CN207033471U - Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template - Google Patents
Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template Download PDFInfo
- Publication number
- CN207033471U CN207033471U CN201720720271.3U CN201720720271U CN207033471U CN 207033471 U CN207033471 U CN 207033471U CN 201720720271 U CN201720720271 U CN 201720720271U CN 207033471 U CN207033471 U CN 207033471U
- Authority
- CN
- China
- Prior art keywords
- template
- inverted arch
- tie
- concrete
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template.It is connected with each other or using integral mold plate as planar arc inverted arch template per three to five pieces of side plane template, be hinged sidewall template respectively at both ends, top is connected by tie-beam, bottom is connected provided with column with inverted arch template, and post, column upper end fixed lateral beam are respectively set up in tie-beam both sides, telescoping tube is inserted in the hollow of both ends, outer end connects road wheel by hoist cylinder, is hinged between telescoping tube and sidewall template and reinforces leading screw, be hinged demoulding oil jar between tie-beam and sidewall template.Overcome the cyclization construction of tunnel side wall inverted arch and lack arc formwork, concrete is hardly formed the problem of ring camber, full arc template liftable is free, fast accurate is positioned, is convenient in demoulding, walking is stable, it is easy to operate, it can ensure construction quality effectively by cyclic concrete and fill concrete step-by-step construction, improve efficiency of construction.
Description
Technical field
It the utility model is related to tunnel side wall inverted arch concrete cyclization cast template, specifically tunnel side wall inverted arch concrete
Cyclization cast automatic moving full arc template, belongs to road and bridge construction field.
Background technology
With the fast development of World Economics, when road infrastructure construction has been enter into important development
Phase, and main projects of the tunnel as construction of road and bridge, its quality constructed just are particularly important with efficiency.Together
Shi Guojia also proposes energy-saving and emission-reduction, environmental protection construction theory, that is, requires to improve efficiency of construction, requires that mitigation workmen's work is strong again
Degree.At present following steps are roughly divided into during constructing tunnel:Prepare before construction;Tunnel portal section is constructed;Environmental monitoring
Measurement;Tunnel advanced support;Tunnel trunk excavates;Inverted arch excavation supporting;Tunnel inner waterproofing draining.Wherein inverted arch excavation supporting needs
Bow member is installed and concrete is poured into a mould into camber and is connected cast with top bow member, while also wants the related concrete by abutment wall
Pour into a mould together, the concrete of the concrete that top two serves as a contrast and bottom inverted arch is formed ring entirety, then second pouring backfill coagulation
Soil, fill concrete label is lower, to strengthen the bearing capacity of inverted arch concrete, reaches design requirement standard.Current
In constructing tunnel, the construction method generally used is the concrete of the lining of cast two after the concrete for first pouring into a mould bottom cyclization, but by
Use, waited so concrete is hardly formed ring camber, during practice of construction after concrete initial set by applying in lacking arc formwork
Worker person could be made concrete form camber reluctantly, then could be poured into a mould the concrete of abutment wall, cause coagulation soil application with spade
The time of work is grown, low construction efficiency, also greatly adds the labor intensity of workmen, and constructing tunnel is badly in need of a kind of tunnel at present
Road abutment wall inverted arch concrete cyclization cast full arc template.
The content of the invention
The purpose of this utility model is to overcome current tunnel side wall inverted arch cyclization construction due to lacking arc formwork, so mixed
Solidifying soil is hardly formed the technical problem of ring camber, is automatically moved so as to disclose a kind of tunnel side wall inverted arch concrete cyclization cast
Full arc template.
The utility model is achieved through the following technical solutions:
Planar arc inverted arch template is interconnected to form by every three to five pieces of plane templates in side or using integral mold plate as plane
Arc inverted arch template, be hinged sidewall template respectively in the inverted arch template end of both sides, in arc inverted arch template upper level direction
Be connected with each other by three to five tie-beams, wherein the tie-beam bottom at every interval be vertically arranged respectively three root posts by its with
Inverted arch template is connected with each other, while one root post of each setting is distinguished in tie-beam top both sides, solid respectively in two root posts upper end
Determine transverse beam, be inserted in telescoping tube in the hollow at transverse beam both ends respectively, hoist cylinder is fixed in telescoping tube outer end, and hoist cylinder is stretched
Road wheel is fixed at contracting end, and road wheel may pass through the note concrete mouth being correspondingly arranged in inverted arch template, two telescoping tubes and sidewall template it
Between respectively be hinged reinforce leading screw, be hinged demoulding oil jar respectively between the tie-beam both ends at remaining interval and sidewall template, at two
Longitudinal beam is fixed on tie-beam on the outside of column respectively to be connected with each other whole tie-beams, the fixed control on the tie-beam at edge
Case, control cabinet both sides installation reductor.
Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template provided by the utility model, overcomes at present
Various defects existing for similar construction, constructing tunnel is filled up and has been badly in need of a kind of tunnel side wall inverted arch concrete cyclization cast full arc mould
The blank of plate.Mutual hinge between sidewall template and inverted arch camber template is characterized in, device during installation is adjusted in full arc template,
Liftable is free, positions fast accurate, is convenient in demoulding, and walking is stable, easy to operate, can be effectively by cyclic concrete with filling out
Concrete step-by-step construction is filled, ensure that construction quality, improves efficiency of construction.
Brief description of the drawings
Accompanying drawing 1 is main structure diagram of the present utility model.
Accompanying drawing 2 is overlooking the structure diagram of the present utility model.
Reference title is as follows:Sidewall template 1, inverted arch template 2, hoist cylinder 3, telescoping tube 4, telescopic oil cylinder 5, walking
Wheel 6, tie-beam 7, demoulding oil jar 8, leading screw 9 is reinforced, transverse beam 10, longitudinal beam 11, note concrete mouth 12, column 13, control cabinet 14, is subtracted
Fast machine 15.
Embodiment:
The utility model is described in more detail below in conjunction with accompanying drawing:
Using integral mold plate as planar arc inverted arch template 2, in the end of inverted arch template 2 of both sides hinge sidewall template 1 respectively,
It is connected with each other in the upper level direction of arc inverted arch template 2 by five tie-beams 7, wherein the bottom of tie-beam 7 at every interval
It is respectively perpendicular and sets three root posts 13 to be connected with each other itself and inverted arch template 2, while distinguishes each setting in the top both sides of tie-beam 7
One root post 13, fixed lateral beam 10 is distinguished in the upper end of two root posts 13, is inserted in respectively in the hollow at the both ends of transverse beam 10 flexible
Hoist cylinder 3 is fixed in pipe 4, the outer end of telescoping tube 4, and the telescopic end of hoist cylinder 3 fixes road wheel 6, and road wheel 6 may pass through inverted arch mould
The note concrete mouth 12 being correspondingly arranged on plate 2, it is hinged respectively between two telescoping tubes 4 and sidewall template 1 and reinforces leading screw 9, remaining interval
The both ends of tie-beam 7 and sidewall template 1 between be hinged respectively demoulding oil jar 8, on the tie-beam 7 in the outside of two root posts 13 respectively
Whole tie-beams 7 are connected with each other by fixed longitudinal beam 11, and control cabinet 14, the both sides of control cabinet 14 are fixed on the tie-beam 7 at edge
Reductor 15 is installed.
The utility model first carries it to tunnel inverted arch when operating and excavates position, opens hydraulic control box, telescopic oil cylinder
Extension drives the hoist cylinder of telescoping tube and its underpart to stretch out with road wheel, stops when road wheel is above note concrete mouth
Only, hoist cylinder extension drives road wheel to decline, and road wheel is placed in inverted arch excavation face through note concrete mouth, and hoist cylinder continues to prolong
Stretch template integrally to begin to ramp up, the traction reductor operation band whole self-propelled movement of moving platen, run to inverted arch and pour position stopping,
Hoist cylinder shrinks template entire lowering, drops to inverted arch and pours height stopping, inverted arch template reinforces fixation, demoulding oil jar up and down
Flexible that sidewall template is adjusted, fixed with reinforcing leading screw after regulating, sidewall template two is closed with plug, is started
Casting concrete, after the completion for the treatment of concreting solidification, reinforcing leading screw is unloaded, demoulding oil jar, which shrinks, drives sidewall template disengaging mixed
Native face is coagulated, telescopic oil cylinder, which shrinks, drives the hoist cylinder of telescoping tube and its underpart to be shunk inwards with road wheel, when road wheel is located at
Stop when above note concrete mouth, hoist cylinder extension drives road wheel to decline, and road wheel is placed in the inverted arch poured through note concrete mouth
On face, hoist cylinder continues extension integral mold plate and begun to ramp up, and traction reductor operation drives integral mold plate automatic moving under
Individual inverted arch pours position.
Claims (3)
1. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template, it is characterised in that:
Planar arc inverted arch template (2) is interconnected to form by every three to five pieces of plane templates in side or using integral mold plate as plane arc
Shape inverted arch template (2), be hinged sidewall template (1) respectively in inverted arch template (2) end of both sides, in arc inverted arch template (2)
Portion's horizontal direction is connected with each other by three to five tie-beams (7), wherein tie-beam (7) bottom at every interval is respectively perpendicular and set
Three root posts (13) are put by itself and inverted arch template (2) interconnection, while in each setting one of tie-beam (7) top both sides difference
Column (13), it is inserted in respectively in two root posts (13) upper end difference fixed lateral beam (10), the hollow at transverse beam (10) both ends
Hoist cylinder (3) is fixed in telescoping tube (4), telescoping tube (4) outer end, and hoist cylinder (3) telescopic end fixes road wheel (6), walking
Wheel (6) may pass through the note concrete mouth (12) being correspondingly arranged in inverted arch template (2), divide between two telescoping tubes (4) and sidewall template (1)
Leading screw (9) Jiao Lian not be reinforced, be hinged demoulding oil jar respectively between tie-beam (7) both ends at remaining interval and sidewall template (1)
(8) longitudinal beam (11), is fixed on the tie-beam (7) on the outside of two root posts (13) respectively to be connected with each other whole tie-beams (7),
Control cabinet (14), control cabinet (14) both sides installation reductor (15) are fixed on the tie-beam (7) at edge.
2. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template according to claim 1, its feature exist
In:Inverted arch template (2) is using integral mold plate as planar arc.
3. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template according to claim 1, its feature exist
In:It is connected with each other in arc inverted arch template (2) upper level direction by five tie-beams (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720720271.3U CN207033471U (en) | 2017-06-20 | 2017-06-20 | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720720271.3U CN207033471U (en) | 2017-06-20 | 2017-06-20 | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207033471U true CN207033471U (en) | 2018-02-23 |
Family
ID=61467817
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720720271.3U Active CN207033471U (en) | 2017-06-20 | 2017-06-20 | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207033471U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107191205A (en) * | 2017-06-20 | 2017-09-22 | 中铁二十局集团第三工程有限公司 | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template |
-
2017
- 2017-06-20 CN CN201720720271.3U patent/CN207033471U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107191205A (en) * | 2017-06-20 | 2017-09-22 | 中铁二十局集团第三工程有限公司 | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template |
CN107191205B (en) * | 2017-06-20 | 2024-01-09 | 中铁二十一局集团第三工程有限公司 | Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105386778B (en) | Tunnel excavation lining construction chassis and tunnel excavation lining construction method | |
CN206784951U (en) | A kind of concreting floorslab thickness control device | |
CN109944161B (en) | Steel box concrete bent pier on steel pipe arch bridge arch and construction method | |
CN108589535A (en) | A kind of reinforced concrete box girder construction method | |
CN207130622U (en) | A kind of flower basket type anticollision barrier construction formwork | |
CN108035737A (en) | Tunnel Second Lining formwork jumbo seals leg structure and its installation method | |
CN110273695A (en) | A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure | |
CN106223960B (en) | High-speed rail major long tunnel inverted arch moves integrally mould bases construction | |
CN207033471U (en) | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template | |
CN106050268B (en) | Round rectangle section tunnel concrete liner telescoping steel form | |
CN107419904A (en) | The skewed slot mounting structure and its application method poured for concrete column | |
CN107191205A (en) | Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template | |
CN206553964U (en) | Whole self-propelled formula culvert trolley formwork | |
CN206233566U (en) | It is a kind of early to tear method alter-pouring strips mould plate supporting construction open | |
CN104894943B (en) | Road and bridge gutter construction concrete cast integral mold plate | |
CN109371851A (en) | More bed die head-shield support frame Channel Makers | |
CN202117031U (en) | Hydraulic slip form construction device for gate pier | |
CN109083184A (en) | A kind of prefabricated cushion cap of land sectional type and its production and installation method | |
CN206053965U (en) | A kind of tunnel ditch cable trough construction trolley | |
CN114908684A (en) | Construction method of suspended casting box girder cradle method | |
CN212563260U (en) | Prefabricated box culvert trolley | |
CN210068184U (en) | Tunnel center escape canal construction template | |
CN209687504U (en) | A kind of tunnel inverted arch one-time-concreting molding machine | |
CN206418406U (en) | Template of pier column of bridge structure | |
CN208121761U (en) | Deep mud pit cast-in-situ bored pile steel pile casting pre-buried structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |