CN219365935U - Geological survey drilling device - Google Patents

Geological survey drilling device Download PDF

Info

Publication number
CN219365935U
CN219365935U CN202320971222.2U CN202320971222U CN219365935U CN 219365935 U CN219365935 U CN 219365935U CN 202320971222 U CN202320971222 U CN 202320971222U CN 219365935 U CN219365935 U CN 219365935U
Authority
CN
China
Prior art keywords
chassis
gag lever
lever post
geological survey
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202320971222.2U
Other languages
Chinese (zh)
Inventor
何贤辉
蒋敖
叶�武
章航瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Haichuan Geological And Mineral Technology Co ltd
Original Assignee
Zhejiang Haichuan Survey Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Haichuan Survey Co ltd filed Critical Zhejiang Haichuan Survey Co ltd
Priority to CN202320971222.2U priority Critical patent/CN219365935U/en
Application granted granted Critical
Publication of CN219365935U publication Critical patent/CN219365935U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/30Assessment of water resources

Abstract

The utility model discloses a geological survey drilling device, which comprises a motor and a connecting disc, wherein a connecting piece is arranged at the output end of the motor, a rotating rod is installed in the connecting piece in a key connection mode, a drilling probe is fixedly installed at the bottom end of the rotating rod in a fitting mode, a connecting plate is installed at the outer cambered surface of the connecting piece in a fitting mode, a stress plate is arranged at the lower portion of the connecting plate, and positioning blocks are installed at the outer side of the stress plate in equal radians. The device is wholly detachable, so that the device can be carried more conveniently, equipment can be carried and used in an incomplete road construction area, the drilling probe can be supported by the aid of the connecting disc, the chassis and the limiting rod, the positioning frame protects the motor, downward pressure is applied to the positioning block, the drilling probe can be stably drilled downwards under the condition that the motor rotating force is applied, and meanwhile, the drilling head is stably drilled due to the fact that the positioning block slides in the limiting rod.

Description

Geological survey drilling device
Technical Field
The utility model relates to the technical field of geological exploration tools, in particular to a geological exploration drilling device.
Background
Geological exploration is to survey and detect geology by various means and methods, determine a proper bearing layer, determine a foundation type according to the foundation bearing capacity of the bearing layer, and calculate investigation and research activities of foundation parameters; geological exploration is one of important components of engineering construction, major geological problems, various mineral resources, water resources, environmental problems and the like in national economic construction are conditions and foundations for stable and sustainable development of society, a foundation form can be selected for engineering construction only by carrying out detailed engineering geological exploration, engineering safety is ensured, the geological exploration needs to be sampled and detected by using drilling equipment for detecting actual data of geology, most of the existing drilling devices are complicated to operate, and the existing drilling devices are inconvenient to carry and operate for more complicated geological road section devices.
As disclosed in patent publication No. CN211008451U, a geological survey drilling device is disclosed, including a protection frame, a support column, a connecting plate and a fixing frame, the bottom end of the protection frame is fixedly connected to a base, the periphery of the bottom of the base is fixedly connected with a roller, one end of the top of the base is fixedly connected with a push rod, the bottom end of the support column is fixedly connected with a limiting plate, the limiting plate is fixedly connected with a small pulley at one end deviating from the support column, the support column is slidably connected in a chute through the small pulley, one end deviating from the limiting plate is fixedly connected with the bottom end of a top plate, a through hole is formed in the connecting plate, the geological survey drilling device is beneficial to reducing the operation difficulty of the device, and is convenient for workers to operate, the drill bit is driven to descend by the second hydraulic rod to perform the drilling process, the drill bit is supported by the support column, the effect that the workers do not need to hold is solved, and the problem that the existing drilling device needs to be operated by a plurality of workers together is inconvenient to operate is solved;
the above-mentioned patent still has some problems when using, and the device is whole can not carry out quick split, and the device is whole great, carries, uses inconvenient under the incomplete environment of road construction for the whole utilization ratio of device reduces, so now needs a geological investigation drilling rig.
Disclosure of Invention
The utility model aims to provide a geological exploration drilling device, which ensures the flexibility of the device in use by detaching all components of the device so as to solve the problems in the prior art.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides a geological survey drilling rig, includes motor and connection pad, the motor output is provided with the connecting piece, the inside key joint of connecting piece is installed and is rotated the pole, the laminating of dwang bottom is fixed mounting and is bored the probe, the connecting plate is installed in the laminating of connecting piece extrados, the connecting plate lower part is provided with the atress board, the locating piece is installed to the radian such as atress board outside;
the connecting plate movable mounting is inside the connection pad, connection pad lower part is provided with the chassis, a plurality of groups of gag lever posts are installed to the radian joint such as connection pad and chassis outside, every group the locating piece corresponds each group gag lever post slidable mounting, the locating rack is installed to connection pad upper portion bolt, electric putter is installed to each group locating piece of locating rack inside correspondence.
Preferably, two groups of sliding inner rods are symmetrically and fixedly arranged on the outer side of the positioning block, a connecting rod is fixedly arranged on the upper surface of the positioning block, and the connecting plate is fixedly connected with the stress plate through a connecting bolt.
Preferably, a plurality of groups of limit grooves are formed in the radians of the connecting disc and the chassis outer cambered surface, and the limit rods are attached to the inner walls of the limit grooves in a movable clamping manner.
Preferably, the protection shield is installed in the laminating of the interior top of gag lever post, the inside lower part laminating of gag lever post is installed and is fixed a position the bottom plate, the spout has been seted up to gag lever post bilateral symmetry, the interior wall slidable mounting of pole laminating spout in the slip.
Preferably, the inner part of the chassis is provided with a threaded groove in a penetrating manner at the middle part of the interval between every two adjacent groups of limiting grooves, leveling bolts are arranged in the threaded grooves in a threaded manner, and drill holes are correspondingly formed in the center of the chassis in a penetrating manner through the drill probes.
Preferably, the locating rack corresponds each group of gag lever post position and is provided with the support, electric putter corresponds each group of support inboard setting, electric putter flexible terminal runs through locating rack and protection shield and connecting rod key connection installation.
Compared with the prior art, the utility model has the beneficial effects that:
1. the device is wholly detachable, so that the device can be more conveniently carried, equipment can be carried and used in an incomplete road construction area, the use of the drilling probe can be supported by the aid of the cooperation of the connecting disc, the chassis and the limiting rod, the use of the drilling probe is effectively limited, the use of the drilling probe is more stable, the positioning frame protects a motor, the positioning block applies downward pressure, the drilling probe can keep downward stable drilling under the condition of being held by the rotating force of the motor, and meanwhile, the stability of drilling of the drilling head is improved due to the sliding of the positioning block in the limiting rod.
2. The leveling operation to the device is accomplished through changing the use of each group leveling bolt bottom to the gag lever post leveling bolt rotation that sets up inside the chassis, messenger leveling bolt bottom can be more stable laminating ground, and the locating bottom plate of installing in the gag lever post lower part can carry out spacingly to the grounding bolt, and the connection ground that makes the device can be more stable further promotes the stability that the device wholly used.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is an overall exploded view of the device of the present utility model;
FIG. 3 is a split view of a force plate mounting structure of the present utility model;
fig. 4 is a split view of the mounting structure of the stop lever of the present utility model.
In the figure: 1. a motor; 2. a connecting piece; 3. a rotating lever; 4. a drill probe; 5. a connecting plate; 6. a force-bearing plate; 7. a positioning block; 8. sliding the inner rod; 9. a connecting rod; 10. a connecting bolt; 11. a connecting disc; 12. a chassis; 13. a limit groove; 14. a limit rod; 15. a protective plate; 16. positioning a bottom plate; 17. a chute; 18. leveling bolts; 19. drilling a drill hole; 20. a positioning frame; 21. an electric push rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The present utility model provides: 1-4, a geological survey drilling device comprises a motor 1 and a connecting disc 11, wherein the output end of the motor 1 is provided with a connecting piece 2, a rotating rod 3 is installed in the connecting piece 2 in a key connection manner, a drilling probe 4 is fixedly installed at the bottom end of the rotating rod 3 in a fitting manner, a connecting plate 5 is installed at the outer cambered surface of the connecting piece 2 in a fitting manner, a stress plate 6 is arranged at the lower part of the connecting plate 5, and a positioning block 7 is installed at the outer side of the stress plate 6 in an equal radian manner; connecting plate 5 movable mounting is inside connection pad 11, connection pad 11 lower part is provided with chassis 12, radian joint such as connection pad 11 and chassis 12 outside installs a plurality of sets of gag lever posts 14, every locating piece 7 of group corresponds each set of gag lever post 14 slidable mounting, locating rack 20 is installed to connection pad 11 upper portion bolt, electric putter 21 is installed to each set of locating piece 7 of locating rack 20 inside, connecting piece 2 atress board 6 that sets up is spacing, make motor 1, connecting piece 2, dwang 3 and boring head 4 can stabilize the atress and move down, and then guarantee to carry out effective drilling operation to different geology.
As the preference, two sets of sliding inner rods 8 are fixedly installed on the outer side of the positioning block 7 in bilateral symmetry, a connecting rod 9 is fixedly installed on the upper surface of the positioning block 7, the connecting plate 5 and the stress plate 6 are fixedly connected with the positioning block 7 installed on the outer side of the stress plate 6 through connecting bolts 10 and are slidably installed inside a limiting rod 14, the sliding inner rods 8 on two sides of the positioning block 7 are matched to slide inside a sliding groove 17, so that the stability of the drilling probe 4 in the drilling process is improved, the change of an inclination angle cannot occur in the drilling process, the connecting plate 5 of the connecting piece 2 and the stress plate 6 are connected through the connecting bolts 10, and the whole use and the stress of the drilling probe 4 can be ensured to be more stable.
Further, a plurality of groups of limit grooves 13 are formed in the radians such as the outer cambered surfaces of the connecting disc 11 and the chassis 12, the limit rods 14 are attached to the inner walls of the limit grooves 13 in a movable clamping mode, the connecting disc 11 and the chassis 12 carry out limit protection on the work of the drilling head 4, meanwhile, the limit grooves 13 formed in the connecting disc 11 and the chassis 12 in a corresponding mode can limit the limit rods 14, and the limit rods 14 can be placed and fixed better, so that the whole device can be split into different parts to be carried.
Furthermore, the protection board 15 is installed on the top laminating in the gag lever post 14, the locating bottom plate 16 is installed on the inside lower part laminating of gag lever post 14, spout 17 has been seted up to gag lever post 14 bilateral symmetry, the inner wall slidable mounting of pole 8 laminating spout 17 in the slip, the protection board 15 at gag lever post 14 top can be spacing to electric putter 21, make electric putter 21 can more nimble and stable the use, the locating bottom plate 16 of setting can make device and bottom surface bolt fixedly when the device is installed, make the device use more stable.
It is worth explaining, the inside thread groove that has run through in every adjacent two sets of spacing groove 13 interval middle part of chassis 12 has been seted up, thread groove internal thread installs leveling bolt 18, the drill hole 19 has been seted up in the corresponding boring probe 4 of chassis 12 center, chassis 12 plays the absorbing purpose as the chassis, make motor 1 make more stable in work, leveling bolt 18 that the internal thread of chassis 12 was installed can adjust simultaneously, make leveling bolt 18 bottom support tight ground, make the whole more steady use of device.
Specifically, the locating rack 20 is provided with the support corresponding to each group of locating lever 14 positions, and electric putter 21 corresponds each group of support inboard setting, and electric putter 21 flexible terminal runs through locating rack 20 and protection shield 15 and connecting rod 9 key connection installation, and locating rack 20 that sets up carries out spacing protection to electric putter 21, and electric putter 21 is connected with connecting rod 9 can exert decurrent force to locating piece 7, makes the drilling of probing head 4 to the ground more effective stability.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. A geological survey drilling rig, characterized in that: the drilling device comprises a motor (1) and a connecting disc (11), wherein a connecting piece (2) is arranged at the output end of the motor (1), a rotating rod (3) is installed in the connecting piece (2) in a key connection mode, a drilling probe (4) is fixedly installed at the bottom end of the rotating rod (3) in a fit mode, a connecting plate (5) is installed at the outer cambered surface of the connecting piece (2) in a fit mode, a stress plate (6) is arranged at the lower portion of the connecting plate (5), and a positioning block (7) is installed at the outer side of the stress plate (6) in an equal radian mode;
connecting plate (5) movable mounting is inside connection pad (11), connection pad (11) lower part is provided with chassis (12), radian joint such as connection pad (11) and chassis (12) outside is installed a plurality of groups gag lever post (14), every group locating piece (7) correspond each group gag lever post (14) slidable mounting, locating rack (20) are installed in connection pad (11) upper portion bolt, electric putter (21) are installed to each group locating piece (7) in locating rack (20) inside.
2. A geological survey drilling rig according to claim 1, characterized in that: two groups of sliding inner rods (8) are symmetrically and fixedly arranged on the outer side of the positioning block (7), a connecting rod (9) is fixedly arranged on the upper surface of the positioning block (7), and the connecting plate (5) and the stress plate (6) are fixedly connected through connecting bolts (10).
3. A geological survey drilling rig according to claim 2, characterized in that: a plurality of groups of limit grooves (13) are formed in the outer arc surfaces of the connecting disc (11) and the chassis (12), and the limit rods (14) are attached to the inner walls of the limit grooves (13) in a movable clamping mode.
4. A geological survey drilling rig according to claim 3, characterized in that: the top laminating is installed protection shield (15) in gag lever post (14), locating bottom plate (16) are installed in inside lower part laminating of gag lever post (14), spout (17) have been seted up to gag lever post (14) bilateral symmetry, interior wall slidable mounting of spout (17) is laminated to interior pole (8).
5. A geological survey drilling rig according to claim 4, characterized in that: the inner part of the chassis (12) is positioned in the middle of the interval between every two adjacent groups of limiting grooves (13), a threaded groove is formed in the middle of the interval, a leveling bolt (18) is arranged in the threaded groove in a threaded manner, and a drill hole (19) is formed in the center of the chassis (12) in a penetrating manner corresponding to the drill probe (4).
6. A geological survey drilling rig according to claim 5, characterized in that: the locating rack (20) is provided with the support corresponding to each group of gag lever post (14) position, electric putter (21) is corresponding to each group of support inboard setting, electric putter (21) flexible terminal run through locating rack (20) and protection shield (15) and connecting rod (9) key connection installation.
CN202320971222.2U 2023-04-26 2023-04-26 Geological survey drilling device Active CN219365935U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202320971222.2U CN219365935U (en) 2023-04-26 2023-04-26 Geological survey drilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202320971222.2U CN219365935U (en) 2023-04-26 2023-04-26 Geological survey drilling device

Publications (1)

Publication Number Publication Date
CN219365935U true CN219365935U (en) 2023-07-18

Family

ID=87118577

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202320971222.2U Active CN219365935U (en) 2023-04-26 2023-04-26 Geological survey drilling device

Country Status (1)

Country Link
CN (1) CN219365935U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116696325A (en) * 2023-08-02 2023-09-05 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Mine goaf drilling exploration equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116696325A (en) * 2023-08-02 2023-09-05 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Mine goaf drilling exploration equipment
CN116696325B (en) * 2023-08-02 2023-10-20 山东省地质矿产勘查开发局八〇一水文地质工程地质大队(山东省地矿工程勘察院) Mine goaf drilling exploration equipment

Similar Documents

Publication Publication Date Title
CN219365935U (en) Geological survey drilling device
CN205638225U (en) Drilling equipment for building
CN205349223U (en) Drilling equipment for building
CN112253083A (en) Automatic positioning device and method for drilling
CN115949361B (en) Coring device and coring method while drilling for coal bed gas content measurement
CN216620909U (en) Geological engineering crack measuring device capable of horizontally rotating
CN210918867U (en) Drilling rig for geological survey
CN216043534U (en) Reaming device for drilling
CN215672182U (en) Geological survey exploration device of adjustable exploration degree of depth
CN215485856U (en) Multifunctional drilling machine for geological exploration
CN214741073U (en) Novel geological survey probing device
CN214303715U (en) Stable fixing device of coal mine tunneling drilling machine
CN215718470U (en) Drilling device for geotechnical engineering construction
CN216076973U (en) Engineering geology reconnaissance device convenient to fixed position
CN214793870U (en) Geotechnical sampling device for constructional engineering investigation
CN215414462U (en) Sample sampling device for geological survey
CN103670277B (en) A kind of electric power line pole tower composite foundation borehole perpendicularity locator
CN2255499Y (en) Practical omnibearing mini-sized drilling machine
CN214250908U (en) Real-time measuring device for residual ruler on drilling machine and drilling machine
CN113882802A (en) Information management system for geological change survey based on big data
CN212003047U (en) Geological survey is with rig balancing unit
CN217738709U (en) Mining geological exploration is with electronic rotation type sampler
CN212458965U (en) Geological survey drilling equipment for architectural design
CN220667470U (en) Rock and soil deep hole drilling equipment
CN219887975U (en) Supporting mechanism for geological drilling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 1701-1, West Building 2, Xigang Development Center, Xihu District, Hangzhou City, Zhejiang Province, 310000

Patentee after: Zhejiang Haichuan Geological and Mineral Technology Co.,Ltd.

Address before: Room 1701-1, West Building 2, Xigang Development Center, Xihu District, Hangzhou City, Zhejiang Province, 310000

Patentee before: Zhejiang Haichuan Survey Co.,Ltd.