments;Temporary support should be set when starting to set up shelf, after setting up, can basis Situation is removed;All it is connected with three strands of 8# galvanized wires between cedar with cedar;Horizontal cedar is taken with two cedars Connect and connect with vertical cedar again after being held together;Cedar is tied up into cross type, on distance ground at 200mm, ties up Prick first vertical equity bar;Protective frame can be come into operation by after project security official's acceptance(check) after setting up.
Points for attention when removing protective frame of the present invention include: check that the cedar of protective frame connects comprehensively, support Whether part meets safety requirements;Remove the foreign material in protective frame and ground obstacle;Dismounting order should the most from top to bottom be carried out, The operation while of forbidding up and down;Removing cedar, forbid to toss earthward, ground delivered to by application coir rope pulley;Protection is removed last During one step, it must not be made freely to fall down, temporary support measure should be taked to remove;When scaffold is removed, security official should be had to exist On-the-spot guidance, supervision;Anti-pound canopy should observe from top to bottom, first take tear open afterwards, after take the principle first torn open, forbid to tear open the most simultaneously Except operation;To assume unified command of during dismounting, echo up and down, coordination, relevant with another person when knotting when untiing, Ying Xiantong Know the other side, with fall arrest;During tearing frame open, it is impossible to substitute in midway, during as substituted, after dismounting situation should being explained removing Can leave.
Above a kind of special building method for high-voltage line protection safety frame provided by the present invention is carried out in detail Introducing, principle and the embodiment of the application are set forth by embodiment used herein, and the explanation of above example is only It is to be adapted to assist in understand the present processes and core concept thereof;Simultaneously for one of ordinary skill in the art, according to this Shen Thought please, the most all will change, and in sum, this specification content should not be managed Solve as the restriction to the application.

Claims (3)

1., for a special building method for high-voltage line protection safety frame, the steps include:
Step one: material prepares;Safety protection frame use second-class peeling Lignum seu Ramulus Cunninghamiae Lanceolatae as strut, described strut any 150mm length On along girth all knaurs size summation less than surveyed position log girth 1/3, the maximum chi of each knaur on described strut Very little less than the 1/6 of surveyed position log girth;The length of described strut circumference is more than 80mm but less than 180mm;
With safety protection frame all standing as standard, prepare safe Dense mesh screen and big eye net;
Step 2: tamp smooth to the ground surface under high-voltage line, arranges discharge conduit, and removes place foreign material;
Step 3: protective frame is built, building step is: establish vertical rod position, vertical rod, colligation longitudinal sweep the floor bar, the big horizontal stroke of colligation Support, colligation bridging, colligation safety net and Dense mesh screen are thrown in bar, the little cross bar of colligation, colligation temporarily;
Specifically build step as follows:
Described protective frame vertical rod employing 8 meters and 6 meters of Lignum seu Ramulus Cunninghamiae Lanceolataes are intervally arranged, and vertical rod transfer is 1.5 meters, advance 1.8 meters, all vertical rods The buried degree of depth is unified and the buried degree of depth of vertical rod is more than 0.6 meter;
8 meters of Lignum seu Ramulus Cunninghamiae Lanceolatae colligations are used longitudinally to sweep the floor bar in vertical rod;
Using 8 meters of Lignum seu Ramulus Cunninghamiae Lanceolatae colligation legers, for making the surface holding level of leger, the joint of leger answers size to overlap, little Head is placed on major part, and the lap of splice is 1.5 meters, uses the three bursts of colligations of No. 8 galvanized wires, and colligation button quantity is more than three roads, colligation Button be smaller than 0.75 meter, joint location is staggered inside and outside up and down, in same step frame, the joint of two legers not same across In;
Use 6 meters of little cross bars of Lignum seu Ramulus Cunninghamiae Lanceolatae colligation, little cross bar together with leger cross colligation, little cross bar spacing be 0.2 meter to 0.5 Rice, little cross bar major part is outer, and by little cross bar and the vertical rod colligation of vertical rod, the length of leger is stretched out more than 0.3 in little cross bar termination Rice;The little cross bar of orlop is 3.2m from bottom surface, from the beginning of the second layer, the distance apart from next layer little cross bar be 1.5 meters to 1.8 Rice;
Overlap vertical vertical rod, during upper and lower two vertical rods overlap joint, above a vertical rod little upside down, the most head-up, and upper and lower two The lap of splice of root vertical rod joint is more than or equal to 1.5m, and uses the three bursts of colligations of No. 8 galvanized wires, and colligation quantity is more than three Road;The joint of adjacent vertical rod mutually staggers;Colligation leger and little cross bar again;So repeatedly build to high-voltage line;
Being positioned at the rod end Distance High Voltage Electricity Transfer immediately below high-voltage line and more than 1.7 meters but be less than 2 meters, arrange below high-voltage line is big Cross bar and little cross bar are more than 1.7 meters from high-voltage line vertical dimension;
High-voltage line is arranged above two-layer leger, and top leger arranges and is spaced apart 0.5 meter to 1.5 meters;
Outside high-voltage line, nearest vertical rod and the distance of high-voltage line are more than 1.7 meters;
Described outside high-voltage line the outside of nearest vertical rod at least provided with row's vertical rod;
At the described every three stride continuous of protective frame horizontal direction, two-way bridging is set;
Arranging continuous way bridging outside protective frame, bridging uses 8 meters and 6 meters of Lignum seu Ramulus Cunninghamiae Lanceolataes settings;Every pair of bridging major part water Mean place is less than bridging microcephaly's horizontal level;
The safe Dense mesh screen of all standing and big eye net outside the protective frame that colligation is good, by 1 meter of spacing, by safe Dense mesh screen and big eye Net is tied up in protective frame.
A kind of special building method for high-voltage line protection safety frame, it is characterised in that: tying up Prick when the little cross bar of high-voltage line line bar, can be little cross bar colligation on high-voltage line line bar.
A kind of special building method for high-voltage line protection safety frame, it is characterised in that: along high Line ball moves towards direction at interval of 12 meters, arranges cable wind rope in protection safety frame both sides.
CN201610677451.8A 2016-08-17 2016-08-17 A kind of special building method for high-voltage line protection safety frame Pending CN106088638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610677451.8A CN106088638A (en) 2016-08-17 2016-08-17 A kind of special building method for high-voltage line protection safety frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610677451.8A CN106088638A (en) 2016-08-17 2016-08-17 A kind of special building method for high-voltage line protection safety frame

Publications (1)

Publication Number Publication Date
CN106088638A true CN106088638A (en) 2016-11-09

Family

ID=58069404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610677451.8A Pending CN106088638A (en) 2016-08-17 2016-08-17 A kind of special building method for high-voltage line protection safety frame

Country Status (1)

Country Link
CN (1) CN106088638A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620259A (en) * 2017-09-30 2018-01-23 中铁二局第四工程有限公司 Construction protection method for bridge under a kind of high-voltage line
CN108442716A (en) * 2017-02-16 2018-08-24 五冶集团上海有限公司 A kind of protective frame erection method of construction site temporary high-pressure line

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658942U (en) * 2012-07-12 2013-01-09 振华集团(昆山)建设工程有限公司 Under-10KV overhead high voltage line safety guard
CN202689680U (en) * 2012-07-14 2013-01-23 南通市城山建设工程有限公司 Protection device of crossing frame for overhead high-voltage lines
CN204266607U (en) * 2014-11-25 2015-04-15 中建四局第一建筑工程有限公司 A kind of high-voltage line protective frame

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202658942U (en) * 2012-07-12 2013-01-09 振华集团(昆山)建设工程有限公司 Under-10KV overhead high voltage line safety guard
CN202689680U (en) * 2012-07-14 2013-01-23 南通市城山建设工程有限公司 Protection device of crossing frame for overhead high-voltage lines
CN204266607U (en) * 2014-11-25 2015-04-15 中建四局第一建筑工程有限公司 A kind of high-voltage line protective frame

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
施岚青: "《注册结构工程师专业考试专题精讲 砌体结构与木结构》", 28 February 2015 *
赵小蒲: "《近临高压线组织施工的安全防护措施》", 《建材技术与应用》 *
郝涛瑞: "《谈塔吊作业临近高压线安全防护措施》", 《山西建筑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108442716A (en) * 2017-02-16 2018-08-24 五冶集团上海有限公司 A kind of protective frame erection method of construction site temporary high-pressure line
CN107620259A (en) * 2017-09-30 2018-01-23 中铁二局第四工程有限公司 Construction protection method for bridge under a kind of high-voltage line

Similar Documents

Publication Publication Date Title
CN202324571U (en) Overhanging type double-row scaffold
CN207079828U (en) A kind of oblique outer reverse erecting device of eaves panel of large cantilever
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN103422714B (en) A kind of high ferro is the safety protecting method of wired construction and the protective fence of formation thereof both
CN203334664U (en) Ultra-long cantilever truss structure high formwork supporting system
CN103311844B (en) Alpine terrain crosses over the stringing method of live high voltage circuit
CN107165281A (en) A kind of high-altitude long-span overhung steel platform mould bases construction
CN106088638A (en) A kind of special building method for high-voltage line protection safety frame
CN103306479A (en) Long-length overhang trusswork high form hanger system
CN202451040U (en) Perpendicular high-altitude crawling ladder
CN104153586A (en) Construction method for installing purline through suspension cable cranes
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN205754137U (en) Fish belly type many ropes photovoltaic bracket
CN201071487Y (en) Suspension basket safety protection system device in bridge construction
CN104278828A (en) Concrete chimney demolition operating platform
CN105908986B (en) A kind of construction method of design of glass lighting roof protective frame
CN203569906U (en) Anti-sliding device of canopy sloping roof without column
CN104278689B (en) Box-type substation and wind generator facility mutual foundation device and construction method thereof
CN206971702U (en) A kind of climbing frame with slide-in type protection network
CN203160659U (en) Assembled cantilever discharging platform for building
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN107217912A (en) It is a kind of to be used for the superelevation physical isolation construction method of neighbouring high ferro Business Line construction
CN205348824U (en) Outer facade safety plain net device of prefabricated construction
CN203022327U (en) Elevator shaft high-altitude construction platform device
CN205976579U (en) Be used for high -voltage line protection safety frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161109