CN219653491U - Steel construction abutment suitable for steel trestle - Google Patents

Steel construction abutment suitable for steel trestle Download PDF

Info

Publication number
CN219653491U
CN219653491U CN202320873747.2U CN202320873747U CN219653491U CN 219653491 U CN219653491 U CN 219653491U CN 202320873747 U CN202320873747 U CN 202320873747U CN 219653491 U CN219653491 U CN 219653491U
Authority
CN
China
Prior art keywords
steel
pipe pile
bridge
steel pipe
pipe piles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320873747.2U
Other languages
Chinese (zh)
Inventor
邓富超
刘大卫
张金福
刘永松
夏浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202320873747.2U priority Critical patent/CN219653491U/en
Application granted granted Critical
Publication of CN219653491U publication Critical patent/CN219653491U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a steel structure bridge abutment suitable for a steel trestle, which comprises two rows of steel pipe piles which are arranged in the transverse direction of the bridge, wherein one row of steel pipe piles is a bench-back steel pipe pile, the steel pipe piles are tightly close to roadbed filling, the top elevation is flush with the top surface of the roadbed filling, a retaining plate is welded between the adjacent bench-back steel pipe piles, and the other row of steel pipe piles are pedestal steel pipe piles and are positioned below the bridge abutment; and welding connecting beams between each back steel pipe pile and the pedestal steel pipe piles opposite to the back steel pipe piles along the bridge, wherein the top surfaces of the connecting beams and the tops of the pedestal steel pipe piles are respectively transversely bridged to erect lower distribution beams, and the elevation of the top surface of the lower distribution beams is consistent with the elevation of the bottom of the bailey beam of the steel trestle. The utility model has low construction cost, and the material can be reused after the abutment is dismantled.

Description

Steel construction abutment suitable for steel trestle
Technical Field
The utility model belongs to the technical field of bridge construction, relates to a steel trestle structure erected during construction of a bridge in water, and particularly relates to a steel structure abutment suitable for the steel trestle.
Background
The abutment is a structure for connecting the bridge head and the roadbed. As shown in fig. 1, the bridge abutment of a general bridge generally comprises a foundation 7 and a abutment wall 8 supported on the foundation, the cross section of the top of the abutment wall is L-shaped, the height of the abutment wall towards one side of the bridge is lower, the abutment wall is used for supporting an abutment 9, the load of the upper structure of the bridge is transferred to the foundation, the load of the upper structure of the bridge is higher towards one side of a roadbed, the horizontal thrust of roadbed filling soil 10 is resisted, the abutment wall is prevented from being directly extruded by the roadbed filling soil, the abutment structure is required to be quite stable, a gravity type structure is generally adopted, a deep foundation pit is required to be excavated during construction, the concrete foundation 7 is poured, the abutment wall 8 is cast by a supporting template, and the excavation amount and the concrete pouring amount are both larger.
When the underwater bridge is constructed, a trestle is usually required to be built and used as a temporary channel for communicating the shoreside with the underwater construction area for the passing of constructors and equipment and the transportation of materials. The trestle generally adopts a steel structure, the lower structure adopts a steel pipe pile foundation, the upper structure adopts a bailey beam which is erected along the bridge direction as a spandrel girder, and the spandrel girder is sequentially erected with a distribution beam and a bridge deck slab.
As with the common bridge, a bridge abutment is also required to be arranged between the bridge head of the trestle and the roadbed on the bank. At present, when a steel trestle is constructed, a gravity type concrete bridge abutment which is the same as a common bridge is generally adopted; but different from the common bridge, the trestle is used as a temporary structure, and the trestle bridge abutment needs to be removed after the construction of the underwater bridge is completed. Because the gravity type concrete bridge platform has high construction cost and cannot be reused after being dismantled, great waste is caused; and the construction and the demolition of the concrete bridge are serious to the environmental damage.
Disclosure of Invention
The utility model aims to solve the problems and provide the steel structure abutment suitable for the steel trestle, so that the construction cost of the abutment is reduced on one hand, and the abutment material can be reused after the abutment is dismantled, so that the waste is reduced.
The technical scheme of the utility model is as follows:
steel construction abutment suitable for steel trestle, its characterized in that: including two rows of steel-pipe piles that the bridge set up, wherein one row of steel-pipe pile is the back of the body steel-pipe pile, the back of the body steel-pipe pile is close to the road bed and fills earth, the top elevation of back of the body steel-pipe pile flushes with the top surface of road bed filling earth, the welding retaining plate between adjacent back of the body steel-pipe pile, the top of retaining plate flushes with the top height of back of the body steel-pipe pile, another row of steel-pipe pile is the pedestal steel-pipe pile, pedestal steel-pipe pile is located landing stage bridge head below, pedestal steel-pipe pile and back of the body steel-pipe pile are along bridge one-to-one correspondence, every back of the body steel-pipe pile and with its along bridge to the welding tie beam between the opposite pedestal steel-pipe pile, each tie beam top and each pedestal steel-pipe pile top are respectively the bridge to set up the lower part and are allocated the roof beam, the top elevation of the lower part is joined in marriage the roof and is consistent with the base of the bridge bottom elevation of steel landing stage.
According to the utility model, two rows of steel pipe piles are adopted, one row of steel pipe piles is used for bearing the lateral pressure of the soil filled on the back of the platform, the other row of steel pipe piles is used for supporting the bridge head of the trestle, the structure is simple, the on-site excavation amount and the concrete pouring amount are reduced, and the construction cost is low; the inserting and driving depth of the steel pipe pile is set according to the pre-calculated stress load, so that pile vibrating equipment of the trestle steel pipe pile can be directly adopted for inserting and driving, and the construction is convenient; when the abutment is removed, the steel pipe pile can be pulled out for reuse.
Drawings
FIG. 1 is a schematic structural view of a conventional abutment;
FIG. 2 is a side view of the forward bridge structure of the present utility model;
fig. 3 is a schematic plan view of the present utility model.
Detailed Description
As shown in fig. 2 and 3, the utility model comprises two rows of steel pipe piles arranged in a transverse bridge direction, wherein one row of steel pipe piles is a back steel pipe pile 1, the back steel pipe pile 1 is tightly filled with roadbed soil, the top elevation of the back steel pipe pile 1 is flush with the top surface of roadbed filling soil 10, a retaining plate 2 is welded between adjacent back steel pipe piles, the top of the retaining plate 2 is flush with the top elevation of the back steel pipe pile 1, the other row of steel pipe piles is a pedestal steel pipe pile 3, the pedestal steel pipe piles are positioned below the bridge head, the pedestal steel pipe piles 3 and the back steel pipe piles 1 are in one-to-one correspondence in the bridge direction, connecting beams 4 are welded between each back steel pipe pile 1 and the pedestal steel pipe pile 3 opposite to the back steel pipe pile in the bridge direction, the top surfaces of the connecting beams 4 and the tops of the pedestal steel pipe piles 3 are respectively transversely erected in the lower part, and the elevation of the top surface of the lower part of each connecting beam is consistent with the elevation of the bailey beam 11 of the steel bridge.
In the structure, the soil retaining plate 2 has the function of resisting the lateral pressure of the roadbed filling together with the back steel pipe piles 1 so as to prevent the roadbed filling from directly extruding the bridge head of the trestle. In the concrete implementation of the utility model, in order to enhance the strength of the soil-blocking plates, a plurality of reinforcing rods 6 can be welded on each soil-blocking plate 2 towards the bridge head side in the transverse bridge direction, and two ends of each reinforcing rod 6 are respectively welded with two adjacent back steel pipe piles 1. In addition, in order to enhance the section modulus of the back steel pipe pile, fine sand can be filled in the back steel pipe pile to the pile top.
When the utility model is embodied, at least 3 bench steel pipe piles and at least 3 bench steel pipe piles are respectively arranged according to the width of the trestle; the platform back steel pipe pile 1 and the pedestal steel pipe pile 3 can be synchronously constructed with the lower supporting steel pipe pile of the trestle, the construction equipment of the steel pipe pile of the trestle is directly adopted for inserting and driving, after the inserting and driving are finished, a soil retaining plate 2 and a reinforcing rod 6 are welded between the platform back steel pipe piles 1, and then roadbed filling 10 is filled and compacted; welding a connecting beam 4 between a back steel pipe pile and a pedestal steel pipe pile, erecting a lower distribution beam 5 on the connecting beam and the pedestal steel pipe pile, supporting the bridge head end of the bailey beam 11 on the lower distribution beam 5 when erecting a trestle bailey beam 11, transversely erecting an upper distribution beam 12 on the bailey beam 11 and the top of the back steel pipe pile 1, and paving a bridge deck 13 on the upper distribution beam 12; and a layer of concrete cover plate 14 is poured on the roadbed filling 10, and the concrete cover plate 14 is flush with the top surface of the bridge deck 13, so that stable transition between the roadbed and the bridge deck is ensured.

Claims (2)

1. Steel construction abutment suitable for steel trestle, its characterized in that: including two rows of steel-pipe piles that the bridge set up, wherein one row of steel-pipe pile is the back of the body steel-pipe pile, the back of the body steel-pipe pile is close to the road bed and fills earth, the top elevation of back of the body steel-pipe pile flushes with the top surface of road bed filling earth, the welding retaining plate between adjacent back of the body steel-pipe pile, the top of retaining plate flushes with the top height of back of the body steel-pipe pile, another row of steel-pipe pile is the pedestal steel-pipe pile, pedestal steel-pipe pile is located landing stage bridge head below, pedestal steel-pipe pile and back of the body steel-pipe pile are along bridge one-to-one correspondence, every back of the body steel-pipe pile and with its along bridge to the welding tie beam between the opposite pedestal steel-pipe pile, each tie beam top and each pedestal steel-pipe pile top are respectively the bridge to set up the lower part and are allocated the roof beam, the top elevation of the lower part is joined in marriage the roof and is consistent with the base of the bridge bottom elevation of steel landing stage.
2. The steel structure abutment suitable for use in a steel trestle according to claim 1, characterized in that: and a plurality of reinforcing rods are welded on each retaining plate towards the transverse bridge direction at one side of the bridge head, and two ends of each reinforcing rod are respectively welded with two adjacent back steel pipe piles.
CN202320873747.2U 2023-04-18 2023-04-18 Steel construction abutment suitable for steel trestle Active CN219653491U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320873747.2U CN219653491U (en) 2023-04-18 2023-04-18 Steel construction abutment suitable for steel trestle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320873747.2U CN219653491U (en) 2023-04-18 2023-04-18 Steel construction abutment suitable for steel trestle

Publications (1)

Publication Number Publication Date
CN219653491U true CN219653491U (en) 2023-09-08

Family

ID=87878920

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320873747.2U Active CN219653491U (en) 2023-04-18 2023-04-18 Steel construction abutment suitable for steel trestle

Country Status (1)

Country Link
CN (1) CN219653491U (en)

Similar Documents

Publication Publication Date Title
CN106320377A (en) Water-rich soft soil area deep foundation pit cover and excavation top-down construction method
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN111236260A (en) Variable-rigidity combined type prefabricated double-row pile supporting structure and construction method thereof
CN112482202A (en) Pull rod type multipurpose steel trestle bridge abutment and construction method thereof
CN110593080A (en) Inter-support trestle system combined with inner support system and construction method
CN111622234B (en) Unloading type thin-wall box-type retaining wall supported by obliquely and vertically combined steel pipe pile and construction process
CN220117272U (en) Interior step precast concrete embankment retaining wall
CN112049011B (en) Reverse construction method for large-span prestressed cast-in-place bridge
CN111705576A (en) Steep slope high-filling roadbed structure adopting high-density EPS filler
CN219653491U (en) Steel construction abutment suitable for steel trestle
CN113818352B (en) Soft foundation high pier curve cast-in-situ box girder bridge and construction method thereof
CN114922200B (en) Existing-newly-built combined retaining structure of wide road embankment and construction method
CN110952563A (en) Temporary anti-floating structure for excavation of foundation pit above existing subway tunnel
CN115045179A (en) Upper-bridge and lower-tunnel combined construction structure and construction method
CN205557535U (en) Compound retaining wall of arch campshed formula
CN213508572U (en) Piping lane supporting construction
CN211772879U (en) Spacing top of steel case roof beam hoist and mount pushes away construction structures
CN107916798A (en) The building structure of skyscraper is built suitable for tier building set
CN209958372U (en) Railway newly-added second-line platform back way foundation pile pipe curtain supporting structure
CN217777323U (en) Combined pedestal for manufacturing high-speed rail prefabricated box girder
CN201567523U (en) Temporary bridge for erecting existing railway overhead in sections with soft foundation or high water level
CN110777827A (en) Structure capable of carrying out deep water area hollowing repair in rapid stream state
CN220117274U (en) Interior step prestressing force embankment retaining wall
CN213448531U (en) A river course cofferdam structure for ground wall protection
CN216338977U (en) Bridge is with striding rebuilding device and bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant