CN103670277B - A kind of electric power line pole tower composite foundation borehole perpendicularity locator - Google Patents

A kind of electric power line pole tower composite foundation borehole perpendicularity locator Download PDF

Info

Publication number
CN103670277B
CN103670277B CN201210347403.4A CN201210347403A CN103670277B CN 103670277 B CN103670277 B CN 103670277B CN 201210347403 A CN201210347403 A CN 201210347403A CN 103670277 B CN103670277 B CN 103670277B
Authority
CN
China
Prior art keywords
fairlead
expansion bracket
electric power
power line
pole tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210347403.4A
Other languages
Chinese (zh)
Other versions
CN103670277A (en
CN103670277B8 (en
Inventor
陈震
白坤
王峰
屈宏磊
李春斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Power Transmission And Distribution Engineering Co ltd
Maintenance Branch Of State Grid Liaoning Electric Power Co ltd
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Shenyang Aerospace University
Original Assignee
Maintenance Branch Of State Grid Liaoning Electric Power Co ltd
Liaoning Power Transmission And Transformation Project Co ltd
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Shenyang Aerospace University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch Of State Grid Liaoning Electric Power Co ltd, Liaoning Power Transmission And Transformation Project Co ltd, State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd, Shenyang Aerospace University filed Critical Maintenance Branch Of State Grid Liaoning Electric Power Co ltd
Priority to CN201210347403.4A priority Critical patent/CN103670277B8/en
Publication of CN103670277A publication Critical patent/CN103670277A/en
Publication of CN103670277B publication Critical patent/CN103670277B/en
Application granted granted Critical
Publication of CN103670277B8 publication Critical patent/CN103670277B8/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to the detent mechanism of electric power line pole tower composite foundation boring, specifically a kind of electric power line pole tower composite foundation borehole perpendicularity locator, comprise fairlead, on fairlead outer surface, be evenly equipped with multiple sleeve pipes, on each sleeve pipe, be equipped with supporting leg, wherein arbitrary sleeve pipe is direct-connected an expansion bracket, and all the other sleeve pipes are connected with expansion bracket by length-adjustable adjusting rod; Described fairlead is enclosed within on the impactor of rig, supports by each supporting leg, and described expansion bracket is connected to respectively on the hole wall of foundation pit in the time of boring. The present invention is location drilling position rapidly and accurately, realizes the quick perforate of rig, accurately locates, and has reduced labour intensity, has improved efficiency of construction; The present invention can accurately locate the position of each anchor hole by adjusting rod and expansion bracket, fairlead is connected to four sides foundation pit wall by expansion bracket and each supporting leg is fixed, and drilling rod and impactor are not swung in the time of boring.

Description

A kind of electric power line pole tower composite foundation borehole perpendicularity locator
Technical field
The present invention relates to the detent mechanism of electric power line pole tower composite foundation boring, specificallyA kind of electric power line pole tower composite foundation borehole perpendicularity locator.
Background technology
Composite foundation is that undisturbed soil is drawn the combination digging with Rock Bolt Foundation, makes full use of differenceMinimum is accomplished on basis by different these characteristics of geology bearing capacity, saves raw materials consumption, reduces workJourney cost; The corresponding environmental issue of simultaneously avoiding heavy excavation, great explosion or digging foundation to bring,Reach the object that engineering environmental protection, joint consume. First composite foundation construction is drawn and is dug cushion cap, size oneAs the length of side or 1~2 meter of diameter, dark 1.5 meters of left and right. Rig is directly propped up to be located to draw and dig cushion capNear coal-mine top, drilling rod is aimed at anchor hole centre mark and is executed brill. But because drilling rod is deeply drawn and dug under cushion cap1.5 meters of left and right, side, 1 meter, the pre-drilling rod of the portion that adds, the drilling rod of unsettled 2.5 meters is aimed at anchor hole centerMark is executed brill, can beat in boring position fixing process displacement, even can be with two longitudes and latitudesInstrument becomes an angle of 90 degrees both direction to detect that location is inaccurate, but is difficult to ensure hanging down of boring while implementingStraight degree.
Very easily beat and be difficult to ensure perpendicularity except the unsettled position fixing process of drilling rod, NEW TYPE OF COMPOSITE basisHave anchor pole and two kinds of modes of dowel according to geological conditions difference, and group's anchor type is various, draws and digsUpper brace openings of sizes differs, and the different tower angular bits of same foundation hole is also different, and foundation pit has4, five types, 8,12,16,20 hole, bore diameter and spacing and quantity are different,Further increase again the difficulty of boring location.
Summary of the invention
In order to solve the above-mentioned defect existing in existing composite foundation drilling construction, order of the present inventionBe to provide a kind of electric power line pole tower composite foundation borehole perpendicularity locator. This locatorCan make drilling rod accurate positioning, perforation of boring machine is quick.
The object of the invention is to be achieved through the following technical solutions:
The present invention includes fairlead, on fairlead outer surface, be evenly equipped with multiple sleeve pipes, Mei GetaoOn pipe, be equipped with supporting leg, wherein arbitrary sleeve pipe is direct-connected an expansion bracket, and all the other sleeve pipes pass through lengthAdjustable adjusting rod is connected with expansion bracket; Described fairlead is enclosed within on the impactor of rig, passes throughEach supporting leg supports, and described expansion bracket is connected to respectively on the hole wall of foundation pit in the time of boring.
Wherein: on described fairlead outer surface, be connected with four sleeve pipes, be symmetrical arranged between two, itsIn arbitrary sleeve pipe is direct-connected an expansion bracket, its excess-three sleeve pipe connects by length-adjustable adjusting rodThere is expansion bracket; On described fairlead outer surface, be connected with four sleeve pipes, be symmetrical arranged between two, itsIn two adjacent sleeve pipes are direct-connected an expansion bracket, all the other two sleeve pipes are by length-adjustable adjustingBar is connected with expansion bracket; The longitudinal center line of one group of symmetrically arranged two sleeve pipe and other one groupThe line of the longitudinal center line of symmetrically arranged two sleeve pipes is vertical and coplanar, and all with described in leadLongitudinal center line to cover intersects vertically; Described fairlead is hollow column structure, this guidingCover formed by a left side half fairlead and right half fairlead that are all semicircle shape, described left half fairlead andRight half fairlead is enclosed within respectively on the impactor of rig, is fixed by connecting bolt; Described adjusting rodComprise multiple nested telescopic joints successively, expansion bracket is connected with the telescopic joint of head joint, each telescopic jointBetween and between minor details telescopic joint and sleeve pipe, fix by projection and groove respectively; Described sleeve pipeOne end is fixed on fairlead, and the other end is affixed by adpting flange and expansion bracket.
Advantage of the present invention and good effect are:
1. the present invention location drilling position rapidly and accurately, realize the quick perforate of rig,Accurately location.
2. the present invention can accurately locate the position of each anchor hole by adjusting rod and expansion bracket,Fairlead is connected to four sides foundation pit wall by expansion bracket and each supporting leg is fixed, and makes drilling rod and punchingHit device does not swing in the time of boring.
3. fairlead of the present invention is divided into left and right two halves, is convenient to installing/dismounting, needn't dismantle brillBar and impactor, reduced labour intensity, improved efficiency of construction.
Brief description of the drawings
Fig. 1 is working state schematic representation of the present invention;
Fig. 2 A draws that to dig in cushion cap hole be the boring schematic diagram of 4 anchor holes;
Fig. 2 B draws that to dig in cushion cap hole be the boring schematic diagram of 8 anchor holes;
Fig. 2 C draws that to dig in cushion cap hole be the boring schematic diagram of 12 anchor holes;
Fig. 2 D draws that to dig in cushion cap hole be the boring schematic diagram of 16 anchor holes;
Fig. 2 E draws that to dig in cushion cap hole be the boring schematic diagram of 20 anchor holes;
Fig. 3 is structural front view of the present invention;
Fig. 4 is that the present invention has a side sleeve pipe directly to connect the top view of expansion bracket;
Fig. 5 is that the present invention has both sides sleeve pipe directly to connect the top view of expansion bracket;
Wherein: 1 is rig stand, 2 is drilling rod, and 3 is base, and 4 is impactor, and 5 for fixedPosition device, 6 is adpting flange, and 7 is connecting hole, and 8 is fairlead, and 9 is supporting leg, 10 areAdjusting rod, 11 is expansion bracket, and 12 is set screw, and 13 is left half fairlead, and 14 for connectingBolt, 15 is right half fairlead, 16 is sleeve pipe.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 3, the present invention includes fairlead 8, on fairlead 8 outer surfaces, be evenly equipped withMultiple sleeve pipes 16, the present embodiment has connected four sleeve pipes 16 at the outer surface of fairlead 8, everyOn individual sleeve pipe 16, be equipped with supporting leg 9; These four sleeve pipes 16 are symmetrical arranged between two, Qi ZhongyiOrganize the longitudinal center line of symmetrically arranged two sleeve pipes 16 and other one group symmetrically arranged twoThe line of the longitudinal center line of sleeve pipe 16 is vertical and coplanar, and all with the axle of described fairlead 8To vertical and intersectant centerline. Fairlead 8 is hollow column structure, and this fairlead 8 is divided into a left sideRight two halves, are divided into a left side half fairlead 13 and right half fairlead 15 that are all semicircle shape, and left halfFairlead 13 with on right half fairlead 15, be respectively connected two sleeve pipes; Left half fairlead 13 and the right sideThe end face edge of half fairlead 15 is respectively provided with four contiguous blocks, all has connecting hole on contiguous block7; In the time of boring, left half fairlead 13 and right half fairlead 15 are enclosed within respectively the impact of rigOn device 4, inserted in connecting hole 7 by connecting bolt 14, left half fairlead 13 and the right side are partly ledFixing to cover 15.
As shown in Figure 4, the arbitrary sleeve pipe 16 in four sleeve pipes 16 is away from one end of fairlead 8Be connected with expansion bracket 11 by adpting flange 6; Remaining 16 of three sleeve pipe can by lengthThe adjusting rod 10 of adjusting connects expansion bracket 11.
As shown in Figure 5, in four sleeve pipes 16 any two adjacent sleeve pipes 16 away from fairleadOne end of 8 is connected with expansion bracket 11 by adpting flange 6 respectively; The sleeve pipe that two other is adjacent16 connect expansion bracket 11 by length-adjustable adjusting rod 10.
Adjusting rod 10 comprises multiple nested telescopic joints successively, and expansion bracket 11 is flexible with first jointJoint is connected, between each telescopic joint and between minor details telescopic joint and sleeve pipe 16 respectively by protruding andGroove is fixed; In the time that adjusting rod 10 carries out length adjustment, the projection on a telescopic joint fallsIn the groove on another telescopic joint, the length of these two telescopic joints regulate complete.
Expansion bracket 11 of the present invention is mechanical scissor-like jack, belongs to prior art, comprisesLever and set screw 12, one end of lever is saved telescopic joint with the head of adjusting rod 10 and is connected, anotherOne end is connected to respectively on the hole wall of foundation pit in the time of boring, makes by rotation set screw 12Telescopic lever.
Operation principle of the present invention is:
As shown in Fig. 2 A~Fig. 2 E, foundation pit has five types, 4,8,12,16,20 hole,Bore diameter and spacing and quantity are different, draw to dig cushion cap openings of sizes and differ. Due to variousThe distance of boring type hole centre distance foundation pit wall is more or less the same, by regulating expansion bracket11 adjust length with adjusting rod 10 digs size and different anchor holes position to adapt to Bu Tong drawing of sizePut.
As shown in Figure 1, rig stand 1 is placed on and is drawn that to dig cushion cap top fixing by base 3, boresBar 2 connects impactor 4 and deeply draws and dig 1.5 meters of left and right, cushion cap below, the pre-drilling rod 1 of the portion that addsRice, aims at the boring of anchor hole centre mark for unsettled 2.5 meters, and boring location and perpendicularity are by locator5 ensure. Locator 5 is enclosed within on impactor 4, and gap is very little, and surrounding is by adjusting rod 10Adjust length with expansion bracket 11 and be connected to draw and dig on cushion cap wall, make drilling rod 2 and impactor 4Stablize and do not move. Be specially:
When rig is fixed, when impactor 4 is aimed at anchor hole centre mark, by left half fairlead 13Be enclosed within respectively on the impactor 4 of rig with right half fairlead 15, fixing with connecting bolt 14,And support by each supporting leg 9. Then by adjusting rod 10 by the interior pull-out of sleeve pipe 16, cooperation is revolvedTurn set screw 12 and make expansion bracket 11 flexible, locator 5 is accurately located, execute while boring and ensureThere is not drill bit and swing, realize perforation of boring machine quick, hi-Fix. Pierce set depth fixedBehind position, utilize set screw 12 to regulate expansion bracket 11, make surrounding depart from wall, then unscrew evenConnecting bolt 14, decomposes left and right half fairlead 13,15, and convenient taking-up, needn't dismounting drilling rod2 and impactor 4, increase work efficiency and reduce labor intensity. Then, again by impactor4 aim at anchor hole centre mark to be bored, and by aforesaid operations, locator 5 are accurately bored locationHole.
Can draw to dig under platform in the difference of 1.2m~1.8m and accurately move in order to realize locator 5Moving location, by making the adjusting rod 10 of different size, makes locator 5 meet difference and draws and digSpan demand under platform; By expansion bracket 11 fine adjustments to each anchor hole in same levelPosition, four expansion brackets, 11 tops are pressed on the foundation pit wall of four sides with fixed guide cover 8.

Claims (6)

1. an electric power line pole tower composite foundation borehole perpendicularity locator, is characterized in that:Comprise fairlead (8), on fairlead (8) outer surface, be evenly equipped with multiple sleeve pipes (16), everyOn individual sleeve pipe (16), be equipped with supporting leg (9), wherein arbitrary sleeve pipe (16) direct-connected have flexibleFrame (11), all the other sleeve pipes (16) are connected with flexible by length-adjustable adjusting rod (10)Frame (11); Described fairlead (8) is enclosed within on the impactor (4) of rig, by each supportLeg (9) supports, and described expansion bracket (11) is connected to respectively the hole wall of foundation pit in the time of boringOn;
Described adjusting rod (10) comprises multiple nested telescopic joints successively, expansion bracket (11) withThe telescopic joint of first joint is connected, and fixes minor details telescopic joint between each telescopic joint by projection and grooveAnd being connected and fixed by projection and groove between sleeve pipe (16) fixed.
2. by electric power line pole tower composite foundation borehole perpendicularity claimed in claim 1 locationDevice, is characterized in that: on described fairlead (8) outer surface, be connected with four sleeve pipes (16),Be symmetrical arranged between two, wherein arbitrary sleeve pipe (16) is direct-connected an expansion bracket (11), its excess-threeSleeve pipe (16) is connected with expansion bracket (11) by length-adjustable adjusting rod (10).
3. by electric power line pole tower composite foundation borehole perpendicularity claimed in claim 1 locationDevice, is characterized in that: on described fairlead (8) outer surface, be connected with four sleeve pipes (16),Be symmetrical arranged between two, wherein two adjacent sleeve pipes (16) are direct-connected an expansion bracket (11), itsTwo sleeve pipes (16) of Yuing are connected with expansion bracket (11) by length-adjustable adjusting rod (10).
4. by the electric power line pole tower composite foundation borehole perpendicularity described in claim 2 or 3Locator, is characterized in that: the longitudinal center line of one group of symmetrically arranged two sleeve pipe (16)Vertical with the line of the longitudinal center line of other one group symmetrically arranged two sleeve pipes (16) and altogetherFace, and all intersect vertically with the longitudinal center line of described fairlead (8).
5. vertical by the electric power line pole tower composite foundation boring described in claim 1,2 or 3Degree locator, is characterized in that: described fairlead (8) is hollow column structure, and this is ledTo overlapping (8) by a left side half fairlead (13) and right half fairlead (15) group that are all semicircle shapeBecome, described left half fairlead (13) and right half fairlead (15) are enclosed within respectively the impact of rigDevice (4) is upper, fixing by connecting bolt (14).
6. vertical by the electric power line pole tower composite foundation boring described in claim 1,2 or 3Degree locator, is characterized in that: one end of described sleeve pipe (16) is fixed in fairlead (8)Upper, the other end is affixed by adpting flange (6) and expansion bracket (11).
CN201210347403.4A 2012-09-18 2012-09-18 A kind of electric power line pole tower composite foundation borehole perpendicularity localizer Active CN103670277B8 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210347403.4A CN103670277B8 (en) 2012-09-18 2012-09-18 A kind of electric power line pole tower composite foundation borehole perpendicularity localizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210347403.4A CN103670277B8 (en) 2012-09-18 2012-09-18 A kind of electric power line pole tower composite foundation borehole perpendicularity localizer

Publications (3)

Publication Number Publication Date
CN103670277A CN103670277A (en) 2014-03-26
CN103670277B true CN103670277B (en) 2016-05-11
CN103670277B8 CN103670277B8 (en) 2016-08-03

Family

ID=50308966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210347403.4A Active CN103670277B8 (en) 2012-09-18 2012-09-18 A kind of electric power line pole tower composite foundation borehole perpendicularity localizer

Country Status (1)

Country Link
CN (1) CN103670277B8 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064918A (en) * 2015-07-17 2015-11-18 中国电力科学研究院 Vertical guide and dust collection device for drilling transmission and transformation line foundations
CN105952386A (en) * 2016-07-18 2016-09-21 吴江福爱梁纺织有限公司 Horizontal control ring of ground source heat pump drilling rig base of textile workshop

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4363568A (en) * 1980-10-14 1982-12-14 Atlantic Richfield Company Conductors for a guyed tower and method for installing same
CN1380934A (en) * 1999-09-21 2002-11-20 威尔工程合作公司 Method and device for moving tube in borehole in ground
CN201236631Y (en) * 2008-03-18 2009-05-13 中冶宝钢技术服务有限公司 Auxiliary positioning device for drilling
CN201343996Y (en) * 2009-02-12 2009-11-11 中国电力科学研究院 Rig substructure for pole and tower rockbolt foundation of transmission lines
CN101824919A (en) * 2010-03-26 2010-09-08 中铁隧道集团有限公司 Deep hole underwater installation and locating method of steel pipe column in weak watery stratum
CN201829901U (en) * 2010-08-24 2011-05-11 中国电力科学研究院 Linear adjustable apart dance-preventing hardware
CN201915835U (en) * 2010-09-30 2011-08-03 洛阳栾川钼业集团股份有限公司 Drilling positioner for strip mine
CN202000891U (en) * 2011-04-29 2011-10-05 重庆迈尔矿山设备开发有限公司 Guider
CN102312435A (en) * 2010-07-02 2012-01-11 Ihc荷兰Ie有限公司 The template and the method for a plurality of basic components are installed in the stratum under water
CN202970469U (en) * 2012-09-18 2013-06-05 辽宁省送变电工程公司 Perpendicularity positioner of electric transmission line pole and tower compound foundation drill hole

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03110288A (en) * 1989-09-22 1991-05-10 Mitsui Constr Co Ltd Excavator for cruved pit
JP3110288B2 (en) * 1995-07-21 2000-11-20 日本電気株式会社 Exponential logarithmic conversion circuit

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4363568A (en) * 1980-10-14 1982-12-14 Atlantic Richfield Company Conductors for a guyed tower and method for installing same
CN1380934A (en) * 1999-09-21 2002-11-20 威尔工程合作公司 Method and device for moving tube in borehole in ground
CN201236631Y (en) * 2008-03-18 2009-05-13 中冶宝钢技术服务有限公司 Auxiliary positioning device for drilling
CN201343996Y (en) * 2009-02-12 2009-11-11 中国电力科学研究院 Rig substructure for pole and tower rockbolt foundation of transmission lines
CN101824919A (en) * 2010-03-26 2010-09-08 中铁隧道集团有限公司 Deep hole underwater installation and locating method of steel pipe column in weak watery stratum
CN102312435A (en) * 2010-07-02 2012-01-11 Ihc荷兰Ie有限公司 The template and the method for a plurality of basic components are installed in the stratum under water
CN201829901U (en) * 2010-08-24 2011-05-11 中国电力科学研究院 Linear adjustable apart dance-preventing hardware
CN201915835U (en) * 2010-09-30 2011-08-03 洛阳栾川钼业集团股份有限公司 Drilling positioner for strip mine
CN202000891U (en) * 2011-04-29 2011-10-05 重庆迈尔矿山设备开发有限公司 Guider
CN202970469U (en) * 2012-09-18 2013-06-05 辽宁省送变电工程公司 Perpendicularity positioner of electric transmission line pole and tower compound foundation drill hole

Also Published As

Publication number Publication date
CN103670277A (en) 2014-03-26
CN103670277B8 (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN205638225U (en) Drilling equipment for building
CN205349223U (en) Drilling equipment for building
CN101319610B (en) Down-hole drilling direction ruler and fast orienting method for hole drilling
CN104343383B (en) A kind of drilling equipment for earthen ruins
CN204924522U (en) A moment of torsion detection device for revolving dig rig unit head
CN103670277B (en) A kind of electric power line pole tower composite foundation borehole perpendicularity locator
CN204920938U (en) Drilling detector of drilling bored concrete pile
CN105275388A (en) Drilling equipment for building pile foundation with square cross section
CN205805416U (en) A kind of double belt drilling pile drills with high verticality
CN203271739U (en) Support for electric coal drill
CN202970469U (en) Perpendicularity positioner of electric transmission line pole and tower compound foundation drill hole
CN208024341U (en) A kind of rotary digging stake locator
CN203940853U (en) A kind of position angle, the quick positioning correcting instrument of inclination angle angle
CN201915948U (en) Rotary magnetic source nipple for remote intersection of coal bed gas drilling
CN205876182U (en) Drilling equipment of building square cross -section pile foundation
CN204532329U (en) Borehole accuracy precise control device
CN205532276U (en) Novel fried punching in irregularity ground device
CN205277318U (en) Mining drill machine drill hole auxiliary stand device
CN203022620U (en) Drilling equipment used in petroleum exploitation process
CN203188917U (en) Base device of core drill for drilling long and thin holes
CN202630860U (en) Testing device for long drill hole by virtue of deep-part base point method
CN205908258U (en) Pneumatic post drill
CN202788633U (en) Adjustable mine drill support
CN206873430U (en) A kind of quiet spy machine suitable for geologic hazard survey
CN204343990U (en) Based on the advance boreholes stand of rotatable arc support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHENYANG AEROSPACE UNIVERSITY INSPECTION BRANCH CO

Free format text: FORMER OWNER: STATE GRID LIAONING ELECTRIC POWER CO., LTD. STATE GRID CORPORATION OF CHINA

Effective date: 20150819

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant after: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant before: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant before: Liaoning Electric Power Co.,Ltd.

Applicant before: State Grid Corporation of China

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: LIAONING ELECTRIC POWER CO., LTD. STATE GRID CORPORATION OF CHINA TO: STATE GRID LIAONING ELECTRIC POWER CO., LTD. STATE GRID CORPORATION OF CHINA

TA01 Transfer of patent application right

Effective date of registration: 20150819

Address after: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant after: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant after: SHENYANG AEROSPACE University

Applicant after: MAINTENANCE BRANCH OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant before: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Zhen

Inventor after: Liu Yanmei

Inventor after: Li Chunbin

Inventor before: Chen Zhen

Inventor before: Bai Kun

Inventor before: Wang Feng

Inventor before: Qu Honglei

Inventor before: Li Chunbin

COR Change of bibliographic data
C53 Correction of patent of invention or patent application
CI01 Publication of corrected invention patent application

Correction item: Inventor

Correct: Chen Zhen|Liu Yanmei|Li Chunbin

False: Chen Zhen|Bai Kun|Wang Feng|Qu Honglei|Li Chunbin

Number: 19

Volume: 32

CI03 Correction of invention patent

Correction item: Inventor

Correct: Chen Zhen|Liu Yanmei|Li Chunbin

False: Chen Zhen|Bai Kun|Wang Feng|Qu Honglei|Li Chunbin

Number: 19

Page: The title page

Volume: 32

ERR Gazette correction
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Patentee after: LIAONING POWER TRANSMISSION AND DISTRIBUTION ENGINEERING Co.,Ltd.

Patentee after: SHENYANG AEROSPACE University

Patentee after: MAINTENANCE BRANCH OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Patentee after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Patentee after: State Grid Corporation of China

Address before: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Patentee before: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT Co.,Ltd.

Patentee before: SHENYANG AEROSPACE University

Patentee before: MAINTENANCE BRANCH OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Patentee before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Patentee before: State Grid Corporation of China