CN207033471U - Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template - Google Patents

Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template Download PDF

Info

Publication number
CN207033471U
CN207033471U CN201720720271.3U CN201720720271U CN207033471U CN 207033471 U CN207033471 U CN 207033471U CN 201720720271 U CN201720720271 U CN 201720720271U CN 207033471 U CN207033471 U CN 207033471U
Authority
CN
China
Prior art keywords
template
inverted arch
tie
concrete
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720720271.3U
Other languages
Chinese (zh)
Inventor
马小利
冯玉坤
杨创路
周明升
张国杰
高新平
王永福
柳吉焕
刘广义
康志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201720720271.3U priority Critical patent/CN207033471U/en
Application granted granted Critical
Publication of CN207033471U publication Critical patent/CN207033471U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template.It is connected with each other or using integral mold plate as planar arc inverted arch template per three to five pieces of side plane template, be hinged sidewall template respectively at both ends, top is connected by tie-beam, bottom is connected provided with column with inverted arch template, and post, column upper end fixed lateral beam are respectively set up in tie-beam both sides, telescoping tube is inserted in the hollow of both ends, outer end connects road wheel by hoist cylinder, is hinged between telescoping tube and sidewall template and reinforces leading screw, be hinged demoulding oil jar between tie-beam and sidewall template.Overcome the cyclization construction of tunnel side wall inverted arch and lack arc formwork, concrete is hardly formed the problem of ring camber, full arc template liftable is free, fast accurate is positioned, is convenient in demoulding, walking is stable, it is easy to operate, it can ensure construction quality effectively by cyclic concrete and fill concrete step-by-step construction, improve efficiency of construction.

Description

Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
Technical field
It the utility model is related to tunnel side wall inverted arch concrete cyclization cast template, specifically tunnel side wall inverted arch concrete Cyclization cast automatic moving full arc template, belongs to road and bridge construction field.
Background technology
With the fast development of World Economics, when road infrastructure construction has been enter into important development
Phase, and main projects of the tunnel as construction of road and bridge, its quality constructed just are particularly important with efficiency.Together Shi Guojia also proposes energy-saving and emission-reduction, environmental protection construction theory, that is, requires to improve efficiency of construction, requires that mitigation workmen's work is strong again Degree.At present following steps are roughly divided into during constructing tunnel:Prepare before construction;Tunnel portal section is constructed;Environmental monitoring Measurement;Tunnel advanced support;Tunnel trunk excavates;Inverted arch excavation supporting;Tunnel inner waterproofing draining.Wherein inverted arch excavation supporting needs Bow member is installed and concrete is poured into a mould into camber and is connected cast with top bow member, while also wants the related concrete by abutment wall Pour into a mould together, the concrete of the concrete that top two serves as a contrast and bottom inverted arch is formed ring entirety, then second pouring backfill coagulation Soil, fill concrete label is lower, to strengthen the bearing capacity of inverted arch concrete, reaches design requirement standard.Current In constructing tunnel, the construction method generally used is the concrete of the lining of cast two after the concrete for first pouring into a mould bottom cyclization, but by Use, waited so concrete is hardly formed ring camber, during practice of construction after concrete initial set by applying in lacking arc formwork Worker person could be made concrete form camber reluctantly, then could be poured into a mould the concrete of abutment wall, cause coagulation soil application with spade The time of work is grown, low construction efficiency, also greatly adds the labor intensity of workmen, and constructing tunnel is badly in need of a kind of tunnel at present Road abutment wall inverted arch concrete cyclization cast full arc template.
The content of the invention
The purpose of this utility model is to overcome current tunnel side wall inverted arch cyclization construction due to lacking arc formwork, so mixed Solidifying soil is hardly formed the technical problem of ring camber, is automatically moved so as to disclose a kind of tunnel side wall inverted arch concrete cyclization cast Full arc template.
The utility model is achieved through the following technical solutions:
Planar arc inverted arch template is interconnected to form by every three to five pieces of plane templates in side or using integral mold plate as plane Arc inverted arch template, be hinged sidewall template respectively in the inverted arch template end of both sides, in arc inverted arch template upper level direction Be connected with each other by three to five tie-beams, wherein the tie-beam bottom at every interval be vertically arranged respectively three root posts by its with Inverted arch template is connected with each other, while one root post of each setting is distinguished in tie-beam top both sides, solid respectively in two root posts upper end Determine transverse beam, be inserted in telescoping tube in the hollow at transverse beam both ends respectively, hoist cylinder is fixed in telescoping tube outer end, and hoist cylinder is stretched Road wheel is fixed at contracting end, and road wheel may pass through the note concrete mouth being correspondingly arranged in inverted arch template, two telescoping tubes and sidewall template it Between respectively be hinged reinforce leading screw, be hinged demoulding oil jar respectively between the tie-beam both ends at remaining interval and sidewall template, at two Longitudinal beam is fixed on tie-beam on the outside of column respectively to be connected with each other whole tie-beams, the fixed control on the tie-beam at edge Case, control cabinet both sides installation reductor.
Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template provided by the utility model, overcomes at present Various defects existing for similar construction, constructing tunnel is filled up and has been badly in need of a kind of tunnel side wall inverted arch concrete cyclization cast full arc mould The blank of plate.Mutual hinge between sidewall template and inverted arch camber template is characterized in, device during installation is adjusted in full arc template, Liftable is free, positions fast accurate, is convenient in demoulding, and walking is stable, easy to operate, can be effectively by cyclic concrete with filling out Concrete step-by-step construction is filled, ensure that construction quality, improves efficiency of construction.
Brief description of the drawings
Accompanying drawing 1 is main structure diagram of the present utility model.
Accompanying drawing 2 is overlooking the structure diagram of the present utility model.
Reference title is as follows:Sidewall template 1, inverted arch template 2, hoist cylinder 3, telescoping tube 4, telescopic oil cylinder 5, walking Wheel 6, tie-beam 7, demoulding oil jar 8, leading screw 9 is reinforced, transverse beam 10, longitudinal beam 11, note concrete mouth 12, column 13, control cabinet 14, is subtracted Fast machine 15.
Embodiment:
The utility model is described in more detail below in conjunction with accompanying drawing:
Using integral mold plate as planar arc inverted arch template 2, in the end of inverted arch template 2 of both sides hinge sidewall template 1 respectively, It is connected with each other in the upper level direction of arc inverted arch template 2 by five tie-beams 7, wherein the bottom of tie-beam 7 at every interval It is respectively perpendicular and sets three root posts 13 to be connected with each other itself and inverted arch template 2, while distinguishes each setting in the top both sides of tie-beam 7 One root post 13, fixed lateral beam 10 is distinguished in the upper end of two root posts 13, is inserted in respectively in the hollow at the both ends of transverse beam 10 flexible Hoist cylinder 3 is fixed in pipe 4, the outer end of telescoping tube 4, and the telescopic end of hoist cylinder 3 fixes road wheel 6, and road wheel 6 may pass through inverted arch mould The note concrete mouth 12 being correspondingly arranged on plate 2, it is hinged respectively between two telescoping tubes 4 and sidewall template 1 and reinforces leading screw 9, remaining interval The both ends of tie-beam 7 and sidewall template 1 between be hinged respectively demoulding oil jar 8, on the tie-beam 7 in the outside of two root posts 13 respectively Whole tie-beams 7 are connected with each other by fixed longitudinal beam 11, and control cabinet 14, the both sides of control cabinet 14 are fixed on the tie-beam 7 at edge Reductor 15 is installed.
The utility model first carries it to tunnel inverted arch when operating and excavates position, opens hydraulic control box, telescopic oil cylinder Extension drives the hoist cylinder of telescoping tube and its underpart to stretch out with road wheel, stops when road wheel is above note concrete mouth Only, hoist cylinder extension drives road wheel to decline, and road wheel is placed in inverted arch excavation face through note concrete mouth, and hoist cylinder continues to prolong Stretch template integrally to begin to ramp up, the traction reductor operation band whole self-propelled movement of moving platen, run to inverted arch and pour position stopping, Hoist cylinder shrinks template entire lowering, drops to inverted arch and pours height stopping, inverted arch template reinforces fixation, demoulding oil jar up and down Flexible that sidewall template is adjusted, fixed with reinforcing leading screw after regulating, sidewall template two is closed with plug, is started Casting concrete, after the completion for the treatment of concreting solidification, reinforcing leading screw is unloaded, demoulding oil jar, which shrinks, drives sidewall template disengaging mixed Native face is coagulated, telescopic oil cylinder, which shrinks, drives the hoist cylinder of telescoping tube and its underpart to be shunk inwards with road wheel, when road wheel is located at Stop when above note concrete mouth, hoist cylinder extension drives road wheel to decline, and road wheel is placed in the inverted arch poured through note concrete mouth On face, hoist cylinder continues extension integral mold plate and begun to ramp up, and traction reductor operation drives integral mold plate automatic moving under Individual inverted arch pours position.

Claims (3)

1. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template, it is characterised in that:
Planar arc inverted arch template (2) is interconnected to form by every three to five pieces of plane templates in side or using integral mold plate as plane arc Shape inverted arch template (2), be hinged sidewall template (1) respectively in inverted arch template (2) end of both sides, in arc inverted arch template (2) Portion's horizontal direction is connected with each other by three to five tie-beams (7), wherein tie-beam (7) bottom at every interval is respectively perpendicular and set Three root posts (13) are put by itself and inverted arch template (2) interconnection, while in each setting one of tie-beam (7) top both sides difference Column (13), it is inserted in respectively in two root posts (13) upper end difference fixed lateral beam (10), the hollow at transverse beam (10) both ends Hoist cylinder (3) is fixed in telescoping tube (4), telescoping tube (4) outer end, and hoist cylinder (3) telescopic end fixes road wheel (6), walking Wheel (6) may pass through the note concrete mouth (12) being correspondingly arranged in inverted arch template (2), divide between two telescoping tubes (4) and sidewall template (1) Leading screw (9) Jiao Lian not be reinforced, be hinged demoulding oil jar respectively between tie-beam (7) both ends at remaining interval and sidewall template (1) (8) longitudinal beam (11), is fixed on the tie-beam (7) on the outside of two root posts (13) respectively to be connected with each other whole tie-beams (7), Control cabinet (14), control cabinet (14) both sides installation reductor (15) are fixed on the tie-beam (7) at edge.
2. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template according to claim 1, its feature exist In:Inverted arch template (2) is using integral mold plate as planar arc.
3. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template according to claim 1, its feature exist In:It is connected with each other in arc inverted arch template (2) upper level direction by five tie-beams (7).
CN201720720271.3U 2017-06-20 2017-06-20 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template Active CN207033471U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720720271.3U CN207033471U (en) 2017-06-20 2017-06-20 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720720271.3U CN207033471U (en) 2017-06-20 2017-06-20 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template

Publications (1)

Publication Number Publication Date
CN207033471U true CN207033471U (en) 2018-02-23

Family

ID=61467817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720720271.3U Active CN207033471U (en) 2017-06-20 2017-06-20 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template

Country Status (1)

Country Link
CN (1) CN207033471U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191205A (en) * 2017-06-20 2017-09-22 中铁二十局集团第三工程有限公司 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107191205A (en) * 2017-06-20 2017-09-22 中铁二十局集团第三工程有限公司 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN107191205B (en) * 2017-06-20 2024-01-09 中铁二十一局集团第三工程有限公司 Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete

Similar Documents

Publication Publication Date Title
CN105386778B (en) Tunnel excavation lining construction chassis and tunnel excavation lining construction method
CN206784951U (en) A kind of concreting floorslab thickness control device
CN109944161B (en) Steel box concrete bent pier on steel pipe arch bridge arch and construction method
CN108589535A (en) A kind of reinforced concrete box girder construction method
CN207130622U (en) A kind of flower basket type anticollision barrier construction formwork
CN108035737A (en) Tunnel Second Lining formwork jumbo seals leg structure and its installation method
CN110273695A (en) A kind of Tunnel Second Lining formwork jumbo and its stage molding pouring procedure
CN106223960B (en) High-speed rail major long tunnel inverted arch moves integrally mould bases construction
CN207033471U (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN106050268B (en) Round rectangle section tunnel concrete liner telescoping steel form
CN107419904A (en) The skewed slot mounting structure and its application method poured for concrete column
CN107191205A (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN206553964U (en) Whole self-propelled formula culvert trolley formwork
CN206233566U (en) It is a kind of early to tear method alter-pouring strips mould plate supporting construction open
CN104894943B (en) Road and bridge gutter construction concrete cast integral mold plate
CN109371851A (en) More bed die head-shield support frame Channel Makers
CN202117031U (en) Hydraulic slip form construction device for gate pier
CN109083184A (en) A kind of prefabricated cushion cap of land sectional type and its production and installation method
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN114908684A (en) Construction method of suspended casting box girder cradle method
CN212563260U (en) Prefabricated box culvert trolley
CN210068184U (en) Tunnel center escape canal construction template
CN209687504U (en) A kind of tunnel inverted arch one-time-concreting molding machine
CN206418406U (en) Template of pier column of bridge structure
CN208121761U (en) Deep mud pit cast-in-situ bored pile steel pile casting pre-buried structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant