CN107191205A - Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template - Google Patents

Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template Download PDF

Info

Publication number
CN107191205A
CN107191205A CN201710470084.9A CN201710470084A CN107191205A CN 107191205 A CN107191205 A CN 107191205A CN 201710470084 A CN201710470084 A CN 201710470084A CN 107191205 A CN107191205 A CN 107191205A
Authority
CN
China
Prior art keywords
template
inverted arch
tie
concrete
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710470084.9A
Other languages
Chinese (zh)
Other versions
CN107191205B (en
Inventor
马小利
冯玉坤
杨创路
周明升
张国杰
高新平
王永福
柳吉焕
刘广义
康志成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway 21st Bureau Group Co Ltd
Priority to CN201710470084.9A priority Critical patent/CN107191205B/en
Publication of CN107191205A publication Critical patent/CN107191205A/en
Application granted granted Critical
Publication of CN107191205B publication Critical patent/CN107191205B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

Full arc template is automatically moved the invention discloses the cyclization cast of tunnel side wall inverted arch concrete.It is connected with each other or using integral mold plate as planar arc inverted arch template per three to five pieces of side plane template, be hinged sidewall template respectively at two ends, top is connected by tie-beam, bottom is connected provided with column with inverted arch template, and post, column upper end fixed lateral beam are respectively set up in tie-beam both sides, telescoping tube is inserted in the hollow of two ends, outer end connects road wheel by hoist cylinder, is hinged between telescoping tube and sidewall template and reinforces leading screw, be hinged demoulding oil jar between tie-beam and sidewall template.Overcome the cyclization construction of tunnel side wall inverted arch and lack arc formwork, the problem of concrete is hardly formed ring camber, full arc template liftable is free, fast accurate is positioned, is convenient in demoulding, walking is stable, it is easy to operate, can be effectively by cyclic concrete and fill concrete step-by-step construction, it is ensured that construction quality, improve efficiency of construction.

Description

Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
Technical field
The present invention relates to the cyclic cast template of tunnel side wall inverted arch concrete, specifically tunnel side wall inverted arch concrete cyclization Automatic moving full arc template is poured into a mould, belongs to road and bridge construction field.
Background technology
With the fast development of World Economics, when road infrastructure construction has been enter into important development
Phase, and tunnel is as the main projects of construction of road and bridge, its quality constructed just is particularly important with efficiency.While state Family also proposes energy-saving and emission-reduction, and environmental protection construction theory requires to improve efficiency of construction, require to mitigate workmen's labor intensity again. Following steps are roughly divided into during current constructing tunnel:Prepare before construction;Tunnel portal section is constructed;Environmental monitoring is surveyed Amount;Tunnel advanced support;Tunnel trunk is excavated;Inverted arch excavation supporting;Tunnel inner waterproofing draining.Wherein inverted arch excavation supporting needs Bow member is installed and concrete is poured into a mould into camber and cast is connected with top bow member, while also wanting the related concrete one by abutment wall Cast is played, makes the concrete formation ring of the concrete that top two is served as a contrast and bottom inverted arch overall, then second pouring fill concrete, Fill concrete label is lower, to strengthen the bearing capacity of inverted arch concrete, reaches design requirement standard.In current tunnel In construction, the construction method generally used is the concrete of the lining of cast two after the concrete for first pouring into a mould bottom cyclization, but due to lacking Weary arc formwork is used, so concrete is hardly formed ring camber, to be waited during practice of construction and constructor is depended on after concrete initial set Member's spade, concrete formation camber could be made reluctantly, the concrete of abutment wall then could be poured into a mould, cause concrete construction Time is long, low construction efficiency, also greatly adds the labor intensity of workmen, and current constructing tunnel is badly in need of a kind of tunnel side Wall inverted arch concrete cyclization cast full arc template.
The content of the invention
The purpose of the present invention is to overcome current tunnel side wall inverted arch cyclization construction due to lacking arc formwork, so concrete The technical problem of ring camber is hardly formed, so that disclosing a kind of tunnel side wall inverted arch concrete cyclization cast automatically moves full arc Template.
The present invention is achieved by the following technical solutions:
Planar arc inverted arch template is interconnected to form by every three to five pieces of plane templates in side or using integral mold plate as planar arc Inverted arch template, be hinged sidewall template respectively in the inverted arch template end of both sides, passes through in arc inverted arch template upper level direction Three to five tie-beams are connected with each other, wherein the tie-beam bottom at every interval is respectively perpendicular three root posts of setting by itself and inverted arch Template is connected with each other, while in tie-beam top both sides difference one root post of each setting, fixing horizontal respectively in two root posts upper end Telescoping tube is inserted in Xiang Liang, the hollow at transverse beam two ends respectively, hoist cylinder, hoist cylinder telescopic end are fixed in telescoping tube outer end Fixed road wheel, road wheel may pass through the note concrete mouthful being correspondingly arranged in inverted arch template, two between telescoping tube and sidewall template points Leading screw Jiao Lian not be reinforced, be hinged demoulding oil jar respectively between the tie-beam two ends at remaining interval and sidewall template, in two root posts Longitudinal beam is fixed on the tie-beam in outside respectively to be connected with each other whole tie-beams, control cabinet is fixed on the tie-beam at edge, Control cabinet both sides are installed by reductor.
The tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template that the present invention is provided, overcomes similar at present The various defects that construction is present, have filled up constructing tunnel and have been badly in need of a kind of tunnel side wall inverted arch concrete cyclization cast full arc template Blank.Mutual hinge is characterized between sidewall template and inverted arch camber template, device in adjusting is installed in full arc template, can be risen Drop freely, positions fast accurate, is convenient in demoulding, and walking is stable, easy to operate, can be effectively mixed with filling by cyclic concrete Solidifying soil step-by-step construction, it is ensured that construction quality, improves efficiency of construction.
Brief description of the drawings
Accompanying drawing 1 is main structure diagram of the invention.
Accompanying drawing 2 is overlooking the structure diagram of the invention.
Reference title is as follows:Sidewall template 1, inverted arch template 2, hoist cylinder 3, telescoping tube 4, telescopic oil cylinder 5, walking Wheel 6, tie-beam 7, demoulding oil jar 8 reinforces leading screw 9, and transverse beam 10, longitudinal beam 11 notes concrete mouthful 12, column 13, control cabinet 14 subtracts Fast machine 15.
Embodiment:
The present invention is described in more detail below in conjunction with accompanying drawing:
Using integral mold plate as planar arc inverted arch template 2, the end of the inverted arch template 2 hinge sidewall template 1 respectively in both sides, in arc The upper level direction of shape inverted arch template 2 is connected with each other by five tie-beams 7, wherein the bottom of tie-beam 7 difference at every interval It is vertically arranged three root posts 13 to be connected with each other it with inverted arch template 2, while in each setting one of the top both sides of tie-beam 7 difference Column 13, telescoping tube 4 is inserted in the upper end of two root posts 13 respectively in difference fixed lateral beam 10, the hollow at the two ends of transverse beam 10, Hoist cylinder 3 is fixed in the outer end of telescoping tube 4, and the telescopic end of hoist cylinder 3 fixes road wheel 6, and road wheel 6 may pass through inverted arch template 2 On the note concrete mouthful 12 that is correspondingly arranged, be hinged respectively between two telescoping tubes 4 and sidewall template 1 and reinforce leading screw 9, the company at remaining interval The demoulding oil jar 8 that is hinged respectively between the two ends of beam 7 and sidewall template 1 is connect, is fixed respectively on the tie-beam 7 in the outside of two root posts 13 Whole tie-beams 7 are connected with each other by longitudinal beam 11, and control cabinet 14 is fixed on the tie-beam 7 at edge, and the both sides of control cabinet 14 are installed Reductor 15.
First carried it to tunnel inverted arch during present invention operation and excavate position, open hydraulic control box, telescopic oil cylinder extension Drive the hoist cylinder of telescoping tube and its underpart to stretch out with road wheel, stop when road wheel is located at note concrete mouthful top, rise Dropping oil cylinder extension drives road wheel to decline, and road wheel is placed in inverted arch excavation face through note concrete mouthful, and hoist cylinder continues extension die Plate is integrally begun to ramp up, the traction reductor operation band whole self-propelled movement of moving platen, is run to inverted arch and is poured position stopping, lifting Oil cylinder shrinks template entire lowering, drops to inverted arch and pours reinforcing fixation above and below height stopping, inverted arch template, demoulding oil jar stretches Sidewall template is adjusted, with reinforcing, leading screw is fixed after regulating, and sidewall template two is closed with plug, starts to pour Concrete, treats after the completion of concreting solidification, unload reinforcing leading screw, demoulding oil jar, which shrinks, drives sidewall template to depart from concrete Face, telescopic oil cylinder, which shrinks, drives the hoist cylinder of telescoping tube and its underpart to be shunk inwards with road wheel, when road wheel is located at note concrete Stop when above mouthful, hoist cylinder extension drives road wheel to decline, road wheel is placed on the inverted arch face poured through concrete mouthful is noted, Hoist cylinder continues extension integral mold plate and begun to ramp up, and traction reductor operation drives integral mold plate automatic moving to next inverted arch Pour position.

Claims (3)

1. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template, it is characterised in that be by following technical side What case was realized:Planar arc inverted arch template is interconnected to form by every three to five pieces of plane templates in side(2)Or using integral mold plate as Planar arc inverted arch template(2), the inverted arch template in both sides(2)End is hinged sidewall template respectively(1), in arc inverted arch template (2)Upper level direction passes through three to five tie-beams(7)It is connected with each other, wherein the tie-beam at every interval(7)Distinguish bottom It is vertically arranged three root posts(13)By itself and inverted arch template(2)It is connected with each other, while in tie-beam(7)Top both sides are respectively set respectively Put a root post(13), in two root posts(13)Distinguish fixed lateral beam in upper end(10), transverse beam(10)Divide in the hollow at two ends Telescoping tube is not inserted in it(4), telescoping tube(4)Hoist cylinder is fixed in outer end(3), hoist cylinder(3)Telescopic end fixes road wheel (6), road wheel(6)It may pass through inverted arch template(2)On the note concrete mouthful that is correspondingly arranged(12), two telescoping tubes(4)With sidewall template (1)Between respectively be hinged reinforce leading screw(9), the tie-beam at remaining interval(7)Two ends and sidewall template(1)Between be hinged respectively it is de- Mould oil cylinder(8), in two root posts(13)The tie-beam in outside(7)It is upper to fix longitudinal beam respectively(11)By whole tie-beams(7)Phase Connect, the tie-beam at edge(7)Upper fixed control cabinet(14), control cabinet(14)Both sides are installed by reductor(15).
2. the tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template according to claim (1), its feature It is:Inverted arch template(2)Using integral mold plate as planar arc.
3. tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template according to claim 1, its feature exists In:In arc inverted arch template(2)Upper level direction passes through five tie-beams(7)It is connected with each other.
CN201710470084.9A 2017-06-20 2017-06-20 Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete Active CN107191205B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710470084.9A CN107191205B (en) 2017-06-20 2017-06-20 Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710470084.9A CN107191205B (en) 2017-06-20 2017-06-20 Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete

Publications (2)

Publication Number Publication Date
CN107191205A true CN107191205A (en) 2017-09-22
CN107191205B CN107191205B (en) 2024-01-09

Family

ID=59879741

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710470084.9A Active CN107191205B (en) 2017-06-20 2017-06-20 Self-moving full-arc template for loop casting of tunnel side wall inverted arch concrete

Country Status (1)

Country Link
CN (1) CN107191205B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108150197A (en) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork
CN111779506A (en) * 2020-07-08 2020-10-16 中铁二十局集团有限公司 Rotatable inverted arch template

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201908664U (en) * 2011-01-13 2011-07-27 成都天博机械有限公司 Movable trestle bridge invert form board trolley
CN203081466U (en) * 2013-03-01 2013-07-24 中铁十七局集团第四工程有限公司 Integrated moving framework for inverted arch of tunnel
KR101494240B1 (en) * 2013-11-28 2015-02-17 주식회사 서진기계 structing method of center roof in turnel
CN104894943A (en) * 2015-06-09 2015-09-09 中铁二十一局集团第四工程有限公司 Integral formwork for road and bridge drainage ditch construction concrete pouring
CN205743931U (en) * 2016-07-19 2016-11-30 重庆工商职业学院 Self-propelled tunnel inverted arch lining template trolley for baffle
CN207033471U (en) * 2017-06-20 2018-02-23 中铁二十一局集团第三工程有限公司 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201908664U (en) * 2011-01-13 2011-07-27 成都天博机械有限公司 Movable trestle bridge invert form board trolley
CN203081466U (en) * 2013-03-01 2013-07-24 中铁十七局集团第四工程有限公司 Integrated moving framework for inverted arch of tunnel
KR101494240B1 (en) * 2013-11-28 2015-02-17 주식회사 서진기계 structing method of center roof in turnel
CN104894943A (en) * 2015-06-09 2015-09-09 中铁二十一局集团第四工程有限公司 Integral formwork for road and bridge drainage ditch construction concrete pouring
CN205743931U (en) * 2016-07-19 2016-11-30 重庆工商职业学院 Self-propelled tunnel inverted arch lining template trolley for baffle
CN207033471U (en) * 2017-06-20 2018-02-23 中铁二十一局集团第三工程有限公司 Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108150197A (en) * 2018-02-05 2018-06-12 中铁隧道集团处有限公司 Radially overturning inverted arch trestle and its installation position method for demoulding to arc formwork
CN108150197B (en) * 2018-02-05 2024-04-05 中铁隧道集团一处有限公司 Radial overturning inverted arch trestle of arc-shaped template and mounting, positioning and demolding method thereof
CN111779506A (en) * 2020-07-08 2020-10-16 中铁二十局集团有限公司 Rotatable inverted arch template

Also Published As

Publication number Publication date
CN107191205B (en) 2024-01-09

Similar Documents

Publication Publication Date Title
CN105386778B (en) Tunnel excavation lining construction chassis and tunnel excavation lining construction method
CN106223980B (en) A kind of construction method of tunnel ditch cable trough construction trolley
CN205676844U (en) A kind of for one-piece casting trench furrow bank with the molding sliding formwork of base plate
CN106759478B (en) A kind of prefabricated piping lane construction method
CN107191205A (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN205638481U (en) Tunnel invert fills slot and removes mould
CN106089256B (en) Ditch cable trench construction trolley and its construction method, tunnel cable die set device
CN207033471U (en) Tunnel side wall inverted arch concrete cyclization cast automatic moving full arc template
CN109083184A (en) A kind of prefabricated cushion cap of land sectional type and its production and installation method
CN206233566U (en) It is a kind of early to tear method alter-pouring strips mould plate supporting construction open
CN106050271A (en) Ditch formwork device for tunnel and construction method of ditch formwork device
CN104894943B (en) Road and bridge gutter construction concrete cast integral mold plate
CN206035501U (en) Tunnel water ditch die carrier device
CN216689076U (en) A prefabricated apron that is used for hollow mound top to pour construction
CN203730011U (en) Formwork limiting device
CN106089257B (en) A kind of tunnel ditch cable trough construction trolley
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN109610354A (en) Cast-in-place slab culvert template system and the cast-in-place slab culvert template system construction method of application
CN209243590U (en) More bed die head-shield support frame Channel Makers
CN212563260U (en) Prefabricated box culvert trolley
CN208323769U (en) A kind of assembled car case general prefabricated component
CN209687504U (en) A kind of tunnel inverted arch one-time-concreting molding machine
CN207846202U (en) A kind of double steel cylinder temporary supports for precast beam installation
CN207277848U (en) Metro Station Structure side wall punching block ruggedized construction
CN207537870U (en) A kind of precast beam unit of cantilevered shape of a hoof bent cap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant