CN2255499Y - Practical omnibearing mini-sized drilling machine - Google Patents
Practical omnibearing mini-sized drilling machine Download PDFInfo
- Publication number
- CN2255499Y CN2255499Y CN 96214364 CN96214364U CN2255499Y CN 2255499 Y CN2255499 Y CN 2255499Y CN 96214364 CN96214364 CN 96214364 CN 96214364 U CN96214364 U CN 96214364U CN 2255499 Y CN2255499 Y CN 2255499Y
- Authority
- CN
- China
- Prior art keywords
- frame
- balladeur train
- rig
- machine
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 29
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 18
- 239000000843 powder Substances 0.000 claims description 6
- 239000002002 slurry Substances 0.000 claims description 5
- 208000006011 Stroke Diseases 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 19
- 238000004873 anchoring Methods 0.000 description 4
- 239000011435 rock Substances 0.000 description 3
- 239000008400 supply water Substances 0.000 description 3
- 239000004568 cement Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 241001074085 Scophthalmus aquosus Species 0.000 description 1
- 238000010009 beating Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000003245 coal Substances 0.000 description 1
- 238000001816 cooling Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 239000013049 sediment Substances 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a practical omnibearing mini-sized drilling machine, which is drill hole construction equipment for earth construction, mine construction and geology shallow exploratory drilling engineering. The utility model is composed of the left machine frame and the right machine frame 1, 3 of the drilling machine, a drilling machine 2, a screw rod hand wheel 7, a sliding carriage 9, a drill rod 12, and a lateral water conveying device 13. The drilling machine has simple structure design, portability, omnibearing and multifunction. The whole machine is designed into three pieces, and the machine frames 1, 3 of the whole machine are the big pieces, and are the frame structures; the omnibearing function is realized by that positioning holes 4 are overspread on four edges of the machine frame; the drilling machine 2 glides on one end frame 9, and realizes drilling and retracting the drill by the hand wheel screw rod 7. Four screw bolts are positioned and loosened each time. The drilling machine is ideal drill hole construction equipment for 3-50 m cable and shallow exploratory drilling engineering.
Description
The utility model relates to a kind of microdrill, and particularly a kind of down-hole, mine shaft and drift supporting that is used for is greater than 3 meters practical comprehensive microdrills less than 50 meters anchor cable engineerings.
At present, widely used drilling machine: hole depth is less than shallow bore hole drilling tools such as 5 meters electric coal drill, powerful electric drill air drill, air leg air drills, and its characteristics bore direction precision is low, construction is bowed, and the powder difficulty is arranged in the hole; Greater than 50 meters deep hole type rigs, though function, performance are all very advanced, majority is relatively heavier, and the dismounting engineering quantity is big, time-consuming, difficult.Owing to adopt complicated hydraulic stroke, Hydraulic Power Transmission System, increased maintenance workload, improved management difficulty, be not suitable for less than 50 meters dark anchor cable engineerings and other borehole engineering that requires porous.
The purpose of this utility model provide a kind of be suitable for constructing greater than 3 meters less than 50 meters, comprehensive, the needs of drilling construction engineering of holing more, and overcome above-mentioned shallow bore hole, deep hole has the practical comprehensive microdrill of drilling tool, rig complexity, heavy disadvantage now.
The purpose of this utility model is achieved in that
The comprehensive microdrill of a kind of practicality is made up of frame 1 and 3, rig 2, handwheel screw 7, balladeur train 9, drill pipe clamp 10, drill bit 11, drilling rod 12, the side direction water feeder 13 of rig; Termination power realizes that with the side direction water feeder depended on pressure slurries carry out deslagging, row's powder to boring, its hole drill of suitably bowing is advanced, it is characterized in that: frame 1 and 3 adopts the quadrilateral frame shelf structure, four limits are covered with locating hole 4 and cooperate with balladeur train 9 both sides installing holes and installing port, realize the comprehensive function of rig, be that different frame locating holes suitably cooperates with the balladeur train installing hole, make rig adapt to various bore angles; Adopt the screw advance and retreat to bore Strok mechanism, rotary screw provides drill bit thrust forward; Rig 2 is positioned on the balladeur train 9, and handwheel screw 7 is installed on balladeur train 9 longitudinal center lines, and rig 2 is slided on balladeur train 9, and balladeur train is installed on left and right sides frame 1 and 3; Drill pipe clamp 10 is clamped drilling rod 12 and is promptly constituted practical comprehensive microdrill.
The utility model has following advantage and good effect:
1. simple in structure, easy accessibility, fault rate is low, maintenance is little, and is practical economical.
2. body is light, carrying is flexible, and gantry base has been set up securement apertures, can add anchoring pins in case of necessity, and frame is anchored on the base plate, guarantees the stability of facility operation.
3. the numerous locating holes about reaching by frame, two upright grooves on two beams cooperate a plurality of installing holes and the installing port on the rig balladeur trains, realize the comprehensive positioning function of vertical plane.
4. realize the comprehensive location of horizontal plane by moving frame.
5. rig belongs to the termination dynamical type, takes the side direction water feeder to send water or send slurry, realizes pressure slurries deslagging, row's powder.
6. rig adopts simple screw Strok mechanism, and travel speed is artificially controlled, and is easy to operate, and dependable performance, fault rate are low.
7. hand drill pipe clamp, easy to use, system simple, fault-free.
8. set up separate type aperture drill pipe clamp, guarantee the safe construction of inclined hole, deep hole.
Fig. 1 is a schematic perspective view of the present utility model.
Describe the utility model in detail below in conjunction with drawings and Examples.
As shown in the figure, it comprises:
Left frame 1 rig 2
Right frame 3 locating holes 4
Feed pipe 5 cables 6
Handwheel screw 7 securement apertures 8
Balladeur train 9 drill pipe clamps 10
Drill bit 11 drilling rods 12
Side direction water feeder 13
In the drawings, rig 2 is positioned on the balladeur train 9, and handwheel screw 7 is installed on balladeur train 9 longitudinal center lines, and rig 2 is slided on balladeur train 9.According to the bore inclining orientation, choose the locating hole 4 on the suitable left and right sides frame 1 and 3, with this location, hole, balladeur train 9 is installed on left and right sides frame 1 and 3.Connect water pipe 5, cable 6, deep hole or core drill advance and will stamp anchoring pins in left and right sides frame 1 and 3 base securement apertures 8, and drill bit 11, drilling rod 12, side direction water feeder 13 are installed, and drill pipe clamp 10 is clamped drilling rod 12 construction of can spudding in.Be dismounting, convenient in carrying, rig is designed to the three-major-items of weights such as being similar to: also slide on balladeur train 9 rig 2 location, constitutes first; Frame 1 and frame 3 are respectively second, third big, and every big part only just can be lifted fortune easily with two people and move.
Illustrate four kinds of mode of occupation of the present utility model below:
One, construction level boring: the rig three-major-items are transported to the scene, and it is suitable that left frame 1 and right frame 3 are laid by level orientation.In the upright groove of two frames, select four appropriate location holes 4 of corresponding level according to drillhole height again.Then, fastening balladeur train 9 is connected water pipe 5, connects cable 6, and drill bit 11 is installed, and drilling rod 12 is installed, and drilling rod is clamped on the drill pipe clamp 10.After installation preparation is finished, can give and establish brill by cable.In the work progress, the operator shakes handwheel screw 7, and rig 2 is slided along balladeur train 9, promotes rod bit and creeps into.Feed pipe 5 to water feeder 13, supplies water the press water supply side to drilling rod 12 drill bits 11, press water cooling drill bit 11 backs are along outwards washing rock dust between drilling rod 12 and the hole wall.Dark or core drilling for stablizing rig, can add anchoring pins in the securement apertures 8 on gantry base when the boring of construction, carries out anchoring, increases operation stability.
Two, construction inclined drill: compare with embodiment one, according to the two upright grooves of well azimuth, by the selected corresponding fastening balladeur train 9 of four locating holes 4 (promptly high two holes, two holes are low) in left frame 1 and right frame 3.Other and embodiment one are identical.
Three, construction high-dipping boring is compared with embodiment two, according to well azimuth at frame corresponding selection two preceding two back four locating holes, 4 fastening balladeur trains 9 in two beams up and down.Other and embodiment two are identical.But the construction hole depth is safe construction during greater than 20 meters, increase with the supporting separate type aperture drill pipe clamp of this machine at the eye mouth.
Four, vertically boring of construction: compare with embodiment three, the one, do not require water detection square position, the 2nd, directly right up and down at the middle part of two crossbeams up and down of left frame 1 and right frame 3, selected four locating hole 4 fastening balladeur trains 9.Other and embodiment three are identical.
Use the practical comprehensive microdrill of the utility model, the general rock stratum of constructing, soil layer get final product with press water, and pressure of supply water is to decide in vertical direction standoff height and drilling direction according to boring.When uphole was constructed, as long as pressure of supply water was greater than holing in vertical direction standoff height (referring to water column pressure).When bowing the hole construction,, require pressure of supply water to be greater than the twice of boring in the vertical direction standoff height owing to the sediment outflow that makes progress, row's powder.
Pressure mud will use in construction layer of sand, broken rock, permeable stratum, and joins the slurry design according to lithology is fastidious, in particular cases also wants first cement injection to seal or creep into cement paste.
It has solved other drilling tool because of beating the difficult problem of hole row's powder problem construction baseboard anchor cable difficulty of bowing, and has filled up the bow blank of hole microdrill of domestic baseboard anchor cable engineering construction.The utility model also can be used in mining shallow bore hole geological prospecting engineering, and can realize core drilling, can also be used in ground civil engineering bank protection, retaining wall greater than 3 meters anchor cable engineerings less than 50 meters, and other each field shallow bore hole borehole engineering.
Claims (1)
1, the comprehensive microdrill of a kind of practicality is made up of frame (1) and (3), rig (2), handwheel screw (7), balladeur train (9), drill pipe clamp (10), drill bit (11), drilling rod (12), the side direction water feeder (13) of rig; Termination power realizes that with the side direction water feeder depended on pressure slurries carry out deslagging, row's powder to boring, its hole drill of suitably bowing is advanced, it is characterized in that: the quadrilateral frame shelf structure is adopted in frame (1) and (3), four limits are covered with locating hole (4) and cooperate with balladeur train (9) both sides installing hole and installing port, realize the comprehensive function of rig, be that different frame locating holes suitably cooperates with the balladeur train installing hole, make rig adapt to various bore angles; Adopt the screw advance and retreat to bore Strok mechanism, rotary screw provides drill bit thrust forward; Rig (2) is positioned on the balladeur train (9), and handwheel screw (7) is installed on balladeur train (9) longitudinal center line, and rig (2) is slided on balladeur train (9), and balladeur train is installed on left and right sides frame (1) and (3); Drill pipe clamp (10) is clamped drilling rod (12) and is promptly constituted practical comprehensive microdrill.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 96214364 CN2255499Y (en) | 1996-07-08 | 1996-07-08 | Practical omnibearing mini-sized drilling machine |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 96214364 CN2255499Y (en) | 1996-07-08 | 1996-07-08 | Practical omnibearing mini-sized drilling machine |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN2255499Y true CN2255499Y (en) | 1997-06-04 |
Family
ID=33896495
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 96214364 Expired - Fee Related CN2255499Y (en) | 1996-07-08 | 1996-07-08 | Practical omnibearing mini-sized drilling machine |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN2255499Y (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103058016A (en) * | 2013-01-07 | 2013-04-24 | 山东唐口煤业有限公司 | Automatic anchor cable rope coiling machine |
| CN104929529A (en) * | 2014-03-21 | 2015-09-23 | 中国有色集团抚顺红透山矿业有限公司 | Ground drilling machine stabilizing frame and mounting method thereof |
| CN105618812A (en) * | 2016-01-05 | 2016-06-01 | 上海同罡建筑工程有限公司 | Drilling device and method in narrow space |
| CN108756726A (en) * | 2018-04-23 | 2018-11-06 | 上海中联重科桩工机械有限公司 | Rotary digging drill power head control device |
| CN109736728A (en) * | 2019-01-16 | 2019-05-10 | 中煤科工集团西安研究院有限公司 | Mine drilling rig automatically loading and unloading drill pipe and water feeder unit, device and construction method |
-
1996
- 1996-07-08 CN CN 96214364 patent/CN2255499Y/en not_active Expired - Fee Related
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103058016A (en) * | 2013-01-07 | 2013-04-24 | 山东唐口煤业有限公司 | Automatic anchor cable rope coiling machine |
| CN103058016B (en) * | 2013-01-07 | 2014-07-30 | 山东唐口煤业有限公司 | Automatic anchor cable rope coiling machine |
| CN104929529A (en) * | 2014-03-21 | 2015-09-23 | 中国有色集团抚顺红透山矿业有限公司 | Ground drilling machine stabilizing frame and mounting method thereof |
| CN104929529B (en) * | 2014-03-21 | 2017-11-10 | 中国有色集团抚顺红透山矿业有限公司 | A kind of earth's surface rig stabilizing bracket and its installation method |
| CN105618812A (en) * | 2016-01-05 | 2016-06-01 | 上海同罡建筑工程有限公司 | Drilling device and method in narrow space |
| CN108756726A (en) * | 2018-04-23 | 2018-11-06 | 上海中联重科桩工机械有限公司 | Rotary digging drill power head control device |
| CN108756726B (en) * | 2018-04-23 | 2020-01-10 | 上海中联重科桩工机械有限公司 | Power head control device of rotary drilling rig |
| CN109736728A (en) * | 2019-01-16 | 2019-05-10 | 中煤科工集团西安研究院有限公司 | Mine drilling rig automatically loading and unloading drill pipe and water feeder unit, device and construction method |
| CN109736728B (en) * | 2019-01-16 | 2020-06-02 | 中煤科工集团西安研究院有限公司 | Automatic drill rod loading and unloading and water feeder unit and device for mining drilling machine and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106437582A (en) | Wireline coring tool and a new green method instead of groove well detective | |
| CN205349223U (en) | Drilling equipment for building | |
| CN116291471A (en) | Construction Method and Excavation Equipment of Large Diameter Shaft in Upper Soft and Lower Hard Ground | |
| CN206129155U (en) | All -round both arms hydraulic pressure tunnelling drill carriage device for coal mine | |
| CN108643830A (en) | The narrow body directional drilling machine of girdle high inclination-angle and drilling method | |
| CN2255499Y (en) | Practical omnibearing mini-sized drilling machine | |
| CN109372430A (en) | A kind of truck-mounted drilling rig and drilling rod | |
| CN88212066U (en) | Omnibearing full-hydro-driller | |
| CN105275388A (en) | Drilling equipment for building pile foundation with square cross section | |
| CN219365935U (en) | Geological survey drilling device | |
| CN206174903U (en) | Cable wire core drilling rig | |
| CN205638222U (en) | Rig for oil development | |
| CN114876389B (en) | Automatic discharge and swing device for geological exploration drill rod | |
| CN110535072A (en) | No-dig technique electric power cable lays pipe lining device and electric power cable laying method | |
| CN215672182U (en) | Geological survey exploration device of adjustable exploration degree of depth | |
| CN213869753U (en) | Roadway excavation type loading unit with detection drilling machine mounted on portal frame | |
| CN204343982U (en) | A kind of advance boreholes equipment based on assembly type drilling rod | |
| CN210289618U (en) | Bridge bored concrete pile drilling machine capable of preventing drilled holes from collapsing | |
| CN204343989U (en) | A kind of advance boreholes frame | |
| CN210487326U (en) | Engineering geology reconnaissance sampling device | |
| CN210858601U (en) | Multi-angle full-hydraulic portable drilling machine for railway engineering investigation | |
| CN110439550B (en) | An inclined soil sampling system | |
| CN115614035A (en) | An iron-gold ore geological survey drilling instrument | |
| CN110080687B (en) | Coal mining drilling machine convenient for replacing drill bit | |
| CN219281660U (en) | Portable engineering geological investigation rig |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C19 | Lapse of patent right due to non-payment of the annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |