CN206942109U - One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection - Google Patents

One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection Download PDF

Info

Publication number
CN206942109U
CN206942109U CN201720577976.4U CN201720577976U CN206942109U CN 206942109 U CN206942109 U CN 206942109U CN 201720577976 U CN201720577976 U CN 201720577976U CN 206942109 U CN206942109 U CN 206942109U
Authority
CN
China
Prior art keywords
wall
scaffold
industrialization
security protection
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720577976.4U
Other languages
Chinese (zh)
Inventor
崔志山
赵亢
肖伟
敖文章
姚玉春
王立宾
邓佳兴
张顺正
侯帅
潘玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Original Assignee
BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd filed Critical BEIJING LIUJIAN CONSTRUCTION GROUP Co Ltd
Priority to CN201720577976.4U priority Critical patent/CN206942109U/en
Application granted granted Critical
Publication of CN206942109U publication Critical patent/CN206942109U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

一种无卸荷产业化安全防护专用悬挑托架及防护架体,悬挑托架为三角型钢悬挑架,由三根角钢首尾顺次连接,其中贴墙杆的椭圆孔内设穿墙螺栓与结构墙体固定;贴墙杆上焊接有至少两根L形限位钢筋,其分别夹固在穿墙螺栓的上下两侧;L形限位钢筋一端垂直焊接在贴墙杆垂直结构墙体一侧的角钢板板上,另一端垂直焊接在紧贴结构墙体一侧的角钢板上;游离垫片设在限位钢筋与贴墙杆之间的空间内。穿墙螺栓同时穿过游离垫片中心的通孔和椭圆孔;上下弦杆之间还设置有加强腹杆。三角型钢悬挑架以上搭设6~8层双排外防护脚手架,其高度不超过18m。本实用新型涉及的结构简单、操作简便,节省了工期,降低了工程成本,施工安全可靠,适用度广。

A special cantilever bracket and protective frame body for non-unloading industrial safety protection. The cantilever bracket is a triangular steel cantilever frame, which is connected from the end to the end by three angle steels, and the oval holes of the wall-attached rods are provided with wall-through bolts. Fixed with the structural wall; at least two L-shaped limit steel bars are welded on the wall-mounted rod, which are respectively clamped on the upper and lower sides of the wall-through bolt; one end of the L-shaped limit steel bar is vertically welded to the vertical structural wall of the wall-mounted rod The angle steel plate on one side is vertically welded on the angle steel plate close to the side of the structural wall at the other end; the free spacer is set in the space between the limit steel bar and the wall stick. The wall-through bolt passes through the through hole and the oval hole in the center of the free spacer at the same time; a reinforcing web is also arranged between the upper and lower chords. 6-8 layers of double-row external protective scaffolding shall be erected above the triangular steel cantilever frame, and its height shall not exceed 18m. The utility model has the advantages of simple structure and convenient operation, which saves construction period and reduces engineering cost, and has safe and reliable construction and wide applicability.

Description

一种无卸荷产业化安全防护专用悬挑托架及防护架体A special cantilever bracket and protective frame body for non-unloading industrial safety protection

技术领域technical field

本实用新型涉及脚手架、悬挑脚手架施工技术领域,具体涉及一种无卸荷产业化安全防护专用悬挑托架及防护架体,适用于装配式结构施工。The utility model relates to the technical field of scaffolding and cantilevered scaffolding construction, in particular to a cantilevered bracket and a protective frame body specially used for non-unloading industrialized safety protection, which are suitable for assembly-type structure construction.

背景技术Background technique

安置房工程是目前国内重要的民生工程之一,其采用部分装配式结构,施工工艺新颖。在装配式结构施工过程中,经常需要搭设悬挑式脚手架,传统外防护悬挑脚手架使用工字钢型钢悬挑,不仅占用内部空间,影响预制构件的吊装就位,而且工字钢型钢悬挑需在楼板内预埋钢制锚环,而装配式结构的预制叠合板无法进行钢制锚环预埋,若外墙开洞则影响墙体的整体性和平整度,增大渗漏隐患。此外,传统工艺中悬挑式脚手架的支撑架一般采用卸荷钢丝绳与墙体进行拉结,施工发现,钢丝绳的设置严重影响悬挑件安拆效率。The resettlement housing project is one of the important livelihood projects in China at present. It adopts a partially assembled structure with novel construction techniques. In the construction process of prefabricated structures, it is often necessary to erect cantilevered scaffolding. Traditional external protective cantilevered scaffolding uses I-shaped steel cantilevered, which not only occupies internal space, but also affects the hoisting and positioning of prefabricated components, and the I-steel cantilevered Steel anchor rings need to be pre-embedded in the floor slab, but the prefabricated laminated slabs of the prefabricated structure cannot be pre-embedded with steel anchor rings. If the outer wall is opened, the integrity and flatness of the wall will be affected, and the hidden danger of leakage will be increased. In addition, the support frame of the cantilevered scaffolding in the traditional process generally uses unloading steel wire ropes to tie the wall to the wall. It was found during construction that the installation and disassembly efficiency of the cantilevered parts was seriously affected by the installation of the steel wire ropes.

实用新型内容Utility model content

本实用新型目的是提供一种无卸荷产业化安全防护专用悬挑托架及防护架体,解决在部分装配式结构施工体系中悬挑架搭设不便、影响吊装施工、不能有效保证外墙结构质量和施工安全性的问题。The purpose of the utility model is to provide a cantilever bracket and a protective frame body specially used for industrial safety protection without unloading, so as to solve the inconvenience of erecting the cantilever frame in the partially assembled structure construction system, affect the hoisting construction, and cannot effectively ensure the structure of the outer wall Quality and construction safety issues.

为实现上述目的,本实用新型采取如下技术方案:In order to achieve the above object, the utility model takes the following technical solutions:

一种无卸荷产业化安全防护专用悬挑托架,为三角型钢悬挑架,其特征在于:A special cantilever bracket for non-unloading industrial safety protection, which is a triangular steel cantilever, and is characterized in that:

包括贴墙竖向设置的贴墙杆、垂直墙面横向固定的上弦杆以及斜向设置在上弦杆与贴墙杆之间的下弦杆,三者均为角钢,首尾顺次连接形成三角型钢悬挑架;It includes the wall-mounted rods installed vertically against the wall, the upper chord rods fixed horizontally on the vertical wall, and the lower chord rods arranged obliquely between the upper chord rods and the wall-mounted rods. pick frame;

所述贴墙杆紧贴结构墙体一侧的角钢板上设置有至少上下两个椭圆孔,所述椭圆孔内均设穿墙螺栓与结构墙体固定;At least two upper and lower oval holes are provided on the angle steel plate on the side of the wall-attaching rod close to the structural wall, and wall-through bolts are arranged in the oval holes to fix the structural wall;

所述贴墙杆上焊接有至少两根限位钢筋,两根限位钢筋分别夹固在穿墙螺栓的上下两侧;At least two limit steel bars are welded on the wall sticking rod, and the two limit steel bars are respectively clamped on the upper and lower sides of the wall-through bolts;

所述限位钢筋与贴墙杆紧贴结构墙体一侧的角钢板之间设有游离垫片;A free spacer is provided between the limit steel bar and the angle steel plate on the side of the wall sticking rod close to the structural wall;

所述穿墙螺栓同时穿过游离垫片中心的通孔和椭圆孔;The through-wall bolt passes through the through hole and the oval hole in the center of the free gasket at the same time;

所述上弦杆和下弦杆之间还设置有加强腹杆。A reinforcing web is also arranged between the upper chord and the lower chord.

其中,作为本实用新型的优选技术方案,所述限位钢筋为L形,其一端垂直焊接在贴墙杆垂直结构墙体一侧的角钢板板上,另一端垂直焊接在紧贴结构墙体一侧的角钢板上;所述游离垫片设在限位钢筋与贴墙杆之间的空间内。Among them, as a preferred technical solution of the present utility model, the limit steel bar is L-shaped, one end of which is vertically welded on the angle steel plate on one side of the vertical structural wall of the wall stick, and the other end is vertically welded on the wall close to the structural wall. On the angle steel plate on one side; the free spacer is arranged in the space between the limit steel bar and the wall stick.

进一步优选的,所述上弦杆上竖直焊接有若干用于顶部脚手架立杆定位的立杆定位件。Further preferably, the upper chord is vertically welded with several pole positioning pieces for positioning the poles of the top scaffolding.

进一步优选的,所述立杆定位件为焊接在上弦杆上的钢管或钢筋件。Further preferably, the pole positioning member is a steel pipe or steel bar welded on the upper chord.

进一步优选的,在靠近所述下弦杆的两个端部底部分别设用于相邻两个三角型钢悬挑架连接横向连接的竖向连接脚手管,相邻两个三角型钢悬挑架之间对应的竖向连接脚手管之间通过横向连接脚手管进行加强连接。Further preferably, at the bottoms of the two ends close to the lower chord, vertical connection scaffolding pipes for connecting two adjacent triangular steel cantilever frames to connect horizontally are arranged respectively, and between the adjacent two triangular steel cantilever frames The corresponding vertical connecting scaffolding pipes are strengthened by horizontal connecting scaffolding pipes.

进一步优选的,所述下弦杆与上弦杆连接的部位对应设置有加强扁铁。Further preferably, the connection between the lower chord and the upper chord is correspondingly provided with a reinforcing flat iron.

进一步优选的,所述贴墙杆、上弦杆、加强腹杆和下弦杆之间均为焊接连接,角钢与角钢间采用贴角焊缝,焊缝厚度为5mm,高度及长度按截面设计满焊。Further preferably, the wall sticking rods, upper chords, reinforcing webs and lower chords are all welded connections, angle steels and angle steels adopt fillet welds, the thickness of the welds is 5mm, and the height and length are fully welded according to the section design .

进一步优选的,所述穿墙螺栓的螺杆穿过结构墙体,位于墙内的螺母与墙体之间分别设小垫片和大垫片,位于墙外侧的锥头一端的螺母与贴墙杆之间设游离垫片,上下两个穿墙螺栓的间距为900mm。Further preferably, the screw rod of the wall-through bolt passes through the structural wall, and a small gasket and a large gasket are respectively arranged between the nut inside the wall and the wall, and the nut at the end of the cone head outside the wall is connected to the wall-mounted rod Free gaskets are set between them, and the distance between the upper and lower two wall-through bolts is 900mm.

此外,本实用新型还提供一种利用上述的无卸荷产业化安全防护专用悬挑托架制备的安全防护架体,其特征在于:包括设于底部的一组无卸荷产业化安全防护专用悬挑托架,所述固定在结构墙体的统一高度上,相邻两个三角型钢悬挑架之间对应的竖向连接脚手管之间通过横向连接脚手管进行加强连接,形成一个稳固的支撑架体;所述无卸荷产业化安全防护专用悬挑托架之上为脚手架,所述脚手架是由立杆和横杆通过钢管扣连接成的双排6~8层双排外防护脚手架,其高度不超过18m;所述立杆底部对应上弦杆上的立杆定位件安装固定,所述横杆垂直立杆设置,中间部分的横杆形成施工平台,所述施工平台上铺设脚手板;在所述双排外防护脚手架的外侧及底部设密目网进行防护。In addition, the utility model also provides a safety protection frame prepared by using the above-mentioned special cantilever bracket for non-unloading industrialization safety protection, which is characterized in that it includes a group of non-unloading industrialization safety protection special The cantilever bracket is fixed at the same height of the structural wall, and the corresponding vertical connecting scaffolding tubes between two adjacent triangular steel cantilevering frames are strengthened and connected through horizontal connecting scaffolding tubes to form a Stable support frame; above the special cantilever bracket for non-unloading industrialized safety protection is a scaffold, and the scaffold is a double-row 6-8-layer double-row outer protection formed by vertical bars and horizontal bars connected by steel pipe buckles Scaffolding, the height of which is no more than 18m; the bottom of the vertical pole is installed and fixed corresponding to the vertical pole positioning part on the upper chord, the horizontal pole is arranged vertically to the vertical pole, the horizontal pole in the middle part forms a construction platform, and the footwork is laid on the construction platform. Protoplank; the outer side and the bottom of the double-row outer protective scaffolding are provided with dense mesh for protection.

其中,上述架体中,在墙体拐角的阳角位置,所述三角型钢悬挑架的尺寸增大,作为水平防护网的支撑架体使用,其上铺设水平防护网。Wherein, among the above-mentioned frame bodies, at the male corner position of the corner of the wall body, the size of the triangular steel cantilever frame is increased, and it is used as a support frame body of the horizontal protective net, and the horizontal protective net is laid on it.

与现有技术相比,本实用新型具有以下特点和有益效果:Compared with the prior art, the utility model has the following characteristics and beneficial effects:

1、墙体破坏小:本实用新型准用于装配式结构施工,克服了传统的工字钢型钢悬挑占用内部空间、影响预制构件吊装就位问题,且仅只采用穿墙螺栓固定,无需在楼板内预埋钢制锚环,也无需在外墙开洞影响墙体美观,极大的提高了外墙的平整性及整体性,减少外墙渗漏隐患;1. Small damage to the wall: This utility model is suitable for the construction of prefabricated structures, which overcomes the problem that the traditional I-steel cantilever occupies the internal space and affects the hoisting and positioning of prefabricated components. Steel anchor rings are pre-embedded in the floor, and there is no need to open holes in the external wall to affect the appearance of the wall, which greatly improves the smoothness and integrity of the external wall and reduces the hidden danger of external wall leakage;

2、安装精准度高:本实用新型产品结构简单,制备时提前与设计单位、预制构件厂联系,确定空洞尺寸,构件厂进行定位留设穿墙椭圆孔,减少了施工现场预留椭圆孔的工作,尺寸也更加精确,最大限度的保证了构件的完整性;2. High installation accuracy: The product structure of the utility model is simple. When preparing, contact the design unit and the prefabricated component factory in advance to determine the size of the cavity. work, the size is more accurate, and the integrity of the components is guaranteed to the greatest extent;

3、施工进度快:贴墙杆件上的两个螺栓孔均为椭圆孔,使安装更加顺利;同时,根据三角型钢悬挑架上双排脚手架立杆间距,在三角型钢悬挑架上弦杆和下弦杆对应位置焊接钢管或钢筋作为定位件,用卡扣及脚手管将三至四榀三角型钢悬挑架组合成整体,一起吊装,减少了塔吊吊次,加快施工进度;3. The construction progress is fast: the two bolt holes on the wall-mounted rods are oval holes, which makes the installation more smooth; at the same time, according to the distance between the double-row scaffolding poles on the triangular steel cantilever frame, the chords on the triangular steel cantilever frame Welded steel pipes or steel bars at the corresponding positions of the lower chords are used as positioning parts, and three to four triangular steel suspension frames are combined into a whole with buckles and scaffolding pipes, and they are hoisted together, which reduces the number of tower cranes and speeds up the construction progress;

4、室内即可完成安装:贴墙杆上利用限位钢筋限制了游离垫片及螺母的掉落,无需将游离垫片及螺母焊接在三角型悬挑架上,在安装时游离垫片及螺母能够充分发挥其固定作用,也减少了三角型钢悬挑架上的电焊施工,保证其构件的完整性,配合吊装,工人只需在室内就能完成安装,大大减少了安全隐患。4. The installation can be completed indoors: the limit steel bars on the wall stick limit the falling of the free gasket and nut, and there is no need to weld the free gasket and nut on the triangular suspension frame. During installation, the free gasket and The nut can give full play to its fixing function, and also reduces the electric welding construction on the triangular steel cantilever frame to ensure the integrity of its components. With hoisting, workers only need to complete the installation indoors, greatly reducing safety hazards.

5、施工便捷:墙内侧的螺母焊接在穿墙螺栓端头,另一侧的螺母及垫片利用限位钢筋固定在了三角型悬挑架上,降低了螺母及垫片这些小构件的丢失、损坏率,穿墙螺栓端头为锥形端头,使穿墙螺栓安装更加方便、快捷。5. Convenient construction: the nuts on the inner side of the wall are welded to the ends of the bolts through the wall, and the nuts and washers on the other side are fixed on the triangular suspension frame with limit steel bars, which reduces the loss of small components such as nuts and washers , Damage rate, the end of the through-wall bolt is a tapered end, which makes the installation of the through-wall bolt more convenient and fast.

6、功能多样、适应范围广:本发明涉及的三角型钢悬挑架除了作为脚手架支撑架体外,还可在三角型钢悬挑架上进行室外空调板或飘窗板的模架搭设,也可用作铺设水平安全网的辅助工具,且不受墙体厚度限制,应用范围广。6. Various functions and wide application range: In addition to being used as a scaffold support frame, the triangular steel cantilever frame involved in the present invention can also be used for erecting the formwork of outdoor air-conditioning panels or bay window panels on the triangular steel cantilever frame. As an auxiliary tool for laying horizontal safety nets, it is not limited by the thickness of the wall and has a wide range of applications.

此外,本实用新型还在现有结构基础上取消卸荷钢丝绳,提高了悬挑架安拆效率,节省工期;三角型钢悬挑架为工具式脚手架,重量更轻,便于周转使用,减少材料浪费,更贴近绿色施工的现代工程施工理念。根据计算,In addition, the utility model also cancels the unloading wire rope on the basis of the existing structure, improves the installation and disassembly efficiency of the cantilever frame, and saves the construction period; the triangular steel cantilever frame is a tool-type scaffold, which is lighter in weight, convenient for turnover, and reduces material waste , which is closer to the modern engineering construction concept of green construction. According to the calculation,

附图说明Description of drawings

通过结合以下附图所作的详细描述,本实用新型的上述和/或其他方面和优点将变得更清楚和更容易理解,这些附图只是示意性的,并不限制本实用新型,其中:The above-mentioned and/or other aspects and advantages of the present utility model will become clearer and easier to understand through the detailed description in conjunction with the following drawings, which are only schematic and do not limit the utility model, wherein:

图1为本实用新型涉及的无卸荷产业化安全防护专用悬挑托架的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the special cantilevered bracket for non-unloading industrialization safety protection related to the utility model;

图2为本实用新型涉及的开设椭圆孔的贴墙杆的结构示意图;Fig. 2 is a structural schematic diagram of a wall-attaching rod with an oval hole related to the utility model;

图3为设置限位钢筋的贴墙杆的结构示意图;Fig. 3 is the structural representation of the wall-attached pole that is provided with limit reinforcement;

图4为穿墙螺栓的结构示意图;Fig. 4 is the structural representation of wall bolt;

图5为双排外防护脚手架设于悬挑托架上的结构示意图;Fig. 5 is a schematic diagram of the structure of the double-row outer protective scaffold erected on the cantilevered bracket;

图6为本实用新型涉及的整个安全防护架体的整体结构示意。FIG. 6 is a schematic diagram of the overall structure of the entire safety protection frame involved in the present invention.

附图标记:1-穿墙螺栓、1.1-螺杆、1.2-螺母、1.3-小垫片、1.4-大垫片、1.5-锥头、2-贴墙杆、2.1-椭圆孔、3-钢筋固定件、4-加强腹杆、5-上弦杆、6-下弦杆、7-加强扁铁、8-限位钢筋、9-结构墙体、10-横向连接脚手管、11-竖向连接脚手管、12-脚手板、13-密目网、14-游离垫片、15-立杆、16-横杆。Reference signs: 1-wall bolt, 1.1-screw, 1.2-nut, 1.3-small washer, 1.4-big washer, 1.5-cone head, 2-wall sticking rod, 2.1-elliptical hole, 3-steel fixing Components, 4-reinforced web, 5-upper chord, 6-lower chord, 7-reinforced flat iron, 8-limiting steel bar, 9-structural wall, 10-horizontal connecting scaffold tube, 11-vertical connecting foot Hand tube, 12-footboard, 13-dense mesh, 14-free spacer, 15-vertical pole, 16-horizontal bar.

具体实施方式detailed description

在下文中,将参照附图描述本实用新型的无卸荷产业化安全防护专用悬挑托架及防护架体的实施例。在此记载的实施例为本实用新型的特定的具体实施方式,用于说明本实用新型的构思,均是解释性和示例性的,不应解释为对本实用新型实施方式及本实用新型范围的限制。除在此记载的实施例外,本领域技术人员还能够基于本申请权利要求书和说明书所公开的内容采用显而易见的其它技术方案,这些技术方案包括采用对在此记载的实施例的做出任何显而易见的替换和修改的技术方案。本说明书的附图为示意图,辅助说明本实用新型的构思,示意性地表示各部分的形状及其相互关系。请注意,为了便于清楚地表现出本实用新型实施例的各部件的结构,各附图之间并未按照相同的比例绘制。相同的参考标记用于表示相同的部分。In the following, embodiments of the special cantilever bracket and protective frame body for non-unloading industrialized safety protection of the present utility model will be described with reference to the accompanying drawings. The embodiments described here are specific specific implementations of the present utility model, and are used to illustrate the concept of the present utility model. They are all explanatory and exemplary, and should not be construed as limitations on the implementation of the present utility model and the scope of the present utility model. limit. In addition to the embodiments described here, those skilled in the art can also adopt other obvious technical solutions based on the claims of the application and the contents disclosed in the description, and these technical solutions include adopting any obvious changes made to the embodiments described here. Replacement and modified technical solutions. The accompanying drawings in this specification are schematic diagrams, which assist in explaining the concept of the utility model, and schematically represent the shapes of various parts and their interrelationships. Please note that in order to clearly show the structures of the components in the embodiment of the present invention, the drawings are not drawn in the same scale. The same reference numerals are used to designate the same parts.

以下结合附图对本实用新型的原理和特征进行描述,所举实例只用于解释本实用新型,并非用于限定本实用新型的范围。The principles and features of the present utility model are described below in conjunction with the accompanying drawings, and the examples given are only used to explain the utility model, and are not used to limit the scope of the utility model.

如图1所示,本实用新型涉及一种无卸荷产业化安全防护专用悬挑托架,为三角型钢悬挑架,包括贴墙竖向设置的贴墙杆2、垂直墙面横向固定的上弦杆5以及斜向设置在上弦杆5与贴墙杆2之间的下弦杆6,三者均为角钢,首尾顺次连接形成三角型钢悬挑架;贴墙杆2、上弦杆5、加强腹杆4和下弦杆6之间均为焊接连接,角钢与角钢间采用贴角焊缝,焊缝厚度为5mm,高度及长度按截面设计满焊。As shown in Figure 1, the utility model relates to a special cantilever bracket for safety protection without unloading industrialization. The upper chord 5 and the lower chord 6 arranged obliquely between the upper chord 5 and the wall-mounting rod 2 are all angle steel, and the head and tail are connected in sequence to form a triangular steel cantilever frame; the wall-mounting rod 2, the upper chord 5, the reinforced Both the web 4 and the lower chord 6 are connected by welding, and the angle steel and the angle steel adopt a fillet weld, the thickness of the weld is 5mm, and the height and length are fully welded according to the section design.

其中,如图2,在贴墙杆2紧贴结构墙体一侧的角钢板上设置有至少上下两个椭圆孔2.1,椭圆孔2.1内均设穿墙螺栓1与结构墙体9固定;如图4,穿墙螺栓1的螺杆1.1穿过结构墙体9,位于墙内的螺母1.2与墙体之间分别设小垫片1.3和大垫片1.4,位于墙外侧的锥头1.5一端的螺母1.2与贴墙杆2之间设游离垫片14,上下两个穿墙螺栓1的间距为900mm。Wherein, as shown in Figure 2, at least two upper and lower oval holes 2.1 are arranged on the angle steel plate on the side of the wall sticking rod 2 close to the structural wall, and the wall bolts 1 are fixed to the structural wall 9 in the oval holes 2.1; Fig. 4, the screw rod 1.1 of the wall-through bolt 1 passes through the structural wall 9, and a small washer 1.3 and a large washer 1.4 are respectively arranged between the nut 1.2 in the wall and the wall, and the nut at the end of the cone head 1.5 on the outside of the wall 1.2 A free spacer 14 is set between the wall sticking rod 2, and the distance between the upper and lower two wall-through bolts 1 is 900mm.

贴墙杆2的角钢板板上焊接有至少两根限位钢筋8,限位钢筋8平行结构墙体9设置且分别夹固在穿墙螺栓1的上下两侧;如图3,优选限位钢筋8为L形,其一端垂直焊接在贴墙杆2垂直结构墙体一侧的角钢板板上,另一端垂直焊接在紧贴结构墙体一侧的角钢板上;游离垫片14设在限位钢筋8与贴墙杆2之间的空间内。限位钢筋8与贴墙杆2紧贴结构墙体9一侧的角钢板之间设有游离垫片14;穿墙螺栓1同时穿过游离垫片14中心的通孔和椭圆孔2.1。At least two limit steel bars 8 are welded on the angle steel plate of the wall stick 2, and the limit steel bars 8 are arranged in parallel to the structural wall 9 and are respectively clamped on the upper and lower sides of the wall-through bolt 1; as shown in Figure 3, the preferred limit Reinforcement bar 8 is L-shaped, and its one end is vertically welded on the angle steel plate on one side of the vertical structure wall of sticking bar 2, and the other end is vertically welded on the angle steel plate close to the structure wall side; Free spacer 14 is located at In the space between the limit steel bar 8 and the wall stick 2. A free spacer 14 is provided between the limit steel bar 8 and the angle steel plate on one side of the wall body 9 close to the wall stick 2; the through-wall bolt 1 passes through the through hole and the oval hole 2.1 in the center of the free spacer 14 at the same time.

此外,上弦杆5和下弦杆6之间还设置有加强腹杆4,上弦杆5上竖直焊接有若干用于顶部脚手架立杆定位的立杆定位件3,优选为焊接在上弦杆5上的钢管或钢筋件。在靠近下弦杆6的两个端部底部分别设用于相邻两个三角型钢悬挑架连接横向连接的竖向连接脚手管11,相邻两个三角型钢悬挑架之间对应的竖向连接脚手管11之间通过横向连接脚手管10进行加强连接。下弦杆6与上弦杆5连接的部位对应设置有加强扁铁7。In addition, a reinforcing web 4 is also provided between the upper chord 5 and the lower chord 6, and several vertical pole positioning parts 3 for positioning the top scaffolding pole are welded vertically on the upper chord 5, preferably welded on the upper chord 5 steel pipes or steel bars. At the bottom of the two ends near the lower chord 6, respectively, vertically connecting scaffolding pipes 11 for connecting two adjacent triangular steel suspension frames to connect horizontally, and corresponding vertical connection pipes 11 between adjacent two triangular steel suspension frames. The connection between the connecting scaffold pipes 11 is strengthened through the horizontal connecting scaffold pipes 10 . The connection between the lower chord 6 and the upper chord 5 is correspondingly provided with a reinforcing flat iron 7 .

如图5和图6,本实用新型还提供一种利用上述的无卸荷产业化安全防护专用悬挑托架制备的安全防护架体,其特征在于:包括设于底部的一组无卸荷产业化安全防护专用悬挑托架,固定在结构墙体9的统一高度上,相邻两个三角型钢悬挑架之间对应的竖向连接脚手管11之间通过横向连接脚手管10进行加强连接,形成一个稳固的支撑架体;无卸荷产业化安全防护专用悬挑托架之上为脚手架,脚手架是由立杆15和横杆16通过钢管扣连接成的双排6~8层双排外防护脚手架,其高度不超过18m;立杆15底部对应上弦杆5上的立杆定位件3安装固定,横杆16垂直立杆15设置,中间部分的横杆16形成施工平台,施工平台上铺设脚手板12;在双排外防护脚手架的外侧及底部设密目网13进行防护。上述安全防护架体的施工方法包括如下步骤:As shown in Figure 5 and Figure 6, the utility model also provides a safety protection frame prepared by using the above-mentioned non-unloading industrial safety protection special cantilever bracket, which is characterized in that: it includes a group of non-unloading Cantilever brackets for industrial safety protection are fixed at the same height of the structural wall 9, and the vertically connected scaffolding tubes 11 corresponding to the adjacent two triangular steel cantilevered frames are connected horizontally to the scaffolding tubes 10 Strengthen the connection to form a stable support frame body; the special cantilever bracket for non-unloading industrial safety protection is a scaffolding, and the scaffolding is a double row of 6-8 connected by vertical rods 15 and horizontal rods 16 through steel pipe buckles. Double-layer outer protective scaffolding, the height of which is not more than 18m; the bottom of the pole 15 is installed and fixed corresponding to the pole positioning part 3 on the upper chord 5, and the cross pole 16 is arranged vertically to the pole 15, and the cross pole 16 in the middle part forms a construction platform. Scaffold boards 12 are laid on the platform; dense mesh nets 13 are set on the outside and bottom of the double-row outer protective scaffolds for protection. The construction method of above-mentioned safety protection frame body comprises the following steps:

1、材料准备:1. Material preparation:

包括角钢、钢筋、钢板垫片和穿墙螺栓材料的准备;三角型钢悬挑架所使用的钢材,其材质应符合现行国家《碳素结构钢》GB/T700中Q235级钢的规定。Including the preparation of angle steel, steel bar, steel plate gasket and wall bolt materials; the steel used for the triangular steel cantilever frame, its material should comply with the current national "Carbon Structural Steel" GB/T700 Q235 grade steel regulations.

2、悬挑托架的加工2. Processing of cantilever bracket

焊接要求:顺次焊接角钢形成三角型钢悬挑架,并在架体框架内设加强腹杆4;在靠近下弦杆6的两个端部底部分别设用于相邻两个三角型钢悬挑架连接横向连接的竖向连接脚手管11,角钢与角钢间采用贴角焊缝,焊缝厚度为5mm,高度及长度按截面设计满焊。2三角型钢悬挑架应按正、反配对加工,安装时按正、反相间排列使用。Welding requirements: Weld angle steel in sequence to form a triangular steel cantilever frame, and set a reinforcing web 4 in the frame body frame; set up two adjacent triangular steel cantilever frames at the bottom of the two ends near the lower chord 6 The vertically connected scaffolding pipe 11 connecting the horizontal connection adopts a fillet weld between the angle steel and the angle steel, the thickness of the weld is 5mm, and the height and length are fully welded according to the section design. 2 The triangular steel cantilever frame should be processed in a positive and negative pair, and used in a positive and negative arrangement during installation.

3、定位、留设穿墙椭圆孔3. Locate and leave an oval hole through the wall

明确架体搭设之前,测设三角型钢悬挑架安装位置及立杆定位控制线。在结构绑扎钢筋时,在钢筋上预留绑扎或焊接穿墙管,浇筑墙体砼拆模后,通孔,安装每个三角型钢悬挑架与墙体螺栓穿墙连接后,两个螺栓间距900mm,三角托架安装顺直。Before setting up the frame body, measure and set the installation position of the triangular steel cantilever frame and the positioning control line of the pole. When binding steel bars in the structure, reserve binding or welding wall-through pipes on the steel bars. After pouring the wall concrete and removing the formwork, through holes are installed. 900mm, the triangle bracket is installed straight.

4、悬挑架的安装4. Installation of cantilever frame

用卡扣及脚手管将三至四榀三角型钢悬挑架组合成整体,一起吊装,通过穿墙螺栓1将悬挑架与结构墙体9连接固定;操作时,将三角型钢悬挑架吊运至指定位置,将穿墙螺栓φ20从外墙内侧按照间距安装好,螺栓总长度根据墙厚确定,加上4个螺母1个角钢厚度和2个钢垫片8mm厚度。施工中注意保护丝扣且工长及安全员需经常巡视检查螺母及扣件的扭力强度。在三脚架上焊接立管定位钢筋头。从此位置以上搭设48钢管脚手架体系。Three to four triangular steel cantilever frames are combined into a whole with buckles and scaffolding tubes, hoisted together, and the cantilever frames are connected and fixed with the structural wall 9 through wall bolts 1; during operation, the triangular steel cantilever frames Hoist to the designated location, and install the wall-through bolts φ20 from the inside of the outer wall according to the spacing. The total length of the bolts is determined according to the wall thickness, plus 4 nuts, 1 angle steel thickness and 2 steel gaskets with a thickness of 8mm. Pay attention to the protection of threaded fasteners during construction, and the foreman and safety personnel need to inspect the torsional strength of nuts and fasteners frequently. Weld the riser on the tripod to position the rebar head. A 48 steel pipe scaffolding system was erected above this position.

5、相邻悬挑架的加强固定5. Reinforcement and fixation of adjacent suspension frames

将相邻吊装批次的边缘两个三角型钢悬挑架之间对应的竖向连接脚手管11之间通过横向连接脚手管10进行加强连接。The corresponding vertical connecting scaffolding pipes 11 between the two triangular steel cantilever frames on the edge of adjacent hoisting batches are strengthened and connected through horizontal connecting scaffolding pipes 10 .

6、双排外防护脚手架安装6. Installation of double-row outer protective scaffolding

对应上弦杆5上的立杆定位件3安装固定立杆15,然后依次搭设横杆16,形成双排6~8层双排外防护脚手架;脚手架体系根据计算搭设,相关构造要求符合规范要求。Corresponding to the pole positioner 3 on the upper chord 5, install and fix the pole 15, and then set up the crossbar 16 in turn to form a double-row 6-8-layer double-row outer protective scaffold; the scaffold system is erected according to the calculation, and the relevant structural requirements meet the requirements of the specification.

7、双排外防护脚手架的拆除7. Removal of double-row outer protective scaffolding

待利用脚手架进行施工后,进行双排外防护脚手架的拆除;After the scaffolding is used for construction, the double-row outer protective scaffolding shall be removed;

1)拆除前必须完成以下准备工作:1) The following preparatory work must be completed before demolition:

(1)全面检查脚手架的扣件连接、连墙件、支撑体系等是否符合安全要求。(1) Comprehensively check whether the fastener connections, wall parts, and support systems of the scaffold meet the safety requirements.

(2)清除脚手架上的杂物及地面障碍物。(2) Remove debris and ground obstacles on the scaffolding.

(3)脚手架的拆除根据外檐施工要求进行拆除,拆除时划出工作区,禁止一切人员进入,同时设专人看守。(3) Scaffolding shall be dismantled according to the construction requirements of the outer eaves. During the dismantling, the work area shall be designated, all personnel shall be prohibited from entering, and special guards shall be assigned at the same time.

2)拆除应符合以下要求:2) The demolition shall meet the following requirements:

(1)拆除顺序遵循先搭后拆、后搭先拆的原则进行,严禁上下同时作业。(1) The sequence of dismantling shall follow the principle of dismantling after erection and dismantling after erection, and it is strictly forbidden to work up and down at the same time.

(2)所有连墙件应随脚手架逐层拆除,严禁将连墙件整层或数层拆除后再拆脚手架;分段拆除高差不应大于2步,如高差大于两步,应增设连墙件加固。(2) All the wall parts should be removed layer by layer along with the scaffolding. It is strictly forbidden to remove the whole layer or several layers of the wall parts before dismantling the scaffolding; Even wall reinforcement.

8、悬挑架的拆除8. Removal of the suspension frame

双排外防护脚手架拆除后,最后拆除悬挑托架,用扳手卸掉螺栓至此,整个施工过程完成。三角型钢悬挑架自重约40kg左右,人工拆卸,成堆码放后吊运上车外运退租。After the double-row outer protective scaffolding is removed, the cantilever bracket is finally removed, and the bolts are removed with a wrench. At this point, the entire construction process is completed. The triangular steel cantilever frame has a self-weight of about 40kg. It is manually dismantled, piled up, hoisted and loaded onto a vehicle for rental return.

步骤7和8的拆除过程中应符合下列要求:The following requirements should be met during the dismantling process of steps 7 and 8:

(1)各配件必须及时运至地面,严禁抛扔。(1) All accessories must be transported to the ground in time, and throwing away is strictly prohibited.

(2)运至地面的构配件应及时检查整修与保养,并按照品种、规格随时码堆存放,置于干燥通风处,防止锈蚀。(2) The components and parts transported to the ground should be inspected, repaired and maintained in time, and should be stacked and stored at any time according to the variety and specification, and placed in a dry and ventilated place to prevent corrosion.

以上所述仅为本实用新型的较佳实施例,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (9)

  1. It is triangular shape suspension scaffold 1. one kind is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:
    Including the vertically arranged patch wall bar of patch wall(2), the top boom laterally fixed of vertical wall(5)And angularly disposed winding up Bar(5)With pasting wall bar(2)Between lower boom(6), three is angle steel, is sequentially connected with to form triangular shape suspension scaffold from beginning to end;
    The patch wall bar(2)It is close to be provided with two elliptical apertures above and below at least on the gusset of structure wall side(2.1), it is described Elliptical aperture(2.1)Inside it is all provided with through-wall bolt(1)With structure wall(9)It is fixed;
    The patch wall bar(2)On be welded with least two limit steel bars(8), two limit steel bars(8)It is clamping respectively to wear Wall screw(1)Both sides up and down;
    The limit steel bar(8)With pasting wall bar(2)It is close to structure wall(9)Free pad is provided between the gusset of side (14);
    The through-wall bolt(1)Also cross free pad(14)The through hole and elliptical aperture at center(2.1);
    The top boom(5)And lower boom(6)Between be additionally provided with reinforcement web member(4).
  2. 2. one kind according to claim 1 is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:It is described Limit steel bar(8)For L-shaped, its one end is vertically welded in patch wall bar(2)On the gusset plate of vertical stratification wall side, the other end It is vertically welded in and is close on the gusset of structure wall side;The free pad(14)It is located at limit steel bar(8)With pasting wall bar (2)Between space in.
  3. 3. one kind according to claim 1 is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:It is described Top boom(5)On be welded with vertically it is some for top scaffold upright rod positioning vertical rod keepers(3).
  4. 4. one kind according to claim 3 is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:It is described Vertical rod keeper(3)To be welded on top boom(5)On steel pipe or steel bar piece.
  5. 5. one kind according to claim 1 is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:By The nearly lower boom(6)Two end bases set respectively for the perpendicular of two neighboring triangular shape suspension scaffold connection lateral connection To connection scaffold tubes(11), corresponding vertical connection scaffold tubes between two neighboring triangular shape suspension scaffold(11)Between pass through horizontal stroke To connection scaffold tubes(10)Carry out reinforcement connection.
  6. 6. one kind according to claim 1 is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:It is described Lower boom(6)With top boom(5)The position of connection is correspondingly arranged on reinforcement band iron(7).
  7. 7. one kind according to claim 1 is without the special bracket of encorbelmenting of off-load industrialization security protection, it is characterised in that:It is described Through-wall bolt(1)Screw rod(1.1)Through structure wall(9), positioned at nut within the walls(1.2)Set pulvinulus respectively between wall Piece(1.3)With big pad(1.4), the conehead on the outside of wall(1.5)The nut of one end(1.2)With pasting wall bar(2)Between set trip From pad(14), upper and lower two through-wall bolts(1)Spacing be 900mm.
  8. 8. a kind of prepare using described in claim 1~7 any one without the special bracket of encorbelmenting of off-load industrialization security protection Security protection support body, it is characterised in that:Including located at one group of bottom without the special bracket of encorbelmenting of off-load industrialization security protection, It is described to be fixed on structure wall(9)Uniform height on, corresponding vertical connecting pin between two neighboring triangular shape suspension scaffold Hand pipe(11)Between pass through lateral connection scaffold tubes(10)Reinforcement connection is carried out, forms a firm supporting frame;The nothing It is scaffold on the special bracket of encorbelmenting of off-load industrialization security protection, the scaffold is by vertical rod(15)And cross bar(16)It is logical Cross steel pipe and buckle double 6~8 layers double outer protective scaffold connected into, its height is no more than 18m;The vertical rod(15)Bottom pair Answer top boom(5)On vertical rod keeper(3)Installation is fixed, the cross bar(16)Vertical posts(15)Set, center section Cross bar(16)Construction platform is formed, scaffold board is laid in the construction platform(12);In the outer of the double outer protective scaffold Side and bottom set Dense mesh screen(13)Protected.
  9. 9. the security protection support body of the special bracket preparation of encorbelmenting of no off-load industrialization security protection according to claim 8, It is characterized in that:External angle position at wall turning, the size increase of the triangular shape suspension scaffold, as horizontal protective net Supporting frame uses, and lays horizontal protective net thereon.
CN201720577976.4U 2017-05-23 2017-05-23 One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection Expired - Fee Related CN206942109U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720577976.4U CN206942109U (en) 2017-05-23 2017-05-23 One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720577976.4U CN206942109U (en) 2017-05-23 2017-05-23 One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection

Publications (1)

Publication Number Publication Date
CN206942109U true CN206942109U (en) 2018-01-30

Family

ID=61361063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720577976.4U Expired - Fee Related CN206942109U (en) 2017-05-23 2017-05-23 One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection

Country Status (1)

Country Link
CN (1) CN206942109U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100358A (en) * 2017-05-23 2017-08-29 北京六建集团有限责任公司 Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection
CN109372240A (en) * 2018-12-06 2019-02-22 广州丰利达安防科技有限公司 All Steel Attached Lifting Scaffolding
CN110644759A (en) * 2019-09-29 2020-01-03 中国京冶工程技术有限公司 An outer protective frame for the construction of a centrally assembled shear wall structure and its connection method
CN110984553A (en) * 2019-12-20 2020-04-10 浙江宝业建设集团有限公司 Detachable turnover high-altitude large-cantilever formwork and construction method
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107100358A (en) * 2017-05-23 2017-08-29 北京六建集团有限责任公司 Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection
CN107100358B (en) * 2017-05-23 2023-12-29 北京六建集团有限责任公司 Cantilever bracket and bracket body special for unloading-free industrialized safety protection and construction method of cantilever bracket and bracket body
CN109372240A (en) * 2018-12-06 2019-02-22 广州丰利达安防科技有限公司 All Steel Attached Lifting Scaffolding
CN110644759A (en) * 2019-09-29 2020-01-03 中国京冶工程技术有限公司 An outer protective frame for the construction of a centrally assembled shear wall structure and its connection method
CN110984553A (en) * 2019-12-20 2020-04-10 浙江宝业建设集团有限公司 Detachable turnover high-altitude large-cantilever formwork and construction method
CN112411772A (en) * 2020-10-24 2021-02-26 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip
CN112411772B (en) * 2020-10-24 2022-05-27 北京中易房建筑工程有限公司 Structure and construction method of basement outer wall post-cast strip

Similar Documents

Publication Publication Date Title
CN107100358A (en) Cantilever bracket, frame body and construction method for non-unloading industrialized safety protection
CN206942109U (en) One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN104074358B (en) The construction method of prefabricated building
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN111910902A (en) Construction method of high-altitude double-layer overlong cantilever reinforced concrete structure
CN101886466A (en) Construction method of tamping type coke oven coal tower formwork support structure
CN111472530A (en) A flower basket tie rod I-beam cantilever bearing frame for construction engineering and its installation method
CN105649314A (en) Suspension platform for high and long-span corridor construction
CN110409318B (en) A method for assembling and erecting large-span simply supported steel-concrete beams
CN103452311A (en) Method for erecting section steel cantilever structure support frame
CN109989348A (en) Cantilever formwork for concrete construction and construction method thereof
CN110409319B (en) Bracket for large-span steel-concrete composite beam cast-in-place bridge deck and construction method
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN100494576C (en) Erecting Method of Suspension Scaffold Outside the Box in Box Bridge Girder Maintenance Project
CN107524284A (en) A kind of regularization pylon protection system and installation method
CN106284103B (en) Steel reinforced concrete combination beam roof steel bar concrete high-altitude cantilever pouring construction method
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN106437188A (en) Reinforcing method of reinforced concrete structure main beam additionally provided with steel structure box beam
CN110306774A (en) A kind of installation method and device of spigot-and-socket builder's jack
CN201420385Y (en) Cantilevered construction unloading platform
CN212336672U (en) I-steel overhanging bearing frame of basket pull rod for constructional engineering
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN111847272A (en) Supporting method of tower crane for renovation of existing buildings
CN205502551U (en) Platform is suspended in midair in high altitude large -span vestibule construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130