CN208023970U CN201820387298.XU CN201820387298U CN208023970U CN 208023970 U CN208023970 U CN 208023970U CN 201820387298 U CN201820387298 U CN 201820387298U CN 208023970 U CN208023970 U CN 208023970U
Authority
CN
China
Prior art keywords
guardrail
guardrails
pedestal
steel plate
several
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820387298.XU
Other languages
Chinese (zh)
Inventor
黄伟明
王阿妮
黄帅
杨芳辉
蒋帅
李春晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geshan Construction Group Co Ltd
Original Assignee
Geshan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geshan Construction Group Co Ltd filed Critical Geshan Construction Group Co Ltd
Priority to CN201820387298.XU priority Critical patent/CN208023970U/en
Application granted granted Critical
Publication of CN208023970U publication Critical patent/CN208023970U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

Construction discharging platform, the utility model is related to construction equipment technical field, pedestal is set by the weldering of several I-steel and is constituted;The bottom surface front end both sides balanced welding of pedestal is equipped with several screw rods, and nut is installed on screw rod;Balanced welding is equipped with several lifting ears on the two side of pedestal, and steel wire rope is respectively connected in each lifting ear;It is bolted in the middle part of pedestal and is provided with hydraulic elevating platform;The top of hydraulic elevating platform, which is bolted, is provided with steel plate;The left and right sides on steel plate top, which is welded, is equipped with No.1 guardrail;The top of No.1 guardrail is inserted with No. two guardrails;The front end weldering of the steel plate is equipped with No. three guardrails, and the height of No. three guardrails is less than No.1 guardrail;It is fixedly installed envelope network on the inside of the No.1 guardrail, No. two guardrails and No. three guardrails, can the material of lower layer and equipment be directly transported to upper layer, is lifted without tower crane, substantially increase production efficiency, the duration is saved, the security performance of equipment is increased, practicability is stronger.

Description

Construction discharging platform
Technical field
The utility model is related to construction equipment technical fields, and in particular to construction discharging platform.
Background technology
Discharging platform is that various provisional operation consoles and crosshead are often set up in construction site, is generally used for the week of material Turn;Unloading carrying platform, to be divided into mobile discharging platform, console mode discharging platform, overhanging type discharging platform a variety of, in skyscraper After the completion of one layer of structure construction, need the building of the template of construction floor concrete structure, steel pipe, equipment lifting to hot work in progress Layer is outer, these materials can not be transported with equipment in building, need to set up discharging platform, so that they are hoisted to discharging with tower crane It is rerunned on platform to job location, the workbench temporary as the offer material transport in building construction process, existing skill In art, support of two I-steel as discharging platform is generally used, and draw using four oblique pull cable wires are outstanding, transhipment every time is completed It is required for dismounting then by tower crane mobile discharge platform later, process is more complicated when operation, needs a large amount of human resources, It wastes time, it would be highly desirable to improve.
Utility model content
The purpose of this utility model is that it is in view of the drawbacks of the prior art and insufficient, a kind of simple in structure, design conjunction is provided Reason, construction discharging platform easy to use, directly can be transported to upper layer by the material of lower layer and equipment, be not necessarily to tower Lifting, substantially increases production efficiency, saves the duration, increase the security performance of equipment, practicability is stronger.
To achieve the above object, the technical solution adopted in the utility model is:It includes pedestal, steel plate, No.1 guardrail, two Number guardrail, No. three guardrails, envelope network, hydraulic elevating platforms;Pedestal is set by the weldering of several I-steel and is constituted;The bottom surface front end two of pedestal Side balanced welding is equipped with several screw rods, and nut is installed on screw rod;Balanced welding is equipped with several lifting ears, Mei Geti on the two side of pedestal Steel wire rope is respectively connected on ear;It is bolted in the middle part of pedestal and is provided with hydraulic elevating platform;Hydraulic elevating platform it is upper Portion, which is bolted, is provided with steel plate;The left and right sides on steel plate top, which is welded, is equipped with No.1 guardrail;It inserts on the top of No.1 guardrail Equipped with No. two guardrails;The front end weldering of the steel plate is equipped with No. three guardrails, and the height of No. three guardrails is less than No.1 guardrail;It is described No.1 guardrail, be fixedly installed envelope network on the inside of No. two guardrails and No. three guardrails.
Further, the connecting portion of the No.1 guardrail and No. two guardrails is by several No. two struts of No. two guardrails It is socketed and constitutes with several No.1 struts of No.1 guardrail, the lower end of every No. two struts is plugged in the upper end of No.1 strut, and logical Bolt is crossed to be fixedly connected.
Further, it is fixedly installed gravity sensor on the steel plate;Warning lamp is provided on the pedestal, and Warning lamp is connect with gravity sensor and external power supply.
Further, it is bolted in the middle part of the No.1 guardrail and is provided with LED display, and LED display It is connect with gravity sensor and external power supply.
With the above structure, the utility model has the beneficial effect that:Construction described in the utility model is flat with discharging The material of lower layer and equipment directly can be transported to upper layer by platform, lifted without tower crane, substantially increased production efficiency, be saved The duration has been saved, the security performance of equipment is increased, practicability is stronger, and the utility model has simple in structure, and setting is reasonable, makes The advantages that at low cost.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, before not making the creative labor property It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the right view of Fig. 1.
Reference sign:
Pedestal 1, No.1 guardrail 3, No.1 strut 3-1,4, No. two strut 4-1 of No. two guardrails, No. three guardrails 5, encloses steel plate 2 Protecting wire net 6, hydraulic elevating platform 7, screw rod 8, nut 9, lifting ear 10, steel wire rope 11, warning lamp 12, LED display 13, gravity sensitive Device 14.
Specific implementation mode
The utility model will be further described below with reference to the accompanying drawings.
Referring to as Figure 1-Figure 2, present embodiment the technical solution adopted is that:It includes pedestal 1, steel plate 2, one Number guardrail 3, two guardrail 4, three guardrail 5, envelope network 6, hydraulic elevating platform 7;Pedestal 1 is set by the weldering of several I-steel and is constituted; The bottom surface front end both sides balanced welding of pedestal 1 is set there are two screw rod 8, is installed with nut 9 on screw rod 8, the front end of pedestal 1 is plugged in building On layer on pre-buried reinforcing steel bar permanent seat, locked by rotating nuts 9 when being had the gap between reinforcing steel bar permanent seat and pedestal 1 Tightly;Balanced welding is set there are two lifting ear 10 on the two side of pedestal 1, and steel wire rope 11, steel wire rope 11 are respectively connected in each lifting ear 10 The other end be fixed on floor embedded part;The middle part of pedestal 1, which is bolted, is provided with hydraulic elevating platform 7;Hydraulic pressure liter The top of drop platform 7, which is bolted, is provided with steel plate 2;The left and right sides on 2 top of steel plate, which is welded, is equipped with No.1 guardrail 3;One The top of number guardrail 3 is inserted with No. two guardrails 4;The front end weldering of the steel plate 2 is equipped with No. three guardrails 5, and the height of No. three guardrails 5 Degree is less than No.1 guardrail 3;The inside of 3, No. two guardrails 4 of No.1 guardrail and No. three guardrails 5 is fixedly installed envelope network 6.
Further, the connecting portion of the No.1 guardrail 3 and No. two guardrails 4 is by several No. two of No. two guardrails 4 Several No.1 strut 3-1 of strut 4-1 and No.1 guardrail 3 sockets are constituted, and the lower end of every No. two strut 4-1 is plugged in No.1 branch The upper end of bar 3-1, and be bolted to connection.
Further, it is fixedly installed gravity sensor 14 on the steel plate 2;It is provided with warning on the pedestal 1 Lamp 12, and warning lamp 12 is connect with gravity sensor 14 and external power supply, when overweight on steel plate 2, warning lamp 12 can light.
Further, the middle part of the No.1 guardrail 3, which is bolted, is provided with LED display 13, and LED is shown Screen 13 is connect with gravity sensor 14 and external power supply, and load-bearing on steel plate 2 is shown on LED display 13.
The working principle of this specific embodiment::The height gone along with sb. to guard him is regulated by No. two guardrails 4, is fixed with bolt, so Envelope network 6 is fixed on the madial wall of No.1 guardrail 3, No. two guardrails, 4, No. three guardrails 5 with iron wire afterwards, is then carried out with tower crane It is lifted into designated position, then the front end of pedestal 1 and steel wire rope 11 are fixed on floor, then manually by material and is set It is standby etc. to be transported on steel plate 2;Material and equipment etc. upper layer is risen to finally by hydraulic elevating platform 7 to be removed by worker again Under, eliminate the trouble lifted again with tower crane.
With the above structure, present embodiment has the beneficial effect that:Construction described in present embodiment With discharging platform, can the material of lower layer and equipment be directly transported to upper layer, be lifted without tower crane, substantially increase production Efficiency saves the duration, increases the security performance of equipment, and practicability is stronger, and the utility model has simple in structure, setting conjunction The advantages that reason, low manufacture cost.
The above is merely intended for describing the technical solutions of the present application, but not for limiting the present application, those of ordinary skill in the art couple The other modifications or equivalent replacement that the technical solution of the utility model is made, without departing from technical solutions of the utility model Spirit and scope should all cover in the right of the utility model.

Claims (4)

1. construction discharging platform, it is characterised in that:It includes pedestal, steel plate, No.1 guardrail, No. two guardrails, No. three shields Column, envelope network, hydraulic elevating platform;Pedestal is set by the weldering of several I-steel and is constituted;The bottom surface front end both sides balanced welding of pedestal is equipped with Several screw rods are installed with nut on screw rod;Balanced welding is equipped with several lifting ears on the two side of pedestal, is respectively connected in each lifting ear Steel wire rope;It is bolted in the middle part of pedestal and is provided with hydraulic elevating platform;The top of hydraulic elevating platform is solid by bolt Surely it is provided with steel plate;The left and right sides on steel plate top, which is welded, is equipped with No.1 guardrail;The top of No.1 guardrail is inserted with No. two guardrails; The front end weldering of the steel plate is equipped with No. three guardrails, and the height of No. three guardrails is less than No.1 guardrail;The No.1 guardrail, two It is fixedly installed envelope network on the inside of number guardrail and No. three guardrails.
2. construction discharging platform according to claim 1, it is characterised in that:The No.1 guardrail and No. two shields The connecting portion on column is made of several No.1 struts socket of several No. two struts and No.1 guardrail of No. two guardrails, every two The lower end of number strut is plugged in the upper end of No.1 strut, and is bolted to connection.
3. construction discharging platform according to claim 1, it is characterised in that:It is fixedly installed on the steel plate Gravity sensor;Warning lamp is provided on the pedestal, and warning lamp is connect with gravity sensor and external power supply.
4. construction discharging platform according to claim 3, it is characterised in that:The middle part of the No.1 guardrail is logical It crosses bolt and is fixedly installed LED display, and LED display is connect with gravity sensor and external power supply.
CN201820387298.XU 2018-03-21 2018-03-21 Construction discharging platform Active CN208023970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820387298.XU CN208023970U (en) 2018-03-21 2018-03-21 Construction discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820387298.XU CN208023970U (en) 2018-03-21 2018-03-21 Construction discharging platform

Publications (1)

Publication Number Publication Date
CN208023970U true CN208023970U (en) 2018-10-30

Family

ID=63907824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820387298.XU Active CN208023970U (en) 2018-03-21 2018-03-21 Construction discharging platform

Country Status (1)

Country Link
CN (1) CN208023970U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185263A (en) * 2019-04-16 2019-08-30 中国建筑第二工程局有限公司 A kind of construction discharging platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185263A (en) * 2019-04-16 2019-08-30 中国建筑第二工程局有限公司 A kind of construction discharging platform

Similar Documents

Publication Publication Date Title
CN104975719A (en) Novel material distribution device and floor concrete casting construction method of novel material distribution device
CN107524284A (en) A kind of regularization pylon protection system and installation method
CN201420385Y (en) Overhanging type unloading platform for building construction
CN107178203A (en) A kind of planar dimension and adjustable for height operating platform
CN206942109U (en) One kind is without special bracket and the protection support body of encorbelmenting of off-load industrialization security protection
CN207048345U (en) Construction discharge platform device
CN208023970U (en) Construction discharging platform
CN207227957U (en) Pier construction security protection platform
CN213804905U (en) Bailey beam suspension structure
CN203795311U (en) Multi-leg high pier and slip form construction device
CN206308988U (en) Tool-type combination construction pylon
CN210483094U (en) Inverted triangular pipe truss lifting device
CN102182324A (en) Anti-falling safety net
CN107587711A (en) A kind of regularization assembled overhanging protection canopy and its assembly method
CN207296361U (en) A kind of regularization assembled overhanging protection canopy
CN206957175U (en) A kind of planar dimension and adjustable for height operating platform
CN205472340U (en) People's passageway on instrument formula tower crane
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN212743447U (en) Reinforced structure that building structure is firm anti collapsing
CN203022327U (en) Elevator shaft high-altitude construction platform device
CN207048281U (en) A kind of ore deposit Jiao groove feed hopper liner installation system
CN206220547U (en) A kind of operating platform for steel structure column installation
CN208056094U (en) A kind of support system of the tower crane of ceiling plate located underground
CN207453439U (en) A kind of elevated hoistway operation platform of subsidiary movable inserted link
CN207277870U (en) A kind of elevator protective device with shaped

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant