PC wallboard construction broaching locating component
Technical Field
The utility model relates to a construction technical field, concretely relates to PC wallboard construction trompil locating component.
Background
In the assembly type structure work progress, precast shear wall panel and interior wallboard connected node need cast in situ concrete to be connected, and node concreting needs add the fixed cast in situ district that forms of aluminium mould in advance, need reserve the aluminium mould split bolt hole in advance with the PVC pipe in the PC panel production process.
The following problems exist in the prior art:
1. after concrete is poured in the use process of the existing PC wallboard construction broaching positioning assembly, the positioning assembly needs to be taken out, at the moment, the assembly is embedded in a preformed hole of a PC board, and workers need to spend much time to disassemble the assembly;
2. the existing hole-drawing positioning component for PC wallboard construction only adopts a PVC pipe to support a preformed hole, the compression resistance of the component is limited, and the condition that the PVC pipe breaks due to overlarge pressure in the use process can cause the preformed hole of a PC board to be deformed.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a PC wallboard construction trompil locating component, places the platform including the template, the top swing joint that the platform was placed to the template has PC panel, the preformed hole has been seted up on the surface of PC panel, the inner wall swing joint in preformed hole has auxiliary device, auxiliary device's bottom is provided with shedder, auxiliary device's top swing joint has a top mounting, shedder is including the drawing of patterns push pedal, the right side fixedly connected with connecting block of drawing of patterns push pedal, the right side fixedly connected with shell fragment one of connecting block, top mounting is including sealed lid, fixedly connected with spliced pole in the middle of the bottom of sealed lid, the bottom fixedly connected with thread head of spliced pole.
By adopting the technical scheme, the connecting blocks in the scheme are fixed with the demoulding push plate, then the connecting blocks and the demoulding push plate are elastically supported through the elastic sheets, then a worker pulls the pull ring to match with the elastic sheets to separate the base from the PC board, and the pull hole material in the PC board can be quickly taken out through the mode.
The utility model discloses technical scheme's further improvement lies in: the outer wall of the connecting column is fixedly connected with a connecting rod, and the left end of the connecting rod is fixedly connected with a supporting plate.
The utility model discloses technical scheme's further improvement lies in: the right side of the bottom of the sealing cover is fixedly connected with a second elastic sheet, the bottom of the second elastic sheet is fixedly connected with a sealing gasket, and the outer wall of the sealing gasket is movably connected with the inner wall of the sealing cover.
Adopt above-mentioned technical scheme, the thread head in this scheme is fixed through rotatory mode with the butt joint nut, and the bottom of propping up the roof simultaneously from this is the bevel connection design, consequently, the inside of PVC pipe can be inserted easily to the spliced pole to owing to adopt the connecting rod to be connected propping up the roof with the spliced pole, so can improve the compressive capacity of PVC pipe greatly through propping up the roof, avoid the PVC pipe in the use because of the too violent condition that the fracture damage appears in the atress.
The utility model discloses technical scheme's further improvement lies in: the auxiliary device comprises a base, the bottom of the base is movably connected with a pull ring, and the inner wall of the base is movably connected with the outer wall of the demolding push plate.
The utility model discloses technical scheme's further improvement lies in: the top fixedly connected with PVC pipe of base, the inner wall of PVC pipe with the outer wall swing joint of a roof board, the outer wall of PVC pipe with the inner wall swing joint of preformed hole, fixed surface is connected with the butt joint nut on the base, the inner wall of butt joint nut with the outer wall swing joint of screw thread head.
The utility model discloses technical scheme's further improvement lies in: the top of the template placing table is movably connected with the bottom of the base.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a PC wallboard construction trompil locating component, through a pair of connecting block of shell fragment and drawing of patterns push pedal elasticity back-up, then staff pulling pull ring cooperation shell fragment one separates base and PC panel, can take out the trompil material in the PC panel fast through this kind of mode, avoided under the traditional mode directly to rely on brute force to take out PVC pipe and base, prevent to cause the damage to the trompil material, the speed that the trompil material was taken out has been improved simultaneously greatly, the convenience that the trompil locating component used has been improved.
2. The utility model provides a PC wallboard construction trompil locating component, it is fixed through rotatory mode with thread head and butt joint nut, simultaneously the bottom of roof is the bevel connection design from this, therefore, the inside of PVC pipe can be inserted easily to the spliced pole, and owing to adopt the connecting rod to be connected roof and spliced pole, so can improve the compressive capacity of PVC pipe greatly through a roof, avoid the PVC pipe in the use because of the too violent condition that breaks and damages appears in the atress, the steadiness that trompil locating component used has been improved from this.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the auxiliary device of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 2 according to the present invention;
fig. 4 is a schematic view of the cross-sectional structure of the supporting device of the present invention.
In the figure: 1. a template placing table; 2. a PC plate; 3. reserving a hole; 4. an auxiliary device; 5. a demolding device; 6. a supporting device; 41. a base; 42. a pull ring; 43. PVC pipes; 44. butting nuts; 51. demoulding push plate; 52. connecting blocks; 53. a first elastic sheet; 61. a sealing cover; 62. connecting columns; 63. a connecting rod; 64. a top supporting plate; 65. a screw head; 66. a second elastic sheet; 67. and a gasket.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the formwork placing table comprises a formwork placing table 1, a PC plate 2 is movably connected to the top of the formwork placing table 1, a preformed hole 3 is formed in the surface of the PC plate 2, an auxiliary device 4 is movably connected to the inner wall of the preformed hole 3, a demoulding device 5 is arranged at the bottom of the auxiliary device 4, and a supporting device 6 is movably connected to the upper side of the auxiliary device 4.
Preferably, the demolding device 5 comprises a demolding push plate 51, a connecting block 52 is fixedly connected to the right side of the demolding push plate 51, a first elastic sheet 53 is fixedly connected to the right side of the connecting block 52, the supporting device 6 comprises a sealing cover 61, a connecting column 62 is fixedly connected to the middle of the bottom of the sealing cover 61, and a threaded head 65 is fixedly connected to the bottom of the connecting column 62.
Further, prop up connecting block 52 and drawing of patterns push pedal 51 elasticity through shell fragment 53, then staff's pulling pull ring 42 cooperation shell fragment 53 separates base 41 and PC panel 2, can take out the trompil material in the PC panel 2 fast through this kind of mode, it takes out PVC pipe 43 and base 41 directly to rely on brute force under the traditional mode to have avoided, prevent to cause the damage to the trompil material, the speed that the trompil material was taken out has been improved simultaneously greatly, the convenience that the trompil locating component used has been improved.
Preferably, the outer wall of the connecting column 62 is fixedly connected with a connecting rod 63, the left end of the connecting rod 63 is fixedly connected with a supporting plate 64, the bottom right side of the sealing cover 61 is fixedly connected with a second elastic sheet 66, the bottom of the second elastic sheet 66 is fixedly connected with a sealing gasket 67, and the outer wall of the sealing gasket 67 is movably connected with the inner wall of the sealing cover 61.
Furthermore, the screw head 65 and the butt-joint screw cap 44 are fixed in a rotating mode, and meanwhile, the bottom of the supporting plate 64 is designed to be an inclined opening, so that the connecting column 62 can be easily inserted into the PVC pipe 43, and the connecting rod 63 is used for connecting the supporting plate 64 and the connecting column 62, so that the pressure resistance of the PVC pipe 43 can be greatly improved through the supporting plate 64, the situation that the PVC pipe 43 is broken and damaged due to over-violent stress in the using process is avoided, the using stability of the pull hole positioning assembly is improved, the top of the PVC pipe 43 is sealed through the sealing cover 61, and the sealing gasket 67 is supported through the two elastic sheets 66 at the bottom of the sealing cover 61, so that the sealing cover 61 is tightly sealed on the top of the PVC pipe 43, concrete is prevented from entering the PVC pipe 43 in the pouring process, and the influence on the next use of the pull hole positioning assembly is prevented.
Example 2
As shown in fig. 1-4, the auxiliary device 4 comprises a base 41, a pull ring 42 is movably connected to the bottom of the base 41, and the inner wall of the base 41 is movably connected to the outer wall of a mold-releasing push plate 51.
Preferably, the top of the base 41 is fixedly connected with a PVC pipe 43, the inner wall of the PVC pipe 43 is movably connected with the outer wall of the supporting top plate 64, the outer wall of the PVC pipe 43 is movably connected with the inner wall of the preformed hole 3, the upper surface of the base 41 is fixedly connected with a butt-joint nut 44, the inner wall of the butt-joint nut 44 is movably connected with the outer wall of the thread head 65, and the top of the formwork placing table 1 is movably connected with the bottom of the base 41.
The working principle of the PC wallboard construction broaching positioning assembly is described in detail below.
As shown in fig. 1-4, in the PC wall panel construction broaching positioning assembly, in use, the screw head 65 and the butt nut 44 are first fixed by rotation, and at the same time, the bottom of the supporting plate 64 is designed to be a bevel opening, so that the connecting column 62 can be easily inserted into the interior of the PVC pipe 43, and the connecting rod 63 is used to connect the supporting plate 64 and the connecting column 62, so that the pressure resistance of the PVC pipe 43 can be greatly improved by the supporting plate 64, and the PC panel 2 can be manufactured by concrete pouring.
In the manufacturing process, seal the top of PVC pipe 43 through sealed lid 61, here, two 66 apical branch sealing gaskets 67 of shell fragment through sealed lid 61 bottom make sealed lid 61 inseparable to the top of PVC pipe 43, avoid pouring in-process concrete entering PVC pipe 43, prevent to influence the next use of trompil locating component.
After the preparation is accomplished, prop up connecting block 52 and drawing of patterns push pedal 51 elasticity through shell fragment 53, then staff's pulling pull ring 42 cooperation shell fragment 53 separates base 41 and PC panel 2, can take out the broaching material in the PC panel 2 fast through this kind of mode, has avoided directly relying on brute force under the traditional mode to take out PVC pipe 43 and base 41, prevents to cause the damage to the broaching material, has improved the speed that the broaching material was taken out simultaneously greatly.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.