CN216921292U - Mounting structure of outer wall construction lift platform - Google Patents

Mounting structure of outer wall construction lift platform Download PDF

Info

Publication number
CN216921292U
CN216921292U CN202220069540.5U CN202220069540U CN216921292U CN 216921292 U CN216921292 U CN 216921292U CN 202220069540 U CN202220069540 U CN 202220069540U CN 216921292 U CN216921292 U CN 216921292U
Authority
CN
China
Prior art keywords
guide rail
platform
wall
rods
wall construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220069540.5U
Other languages
Chinese (zh)
Inventor
刘光彬
徐宁
何明阳
马培钦
宁爱龙
杨国枢
曹强
蔡佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan First Construction Engineering Co ltd
Original Assignee
Sichuan First Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan First Construction Engineering Co ltd filed Critical Sichuan First Construction Engineering Co ltd
Priority to CN202220069540.5U priority Critical patent/CN216921292U/en
Application granted granted Critical
Publication of CN216921292U publication Critical patent/CN216921292U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses an installation structure of an outer wall construction lifting platform, which comprises a guide rail, a plurality of guide rail seats and a driving device, wherein the guide rail is connected with a platform main body, the guide rail seats are respectively arranged on each layer of wall body, the guide rail seats on each layer of wall body are arranged in a row, the guide rail is slidably arranged on the guide rail seats, the driving device is used for driving the guide rail to move up and down along the guide rail seats, and the guide rail is also provided with a diagonal draw bar used for being connected with the wall body. This outer wall construction lift platform's mounting structure slides erection joint through with lift platform and building outer wall for lift platform simple to operate, and can conveniently upwards slide along with outer wall construction height and rise, lift platform's altitude mixture control is also comparatively convenient.

Description

Mounting structure of outer wall construction lift platform
Technical Field
The utility model relates to the technical field of building construction, in particular to an installation structure of an outer wall construction lifting platform.
Background
The outer wall construction is a common building construction process, and a scaffold is usually required to be erected before the outer wall construction. Traditional scaffold frame uses steel pipe fastener to carry out on-the-spot erection, not only wastes time and energy, and the security performance is not high moreover. With the appearance of a large number of modern large-scale building systems in China, the fastener type steel pipe scaffold cannot meet the requirements of building construction development, particularly high-rise and super high-rise buildings. The problem is solved by the lifting platform, and the existing lifting platform is arranged on the outer wall of a building and can be adjusted along with the construction height of the building. But the erection joint of present lift platform and building outer wall is comparatively inconvenient, also is inconvenient when carrying out the altitude mixture control to lift platform moreover.
SUMMERY OF THE UTILITY MODEL
The utility model aims to: the mounting structure of the outer wall construction lifting platform is provided for the above shortcomings of the existing lifting platform and the building outer wall in mounting connection, the lifting platform is mounted conveniently by sliding and mounting connection with the building outer wall, the lifting platform can slide upwards along with the construction height, and the lifting platform is convenient to adjust.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides an outer wall construction lift platform's mounting structure, includes guide rail, a plurality of guide rail seat and drive arrangement, the guide rail links to each other with the platform main part, on each layer wall body was located respectively to the guide rail seat, and the guide rail seat on each layer wall body was a row and arranges, set up on the guide rail seat guide rail slidable, drive arrangement is used for driving the guide rail along guide rail seat elevating movement, still be equipped with on the guide rail and be used for the diagonal draw bar that links to each other with the wall body.
According to the mounting structure, the lifting platform is connected with the outer wall of the building in a sliding mounting manner, the lifting platform is convenient to mount and can conveniently slide upwards along the construction height of the outer wall, and the height position of the lifting platform is convenient to adjust.
As a preferable scheme of the present invention, a plurality of connecting rods are arranged on one side of the guide rail facing the platform main body, the connecting rods are perpendicular to the guide rail and are uniformly arranged along the length direction of the guide rail, the connecting rods are detachably connected with the platform main body, and a T-shaped sliding groove adapted to the guide rail and the connecting rods is arranged on the guide rail seat. By adopting the technical scheme, one end of the connecting rod is fixedly connected with the guide rail, then the connecting rod is placed in the T-shaped sliding groove in the guide rail seat, the other end of the connecting rod is connected with the platform body, the platform body and the guide rail are conveniently and reliably connected, the guide rail and the connecting rod form a T-shaped limit with the guide rail seat, the installation stability of the platform body is good, and the condition that the platform body inclines is effectively avoided.
As a preferable scheme of the utility model, a plurality of inclined reinforcing rods are also arranged between the connecting rod and the platform main body. Through the arrangement of the inclined reinforcing rods, a more stable integral structure is formed among the guide rails, the connecting rods, the reinforcing rods and the platform main body.
As a preferable scheme of the utility model, the spacing distance between the connecting rods is consistent with the spacing distance between each layer of wall body, the guide rail seat is provided with a movable bolt, and the movable bolt is abutted with the lower side of the connecting rod after being inserted. By adopting the technical scheme, after the platform main body is lifted to each layer of wall body, the connecting rod is just right positioned at the position of the guide rail seat, the movable bolt is inserted into the position abutted against the lower side of the connecting rod, the platform main body can be prevented from dropping, and the construction safety of the wall body is further improved.
As the preferred scheme of the utility model, the driving device is an inverted electric hoist, so that the driving device is convenient to control during construction.
As a preferred scheme of the present invention, a lower hanger is provided at a lower portion of the platform main body, an upper hanger is provided on the wall, and the electric hoist is suspended on the lower hanger and the upper hanger. The chain of the electric hoist acts to drive the platform main body to move up and down.
In a preferred embodiment of the present invention, a chain tensioning bracket is provided at an upper portion of the platform body. The chain tensioning support can bear the weight of the chain on the upper portion of the electric hoist and the tension of the spring, the chain is in a tensioning state when the chain tensioning support is used, and the condition that damage occurs due to the fact that the chain is wound and knotted is effectively prevented.
As a preferable scheme of the utility model, the platform main body comprises a plurality of inner rods and outer rods, a plurality of layers of walkway plates are arranged between the inner rods and the outer rods, and a protective net is arranged between the adjacent outer rods.
In summary, due to the adoption of the technical scheme, the utility model has the beneficial effects that:
according to the mounting structure, the lifting platform is connected with the outer wall of the building in a sliding mounting manner, the lifting platform is convenient to mount and can conveniently slide upwards along the construction height of the outer wall, and the height position of the lifting platform is convenient to adjust.
Drawings
Fig. 1 is a schematic view of an installation structure of an outer wall construction lifting platform according to the present invention.
Fig. 2 is a side view of fig. 1.
Fig. 3 is a schematic sectional view of the installation of the guide rail and the guide rail seat.
Fig. 4 is a schematic view of the connection between the guide rail and the platform body in fig. 2.
Fig. 5 is a schematic view of the drive assembly installation.
The labels in the figure are: 1-guide rail, 2-guide rail seat, 3-wall body, 4-diagonal draw bar, 5-inner bar, 6-outer bar, 7-walkway plate, 8-protective net, 9-connecting bar, 10-reinforcing bar, 11-movable bolt, 12-electric hoist, 13-lower hanger, 14-upper hanger, 15-chain tensioning bracket and 16-chain.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Examples
The embodiment provides an installation structure of an outer wall construction lifting platform;
as shown in fig. 1-5, the mounting structure of the lifting platform for exterior wall construction in this embodiment includes a guide rail 1, a plurality of guide rail seats 2 and a driving device, the guide rail 1 is connected to a platform main body, the guide rail seats 2 are respectively fixed to each floor wall 3 through bolts, and the guide rail seats 2 on each floor wall 3 are arranged in a row, the guide rail 1 is slidably disposed on the guide rail seats 2, the driving device is configured to drive the guide rail 1 to move up and down along the guide rail seats 2, the guide rail 1 is further provided with a diagonal draw bar 4 for connecting to the wall 3, and the diagonal draw bar 4 can be detached and separated from the wall 3 when the guide rail 1 goes up and down.
According to the mounting structure, the lifting platform is connected with the outer wall of the building in a sliding mounting manner, the lifting platform is convenient to mount and can conveniently slide upwards along the construction height of the outer wall, and the height position of the lifting platform is convenient to adjust.
In this embodiment, the platform main part includes a plurality of interior poles 5 and outer poles 6, interior pole 6 has two at least and is close to the vertical setting of wall body 3, outer pole 6 has two at least and locates the outside of interior pole 5, be equipped with a plurality of layers between interior pole 5 and outer pole 6 and walk guidance tape 7, the below of walking guidance tape 7 sets up the A-frame and supports, each layer walks guidance tape 7 along vertical interval setting and interval and each layer wall body 3 highly spaced unanimous, of course, also can set up two-layer guidance tape 7 in each layer wall body 3 highly spaced, in order to improve the inconvenient condition of wall body construction when floor layer height is higher, be equipped with protection network 8 between adjacent outer pole 6, in order to prevent that the people from falling when being under construction on walking the guidance tape.
In this embodiment, one side towards the platform main part is equipped with a plurality of connecting rods 9 on the guide rail 1, connecting rod 9 perpendicular to guide rail 1 just evenly arranges along 1 length direction of guide rail, connecting rod 9 can dismantle with the platform main part and be connected, and is concrete, 5 bolted connection in the pole in connecting rod 9 and the platform main part, be equipped with the T type spout with guide rail 1 and connecting rod 9 looks adaptation on the guide rail seat 2. By adopting the technical scheme, one end of the connecting rod is fixedly connected with the guide rail, then the connecting rod is placed in the T-shaped sliding groove in the guide rail seat, the other end of the connecting rod is connected with the platform body, the platform body and the guide rail are conveniently and reliably connected, the guide rail and the connecting rod form a T-shaped limit with the guide rail seat, the installation stability of the platform body is good, and the condition that the platform body inclines is effectively avoided.
In this embodiment, a plurality of inclined reinforcing rods 10 are further arranged between the connecting rod 9 and the platform main body, specifically, one end of each reinforcing rod 10 is connected with the connecting rod 9, and the other end of each reinforcing rod is connected with the inner rod 5 of the platform main body. Through the arrangement of the inclined reinforcing rods, a more stable integral structure is formed among the guide rails, the connecting rods, the reinforcing rods and the platform main body.
In this embodiment, the spacing distance between the connecting rods 9 is the same as the spacing distance between each layer of wall 3, the guide rail seat 2 is provided with a movable bolt 11, and the movable bolt 11 is abutted against the lower side of the connecting rod 9 after being inserted. Adopt above-mentioned technical scheme, adopt floor layer height that goes up and down at every turn when the platform main part goes up and down, the connecting rod just in time is located guide rail seat position department like this, insert the activity bolt with the connecting rod downside butt after, can prevent that the platform main part from weighing down, further improve wall body construction security. Before moving the platform body, the movable bolt 11 on the guide rail seat 2 needs to be pulled out first, so that the movable bolt does not interfere with the connecting rod 9, and the guide rail can be lifted normally.
In this embodiment, the driving device is the inverted electric hoist 12, and is controlled during convenient construction.
In this embodiment, a lower hanger 13 is provided at a lower portion of the platform main body, the lower hanger 13 is provided on a structure formed by the connecting rod 9 and the reinforcing rod 10, an upper hanger 14 is provided on the wall 3, and the electric hoist 12 is hung and mounted on the lower hanger 13 and the upper hanger 14. The chain of the electric hoist acts to drive the platform main body to move up and down. The upper hanger 14 is fixed on the building wall 3, the electric hoist 12 is installed on a hanging point of the lower hanger 13, the middle chain hook is installed on the upper hanger 14, and the upper hanger 14 on the wall 3 only needs to be moved along with the floor construction height in the using process without moving the electric hoist 12.
In this embodiment, a chain tensioning bracket 15 is provided at the upper part of the platform main body, and the chain tensioning bracket 15 is provided on the structure formed by the connecting rod 9 and the reinforcing rod 10. The chain tensioning support 15 is used for bearing the weight of the chain 16 on the upper portion of the electric hoist and the tension of the spring, so that the chain 16 is in a tensioning state when the chain tensioning support is used, and the condition that damage is caused due to the fact that the chain is wound and knotted is effectively prevented. The chain tensioning bracket 15 is mounted on the structure formed by the connecting rods and the reinforcing rods beside the guide rails at the position of the floor above the upper hanger 14.
In order to make the platform body lift more stably, two rows of guide rail seats 2 are arranged on the floor wall 3 in the embodiment, two guide rails 1 are correspondingly arranged and connected with two inner rods 5 on the platform body, and two groups of inverted electric hoists 12 are arranged as driving devices to drive the guide rails 1 to lift along the guide rail seats 2.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the utility model, and any modifications, equivalents and improvements made within the spirit of the present invention are intended to be included within the scope of the present invention.

Claims (8)

1. The utility model provides an outer wall construction lift platform's mounting structure, its characterized in that, includes guide rail, a plurality of guide rail seat and drive arrangement, the guide rail links to each other with the platform main part, on each layer wall body was located respectively to the guide rail seat, and the guide rail seat on each layer wall body is a row and arranges, set up on the guide rail seat guide rail slidable, drive arrangement is used for driving the guide rail along guide rail seat elevating movement, still be equipped with on the guide rail and be used for the oblique pull rod that links to each other with the wall body.
2. The mounting structure of an external wall construction lifting platform according to claim 1, wherein a plurality of connecting rods are arranged on one side of the guide rail facing the platform main body, the connecting rods are perpendicular to the guide rail and are uniformly arranged along the length direction of the guide rail, the connecting rods are detachably connected with the platform main body, and a T-shaped sliding groove matched with the guide rail and the connecting rods is arranged on the guide rail seat.
3. The structure of claim 2, wherein a plurality of inclined reinforcing rods are arranged between the connecting rods and the platform body.
4. The mounting structure of an external wall construction lifting platform according to claim 3, wherein the spacing distance between the connecting rods is consistent with the spacing distance between each layer of wall body, the guide rail seat is provided with a movable bolt, and the movable bolt is abutted against the lower side of the connecting rod after being inserted.
5. The exterior wall construction lifting platform installation structure of one of claims 1 to 4, wherein the driving means is an inverted electric hoist.
6. The mounting structure of an external wall construction lifting platform according to claim 5, wherein a lower hanger is provided at a lower portion of the platform main body, an upper hanger is provided on the wall body, and the electric hoist is hung on the lower hanger and the upper hanger.
7. The structure of claim 6, wherein a chain tension bracket is provided at an upper portion of the platform body.
8. The structure for installing the outer wall construction lifting platform according to any one of claims 1 to 4, wherein the platform body comprises a plurality of inner rods and outer rods, a plurality of layers of walkway plates are arranged between the inner rods and the outer rods, and a protective net is arranged between adjacent outer rods.
CN202220069540.5U 2022-01-12 2022-01-12 Mounting structure of outer wall construction lift platform Active CN216921292U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220069540.5U CN216921292U (en) 2022-01-12 2022-01-12 Mounting structure of outer wall construction lift platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220069540.5U CN216921292U (en) 2022-01-12 2022-01-12 Mounting structure of outer wall construction lift platform

Publications (1)

Publication Number Publication Date
CN216921292U true CN216921292U (en) 2022-07-08

Family

ID=82262931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220069540.5U Active CN216921292U (en) 2022-01-12 2022-01-12 Mounting structure of outer wall construction lift platform

Country Status (1)

Country Link
CN (1) CN216921292U (en)

Similar Documents

Publication Publication Date Title
CN113250434B (en) Multifunctional composite scaffold system
CN110004834B (en) Automatic climbing platform for hanging cable construction
CN202273397U (en) Lifting device for reversal hanging lifting frame
CN211736309U (en) Building climbing frame lifting device
CN216921292U (en) Mounting structure of outer wall construction lift platform
CN213268983U (en) Self-climbing discharging platform
CN213418443U (en) Self-climbing type elevator shaft operation platform
CN113235906A (en) Integrally-lifted peripheral protection hanging frame and lifting method
CN209585654U (en) Adhesion type goes up and down discharging platform
CN202441045U (en) Rail-type electric attached lifting scaffold
CN105776092B (en) A kind of extended position nacelle device
CN202718381U (en) Transfer-free lifting device
CN216007754U (en) All-steel attached lifting scaffold
CN113443535B (en) Down extending type lifting equipment for well construction and mounting method thereof
CN210973660U (en) Temporary tower crane passageway of can overturning suitable for whole hoisting frame
CN209367692U (en) It is a kind of to rise gantry type two-way lifter device certainly
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
CN2578461Y (en) Liftable scaffold
CN218919785U (en) Device for hanging and detaching anti-falling rope by adopting unmanned aerial vehicle
CN215291325U (en) Whole promotion formula peripheral protection stores pylon
CN210857952U (en) Novel attached lifting scaffold
CN217417979U (en) Automatic transport climbs a material auxiliary device
CN216196501U (en) Construction is with fixed hanging flower basket of no support
CN216240384U (en) Operation platform assembly with ladder stand suitable for steel structure high altitude installation
CN214462409U (en) Climbing frame attachment structure suitable for decorative constructional column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant