CN218815315U - PC wallboard construction broaching locating component - Google Patents

PC wallboard construction broaching locating component Download PDF

Info

Publication number
CN218815315U
CN218815315U CN202221401757.8U CN202221401757U CN218815315U CN 218815315 U CN218815315 U CN 218815315U CN 202221401757 U CN202221401757 U CN 202221401757U CN 218815315 U CN218815315 U CN 218815315U
Authority
CN
China
Prior art keywords
wall
fixedly connected
broaching
pvc pipe
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221401757.8U
Other languages
Chinese (zh)
Inventor
陈林
张�浩
周晓斌
倪义锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ili Dejing Construction Technology Co ltd
Original Assignee
Jiangsu Suzhong Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Suzhong Construction Group Co Ltd filed Critical Jiangsu Suzhong Construction Group Co Ltd
Priority to CN202221401757.8U priority Critical patent/CN218815315U/en
Application granted granted Critical
Publication of CN218815315U publication Critical patent/CN218815315U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a PC wallboard construction trompil locating component relates to construction technical field, place the platform including the template, the top swing joint that the platform was placed to the template has the PC panel, the preformed hole has been seted up on the surface of PC panel, the inner wall swing joint in preformed hole has auxiliary device. The utility model discloses a pair of connecting block of shell fragment and drawing of patterns push pedal elasticity back-up, then staff pulling pull ring cooperation shell fragment one separates base and PC panel, can take out the broaching material in the PC panel fast through this kind of mode, the convenience that broaching locating component used has been improved, it is fixed through rotatory mode with the butt nut with the screw thread head, the bottom of simultaneously from this back-up board is the bevel connection design, therefore, the inside that the PVC pipe can be inserted easily to the spliced pole, and owing to adopt the connecting rod to be connected with the spliced pole with a roof, so can improve the compressive capacity of PVC pipe greatly through a roof board.

Description

PC wallboard construction broaching locating component
Technical Field
The utility model relates to a construction technical field, concretely relates to PC wallboard construction trompil locating component.
Background
In the assembly type structure work progress, precast shear wall panel and interior wallboard connected node need cast in situ concrete to be connected, and node concreting needs add the fixed cast in situ district that forms of aluminium mould in advance, need reserve the aluminium mould split bolt hole in advance with the PVC pipe in the PC panel production process.
The following problems exist in the prior art:
1. after concrete is poured in the use process of the existing PC wallboard construction broaching positioning assembly, the positioning assembly needs to be taken out, at the moment, the assembly is embedded in a preformed hole of a PC board, and workers need to spend much time to disassemble the assembly;
2. the existing hole-drawing positioning component for PC wallboard construction only adopts a PVC pipe to support a preformed hole, the compression resistance of the component is limited, and the condition that the PVC pipe breaks due to overlarge pressure in the use process can cause the preformed hole of a PC board to be deformed.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a PC wallboard construction trompil locating component, places the platform including the template, the top swing joint that the platform was placed to the template has PC panel, the preformed hole has been seted up on the surface of PC panel, the inner wall swing joint in preformed hole has auxiliary device, auxiliary device's bottom is provided with shedder, auxiliary device's top swing joint has a top mounting, shedder is including the drawing of patterns push pedal, the right side fixedly connected with connecting block of drawing of patterns push pedal, the right side fixedly connected with shell fragment one of connecting block, top mounting is including sealed lid, fixedly connected with spliced pole in the middle of the bottom of sealed lid, the bottom fixedly connected with thread head of spliced pole.
By adopting the technical scheme, the connecting blocks in the scheme are fixed with the demoulding push plate, then the connecting blocks and the demoulding push plate are elastically supported through the elastic sheets, then a worker pulls the pull ring to match with the elastic sheets to separate the base from the PC board, and the pull hole material in the PC board can be quickly taken out through the mode.
The utility model discloses technical scheme's further improvement lies in: the outer wall of the connecting column is fixedly connected with a connecting rod, and the left end of the connecting rod is fixedly connected with a supporting plate.
The utility model discloses technical scheme's further improvement lies in: the right side of the bottom of the sealing cover is fixedly connected with a second elastic sheet, the bottom of the second elastic sheet is fixedly connected with a sealing gasket, and the outer wall of the sealing gasket is movably connected with the inner wall of the sealing cover.
Adopt above-mentioned technical scheme, the thread head in this scheme is fixed through rotatory mode with the butt joint nut, and the bottom of propping up the roof simultaneously from this is the bevel connection design, consequently, the inside of PVC pipe can be inserted easily to the spliced pole to owing to adopt the connecting rod to be connected propping up the roof with the spliced pole, so can improve the compressive capacity of PVC pipe greatly through propping up the roof, avoid the PVC pipe in the use because of the too violent condition that the fracture damage appears in the atress.
The utility model discloses technical scheme's further improvement lies in: the auxiliary device comprises a base, the bottom of the base is movably connected with a pull ring, and the inner wall of the base is movably connected with the outer wall of the demolding push plate.
The utility model discloses technical scheme's further improvement lies in: the top fixedly connected with PVC pipe of base, the inner wall of PVC pipe with the outer wall swing joint of a roof board, the outer wall of PVC pipe with the inner wall swing joint of preformed hole, fixed surface is connected with the butt joint nut on the base, the inner wall of butt joint nut with the outer wall swing joint of screw thread head.
The utility model discloses technical scheme's further improvement lies in: the top of the template placing table is movably connected with the bottom of the base.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a PC wallboard construction trompil locating component, through a pair of connecting block of shell fragment and drawing of patterns push pedal elasticity back-up, then staff pulling pull ring cooperation shell fragment one separates base and PC panel, can take out the trompil material in the PC panel fast through this kind of mode, avoided under the traditional mode directly to rely on brute force to take out PVC pipe and base, prevent to cause the damage to the trompil material, the speed that the trompil material was taken out has been improved simultaneously greatly, the convenience that the trompil locating component used has been improved.
2. The utility model provides a PC wallboard construction trompil locating component, it is fixed through rotatory mode with thread head and butt joint nut, simultaneously the bottom of roof is the bevel connection design from this, therefore, the inside of PVC pipe can be inserted easily to the spliced pole, and owing to adopt the connecting rod to be connected roof and spliced pole, so can improve the compressive capacity of PVC pipe greatly through a roof, avoid the PVC pipe in the use because of the too violent condition that breaks and damages appears in the atress, the steadiness that trompil locating component used has been improved from this.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the auxiliary device of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 2 according to the present invention;
fig. 4 is a schematic view of the cross-sectional structure of the supporting device of the present invention.
In the figure: 1. a template placing table; 2. a PC plate; 3. reserving a hole; 4. an auxiliary device; 5. a demolding device; 6. a supporting device; 41. a base; 42. a pull ring; 43. PVC pipes; 44. butting nuts; 51. demoulding push plate; 52. connecting blocks; 53. a first elastic sheet; 61. a sealing cover; 62. connecting columns; 63. a connecting rod; 64. a top supporting plate; 65. a screw head; 66. a second elastic sheet; 67. and a gasket.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the formwork placing table comprises a formwork placing table 1, a PC plate 2 is movably connected to the top of the formwork placing table 1, a preformed hole 3 is formed in the surface of the PC plate 2, an auxiliary device 4 is movably connected to the inner wall of the preformed hole 3, a demoulding device 5 is arranged at the bottom of the auxiliary device 4, and a supporting device 6 is movably connected to the upper side of the auxiliary device 4.
Preferably, the demolding device 5 comprises a demolding push plate 51, a connecting block 52 is fixedly connected to the right side of the demolding push plate 51, a first elastic sheet 53 is fixedly connected to the right side of the connecting block 52, the supporting device 6 comprises a sealing cover 61, a connecting column 62 is fixedly connected to the middle of the bottom of the sealing cover 61, and a threaded head 65 is fixedly connected to the bottom of the connecting column 62.
Further, prop up connecting block 52 and drawing of patterns push pedal 51 elasticity through shell fragment 53, then staff's pulling pull ring 42 cooperation shell fragment 53 separates base 41 and PC panel 2, can take out the trompil material in the PC panel 2 fast through this kind of mode, it takes out PVC pipe 43 and base 41 directly to rely on brute force under the traditional mode to have avoided, prevent to cause the damage to the trompil material, the speed that the trompil material was taken out has been improved simultaneously greatly, the convenience that the trompil locating component used has been improved.
Preferably, the outer wall of the connecting column 62 is fixedly connected with a connecting rod 63, the left end of the connecting rod 63 is fixedly connected with a supporting plate 64, the bottom right side of the sealing cover 61 is fixedly connected with a second elastic sheet 66, the bottom of the second elastic sheet 66 is fixedly connected with a sealing gasket 67, and the outer wall of the sealing gasket 67 is movably connected with the inner wall of the sealing cover 61.
Furthermore, the screw head 65 and the butt-joint screw cap 44 are fixed in a rotating mode, and meanwhile, the bottom of the supporting plate 64 is designed to be an inclined opening, so that the connecting column 62 can be easily inserted into the PVC pipe 43, and the connecting rod 63 is used for connecting the supporting plate 64 and the connecting column 62, so that the pressure resistance of the PVC pipe 43 can be greatly improved through the supporting plate 64, the situation that the PVC pipe 43 is broken and damaged due to over-violent stress in the using process is avoided, the using stability of the pull hole positioning assembly is improved, the top of the PVC pipe 43 is sealed through the sealing cover 61, and the sealing gasket 67 is supported through the two elastic sheets 66 at the bottom of the sealing cover 61, so that the sealing cover 61 is tightly sealed on the top of the PVC pipe 43, concrete is prevented from entering the PVC pipe 43 in the pouring process, and the influence on the next use of the pull hole positioning assembly is prevented.
Example 2
As shown in fig. 1-4, the auxiliary device 4 comprises a base 41, a pull ring 42 is movably connected to the bottom of the base 41, and the inner wall of the base 41 is movably connected to the outer wall of a mold-releasing push plate 51.
Preferably, the top of the base 41 is fixedly connected with a PVC pipe 43, the inner wall of the PVC pipe 43 is movably connected with the outer wall of the supporting top plate 64, the outer wall of the PVC pipe 43 is movably connected with the inner wall of the preformed hole 3, the upper surface of the base 41 is fixedly connected with a butt-joint nut 44, the inner wall of the butt-joint nut 44 is movably connected with the outer wall of the thread head 65, and the top of the formwork placing table 1 is movably connected with the bottom of the base 41.
The working principle of the PC wallboard construction broaching positioning assembly is described in detail below.
As shown in fig. 1-4, in the PC wall panel construction broaching positioning assembly, in use, the screw head 65 and the butt nut 44 are first fixed by rotation, and at the same time, the bottom of the supporting plate 64 is designed to be a bevel opening, so that the connecting column 62 can be easily inserted into the interior of the PVC pipe 43, and the connecting rod 63 is used to connect the supporting plate 64 and the connecting column 62, so that the pressure resistance of the PVC pipe 43 can be greatly improved by the supporting plate 64, and the PC panel 2 can be manufactured by concrete pouring.
In the manufacturing process, seal the top of PVC pipe 43 through sealed lid 61, here, two 66 apical branch sealing gaskets 67 of shell fragment through sealed lid 61 bottom make sealed lid 61 inseparable to the top of PVC pipe 43, avoid pouring in-process concrete entering PVC pipe 43, prevent to influence the next use of trompil locating component.
After the preparation is accomplished, prop up connecting block 52 and drawing of patterns push pedal 51 elasticity through shell fragment 53, then staff's pulling pull ring 42 cooperation shell fragment 53 separates base 41 and PC panel 2, can take out the broaching material in the PC panel 2 fast through this kind of mode, has avoided directly relying on brute force under the traditional mode to take out PVC pipe 43 and base 41, prevents to cause the damage to the broaching material, has improved the speed that the broaching material was taken out simultaneously greatly.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (6)

1. The utility model provides a PC wallboard construction trompil locating component, places platform (1) including the template, its characterized in that: the top of the template placing table (1) is movably connected with a PC plate (2), a preformed hole (3) is formed in the surface of the PC plate (2), an auxiliary device (4) is movably connected to the inner wall of the preformed hole (3), a demolding device (5) is arranged at the bottom of the auxiliary device (4), and a supporting device (6) is movably connected above the auxiliary device (4);
the demolding device (5) comprises a demolding push plate (51), the right side of the demolding push plate (51) is fixedly connected with a connecting block (52), and the right side of the connecting block (52) is fixedly connected with a first elastic sheet (53);
the supporting device (6) comprises a sealing cover (61), a connecting column (62) is fixedly connected to the middle of the bottom of the sealing cover (61), and a threaded head (65) is fixedly connected to the bottom of the connecting column (62).
2. The PC wallboard construction broaching positioning assembly of claim 1, wherein: the outer wall fixedly connected with connecting rod (63) of spliced pole (62), the left end fixed connection roof (64) of connecting rod (63).
3. The PC wallboard construction broaching location assembly of claim 1, wherein: the bottom right side fixedly connected with shell fragment two (66) of sealed lid (61), the bottom fixedly connected with of shell fragment two (66) seals up (67), the outer wall that seals up (67) with the inner wall swing joint of sealed lid (61).
4. The PC wallboard construction broaching positioning assembly of claim 2, wherein: the auxiliary device (4) comprises a base (41), the bottom of the base (41) is movably connected with a pull ring (42), and the inner wall of the base (41) is movably connected with the outer wall of the demolding push plate (51).
5. The PC wallboard construction broaching location assembly of claim 4, wherein: the top fixedly connected with PVC pipe (43) of base (41), the inner wall of PVC pipe (43) with the outer wall swing joint of a roof (64), the outer wall of PVC pipe (43) with the inner wall swing joint of preformed hole (3), fixed surface is connected with butt-joint nut (44) on base (41), the inner wall of butt-joint nut (44) with the outer wall swing joint of thread head (65).
6. The PC wallboard construction broaching positioning assembly of claim 4, wherein: the top of the template placing table (1) is movably connected with the bottom of the base (41).
CN202221401757.8U 2022-06-07 2022-06-07 PC wallboard construction broaching locating component Active CN218815315U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221401757.8U CN218815315U (en) 2022-06-07 2022-06-07 PC wallboard construction broaching locating component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221401757.8U CN218815315U (en) 2022-06-07 2022-06-07 PC wallboard construction broaching locating component

Publications (1)

Publication Number Publication Date
CN218815315U true CN218815315U (en) 2023-04-07

Family

ID=87268459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221401757.8U Active CN218815315U (en) 2022-06-07 2022-06-07 PC wallboard construction broaching locating component

Country Status (1)

Country Link
CN (1) CN218815315U (en)

Similar Documents

Publication Publication Date Title
CN105544979A (en) Formwork supporting device for wall corner portion construction and construction method
CN111827670A (en) Reinforcing tool for floor hole hanging die and construction method thereof
CN218815315U (en) PC wallboard construction broaching locating component
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN111519899A (en) Cast-in-place casting mold and casting body for prefabricated building and construction method thereof
CN110629787A (en) Core mold for pipe gallery pouring and construction method
CN112609963B (en) Installation anchoring device of composite heat-insulation template and use method thereof
CN206581152U (en) Rectangle Prefabricated aqueduct internal corner formwork supporting removal device
CN214301761U (en) Staple bolt-bolt hybrid node and foundation pit inner support structure
CN213471655U (en) Concrete water pipe internal pouring device for water supply and drainage
CN212224611U (en) Shear force wall pouring template reinforcing apparatus
CN214401439U (en) Bent cap template convenient to dismantle
CN210712964U (en) Bilateral-shaped basement shear wall post-cast strip plugging member
CN211548764U (en) Stiffened column base integral template structure
CN210685368U (en) Convenient reinforcing complete die set for concrete wall formworks on two sides of deformation joint
CN207033471U (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN111441575A (en) Method and structure for pouring concrete column by adopting inflatable template fixed with floor slab
CN216405499U (en) Connection structure of cut-off wall and hydraulic structure
CN215443116U (en) Assembly type beam pouring template assembly and concrete structure
CN205330172U (en) A formwork support device that is used for wall body corner position to be under construction
CN219973630U (en) Cast-in-place slab band reinforcement of assembled superimposed sheet
CN211597705U (en) Anti-sliding reinforcing construction device for shear wall at high-rise building expansion joint
CN214995934U (en) Full cast-in-place concrete outer wall structure seam construction device
CN217420178U (en) Assembled superimposed sheet pouring structure
CN214725202U (en) Simple and easy prefabricating device of porous no sand concrete pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240218

Address after: 835004 321, Building A, SME Incubation Park, 999 Huining Road, Yining Park, Khorgos Economic Development Zone, Yili Kazak Autonomous Prefecture, Xinjiang Uygur Autonomous Region

Patentee after: Ili Dejing Construction Technology Co.,Ltd.

Country or region after: China

Address before: No.18 Zhongba South Road, Hai'an town, Haian County, Nantong City, Jiangsu Province, 226000

Patentee before: JIANGSU SUZHONG CONSTRUCTION GROUP Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right