CN219137647U - Temporary fixing and centering tool for pile foundation reinforcement cage - Google Patents

Temporary fixing and centering tool for pile foundation reinforcement cage Download PDF

Info

Publication number
CN219137647U
CN219137647U CN202223529617.1U CN202223529617U CN219137647U CN 219137647 U CN219137647 U CN 219137647U CN 202223529617 U CN202223529617 U CN 202223529617U CN 219137647 U CN219137647 U CN 219137647U
Authority
CN
China
Prior art keywords
reinforcement cage
ring fixing
outer ring
fixing frame
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223529617.1U
Other languages
Chinese (zh)
Inventor
陈继华
田天懿
周元成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heze Urban Construction Engineering Development Group Co ltd
Original Assignee
Heze Urban Construction Engineering Development Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heze Urban Construction Engineering Development Group Co ltd filed Critical Heze Urban Construction Engineering Development Group Co ltd
Priority to CN202223529617.1U priority Critical patent/CN219137647U/en
Application granted granted Critical
Publication of CN219137647U publication Critical patent/CN219137647U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to the technical field of installation of bored pile reinforcement cages, in particular to a temporary fixing and centering tool for a pile foundation reinforcement cage, which comprises a reinforcement cage, wherein a plurality of hanging ribs are arranged at the upper end of the reinforcement cage, all the hanging ribs are connected through reinforcing ribs, a pile casing is arranged outside the reinforcement cage, and the temporary centering tool is clamped on the pile casing; the temporary centering tool comprises an outer ring fixing frame, an inner ring fixing ring, stiffening ribs and turnbuckle screws, wherein the outer ring fixing frame is clamped and fixed around the protective cylinder, the inner ring fixing ring is arranged in the outer ring fixing frame and connected with the outer ring fixing frame through a plurality of stiffening ribs, the turnbuckle screws are further arranged on the inner side of the outer ring fixing frame, one ends of the turnbuckle screws are arranged on the outer ring fixing frame, and the other ends of the turnbuckle screws are connected with hanging ribs through hanging hooks. The tool ensures that the reinforcement cage does not generate displacement in the processes of subsequent pipe descending, concrete pouring and pipe pulling, and the thickness of the reinforcement cage concrete protection layer is effectively controlled.

Description

Temporary fixing and centering tool for pile foundation reinforcement cage
Technical Field
The utility model relates to the technical field of installation of bored pile reinforcement cages, in particular to a temporary fixing and centering tool for pile foundation reinforcement cages.
Background
Along with the rapid development of urban economy, the bored pile foundation is widely applied to house construction and bridge engineering.
The bored concrete pile has one and surpasss and irritates the height in the construction, and when the steel reinforcement cage was installed one section at the top, the job site can adopt two hanging bars to put down the steel reinforcement cage in place, because of hanging bars are few, and overall rigidity is little. The concrete protection layer thickness of the cast-in-place pile reinforcement cage is deviated due to the fact that the installation center point of the reinforcement cage is not coincident with the center of the pile casing, the concrete casting vibration, tube drawing and other factors are affected, the phenomenon that the concrete protection layer thickness is too much and too little exists, the rib exposing phenomenon can occur seriously, and the service life of the pile is affected. Meanwhile, the problems that the thickness of the protective layer is insufficient and the exposed part of the rib needs to be treated again occur, so that manpower is wasted seriously, the construction cost is increased, and the construction period is delayed.
Disclosure of Invention
The utility model is developed aiming at the problems in the prior art, and provides a temporary fixing and centering tool for a pile foundation reinforcement cage, which can ensure that the reinforcement cage coincides with the center of a pile casing when being installed, does not generate displacement in the concrete pouring process, can be reused, and has the advantages of simple operation and strong practicability.
The utility model is realized by the following technical scheme: the temporary fixing and centering tool for the pile foundation reinforcement cage comprises a reinforcement cage, wherein a plurality of hanging ribs are arranged at the upper end of the reinforcement cage, all the hanging ribs are connected through reinforcing ribs, a pile casing is arranged outside the reinforcement cage, and the temporary centering tool is clamped on the pile casing; it is characterized in that the method comprises the steps of,
the temporary centering tool comprises an outer ring fixing frame, an inner ring fixing ring, stiffening ribs and turnbuckle screws, wherein the outer ring fixing frame is clamped and fixed around the protective cylinder, the inner ring fixing ring is arranged in the outer ring fixing frame and connected with the outer ring fixing frame through a plurality of stiffening ribs, the turnbuckle screws are further arranged on the inner side of the outer ring fixing frame, one ends of the turnbuckle screws are arranged on the outer ring fixing frame, and the other ends of the turnbuckle screws are connected with hanging ribs through hanging hooks.
Preferably, the number of the hanging ribs is 4, and the hanging ribs are distributed in a circumferential array along the reinforcement cage.
Preferably, the inner ring fixing ring passes through screw cabins of all turnbuckle screws.
Preferably, the upper end of the reinforcement cage is also penetrated with a steel rod.
The beneficial effects of the utility model are as follows: the tool ensures that the reinforcement cage does not generate displacement in the processes of subsequent pipe descending, concrete pouring and pipe pulling, and the thickness of the reinforcement cage concrete protection layer is effectively controlled.
The tool is simple to operate and can be reused.
Drawings
Fig. 1 is a schematic view of a mounting structure for use in the present utility model.
Fig. 2 is a schematic top view of a use installation of the present utility model.
FIG. 3 is a schematic view of the temporary centering tool of the present utility model.
In the attached drawings, 1-a reinforcement cage; 2-protecting a cylinder; 3-hanging bars; 4-reinforcing ribs; 5-steel bars; 6-an outer ring fixing frame; 7-an inner ring fixing ring; 8-stiffening ribs; 9-turn buckle.
Detailed Description
In order to make the objects, technical solutions and advantageous effects of the present utility model more apparent, the technical solutions of the present utility model will be further described below with reference to examples.
As shown in fig. 1 to 3, a temporary fixing and centering tool for lowering and installing a pile foundation reinforcement cage comprises a reinforcement cage 1, wherein a steel bar 5 penetrates through the upper end of the reinforcement cage 1, 4 hanging ribs 3 are arranged on the reinforcement cage 1, the hanging ribs 3 are distributed in a circumferential array along the reinforcement cage 1, in order to increase the overall rigidity of the hanging ribs 3 and the reinforcement cage 1, at least 2 reinforcing ribs 4 are welded in the length range of the hanging ribs 3 for fixing, a pile casing 2 is arranged outside the reinforcement cage 1, and the pile casing 2 is provided with a temporary centering tool; the temporary centering tool comprises an outer ring fixing frame 6, an inner ring fixing ring 7, stiffening ribs 8 and turnbuckle screws 9, wherein the outer ring fixing frame 6 is clamped and fixed along the periphery of the protective barrel 2, the inner ring fixing ring 7 is arranged in the outer ring fixing frame 6, the inner ring fixing ring 7 is connected with the outer ring fixing frame 6 through a plurality of stiffening ribs 8, turnbuckle screws 9 are further arranged on the inner side of the outer ring fixing frame 6, one end of each turnbuckle screw 9 is arranged on the outer ring fixing frame 6, and the other end of each turnbuckle screw 9 is connected with a hanging rib 3 through a hanging hook.
The inner ring fixing ring 7 passes through all screw bins of the turnbuckle 9.
During hoisting, a temporary fixing and centering tool is placed, at the moment, the outer ring fixing frame 6 is clamped and fixed around the pile casing 2, the stiffening rib 8 and the turnbuckle 9 connected with the outer ring fixing frame 6 are connected with the stiffening rib 8, one end of the turnbuckle 9 is fixed on the outer ring fixing frame 6, the other end of the turnbuckle passes through the inner ring fixing ring 7, a hook at the end part of the turnbuckle 9 pulls the hanging rib 33, after the center of the steel reinforcement cage 1 coincides with the center of the pile casing 2, the turnbuckle 9 is screwed for temporary fixing, the steel bar 5 is taken down after concrete pouring is completed, the turnbuckle 9 is loosened, and the temporary fixing and centering device is taken down.
The technical features are known to those skilled in the art except the technical features described in the specification.

Claims (4)

1. The utility model provides a pile foundation steel reinforcement cage temporary fixation centering instrument, includes steel reinforcement cage (1), and steel reinforcement cage (1) upper end is equipped with a plurality of hanging bars (3), connects through strengthening rib (4) between all hanging bars (3), and steel reinforcement cage (1) are equipped with a protection section of thick bamboo (2) outward, the card has temporary centering instrument on the protection section of thick bamboo (2); it is characterized in that the method comprises the steps of,
the temporary centering tool comprises an outer ring fixing frame (6), an inner ring fixing ring (7), stiffening ribs (8) and turnbuckle screws (9), wherein the outer ring fixing frame (6) is clamped and fixed around the protective barrel (2), the inner ring fixing ring (7) is arranged in the outer ring fixing frame (6), the inner ring fixing ring (7) is connected with the outer ring fixing frame (6) through a plurality of stiffening ribs (8), turnbuckle screws (9) are further arranged on the inner side of the outer ring fixing frame (6), one end of each turnbuckle screw (9) is arranged on the outer ring fixing frame (6), and the other end of each turnbuckle screw (9) is connected with a hanging rib (3) through a hanging hook.
2. The temporary fixing and centering tool for pile foundation reinforcement cages according to claim 1, wherein the number of the hanging ribs (3) is 4, and the hanging ribs (3) are distributed in a circumferential array along the reinforcement cage (1).
3. A tool for temporary fixing and centering of pile foundation reinforcement cages according to claim 1, characterized in that said inner ring fixing ring (7) passes through the screw pockets of all turnbuckle screws (9).
4. The temporary fixing and centering tool for pile foundation reinforcement cages according to claim 1, wherein the upper end of the reinforcement cage (1) is further provided with a steel rod (5).
CN202223529617.1U 2022-12-29 2022-12-29 Temporary fixing and centering tool for pile foundation reinforcement cage Active CN219137647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223529617.1U CN219137647U (en) 2022-12-29 2022-12-29 Temporary fixing and centering tool for pile foundation reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223529617.1U CN219137647U (en) 2022-12-29 2022-12-29 Temporary fixing and centering tool for pile foundation reinforcement cage

Publications (1)

Publication Number Publication Date
CN219137647U true CN219137647U (en) 2023-06-06

Family

ID=86597921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223529617.1U Active CN219137647U (en) 2022-12-29 2022-12-29 Temporary fixing and centering tool for pile foundation reinforcement cage

Country Status (1)

Country Link
CN (1) CN219137647U (en)

Similar Documents

Publication Publication Date Title
JP4850151B2 (en) Hybrid tower for wind power generation and its construction method
CN109095351B (en) Recoverable steel reinforcement cage hanging rib hoisting method
CN212503601U (en) Installation die for unit sections of vertical pipes of pipe well
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN107165056B (en) Anti-overturning steel bar bracket for cantilever bent cap concrete pouring and mounting method thereof
CN219137647U (en) Temporary fixing and centering tool for pile foundation reinforcement cage
CN212027054U (en) Overhanging scaffold
CN212104105U (en) Deep foundation pit prestress support replacing and supporting system
CN211547694U (en) Bored concrete pile steel reinforcement cage location centering device
CN212271401U (en) Independent suspension type anchor bolt-free circular tube steel column mounting tool
CN210316557U (en) Concrete combined formwork frame for reserving support anchor bolt hole
CN211283476U (en) Be used for inclined roofing precast beam hoist device of assembled concrete structure
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN111794120A (en) Device for mounting thin-wall box-shaped structural steel bars of bridge tower
CN113001749A (en) Column prefabricating construction process
CN215669462U (en) Auxiliary device for installing reinforcing cage of bored pile
CN110700574A (en) Post-cast strip supporting structure and construction method thereof
CN217299021U (en) Prefabricated portal frame assembled box culvert
CN212294631U (en) Hoisting and positioning fixture for large-diameter steel reinforcement cage
CN210066725U (en) Drilled pile reinforcement cage hanging bar capable of being recycled
CN217174892U (en) Auxiliary positioning keel frame
CN209194855U (en) A kind of wheeled locating support of reinforced concrete protective layer
CN219386282U (en) Device for positioning pile foundation reinforcement cage
CN114293586B (en) Use method of high-low photovoltaic panel pouring structure for mountain environment