CN109779226A - A kind of opposite sex chimney construction security platform structure and its construction method - Google Patents
A kind of opposite sex chimney construction security platform structure and its construction method Download PDFInfo
- Publication number
- CN109779226A CN109779226A CN201910207734.XA CN201910207734A CN109779226A CN 109779226 A CN109779226 A CN 109779226A CN 201910207734 A CN201910207734 A CN 201910207734A CN 109779226 A CN109779226 A CN 109779226A
- Authority
- CN
- China
- Prior art keywords
- chimney
- outer cylinder
- layer
- chimney outer
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention discloses a kind of anisotropic chimney construction security platform structure and its construction methods, it is related to construction safety platform related fields, it is slow to solve chimney construction security platform structure construction in the prior art, it carries out formwork and to set up labor and materials needed for scaffold more, the problems such as construction joint is more in casting process, and verticality is big a possibility that there are relatively large deviations.The upper end of one layer of chimney outer cylinder is provided with two layers of chimney outer cylinder, the side of one layer of chimney outer cylinder and two layers of chimney outer cylinder is provided with shearing wall opening, the edge of one layer of chimney outer cylinder and two layers of chimney outer barrel is provided with corner post, sliding formwork group is installed on one layer of chimney outer cylinder, one end of the sliding formwork group is provided with operating platform, the sliding formwork group includes hoisting frame, side among the hoisting frame is equipped with periphery ring, the other side among the hoisting frame is equipped with interior enclosure, and the other side of the periphery ring is equipped with exterior sheathing.
Description
Technical field
The present invention relates to construction safety platform related fields, specially a kind of anisotropic chimney construction security platform structure and its
Construction method.
Background technique
Chimney is the important structures in industrial building, is held recently as thermal power generation, garbage incinerating power plant installation
The continuous increase of amount, country is to the pay attention to day by day of energy environment protection problem, and the design height of chimney is also higher and higher, due to towering
Chimney works difficulty of construction is higher, and risk is larger, and the construction quality of chimney reinforced concrete barrel is necessary to ensure that in work progress
With safety.
Existing chimney construction security platform structure construction is slow, carries out formwork and to set up labor and materials needed for scaffold more, pouring
Construction joint is more during building, and verticality is big a possibility that there are relatively large deviations;Therefore a kind of anisotropic chimney is developed in market in urgent need
Construction safety platform structure and its construction method are existing to help people to solve the problems, such as.
Summary of the invention
The purpose of the present invention is to provide a kind of anisotropic chimney construction security platform structure and its construction methods, on solving
It is slow to state the chimney construction security platform structure construction proposed in background technique, carries out formwork and to set up labor and materials needed for scaffold more,
The problems such as construction joint is more in casting process, and verticality is big a possibility that there are relatively large deviations.
To achieve the above object, the invention provides the following technical scheme: it is a kind of the opposite sex chimney construction security platform structure and
Its construction method, including one layer of chimney outer cylinder, the upper end of one layer of chimney outer cylinder are provided with two layers of chimney outer cylinder, and described one layer
The side of chimney outer cylinder and two layers of chimney outer cylinder is provided with shearing wall opening, one layer of chimney outer cylinder and two layers of chimney outer cylinder
Internal edge is provided with corner post, and sliding formwork group, one end setting of the sliding formwork group are equipped on one layer of chimney outer cylinder
There is operating platform, the sliding formwork group includes hoisting frame, and the side among the hoisting frame is equipped with periphery ring, in the hoisting frame
Between the other side interior enclosure is installed, the other side of the periphery ring is equipped with exterior sheathing, the other side installation of the interior enclosure
There is inner template, the centre of the hoisting frame is provided with support rod, and the lower end of the operating platform is equipped with steel pipe truss, described to mention
The rear end for rising frame side is provided with outrigger platform.
Preferably, the side of one layer of chimney outer cylinder lower end is provided with opening, one layer of chimney outer cylinder and two layers of cigarette
Chimney outer cylinder is fixed by armored concrete, and one layer of chimney outer cylinder and two layers of chimney outer cylinder and corner post pass through armored concrete
Fixed, there are four the corner post settings.
Preferably, the lower end of the outrigger platform is provided with support frame, and support frame is fixedly connected with exterior sheathing, described interior
The vertical cross-section size of template and the vertical cross-section size of exterior sheathing are identical, are provided with wall between the inner template and exterior sheathing
Body, and one end of support rod extends to the inside of wall.
Preferably, the periphery ring is fixedly connected with exterior sheathing, and the interior enclosure is fixedly connected with inner template.
Preferably, the hoisting frame includes promoting cross bar, and the two sides for promoting cross bar lower end are provided with promotion vertical bar,
Reinforcing rod is provided between the promotion vertical bar and promotion cross bar.
Preferably, the reinforcing rod is welded to connect with promotion cross bar and promotion vertical bar, the promotion cross bar and promotion vertical bar
It is welded to connect, there are two the promotion vertical bar settings, and the promotion cross bar is axially symmetric.
Preferably, the steel pipe truss includes top boom, and the lower end of the top boom is provided with brace, under the brace
End is provided with lower boom, and the centre of the operating platform lower end is provided with support rod, and the lower end of the support rod is provided with fixation
Pier.
Preferably, the top boom, lower boom and brace pass through fastener shaped by lapping between any two, and the one of the support rod
End extends to the inside of anchor block.
A kind of construction method, includes the following steps:
Step 1: in one layer of chimney outer cylinder bottom, outside once assembles high about 120 centimetres along barrel
The hoisting frame;
Step 2: the periphery ring and the interior enclosure are installed in two the intermediate of vertical bar that promoted;
Step 3: the inner template is installed in the outside of the interior enclosure;
Step 4: assembling reinforcement in the space between the inner template and the exterior sheathing;
Step 5: it is hung between the reinforcing bar and the periphery ring of binding and seals the exterior sheathing;
Step 6: the top boom, the lower boom and the brace are taken by fastener in the inside of the interior enclosure
It is connected into type, and upper berth flitch and walkway board construct the operating platform;
Step 7: installation oil pump, jack and hydraulic circuit are installed cage and Tai Ling, and be inserted into support rod, are tried
Vehicle;
Step 8: the casting concrete between the inner template and the exterior sheathing;
Step 9: by hydraulic system and jack, the inner template and the exterior sheathing are carried out sliding;
Step 10: assembling reinforcement in the space between the inner template and the exterior sheathing;
Step 11: the casting concrete between the inner template and the exterior sheathing;
Step 12: it repeats step 9 and tops out to step 11 until concreting is completed.
Compared with prior art, the beneficial effects of the present invention are:
1, the speed of application of the invention is fast, labor and materials needed for saving formwork and setting up scaffold, can be more easily by template
It is broken and flexible assembling and reusable, reduction expense;
2, the invention is by the setting of sliding formwork group, and preferable to degree control, good integrity, shock resistance is strong, concrete
Surface is smooth, is easier to guarantee construction quality, and work progress safety, civilization, environmental protection;
3, the invention is flat by sliding formwork group, hoisting frame, interior enclosure, periphery ring, inner template, exterior sheathing, operating platform, overhanging
The continuity of casting process is realized in the setting of platform and support rod, and every layer concrete uniformly pours full, every interlayer in four times in construction
Every the time at one hour or so, when guaranteeing concrete mould unloading strength in 0.2~0.4Mpa by suitable under the sliding effect of sliding formwork group
Hoisting frame promoted, carry out pouring for next step, make concreting have continuity, make the construction joint occurred in casting process
It reduces, keeps structure more firm;
4, the invention enables chimney sliding formwork group in lifting process to mention with uniform speed by the setting of reinforcing rod
It rises, avoids keeping the perpendicularity deviation for pouring chimney larger due to shaking in lifting process, be conducive to the quality for pouring chimney;
5, the invention passes through the setting of top boom, lower boom and brace, and top boom, lower boom and brace support whole operation
Platform constitutes three-legged structure between top boom, lower boom and brace, more stable, and the safety of operating platform is made to be protected.
Detailed description of the invention
Fig. 1 is the main view of of the invention a kind of anisotropic chimney construction security platform structure and its construction method;
Fig. 2 is the structural schematic diagram of one layer of chimney outer cylinder of the invention;
Fig. 3 is the structural schematic diagram of two layers of chimney outer cylinder of the invention;
Fig. 4 is the top view of sliding formwork group of the invention;
Fig. 5 is the structural schematic diagram of sliding formwork group of the invention.
In figure: 1, one layer of chimney outer cylinder;2, two layers of chimney outer cylinder;3, wall opening is sheared;4, corner post;5, operating platform;6,
Sliding formwork group;7, hoisting frame;8, periphery ring;9, interior enclosure;10, inner template;11, exterior sheathing;12, support rod;13, cross bar is promoted;
14, vertical bar is promoted;15, reinforcing rod;16, steel pipe truss;17, support rod;18, anchor block;19, top boom;20, lower boom;21,
Brace;22, outrigger platform.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
Please refer to Fig. 1-5, a kind of embodiment provided by the invention: a kind of opposite sex and its is applied chimney construction security platform structure
Work method, including one layer of chimney outer cylinder 1, the upper end of one layer of chimney outer cylinder 1 are provided with two layers of chimney outer cylinder 2, one layer of chimney outer cylinder 1
It is shear wall structure with two layers of chimney outer cylinder 2, a length of 7 points 5 meters of the square tube of flat edge, since minus four meters of basic top surface,
Top mark is 7 points 7 meters high, and one layer of 1 height of chimney outer cylinder is 30 meters, and wall thickness is 400 millimeters, two layers of 2 height of chimney outer cylinder
It is 4 points 7 meters, wall thickness is 350 millimeters, and 30 section meter Chu of shear wall becomes 350 millis from 400 millimeters
Rice has steel inner cylinder, steel inner cylinder meter three in one layer of chimney outer cylinder 1 and two layers of chimney outer cylinder 2 to change section using sliding reorganization is stopped
Only, diameter be 1 point 8 meter, tri- or five meters of Cong Wudian start, Gao Bashi meters of top mark, 20 meters the following are 14 millimeters thick Q345B steel
Plate production, the production of 20 meter Zhi Si, ten meter Wei Shi, tetra- millimeters thick Q235B steel plate, 40 meters to 70 meter Wei Shi, bis- millimeters thick
The production of Q235B steel plate, 70 meters the above are the production of 12 millimeters thick stainless steel plates, and steel is arranged at five meters, 7 points 5 meters
Reinforced concrete podium level, 10.0,15.0,20.0,25.0,30.0,35.0,40.0,45,50.0,55.0,60.0,65.0,
Steel-concrete composite construction platform (platform, steel ladder platform) is set at 70.0 and 75.0M meters, one layer of chimney outer cylinder 1 and two layers of cigarette
The side of chimney outer cylinder 2 is provided with shearing wall opening 3, and sleeper is arranged in side, and setting concealed beam is reinforced at the top of hole, one layer of chimney outer cylinder
1 and two layers of chimney outer cylinder 2 inside edge be provided with corner post 4, corner post 4 is 850 millimeters of side length rectangular, one layer
Sliding formwork group 6 is installed, one end of sliding formwork group 6 is provided with operating platform 5, and sliding formwork group 6 includes hoisting frame 7, is promoted on chimney outer cylinder 1
Side among frame 7 is equipped with periphery ring 8, and the other side among hoisting frame 7 is equipped with interior enclosure 9, the other side peace of periphery ring 8
Equipped with exterior sheathing 11, the other side of interior enclosure 9 is equipped with inner template 10, and stack shell inner template 10 is common using 200-300 × 1200
Sizing punching block, for exterior sheathing 11 using 600 × 1260 sizing punching blocks, inner template 10 and 11 upper and lower side of exterior sheathing are provided with hole, stomidium
Place sets enclosure 9 and periphery ring 8 in double steel pipe, interior enclosure 9 and periphery ring 8 with pipe clamp eave tile drawknot inner template 10 and exterior sheathing 11,
Interior enclosure 9 and periphery ring 8 are connect with adjusting steel pipe with vertical bar 14 is promoted, and the centre of hoisting frame 7 is provided with support rod 12, support rod
12 diameters are 48 millimeters, and the lower end of operating platform 5 is equipped with steel pipe truss 16, and the rear end of 7 side of hoisting frame is provided with outstanding
Choose platform 22.
Further, the side of one layer of 1 lower end of chimney outer cylinder is provided with opening, one layer of chimney outer cylinder 1 and two layers of chimney outer cylinder 2
It is fixed by armored concrete, one layer of chimney outer cylinder 1 and two layers of chimney outer cylinder 2 are fixed by armored concrete with corner post 4, angle
There are four the settings of column 4.
Further, the lower end of outrigger platform 22 is provided with support frame, and support frame is fixedly connected with exterior sheathing 11, inner template
10 vertical cross-section size is identical as the vertical cross-section size of exterior sheathing 11, is provided with wall between inner template 10 and exterior sheathing 11
Body, and one end of support rod 12 extends to the inside of wall.
Further, periphery ring 8 is fixedly connected with exterior sheathing 11, and interior enclosure 9 is fixedly connected with inner template 10.
Further, hoisting frame 7 includes promoting cross bar 13, and promotion cross bar 13 is ten No. six channel steels of Two bors d's oeuveres, is promoted under cross bar 13
The two sides at end, which are provided with, promotes vertical bar 14, promotes vertical bar 14 having a size of 2400 × 160, inside and outside leg is double joint D48*3.5 steel
Pipe welding sizing door frame, is promoted and is provided with reinforcing rod 15 between vertical bar 14 and promotion cross bar 13.
Further, reinforcing rod 15 and promotion cross bar 13 and promotion vertical bar 14 are welded to connect, and promote cross bar 13 and promotion vertical bar
14 are welded to connect, and are promoted there are two the settings of vertical bar 14, it is axially symmetric to promote cross bar 13.
Further, steel pipe truss 16 includes top boom 19, and the lower end of top boom 19 is provided with brace 21, the lower end of brace 21
It is provided with lower boom 20, the centre of 5 lower end of operating platform is provided with support rod 17, and the lower end of support rod 17 is provided with anchor block
18。
Further, top boom 19, lower boom 20 and brace 21 are between any two by fastener shaped by lapping, and the one of support rod 17
End extends to the inside of anchor block 18.
A kind of construction method, includes the following steps:
Step 1: one layer of 1 bottom of chimney outer cylinder, outside once assembles high about 120 centimetres of promotion along barrel
Frame 7;
Step 2: intermediate installation periphery ring 8 and the interior enclosure 9 of vertical bar 14 are promoted at two;
Step 3: inner template 10 is installed in the outside of interior enclosure 9;
Step 4: assembling reinforcement in the space between inner template 10 and exterior sheathing 11;
Step 5: envelope exterior sheathing 11 is hung between the reinforcing bar and periphery ring 8 of binding;
Step 6: in the inside of interior enclosure 9 by top boom 19, lower boom 20 and brace 21 by fastener shaped by lapping, and
Upper berth flitch and walkway board construct operating platform 5;
Step 7: installation oil pump, jack and hydraulic circuit, jack use six tons of ball-type jack, hydraulic device
Using YHJ-36 type console, cage and Tai Ling are installed, cage handling concrete, reinforcing bar is transported in platform spirit, and is inserted into support rod, into
Row test run;
Step 8: the casting concrete between inner template 10 and exterior sheathing 11;
Step 9: by hydraulic system and jack, inner template 10 and exterior sheathing 11 are carried out sliding, climbs pour for the first time
When the control of every layer concrete height at 30 centimetres hereinafter, uniformly pouring in four times full, every layer concrete height difference is less than ten centimetres, often
Layer interval time at one hour or so, enter for the first time mould concrete beginning initial rise in three to five hours (view temperature fixed) one to two
Stroke is no more than every time later and mentions a stroke in, prevents template from bonding, guarantee concrete mould unloading strength 0.2~
It is transferred to normal sliding when 0.4Mpa, sliding formwork concrete slump is inserted into lower layer at five centimetres or so, upper layer concrete vibrating
Concrete depth without departing from 50 millimeters, it is sliding in stack shell because self-strength is still in growth, by wind load, equipment and materials weight
The various factors such as amount, frictional force influence, and after the moment has certain shaking, each pouring layer to promote 60 centimetres, are hung with plumb bob
In it is primary, when deviation exceeds ten millimeters, low rectified a deviation immediately, avoid the occurrence of sharp turn phenomenon;
Step 10: assembling reinforcement in the space between inner template 10 and exterior sheathing 11, vertical cutting length are four to six
Rice, when carrying out binding overlap joint, lap of splice 35d, same level nipple number is less than 25%, and circumferential muscle segmentation is in order to wear
Hoisting frame 7 is crossed, the lap of splice is unified;
Step 11: the casting concrete between inner template 10 and exterior sheathing 11;
Step 12: it repeats step 9 and tops out to step 11 until concreting is completed, when carrying out demoulding
Hydraulic-pressure control apparatus is first removed, then removes periphery ring 8, exterior sheathing 11, interior enclosure 9 and inner template 10, then hangs foot inside and outside dismounting
Hand, then lifting means such as dismantling operation platform 5, hoisting frame 7, jack.
It is high to solve high material consumption, danger coefficient that previous stay in place form support system occurs using slipform process
Problem has saved the materials such as a large amount of steel pipe, fastener, big plate, obtains huge economic benefit, while slding form operation speed
Fastly, construction in normal one day can reach three to four meters, and 80 meters of chimneys construction in one month completion ensure that construction speed, comprehensive analysis
Chimney template construction is carried out using this engineering method, it is convenient and efficient, formwork speed is greatly enhanced, has saved manually, has been produced
Raw economy, environmental protection, security civilization, energy conservation and social equivalent Yidu is huge.
Working principle: in use, one layer of 1 bottom of chimney outer cylinder, along barrel outside once assemble it is high by about 120
Centimetre hoisting frame 7, intermediate installation periphery ring 8 and the interior enclosure 9 of vertical bars 14 are promoted at two, is installed in the outside of interior enclosure 9
Inner template 10, assembling reinforcement in the space between inner template 10 and exterior sheathing 11, hangs between the reinforcing bar and periphery ring 8 of binding
Exterior sheathing 11 is sealed, top boom 19, lower boom 20 and brace 21 are passed through into fastener shaped by lapping, and upper berth in the inside of interior enclosure 9
Flitch and walkway board construct operating platform 5, installation oil pump, jack and hydraulic circuit, and jack uses six tons of ball-types very heavy
Top, hydraulic device use YHJ-36 type console, install cage and Tai Ling, cage handling concrete, reinforcing bar is transported in platform spirit, and inserts
Enter support rod, carry out test run, the casting concrete between inner template 10 and exterior sheathing 11 will by hydraulic system and jack
Inner template 10 and exterior sheathing 11 carry out sliding, and every layer concrete height control of climbing when pouring for the first time is at 30 centimetres hereinafter,
Even to pour in four times completely, for every layer concrete height difference less than ten centimetres, each interval time at one hour or so, enters mould coagulation for the first time
Soil started one to two stroke of initial rise at three to five hours (fixed depending on temperature), is no more than one hour every time later and mentions a stroke,
It prevents template from bonding, normal sliding, sliding formwork Control Measures for Concrete Slump is transferred to when guaranteeing concrete mould unloading strength in 0.2~0.4Mpa
Degree at five centimetres or so, upper layer concrete vibrating be inserted into lower-layer concrete depth without departing from 50 millimeters, it is sliding in stack shell
Because self-strength is still in growth, influenced by various factors such as wind load, equipment and materials weight, frictional force, the moment has certain
Shake, after each pourings layer promotes 60 centimetres, with plumb bob hang in it is primary, when deviation is beyond ten millimeters, carry out immediately low
Correction, avoids the occurrence of sharp turn phenomenon, assembling reinforcement in the space between inner template 10 and exterior sheathing 11, and vertical cutting length is
Four to six meters, when carrying out binding overlap joint, lap of splice 35d, same level nipple number less than 25%, the segmentation of circumferential muscle with
Convenient for across hoisting frame 7, the lap of splice is unified, the casting concrete between inner template 10 and exterior sheathing 11, and repetition climbs, binds
Reinforcing bar and casting concrete step top out until concreting is completed, and first remove hydraulic control when demoulding and set
It is standby, then periphery ring 8, exterior sheathing 11, interior enclosure 9 and inner template 10 are removed, foot hand then is hung inside and outside dismounting, then dismantling operation is flat
The lifting means such as platform 5, hoisting frame 7, jack.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
Claims (9)
1. a kind of opposite sex chimney construction security platform structure and its construction method, including one layer of chimney outer cylinder (1), feature exists
In: the upper end of one layer of chimney outer cylinder (1) is provided with two layers of chimney outer cylinder (2), one layer of chimney outer cylinder (1) and two layers of cigarette
The side of chimney outer cylinder (2) is provided with shearing wall opening (3), and one layer of chimney outer cylinder (1) and two layers of chimney outer cylinder (2) are internal
Edge be provided with corner post (4), be equipped with sliding formwork group (6) on one layer of chimney outer cylinder (1), the sliding formwork group (6)
One end is provided with operating platform (5), and the sliding formwork group (6) includes hoisting frame (7), the intermediate side installation of the hoisting frame (7)
Have periphery ring (8), the intermediate other side of the hoisting frame (7) is equipped with interior enclosure (9), the other side peace of the periphery ring (8)
Equipped with exterior sheathing (11), the other side of the interior enclosure (9) is equipped with inner template (10), the intermediate setting of the hoisting frame (7)
Have support rod (12), the lower end of the operating platform (5) is equipped with steel pipe truss (16), the rear end of hoisting frame (7) side
It is provided with outrigger platform (22).
2. a kind of anisotropic chimney construction security platform structure according to claim 1 and its construction method, it is characterised in that:
The side of one layer of chimney outer cylinder (1) lower end is provided with opening, one layer of chimney outer cylinder (1) and two layers of chimney outer cylinder (2)
It is fixed by armored concrete, one layer of chimney outer cylinder (1) and two layers of chimney outer cylinder (2) and corner post (4) are mixed by reinforcing bar
Solidifying soil is fixed, and there are four corner post (4) settings.
3. a kind of anisotropic chimney construction security platform structure according to claim 1 and its construction method, it is characterised in that:
The lower end of the outrigger platform (22) is provided with support frame, and support frame is fixedly connected with exterior sheathing (11), the inner template
(10) vertical cross-section size is identical as the vertical cross-section size of exterior sheathing (11), the inner template (10) and exterior sheathing (11) it
Between be provided with wall, and one end of support rod (12) extends to the inside of wall.
4. a kind of anisotropic chimney construction security platform structure according to claim 1 and its construction method, it is characterised in that:
The periphery ring (8) is fixedly connected with exterior sheathing (11), and the interior enclosure (9) is fixedly connected with inner template (10).
5. a kind of anisotropic chimney construction security platform structure according to claim 1 and its construction method, it is characterised in that:
The hoisting frame (7) includes promoting cross bar (13), and the two sides for promoting cross bar (13) lower end, which are provided with, promotes vertical bar (14),
Reinforcing rod (15) are provided between the promotion vertical bar (14) and promotion cross bar (13).
6. a kind of anisotropic chimney construction security platform structure according to claim 5 and its construction method, it is characterised in that:
The reinforcing rod (15) is welded to connect with promotion cross bar (13) and promotion vertical bar (14), the promotion cross bar (13) and promotion vertical bar
(14) it is welded to connect, there are two promotion vertical bar (14) settings, and the promotion cross bar (13) is axially symmetric.
7. a kind of anisotropic chimney construction security platform structure according to claim 1 and its construction method, it is characterised in that:
The steel pipe truss (16) includes top boom (19), and the lower end of the top boom (19) is provided with brace (21), the brace
(21) lower end is provided with lower boom (20), and the centre of operating platform (5) lower end is provided with support rod (17), the support
The lower end of bar (17) is provided with anchor block (18).
8. a kind of anisotropic chimney construction security platform structure according to claim 7 and its construction method, it is characterised in that:
The top boom (19), lower boom (20) and brace (21) pass through fastener shaped by lapping between any two, the support rod (17)
One end extends to the inside of anchor block (18).
9. a kind of construction method described in -8 according to claim 1, which comprises the steps of:
Step 1: in one layer of chimney outer cylinder (1) bottom, outside once assembles high about 120 centimetres of institute along barrel
State hoisting frame (7);
Step 2: the periphery ring (8) and the interior enclosure (9) are installed in two the intermediate of vertical bar (14) that promoted;
Step 3: the inner template (10) is installed in the outside of the interior enclosure (9);
Step 4: assembling reinforcement in the space between the inner template (10) and the exterior sheathing (11);
Step 5: it is hung between the reinforcing bar and the periphery ring (8) of binding and seals the exterior sheathing (11);
Step 6: in the inside of the interior enclosure (9) by the top boom (19), the lower boom (20) and the brace (21)
By fastener shaped by lapping, and upper berth flitch and walkway board construct the operating platform (5);
Step 7: installation oil pump, jack and hydraulic circuit install cage and Tai Ling, and be inserted into support rod, carry out test run;
Step 8: the casting concrete between the inner template (10) and the exterior sheathing (11);
Step 9: by hydraulic system and jack, the inner template (10) and the exterior sheathing (11) are carried out sliding;
Step 10: assembling reinforcement in the space between the inner template (10) and the exterior sheathing (11);
Step 11: the casting concrete between the inner template (10) and the exterior sheathing (11);
Step 12: it repeats step 9 and tops out to step 11 until concreting is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910207734.XA CN109779226A (en) | 2019-03-19 | 2019-03-19 | A kind of opposite sex chimney construction security platform structure and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910207734.XA CN109779226A (en) | 2019-03-19 | 2019-03-19 | A kind of opposite sex chimney construction security platform structure and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109779226A true CN109779226A (en) | 2019-05-21 |
Family
ID=66488744
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910207734.XA Pending CN109779226A (en) | 2019-03-19 | 2019-03-19 | A kind of opposite sex chimney construction security platform structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109779226A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962849A (en) * | 2020-07-31 | 2020-11-20 | 晟通科技集团有限公司 | Operation platform |
CN112502431A (en) * | 2020-11-17 | 2021-03-16 | 中国三冶集团有限公司 | Hydraulic reverse formwork construction method for light aluminum alloy formwork of square chimney |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08232465A (en) * | 1995-02-28 | 1996-09-10 | Ohbayashi Corp | Inner cylinder connecting scaffold of smokestack |
CN200968056Y (en) * | 2006-11-17 | 2007-10-31 | 山西焦煤集团有限责任公司 | Slipping form |
CN101748799A (en) * | 2009-12-30 | 2010-06-23 | 河南四建股份有限公司 | Hydraulic lifting rollover construction method of chimney reinforced concrete shaft wall |
CN206233576U (en) * | 2016-10-21 | 2017-06-09 | 中亿丰建设集团股份有限公司 | For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney |
CN107575018A (en) * | 2017-08-31 | 2018-01-12 | 山东丰汇设备技术有限公司 | A kind of special-shaped chimney hydraulic mould lifting device |
CN107882321A (en) * | 2017-11-23 | 2018-04-06 | 中铁建设集团南方工程有限公司 | Diameter Silo slding form operation engineering method |
CN209703982U (en) * | 2019-03-19 | 2019-11-29 | 南通市第七建筑安装工程有限公司 | A kind of opposite sex chimney construction security platform structure |
-
2019
- 2019-03-19 CN CN201910207734.XA patent/CN109779226A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08232465A (en) * | 1995-02-28 | 1996-09-10 | Ohbayashi Corp | Inner cylinder connecting scaffold of smokestack |
CN200968056Y (en) * | 2006-11-17 | 2007-10-31 | 山西焦煤集团有限责任公司 | Slipping form |
CN101748799A (en) * | 2009-12-30 | 2010-06-23 | 河南四建股份有限公司 | Hydraulic lifting rollover construction method of chimney reinforced concrete shaft wall |
CN206233576U (en) * | 2016-10-21 | 2017-06-09 | 中亿丰建设集团股份有限公司 | For the hydraulic pressure lift turnover formwork construction device of bundled-tube structure chimney |
CN107575018A (en) * | 2017-08-31 | 2018-01-12 | 山东丰汇设备技术有限公司 | A kind of special-shaped chimney hydraulic mould lifting device |
CN107882321A (en) * | 2017-11-23 | 2018-04-06 | 中铁建设集团南方工程有限公司 | Diameter Silo slding form operation engineering method |
CN209703982U (en) * | 2019-03-19 | 2019-11-29 | 南通市第七建筑安装工程有限公司 | A kind of opposite sex chimney construction security platform structure |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111962849A (en) * | 2020-07-31 | 2020-11-20 | 晟通科技集团有限公司 | Operation platform |
CN112502431A (en) * | 2020-11-17 | 2021-03-16 | 中国三冶集团有限公司 | Hydraulic reverse formwork construction method for light aluminum alloy formwork of square chimney |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104746422B (en) | A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method | |
CN101886466B (en) | Construction method for support structure of coal tower template for tamping type coke oven | |
CN101435276B (en) | Cabin top steel beam hydraulic hoisting and positioning apparatus of cylinder cabin structure building and construction method thereof | |
CN202227476U (en) | High-altitude large-span overhung corridor-type reinforced concrete structure | |
CN205025086U (en) | Strength nature skeleton concrete beam construction suspend template in midair | |
CN102787560B (en) | Integrated construction method of support of large cantilevered capping beam and vertical column | |
CN101481944A (en) | Method for mounting high pier, tower over-form construction reinforced bar and movable support thereof | |
CN106192758A (en) | A kind of construction method utilizing the cantilever form large-scale high pier stud of construction | |
CN103790423A (en) | Construction method of large concrete granary | |
CN108005118A (en) | Underground pipe gallery agent structure integrates construction method | |
CN107687254A (en) | A kind of concrete disjunctor group storehouse slip form construction device and construction method | |
CN204097864U (en) | A kind of bridge prefabrication hollow pier stud delay-pour joint structure | |
CN109779226A (en) | A kind of opposite sex chimney construction security platform structure and its construction method | |
CN102337782A (en) | Lift system for constructing truss platform on top of tall and large space and construction method for lift system | |
CN104846745B (en) | Urban high-pier support-free formwork turnover construction method | |
CN102733608A (en) | Construction method for spray head layer of granulation tower | |
CN208235575U (en) | A kind of assembly concrete retaining wall having enough to meet the need | |
CN209703982U (en) | A kind of opposite sex chimney construction security platform structure | |
CN103243912B (en) | Multilayer is without plate framework construction method | |
CN206722208U (en) | A kind of prefabricated external wall panel structure | |
CN109457814B (en) | Construction method for top cover of high-rise and large-diameter building based on Bailey truss structure | |
CN102691267A (en) | High pier construction method for external whole operation platform | |
CN205874944U (en) | Double T type wave form steel web profiled steel sheet combination beam | |
CN209397712U (en) | The connection structure of antidetonation steel pipe in a kind of shear wall | |
CN102605988A (en) | Synchronous construction method for chimney lining external concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |