CN217896273U - 一种钢箱梁安装用可自动调平支架 - Google Patents
一种钢箱梁安装用可自动调平支架 Download PDFInfo
- Publication number
- CN217896273U CN217896273U CN202222196644.5U CN202222196644U CN217896273U CN 217896273 U CN217896273 U CN 217896273U CN 202222196644 U CN202222196644 U CN 202222196644U CN 217896273 U CN217896273 U CN 217896273U
- Authority
- CN
- China
- Prior art keywords
- box girder
- steel box
- plate
- mounting
- top plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 64
- 239000010959 steel Substances 0.000 title claims abstract description 64
- 230000007246 mechanism Effects 0.000 claims abstract description 44
- 238000009434 installation Methods 0.000 claims description 21
- 238000010276 construction Methods 0.000 abstract description 17
- 238000000034 method Methods 0.000 abstract description 6
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 210000001503 joint Anatomy 0.000 description 7
- 238000003466 welding Methods 0.000 description 6
- 230000009471 action Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 239000002184 metal Substances 0.000 description 3
- 230000000149 penetrating effect Effects 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 239000010720 hydraulic oil Substances 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222196644.5U CN217896273U (zh) | 2022-08-19 | 2022-08-19 | 一种钢箱梁安装用可自动调平支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222196644.5U CN217896273U (zh) | 2022-08-19 | 2022-08-19 | 一种钢箱梁安装用可自动调平支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217896273U true CN217896273U (zh) | 2022-11-25 |
Family
ID=84142594
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222196644.5U Active CN217896273U (zh) | 2022-08-19 | 2022-08-19 | 一种钢箱梁安装用可自动调平支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217896273U (zh) |
-
2022
- 2022-08-19 CN CN202222196644.5U patent/CN217896273U/zh active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR19990072014A (ko) | 위에서지면으로건축물을건설하는리프트업공법 | |
CN111395641A (zh) | 一种预制混凝土外挂墙板及其施工方法 | |
CN213597220U (zh) | 一种方管柱与h型钢梁高装配节点 | |
CN217896273U (zh) | 一种钢箱梁安装用可自动调平支架 | |
CN113585828A (zh) | 一种大跨度倒三角管桁架坡屋面厂房的安装方法 | |
CN111042575A (zh) | 一种地下室顶板临时道路的钢结构立柱加固结构及方法 | |
CN112523258B (zh) | 一种便捷式单侧模板支撑系统及其施工方法 | |
JP7136309B2 (ja) | 上部工部材運搬設備および上部工部材運搬方法 | |
CN214033785U (zh) | 一种单侧模板支撑系统 | |
CN212801921U (zh) | 一种钢平台调平机构 | |
CN210767913U (zh) | 一种临时支撑预制混凝土外墙的结构 | |
CN114439242A (zh) | 装配式悬挑复杂构件优化及吊装加固施工工法 | |
CN102359073A (zh) | 混凝土简支箱梁支座灌浆模板结构 | |
CN220868875U (zh) | 一种楼承板临时支撑次梁安装装置 | |
CN112049415A (zh) | 一种挑檐支模的施工方法 | |
CN220035217U (zh) | 一种用于方柱墩盖梁施工的抱箍 | |
CN218933412U (zh) | 一种装配可调节式连廊 | |
CN115126329B (zh) | 一种装配式电杆安装装置及方法 | |
CN215925687U (zh) | 一种钢箱梁对接调平装置 | |
CN211499768U (zh) | 一种可移动式的侧墙混凝土浇筑用装置 | |
CN218815137U (zh) | 一种建筑施工升降机附墙 | |
CN218813219U (zh) | 一种钢混结合梁桥面板三角托架 | |
CN217298631U (zh) | 一种墩侧装配式施工平台 | |
CN217174381U (zh) | 一种钢管桩支架顶部平台固定扣件 | |
CN218028872U (zh) | 一种悬挂式脚手架转角钢梁支撑结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: No. 114 South Street, Jiaotoukou, Dongcheng District, Beijing, 100010 Patentee after: CCCC Construction Group Co.,Ltd. Patentee after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Address before: No. 114 South Street, Jiaotoukou, Dongcheng District, Beijing, 100010 Patentee before: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Patentee before: CCCC FOURTH HIGHWAY FIRST ENGINEERING FIRMS CO.,LTD. |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 102600 1308, unit 1, 15th floor, building 1, No. 3, rongjingdong street, Beijing Economic and Technological Development Zone, Daxing District, Beijing Patentee after: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. Patentee after: CCCC Construction Group Co.,Ltd. Address before: No. 114 South Street, Jiaotoukou, Dongcheng District, Beijing, 100010 Patentee before: CCCC Construction Group Co.,Ltd. Patentee before: CCCC FOURTH HIGHWAY ENGINEERING Co.,Ltd. |