CN218375439U CN202221735314.2U CN202221735314U CN218375439U CN 218375439 U CN218375439 U CN 218375439U CN 202221735314 U CN202221735314 U CN 202221735314U CN 218375439 U CN218375439 U CN 218375439U
Authority
CN
China
Prior art keywords
rings
steel plate
pattern steel
built
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221735314.2U
Other languages
Chinese (zh)
Inventor
王政
苗恩新
要学聪
张志远
韩江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202221735314.2U priority Critical patent/CN218375439U/en
Application granted granted Critical
Publication of CN218375439U publication Critical patent/CN218375439U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a well type elevator regularization isolation device, and the technical field of elevator equipment, which comprises a pattern steel plate, wherein the pattern steel plate is connected with a main beam and a secondary beam which are arranged at the bottom; wherein, decorative pattern steel sheet tip is equipped with the built-in fitting of being connected with the girder, and the built-in fitting rotates with the round pin axle of laying on keeping apart the canopy to be connected, and the one end that the built-in fitting was kept away from to the decorative pattern steel sheet is equipped with rings, rings pass through wire rope and are connected with the round steel rings of laying on keeping apart the canopy upper strata, and for the hard steel pipe template of keeping apart of tradition, overall rigidity has a big amplitude enhancement, because centralized processing welding forms, need not the elevartor shaft again and carries out setting up of steel pipe and template, when having reduced the potential safety hazard, the size accessible decorative pattern steel sheet of regularizing hard isolation is more nimble with the welding of girder and secondary beam, and keeps apart canopy itself through the rings of its tip, utilizes wire rope to connect, when guaranteeing waterproof angle, overall stability is higher, and the bearing capacity is stronger.

Description

Well formula lift regularization isolating device
Technical Field
The utility model relates to a lift equipment technical field, concretely relates to well formula lift regularization isolating device.
Background
The traditional elevator shaft is isolated firmly, the steel pipe and the template are combined commonly in a construction site, the rigidity of the elevator shaft is limited, sporadic materials and garbage can be blocked, the template is inevitably worn and large in loss if exposed to the sun and rain, the material performance cannot be effectively exerted, and the waterproof and floor falling prevention effects are greatly reduced while the waste template is utilized in a conventional project;
meanwhile, because the two sides of the elevator shaft door opening are masonry or integrally poured, the traditional hard isolation erection and dismantling space is limited, and construction is inconvenient. The project that adopts well formula lift, the top need carry out the protection of host computer, carries out the floor according to the project moreover and promotes, and the number of times is many, leads to the tradition to keep apart firmly and demolish, install, more waste time and energy to influence follow-up construction.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a well formula lift regularization isolating device solves following technical problem:
because elevator shaft door opening both sides are brickwork or whole pouring, traditional hard isolation sets up and demolishs the space limited, causes the construction inconvenience.
The purpose of the utility model can be realized by the following technical scheme:
a well type elevator regularization isolating device comprises a pattern steel plate, wherein the pattern steel plate is connected with a main beam and a secondary beam which are arranged at the bottom;
the end part of the patterned steel plate is provided with an embedded part connected with the main beam, the embedded part is rotatably connected with pin shafts distributed on the isolation shed, one end, far away from the embedded part, of the patterned steel plate is provided with a lifting ring, and the lifting ring is connected with round steel lifting rings distributed on the upper layer of the isolation shed through a steel wire rope.
Preferably, the main beam is welded with the secondary beam, one end of the patterned steel plate is welded with the main beam through the stiffened plate, and the other end of the patterned steel plate is welded with the lap joint part of the secondary beam.
Preferably, the steel plate with patterns has an inclination angle of 15 degrees compared with the horizontal plane when being installed.
Preferably, the pin shaft is connected with the isolation device through a high-strength bolt, and a bolt hole is reserved in the pin shaft.
Preferably, two groups of the lifting rings and the steel wire ropes are arranged.
Preferably, the width of the embedded part is 20-30cm, and the length is 30cm.
The utility model has the advantages that:
(1) The utility model discloses adopt the steel construction in the processing of carrying out regularization isolating device, for the steel pipe template of traditional hard isolation, overall rigidity has the promotion by a wide margin, because the welding of concentrated processing forms, need not the elevartor shaft again and carry out setting up of steel pipe and template, when having reduced the potential safety hazard, the size accessible decorative pattern steel sheet of regularization hard isolation is more nimble with the welding of girder and secondary beam, the size after the use also can be through reprocessing, the technology of spraying paint, reuse, and keep apart canopy itself through the rings of its tip, utilize the connection of two wire rope, when guaranteeing waterproof angle, overall stability is higher, the bearing capacity is stronger;
(2) The utility model has the advantages of simple structure, can reduce the field operation of old and useless template and steel pipe, the isolating device reprocessing after using simultaneously is favorable to the reuse, accords with national energy saving and consumption reduction's requirement, can effectively reduce construction cost, is worth promoting.
Drawings
The present invention will be further described with reference to the accompanying drawings.
Fig. 1 is a schematic structural diagram of a well-type elevator regularization isolation device of the present invention;
fig. 2 is a schematic view of the top view structure of the well-type elevator sizing and isolating device of the present invention.
In the figure: 1. a patterned steel plate; 2. a main beam; 3. a secondary beam; 4. a pin shaft; 5. embedding parts; 6. a hoisting ring; 7. a round steel hoisting ring; 8. a steel cord.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person skilled in the art without making creative efforts belong to the protection scope of the present invention.
Please refer to fig. 1-2, the utility model relates to a well formula lift regularization isolating device, including the decorative pattern steel sheet 1, the decorative pattern steel sheet 1 is connected with girder 2 and secondary beam 3 laid at the bottom, and girder 2 and secondary beam 3 are welded and formed, and during the welding, girder 2 and secondary beam 3 are full weld, and at the position of not noting welding length, all adopt right angle weld, after girder 2 and secondary beam 3 are wholly welded into the frame, decorative pattern steel sheet 1 one end is through the gusset and the girder 2 welds, and the other end is welded with secondary beam 3 overlap joint position, guarantees holistic stability;
the patterned steel plate 1 is at an inclination angle of 15 degrees compared with a horizontal plane when being installed, partial hoisting can be carried out according to the size of a well when the patterned steel plate is hoisted in the well, the pin shaft 4 is connected with the processed isolation device through a high-strength bolt, after the connection is ensured to be stable, the steel wire rope 8 is tightened, the inclination angle of 15 degrees is completed, and thus the installation of the finalized isolation device is completed;
the end part of the patterned steel plate 1 is provided with an embedded part 5 connected with the main beam 2, the embedded part 5 is rotatably connected with a pin shaft 4 distributed on an isolation shed, the width of the embedded part 5 is 20-30cm, the length of the embedded part 5 is 30cm, the pin shaft 4 is processed in advance and is reserved with a bolt hole, one end of the patterned steel plate 1, which is far away from the embedded part 5, is provided with a hanging ring 6, and the hanging ring 6 is connected with a round steel hanging ring 7 distributed on the upper layer of the isolation shed through a steel wire rope 8; two groups of lifting rings 6 and steel wire ropes 8 are arranged.
The utility model discloses a theory of operation: when hoisting is carried out in the well, partial hoisting can be carried out according to the size of the well, after the steel wire rope 8 is connected with the lifting rings 6, the pin shaft 4 is connected with the processed isolating device through the high-strength bolt, the steel wire rope 8 is tightened after the connection is stable, the 15-degree inclination angle is completed, the installation of the finalized isolating device is completed, when the steel wire rope is lifted subsequently, the pin shaft 4 is only required to be unscrewed from the main beam 2 through the bolt, the connection between the steel wire rope 8 and the round steel lifting rings 7 is loosened, the tower crane is lifted upwards through the end lifting rings 6, the lifting can be completed by repeating the installation process again, the traditional hard isolation is not needed, the blanking cutting is carried out again, and the template is laid.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of the description, but do not indicate or imply that the device or element referred to must have a specific orientation and a specific orientation configuration and operation, and thus, should not be construed as limiting the present invention. Furthermore, "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate member, or they may be connected through two or more elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Although an embodiment of the present invention has been described in detail, the description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (6)

1. A well type elevator regularization isolating device comprises a pattern steel plate (1), and is characterized in that the pattern steel plate (1) is connected with a main beam (2) and a secondary beam (3) which are arranged at the bottom;
wherein, decorative pattern steel sheet (1) tip is equipped with built-in fitting (5) of being connected with girder (2), and built-in fitting (5) rotate with round pin axle (4) of laying on keeping apart the canopy and be connected, and the one end that built-in fitting (5) were kept away from in decorative pattern steel sheet (1) is equipped with rings (6), rings (6) are connected with round steel rings (7) of laying on keeping apart the canopy upper strata through wire rope (8).
2. The well type elevator finalized isolation device according to claim 1, wherein a main beam (2) and a secondary beam (3) are welded, one end of the patterned steel plate (1) is welded with the main beam (2) through a stiffened plate, and the other end of the patterned steel plate is welded with the lap joint of the secondary beam (3).
3. The well type elevator stereotyped isolating device according to claim 2, characterized in that the pattern steel plate (1) has an inclination angle of 15 ° compared with the horizontal plane when installed.
4. The well type elevator sizing isolation device according to claim 1, wherein the pin shaft (4) is connected with the isolation device through a high-strength bolt, and a bolt hole is reserved in the pin shaft (4).
5. A well type elevator sizing isolation device according to claim 2, wherein two sets of the hoisting rings (6) and the steel wire ropes (8) are arranged.
6. A hoistway-type elevator finalized isolation device according to claim 1, wherein the embedded part (5) has a width of 20-30cm and a length of 30cm.
CN202221735314.2U 2022-07-05 2022-07-05 Well formula lift regularization isolating device Expired - Fee Related CN218375439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221735314.2U CN218375439U (en) 2022-07-05 2022-07-05 Well formula lift regularization isolating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221735314.2U CN218375439U (en) 2022-07-05 2022-07-05 Well formula lift regularization isolating device

Publications (1)

Publication Number Publication Date
CN218375439U true CN218375439U (en) 2023-01-24

Family

ID=84960636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221735314.2U Expired - Fee Related CN218375439U (en) 2022-07-05 2022-07-05 Well formula lift regularization isolating device

Country Status (1)

Country Link
CN (1) CN218375439U (en)

Similar Documents

Publication Publication Date Title
CN207844890U (en) A kind of hoisting fixture for building curtain wall
CN105908761A (en) Construction technology of hanging basket moving platform for high slope
CN218375439U (en) Well formula lift regularization isolating device
CN206942109U (en) One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN107288352A (en) The transport of the closed shed dormer roof boarding of overlarge area and installation method
CN210619969U (en) Prefabricated staircase hoist and mount subassembly
CN207645604U (en) A kind of erecting by overhang
CN104963521B (en) A kind of system and construction method for head tower integral hoisting rotation
CN201334770Y (en) Wall-attached supporting seat
CN205474862U (en) Wet seam template operation platform of portable case roof beam
CN217631187U (en) Protective structure of climbing frame
CN105731271A (en) Combined tower crane for roof construction and construction method thereof
CN211341606U (en) Operating platform for structural light well part
CN218758633U (en) Setting integral lifting type operation platform for light production well
CN210032102U (en) Support for mounting external hanging piece of building
CN209384548U (en) A kind of double eave structures that drip of stone curtain wall
CN107879261A (en) Inclined type arched trash rack hoisting device and hoisting method
CN107100155A (en) A kind of construction method of the monoblock type job platform constructed for offshore wind farm and the platform
CN208329578U (en) Cantilever steel platform for material unloading novel rings
CN111962912B (en) Integral hoisting and dismantling construction method for high-altitude frame column
CN207709189U (en) A kind of arch key positioning device of vertical roll grinder
CN208023970U (en) Construction discharging platform
CN215974665U (en) Portable steel structure auxiliary hoisting device
CN220100762U (en) Interior climbing formula well promotes protection system
CN217460951U (en) Can have enough to meet need elevator rings device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230124