CN211547694U - Bored concrete pile steel reinforcement cage location centering device - Google Patents

Bored concrete pile steel reinforcement cage location centering device Download PDF

Info

Publication number
CN211547694U
CN211547694U CN201922123416.3U CN201922123416U CN211547694U CN 211547694 U CN211547694 U CN 211547694U CN 201922123416 U CN201922123416 U CN 201922123416U CN 211547694 U CN211547694 U CN 211547694U
Authority
CN
China
Prior art keywords
reinforcement cage
arc
threaded rod
concrete pile
bored concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201922123416.3U
Other languages
Chinese (zh)
Inventor
赵秀丽
闫博华
殷志建
段建荣
赵丹
宋娜
武新发
许艳妮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Huajin Geotechnical Engineering Prospecting Co ltd
Original Assignee
Shanxi Huajin Geotechnical Engineering Prospecting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Huajin Geotechnical Engineering Prospecting Co ltd filed Critical Shanxi Huajin Geotechnical Engineering Prospecting Co ltd
Priority to CN201922123416.3U priority Critical patent/CN211547694U/en
Application granted granted Critical
Publication of CN211547694U publication Critical patent/CN211547694U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model provides a bored concrete pile steel reinforcement cage location centering device, belongs to concrete bored concrete pile construction field, mainly used bored concrete pile steel reinforcement cage's location is placed in the middle, it comprises two arc steel sheets that have the screw hole, the threaded rod, the nut, the gasket, an arc steel sheet arc length is 15cm, another arc steel sheet arc length is 20cm, threaded rod one end is 20 cm's arc steel sheet welding with the arc length, the threaded rod other end passes the steel reinforcement cage, protect a section of thick bamboo and arc length and be 20 cm's arc steel sheet and fasten with the nut. The utility model discloses light in weight, simple structure, with the material convenience, good reliability, installation, dismantle convenient, repeatedly usable, but wide application drilling concrete bored concrete pile construction field.

Description

Bored concrete pile steel reinforcement cage location centering device
Technical Field
The utility model relates to a bored concrete pile steel reinforcement cage hoist and mount technical field, in particular to bored concrete pile steel reinforcement cage positioner.
Background
The cast-in-place concrete pile has the advantages of low noise, small vibration, small influence on the environment, adjustable diameter of the pile body, high bearing capacity of the pile body and strong shearing strength during construction, so that the cast-in-place concrete pile is widely applied to high-rise buildings, large bridges, deepwater wharfs, offshore oil drilling platforms and the like. In the cast-in-place pile construction process, whether the steel reinforcement cage is centered directly influences the thickness of a protective layer, and even some supporting piles have the condition that steel reinforcements are exposed after excavation, the durability of the cast-in-place pile is seriously influenced, so whether the steel reinforcement cage is centered is an important influence factor of whether the cast-in-place pile can meet the designed load requirement.
The traditional reinforcement cage positioning method comprises the following steps: the method comprises the steps of pulling a cross line on a reinforcement cage, finding out the center of the reinforcement cage, finding out the center of a pile position according to a pile casing, inserting two parallel square steel bars below a top hanging ring at the top end of a positioning reinforcement cage, placing two parallel sleepers on two sides of the pile casing, and supporting the square steel bars on the sleepers to enable the center of the reinforcement cage to be coincident with the center of the pile position. The method only ensures that the center of the upper part of the reinforcement cage coincides with the center of the pile at the time, but the problem that the reinforcement cage inclines or touches the side wall can occur when the guide pipe is inserted for pouring concrete in the later period of pouring concrete, and the center of the reinforcement cage and the center of the pile cannot be ensured to be on the same straight line, so that the bearing capacity of the pile foundation is influenced, and meanwhile, the thickness of the protective layer of the reinforcement cage cannot be ensured, and the durability of the pile foundation is influenced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a bored concrete pile steel reinforcement cage location centering device mainly solves the problem of bored concrete pile steel reinforcement cage hoist and mount to the in-process steel reinforcement cage location of accomplishing the back.
The utility model discloses a simple easy site operation preparation can be according to steel reinforcement cage positioner who tears open, reuse fast.
The utility model provides a bored concrete pile steel reinforcement cage location centering device, comprises two arc steel sheets, threaded rod, nut, the gasket that have the screw hole, and an arc steel sheet arc length is 15cm, and another arc steel sheet arc length is 20cm, and threaded rod one end is welded with the arc steel sheet that the arc length is 20cm, and the threaded rod other end passes steel reinforcement cage, protects a section of thick bamboo and the arc steel sheet that the arc length is 20cm and fastens with the nut.
The height of the two arc-shaped steel plates is 30cm, and the thickness of the two arc-shaped steel plates is 2 cm.
The threaded rod length is 25cm and the rubber ring washer diameter is 80 mm.
Adopt 3 groups the same the utility model discloses become 120 degrees and place and fix a position the steel reinforcement cage. Be about for 3 pump utility model settings inboard and protect between the section of thick bamboo outside and protect a section of thick bamboo with the steel reinforcement cage and fix. Through adjusting three nut, remove every group the utility model discloses the relative distance of well two steel sheets, and then the position of removal steel reinforcement cage makes steel reinforcement cage center and pile position center coincidence and fixed steel reinforcement cage.
The utility model discloses light in weight, simple structure, installation, dismantlement convenience, reuse, but wide application drilling concrete bored concrete pile construction field.
Drawings
Fig. 1 is a usage state diagram of the present invention.
In the figure, 1, a large steel plate, 2, a small steel plate, 3, a nut, 4, a threaded rod, 5, a protective cylinder, 6, a reinforcement cage, 7 and a positioning reinforcement.
Detailed Description
Example (b): fig. 1 shows that the utility model is composed of a big steel plate 1, a small steel plate 2, a threaded rod 4, a nut 3 and a gasket. Wherein the threaded rod 4 is welded in the middle of the back surface of the large steel plate 1, and the threaded hole is arranged in the middle of the small steel plate 2.
The large steel plate 1 is arc-shaped, the arc length is 20cm, the height is 30cm, and the thickness is 2 cm.
The small steel plate 2 is arc-shaped, the arc length is 15cm, the height is 30cm, and the thickness is 2 cm.
The threaded rod length is 25cm and the rubber ring gasket outer diameter is 80 mm.
The utility model discloses a use method: after the hoisting of the cast-in-place pile reinforcement cage is completed, two parallel square steel bars are inserted below a top hanging ring at the top end of the framework of the positioning steel bar 7, and two parallel sleepers are placed on two sides of the pile casing 5.
The large steel plate 1 and the threaded rod 4 of the utility model are extended into the inner side of the reinforcement cage 6, and the threaded rod 4 passes through the wall of the reinforcement cage and the wall of the pile casing and extends out of the outer side of the pile casing 5;
the small steel plate 2 is screwed on the threaded rod 4 and the washer is padded with the nut 3.
The other two sets of the same reason installation the utility model discloses, and with a set of in same level that has installed and become 120 degrees angles respectively.
At last, draw the cross wire on the steel reinforcement cage, find out the steel reinforcement cage center, find out stake position center according to protecting a section of thick bamboo, whether inspection steel reinforcement cage central point puts and coincides with stake position center, if the coincidence, it is qualified to explain steel reinforcement cage hoist and mount, needn't adjust the utility model discloses, direct fastening nut can. If deviation exists, the reinforcing cage needs to be forced to be centered and then fixed through adjusting the nuts of a certain group of positioning devices on the pile casing.

Claims (1)

1. The utility model provides a bored concrete pile steel reinforcement cage location centering device, characterized by comprises two arc steel sheets that have the screw hole, threaded rod, nut, gasket, and an arc steel sheet arc length is 15cm, and another arc steel sheet arc length is 20cm, and threaded rod one end is welded with the arc steel sheet that the arc length is 20cm, and the threaded rod other end passes steel reinforcement cage, protects a section of thick bamboo and the arc steel sheet that the arc length is 20cm and fastens with the nut, and threaded rod length is 25 cm.
CN201922123416.3U 2019-12-02 2019-12-02 Bored concrete pile steel reinforcement cage location centering device Active CN211547694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201922123416.3U CN211547694U (en) 2019-12-02 2019-12-02 Bored concrete pile steel reinforcement cage location centering device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201922123416.3U CN211547694U (en) 2019-12-02 2019-12-02 Bored concrete pile steel reinforcement cage location centering device

Publications (1)

Publication Number Publication Date
CN211547694U true CN211547694U (en) 2020-09-22

Family

ID=72503352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201922123416.3U Active CN211547694U (en) 2019-12-02 2019-12-02 Bored concrete pile steel reinforcement cage location centering device

Country Status (1)

Country Link
CN (1) CN211547694U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396071A (en) * 2022-01-14 2022-04-26 中铁二院工程集团有限责任公司 Soil retaining assembly and connecting and bar planting anchoring method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396071A (en) * 2022-01-14 2022-04-26 中铁二院工程集团有限责任公司 Soil retaining assembly and connecting and bar planting anchoring method thereof

Similar Documents

Publication Publication Date Title
CN106758787B (en) A kind of Precast Pier Columns mounting and positioning device
CN107817162B (en) Rapid drawing test method for nonmetal anti-floating anchor rod with enlarged head
CN102493471B (en) Suspending installation construction process method of structural foot margin anchor bolt
CN102704491A (en) Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN104141318A (en) Installation and construction method of column base of large-diameter steel pipe column
CN107621412B (en) Quick drawing test device for nonmetal anti-floating anchor rod with enlarged head
CN206127746U (en) Isolation bearing handles accurate location structure of pre -buried steel sheet in back
CN112663613A (en) Verticality control device and verticality control method for latticed column
CN211735397U (en) Positioning and guiding device for lattice column bored pile construction
CN113529763A (en) Method for constructing sea area shoal cushion cap by utilizing reinforced concrete combined steel cofferdam
CN211547694U (en) Bored concrete pile steel reinforcement cage location centering device
CN108118689B (en) Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method
CN204001429U (en) A kind of Large-diameter Steel tubing string suspension column structure and suspension column absolute altitude adjustment fixing structure thereof
CN112030968A (en) Novel construction process for solving holding pressure pile sinking difficulty
CN111456009A (en) Engineering pile guiding device in piling construction and using method thereof
JP6703466B2 (en) Jig for preventing leakage of filler and method for manufacturing composite pile using the jig
CN109779226A (en) A kind of opposite sex chimney construction security platform structure and its construction method
CN204001427U (en) A kind of steel pipe column suspension column is installed the pre-buried positioning supports structure with location ring flat-plate
CN110700574A (en) Post-cast strip supporting structure and construction method thereof
CN105804087A (en) Installation method for steel structure below large deep foundation pit supporting beam
CN215629898U (en) Pile foundation reinforcement cage installation positioner
CN205483737U (en) Mortar stock making devices
CN210122715U (en) Novel steel reinforcement cage
CN219886822U (en) Viaduct pile foundation positioning protection device
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant