CN105776092B - A kind of extended position nacelle device - Google Patents

A kind of extended position nacelle device Download PDF

Info

Publication number
CN105776092B
CN105776092B CN201610251467.2A CN201610251467A CN105776092B CN 105776092 B CN105776092 B CN 105776092B CN 201610251467 A CN201610251467 A CN 201610251467A CN 105776092 B CN105776092 B CN 105776092B
Authority
CN
China
Prior art keywords
bracket
expansion bracket
rope
steel wire
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610251467.2A
Other languages
Chinese (zh)
Other versions
CN105776092A (en
Inventor
杨平
贺丹
吴万春
王士民
石贤春
岳骉
张显中
邱宏刚
李升波
刘爱东
肖伟峰
李蓉
芦海清
徐忠成
徐佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Jangho Group Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Jangho Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd, Jangho Group Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201610251467.2A priority Critical patent/CN105776092B/en
Publication of CN105776092A publication Critical patent/CN105776092A/en
Application granted granted Critical
Publication of CN105776092B publication Critical patent/CN105776092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Mechanical Engineering (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

本发明公开了一种结构简单、安全性好的伸展式吊篮装置及其施工方法,包括横架于楼层上的悬挂架,所述悬挂架下方设有下支架,所述悬挂架通过下支架固定于楼层上,所述悬挂架靠近楼层内部一端设置有调节支架,所述调节支架上安装有提升机构、收绳机构、导绳机构和电源主控制箱。本发明集施工作业吊篮、液压装置及配套的安全保护系统为一体,可用于屋面四周带有较大悬挑挑檐、连廊、连桥,整体立面造型独特、进出凸凹不平,整体呈直线型、弧形、正V型或正W型等向楼外倾斜的高层建筑立面幕墙特别是悬挑挑檐底部吊顶幕墙施工。

The invention discloses a stretchable hanging basket device with simple structure and good safety and a construction method thereof, which comprises a suspension frame mounted horizontally on the floor, a lower bracket is arranged under the suspension bracket, and the suspension frame passes through the lower bracket. Fixed on the floor, the suspension frame is provided with an adjustment bracket near the inner end of the floor, and the adjustment bracket is equipped with a lifting mechanism, a rope receiving mechanism, a rope guiding mechanism and a main power control box. The invention integrates the construction work hanging basket, the hydraulic device and the supporting safety protection system, and can be used for roofs with large cantilevered eaves, corridors and bridges. Straight line, curved, positive V-shaped or positive W-shaped high-rise building facade curtain wall that is inclined to the outside of the building, especially the construction of the ceiling curtain wall at the bottom of the cantilevered eaves.

Description

一种伸展式吊篮装置An extendable hanging basket device

技术领域technical field

本发明涉及建筑施工领域,特别是涉及一种伸展式吊篮装置及其施工方法。The invention relates to the field of building construction, in particular to an extending hanging basket device and a construction method thereof.

背景技术Background technique

建筑设计随着城市建设的发展需要,高层、超高层建筑单体或群体建筑越来越多,其造型千变万化,风格各异、独特时尚,这给建筑施工尤其是幕墙施工带来越来越大的技术难点,也给施工工法带来前所未有的挑战。其中屋面四周带有较大悬挑挑檐、连廊、连桥,整体立面造型独特、进出凸凹不平,整体呈直线型、弧形、正V型或正W型等向楼外倾斜的高层建筑,立面幕墙或挑檐处吊顶幕墙施工是目前建筑幕墙施工的一大技术难题,也是施工安全技术的一大难题。Architectural Design With the development of urban construction, there are more and more high-rise and super-high-rise single or group buildings with ever-changing shapes, different styles, unique fashions, which bring more and more serious problems to building construction, especially curtain wall construction. The technical difficulties also brought unprecedented challenges to the construction method. Among them, there are large cantilevered eaves, corridors, and bridges around the roof. The overall facade has a unique shape, with uneven entrances and exits. The overall shape is straight, curved, positive V-shaped or positive W-shaped, etc. Building, the construction of facade curtain wall or ceiling curtain wall at the overhanging eaves is a major technical problem in the construction of building curtain walls at present, and it is also a major problem in construction safety technology.

目前建筑幕墙施工,一般是采取在楼层内架设吊篮或沿着建筑外围满铺脚手架作为施工人员操作平台。当遇到上述类型的建筑特别是高层、超高层建筑,如采取传统的普通吊篮,需要频繁进行不同楼层间移位,甚至操作人员就无法到达作业面顺利开展施工。如果采取在建筑外围满铺脚手架方式,经济方面搭设、维护费用高而且过于浪费资源,建筑整体越高,其劣势就越明显。At present, in the construction of building curtain walls, it is generally adopted to erect hanging baskets in the floors or spread scaffolding along the periphery of the building as the construction personnel's operating platform. When encountering the above types of buildings, especially high-rise and super high-rise buildings, if traditional ordinary hanging baskets are used, frequent shifts between different floors are required, and even operators cannot reach the working surface to carry out construction smoothly. If the method of paving scaffolding on the periphery of the building is adopted, the economical construction and maintenance costs will be high and resources will be wasted too much. The higher the building as a whole, the more obvious its disadvantages.

发明内容Contents of the invention

为了解决上述技术问题,本发明提供了一种结构简单、安全性好的伸展式吊篮装置及其施工方法。In order to solve the above-mentioned technical problems, the present invention provides a simple structure, good safety extension type hanging basket device and its construction method.

本发明所要解决的技术问题通过以下技术方案来实现:The technical problem to be solved by the present invention is realized by the following technical solutions:

本发明的一种伸展式吊篮装置,包括横架于楼层上的悬挂架,所述悬挂架下方设有下支架,所述悬挂架通过下支架固定于楼层上,所述悬挂架靠近楼层内部一端设置有调节支架,所述调节支架上安装有提升机构、收绳机构、导绳机构和电源主控制箱,所述悬挂架上安装有第一钢丝绳,所述第一钢丝绳一端与提升机构和收绳机构连接,另一端与悬挂架远离楼层内部一端连接,所述悬挂架上方安装有上支架,所述上支架下端与悬挂架固定,上端与第一钢丝绳活动连接;An extended hanging basket device according to the present invention comprises a suspension frame horizontally mounted on the floor, a lower bracket is provided below the suspension frame, the suspension frame is fixed on the floor through the lower bracket, and the suspension frame is close to the inside of the floor One end is provided with an adjusting bracket, and the lifting mechanism, the rope receiving mechanism, the guiding rope mechanism and the main control box of the power supply are installed on the adjusting bracket, and the first steel wire rope is installed on the suspension frame, and one end of the first steel wire rope is connected with the lifting mechanism and the The rope receiving mechanism is connected, and the other end is connected with the end of the suspension frame away from the interior of the floor. An upper bracket is installed above the suspension frame, the lower end of the upper bracket is fixed with the suspension frame, and the upper end is movably connected with the first steel wire rope;

所述悬挂架远离楼层内部一端通过第二钢丝绳连接有伸缩架,所述伸缩架包括第一伸缩架和第二伸缩架,所述第一伸缩架一端固定有吊篮,所述第一伸缩架远离吊篮一侧设置有第一连接部,所述第二钢丝绳与第一连接部连接,所述第二伸缩架一端与第一伸缩架铰接于第一连接部,所述第二伸缩架上设置有第二连接部,所述伸缩架上设置有液压装置,所述液压装置的缸杆与第一伸缩架远离吊篮一端的端部活动连接,所述液压装置的缸体与第二连接部活动连接;The end of the suspension frame away from the interior of the floor is connected to a telescopic frame through a second steel wire rope, and the telescopic frame includes a first telescopic frame and a second telescopic frame, and a hanging basket is fixed at one end of the first telescopic frame, and the first telescopic frame A first connection part is provided on the side away from the hanging basket, the second steel wire rope is connected to the first connection part, one end of the second telescopic frame is hinged to the first connection part with the first telescopic frame, and the second telescopic frame A second connection part is provided, and a hydraulic device is provided on the telescopic frame, the cylinder rod of the hydraulic device is movably connected with the end of the first telescopic frame away from the end of the hanging basket, and the cylinder body of the hydraulic device is connected with the second Ministry activity connection;

所述第一钢丝绳与第二钢丝绳相连接,所述第一钢丝绳通过提升机构和收绳机构带动吊篮向上或向下移动。The first steel wire rope is connected to the second steel wire rope, and the first steel wire rope drives the hanging basket to move up or down through the lifting mechanism and the rope receiving mechanism.

进一步的,所述伸缩架通过液压装置展开或闭合,所述吊篮通过伸缩架沿水平方向位移;Further, the telescopic frame is expanded or closed by a hydraulic device, and the hanging basket is displaced in the horizontal direction by the telescopic frame;

伸缩架展开时,所述第一伸缩架垂直于第二钢丝绳、水平悬于第二钢丝绳下方,所述液压装置的缸杆收入缸体内;When the telescopic frame is unfolded, the first telescopic frame is perpendicular to the second steel wire rope and hangs horizontally below the second steel wire rope, and the cylinder rod of the hydraulic device is received into the cylinder body;

伸缩架闭合时,所述液压装置的缸杆伸出,所述第一伸缩架和第二伸缩架相靠近。When the telescopic frame is closed, the cylinder rod of the hydraulic device is stretched out, and the first telescopic frame and the second telescopic frame are close to each other.

进一步的,所述上支架与第一钢丝绳连接处设置有防超速安全锁。Further, an anti-overspeed safety lock is provided at the connection between the upper bracket and the first wire rope.

进一步的,所述第二伸缩架上设置有配重装置。Further, a counterweight device is provided on the second telescopic frame.

进一步的,所述调节支架上设置有配重块。Further, a counterweight is provided on the adjustment bracket.

进一步的,所述悬挂架上设置有限位装置。Further, a limiting device is provided on the suspension frame.

进一步的,所述提升机构、收绳机构、导绳机构和电源主控制箱通过螺栓安装于调节支架上,所述电源主控制箱安装于靠近楼层内部一侧。Further, the lifting mechanism, the rope receiving mechanism, the rope guiding mechanism and the main control box of the power supply are installed on the adjustment bracket through bolts, and the main control box of the power supply is installed on the side close to the interior of the floor.

一种伸展式吊篮装置的施工方法,包括以下步骤:A construction method for an extended hanging basket device, comprising the following steps:

S1、安装悬挂架:悬挂架通过塔吊运送至指定楼层,并安装上支架、下支架、悬挂架和第一钢丝绳;S1. Install the suspension frame: the suspension frame is transported to the designated floor by the tower crane, and the upper bracket, the lower bracket, the suspension frame and the first wire rope are installed;

S2、组装调节支架:悬挂架靠近楼层内部一侧的端部安装有调节支架,所述调节支架呈框架式结构,所述调节支架上通过螺栓安装有提升机构、收绳机构、导绳机构和电源主控制箱;S2. Assembling the adjustment bracket: an adjustment bracket is installed on the end of the suspension frame close to the inner side of the floor. Main power control box;

S3、组装吊篮:根据施工要求确定吊篮尺寸,并组装,在吊篮上安装提升机、安全锁和电源分控制箱;S3. Assembling the hanging basket: determine the size of the hanging basket according to the construction requirements, and assemble it, and install the hoist, safety lock and power control box on the hanging basket;

S4、安装伸缩架:在地面组装好,通过螺栓与吊篮固定,并安装液压装置,最后连接第二钢丝绳。S4. Install the telescopic frame: assemble it on the ground, fix it with the hanging basket through bolts, install the hydraulic device, and finally connect the second wire rope.

借由上述方案,本发明至少具有以下优点:By means of the above solution, the present invention has at least the following advantages:

本发明集施工作业吊篮、液压装置及配套的安全保护系统为一体,可用于屋面四周带有较大悬挑挑檐、连廊、连桥,整体立面造型独特、进出凸凹不平,整体呈直线型、弧形、正V型或正W型等向楼外倾斜的高层建筑立面幕墙特别是悬挑挑檐底部吊顶幕墙施工。解决了具有以上特殊造型的楼体幕墙施工技术难题,克服了搭设脚手架经济上不合理、用普通吊篮又难以施工的局限性。本发明伸展式吊篮的重复利用率高,节省了成本,机械性能好,大大提升了特殊型体幕墙施工工效,保证了高空施工安全。The invention integrates the construction work hanging basket, the hydraulic device and the supporting safety protection system, and can be used for roofs with large cantilevered eaves, corridors and bridges. Straight line, curved, positive V-shaped or positive W-shaped high-rise building facade curtain wall that is inclined to the outside of the building, especially the construction of the ceiling curtain wall at the bottom of the cantilevered eaves. It solves the technical problems in the construction of the curtain wall of the building with the above special shapes, and overcomes the limitations of unreasonable economics and difficult construction with ordinary hanging baskets. The stretching hanging basket of the present invention has a high reutilization rate, saves costs, has good mechanical performance, greatly improves the construction efficiency of the special-shaped curtain wall, and ensures the safety of high-altitude construction.

上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。The above description is only an overview of the technical solutions of the present invention. In order to understand the technical means of the present invention more clearly and implement them according to the contents of the description, the preferred embodiments of the present invention and accompanying drawings are described in detail below.

附图说明Description of drawings

图1是本发明的一种伸展式吊篮装置的结构示意图;Fig. 1 is the structural representation of a kind of extension type hanging basket device of the present invention;

图2是图1所示的一种伸展式吊篮装置的提升机构、收绳机构和导绳机构固定放大图;Fig. 2 is a fixed enlarged view of a hoisting mechanism, a rope receiving mechanism and a rope guiding mechanism of the extended hanging basket device shown in Fig. 1;

图3是图1所示的一种伸展式吊篮装置的伸缩架展开结构示意图;Fig. 3 is a schematic diagram of the expanded structure of the telescopic frame of the extended hanging basket device shown in Fig. 1;

图4是图1所示的一种伸展式吊篮装置的伸缩架闭合结构示意图。Fig. 4 is a schematic diagram of the closed structure of the telescopic frame of the extended hanging basket device shown in Fig. 1 .

1、悬挂架;2、提升机构;3、收绳机构;4、导绳机构;5、电源主控制箱;6、配重块;7、限位装置;8、下支架;9、第二钢丝绳;10、第一伸缩架;11、液压装置;12、配重装置;13、吊篮;14、第一钢丝绳;15、第二伸缩架;16、上支架;17、调节支架;18、第一连接部;19、第二连接部。1. Suspension frame; 2. Lifting mechanism; 3. Rope receiving mechanism; 4. Rope guiding mechanism; 5. Main control box of power supply; 6. Counterweight block; 7. Limiting device; 8. Lower bracket; Steel wire rope; 10. The first telescopic frame; 11. Hydraulic device; 12. Counterweight device; 13. Hanging basket; 14. The first steel wire rope; 15. The second telescopic frame; 16. Upper bracket; 17. Adjusting bracket; 18. The first connection part; 19. The second connection part.

具体实施方式detailed description

下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。The specific implementation manners of the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

参见图1-4所示,一种伸展式吊篮装置,包括横架于楼层上的悬挂架1,悬挂架1下方设有下支架16,悬挂架1通过下支架16固定于楼层上,悬挂架1靠近楼层内部一端设置有调节支架17,调节支架17上安装有提升机构2、收绳机构3、导绳机构4和电源主控制箱5,悬挂架1上安装有第一钢丝绳14,第一钢丝绳14一端与提升机构2和收绳机构3连接,另一端与悬挂架1远离楼层内部一端连接,悬挂架1上方安装有上支架8,上支架8下端与悬挂架1固定,上端与第一钢丝绳14活动连接;Referring to Fig. 1-4, a kind of stretching hanging basket device comprises a suspension frame 1 horizontally mounted on the floor, a lower bracket 16 is arranged under the suspension frame 1, and the suspension frame 1 is fixed on the floor through the lower bracket 16, and the hanging frame 1 is suspended. The frame 1 is provided with an adjusting bracket 17 near the inner end of the floor. The adjusting bracket 17 is equipped with a hoisting mechanism 2, a rope receiving mechanism 3, a rope guiding mechanism 4 and a main power control box 5. The suspension frame 1 is equipped with a first steel wire rope 14. One end of a steel wire rope 14 is connected with the hoisting mechanism 2 and the rope-receiving mechanism 3, and the other end is connected with the suspension frame 1 away from the inner end of the floor. The upper bracket 8 is installed above the suspension frame 1. A steel wire rope 14 is flexibly connected;

悬挂架1远离楼层内部一端通过第二钢丝绳9连接有伸缩架,伸缩架包括第一伸缩架10和第二伸缩架15,第一伸缩架10一端固定有吊篮13,第一伸缩架10远离吊篮13一侧设置有第一连接部18,第二钢丝绳9与第一连接部18连接,第二伸缩架15一端与第一伸缩架10铰接于第一连接部18,第二伸缩架15上设置有第二连接部19,伸缩架上设置有液压装置11,液压装置11的缸杆与第一伸缩架10远离吊篮13一端的端部活动连接,液压装置11的缸体与第二连接部19活动连接;The end of the suspension frame 1 away from the interior of the floor is connected with a telescopic frame through the second steel wire rope 9. The telescopic frame includes a first telescopic frame 10 and a second telescopic frame 15. One end of the first telescopic frame 10 is fixed with a hanging basket 13, and the first telescopic frame 10 is far away from the floor. One side of the hanging basket 13 is provided with a first connecting portion 18, the second wire rope 9 is connected to the first connecting portion 18, one end of the second telescopic frame 15 is hinged to the first connecting portion 18 with the first telescopic frame 10, and the second telescopic frame 15 The second connection part 19 is arranged on the telescopic frame, and the hydraulic device 11 is provided on the telescopic frame. The connecting part 19 is movable and connected;

第一钢丝绳14与第二钢丝绳9相连接,第一钢丝绳14通过提升机构2和收绳机构3带动吊篮13向上或向下移动。The first steel wire rope 14 is connected with the second steel wire rope 9 , and the first steel wire rope 14 drives the hanging basket 13 to move up or down through the hoisting mechanism 2 and the rope receiving mechanism 3 .

本申请的伸展式吊篮装置采取压配重方式固定,单独的提升机构2、收绳机构3、导绳机构4、电源主控制箱5固定在悬挂架1后端的调节支架17上,吊篮13直接与带有液压装置11的伸缩架相连,伸缩架再与悬挂吊篮13的第二钢丝绳9连接在一起,施工人员在吊篮13里通过操纵液压伸缩按钮即可实现吊篮13向前伸展、闭合功能。The extension-type hanging basket device of the present application is fixed by means of pressure counterweight, and the separate lifting mechanism 2, rope receiving mechanism 3, rope guiding mechanism 4, and power main control box 5 are fixed on the adjustment bracket 17 at the rear end of the suspension frame 1, and the hanging basket 13 is directly connected with the telescopic frame with hydraulic device 11, and the telescopic frame is connected with the second wire rope 9 for hanging the hanging basket 13. The construction personnel can realize the forward movement of the hanging basket 13 by operating the hydraulic telescopic button in the hanging basket 13. Stretch and close functions.

悬挂架1可以像普通吊篮支架一样在楼层内进行组装或拆解,后端的调节支架17处放置足够数量的配重块6作为主要承重体系。The suspension frame 1 can be assembled or disassembled in the floor like a common hanging basket support, and a sufficient number of counterweights 6 are placed at the adjustment bracket 17 at the rear end as the main load-bearing system.

提升机构2可以在吊篮里安装有提升机,另外考虑吊篮13安装、移位或拆除时为了方便穿钢丝绳或抽出钢丝绳,在悬挂架1后端的调节支架17也设置有单独的提升机构2。The hoisting mechanism 2 can be equipped with a hoist in the hanging basket. In addition, when the hanging basket 13 is installed, shifted or removed, in order to facilitate the wire rope or pull out the wire rope, the adjustment bracket 17 at the rear end of the suspension frame 1 is also provided with a separate lifting mechanism 2. .

本申请的收绳机构3结构上做出了适当创新,普通吊篮在提升时钢丝绳是不动的,在提升机动力下吊篮直接沿着钢丝绳往上爬升。而本申请的吊篮13在悬挂架1上设置有单独的收绳机构3,当吊篮13提升时在顶部提升机构2的驱动下,会将第一钢丝绳14直接缠绕排布在悬挂架1后端的调节支架17上固定的收绳机构3的轮盘上。同样随着吊篮13下降,在顶部提升机构2的驱动下会将收绳机构3轮盘上的第一钢丝绳14同步释放。Appropriate innovations have been made in the structure of the rope receiving mechanism 3 of the present application. The steel wire rope does not move when the ordinary hanging basket is lifted, and the hanging basket directly climbs up along the steel wire rope under the power of the hoist. The hanging basket 13 of the present application is provided with a separate rope receiving mechanism 3 on the suspension frame 1. When the hanging basket 13 is lifted, driven by the top lifting mechanism 2, the first steel wire rope 14 will be directly wound and arranged on the suspension frame 1. On the wheel disc of the fixed rope receiving mechanism 3 on the adjustment bracket 17 of the rear end. Also along with hanging basket 13 descending, under the drive of top hoisting mechanism 2, the first wire rope 14 on the pulley of rope receiving mechanism 3 will be synchronously released.

同时,本申请在悬挂架1的调节支架17上设置有单独的导绳机构4,是为了使轮盘上的第一钢丝绳14在进行缠绕或释放过程中,不会发生排放混乱或互相咬绳现象。At the same time, the present application is provided with a separate rope guide mechanism 4 on the adjustment bracket 17 of the suspension frame 1, in order to prevent the first wire rope 14 on the wheel from being discharged in disorder or biting each other during the winding or releasing process. Phenomenon.

本申请将电源主控制箱5设置在调节支架17上,保证在进行吊篮13安装、移位或拆除时更容易控制、操作,当吊篮13运行过程中遇到任何突发情况,操作人员可以第一时间关闭电源主控制箱5。In this application, the main control box 5 of the power supply is arranged on the adjustment bracket 17 to ensure that it is easier to control and operate when the hanging basket 13 is installed, displaced or removed. Can turn off the main control box 5 of the power supply at the first time.

伸缩架通过液压装置11展开或闭合,吊篮13通过伸缩架沿水平方向位移;The telescopic frame is expanded or closed through the hydraulic device 11, and the hanging basket 13 is displaced in the horizontal direction through the telescopic frame;

伸缩架展开时,第一伸缩架10垂直于第二钢丝绳9、水平悬于第二钢丝绳9下方,液压装置11的缸杆收入缸体内;When the telescopic frame is unfolded, the first telescopic frame 10 is perpendicular to the second steel wire rope 9 and hangs below the second steel wire rope 9 horizontally, and the cylinder rod of the hydraulic device 11 is received in the cylinder body;

伸缩架闭合时,液压装置11的缸杆伸出,第一伸缩架10和第二伸缩架15相靠近。When the telescopic frame is closed, the cylinder rod of the hydraulic device 11 stretches out, and the first telescopic frame 10 and the second telescopic frame 15 are close to each other.

上支架16与第一钢丝绳14连接处设置有防超速安全锁。An anti-overspeed safety lock is provided at the joint between the upper bracket 16 and the first wire rope 14 .

第二伸缩架15上设置有配重装置12。调节支架17上设置有配重块6。悬挂架1上设置有限位装置7。A counterweight device 12 is arranged on the second telescopic frame 15 . A counterweight 6 is arranged on the adjustment bracket 17 . A limit device 7 is arranged on the suspension frame 1 .

提升机构2、收绳机构3、导绳机构4和电源主控制箱5通过螺栓安装于调节支架17上,电源主控制箱5安装于靠近楼层内部一侧。Hoisting mechanism 2, rope receiving mechanism 3, rope guide mechanism 4 and power supply main control box 5 are installed on the adjustment bracket 17 by bolts, and power supply main control box 5 is installed near the inner side of the floor.

一种伸展式吊篮装置的施工方法,包括以下步骤:A construction method for an extended hanging basket device, comprising the following steps:

S1、安装悬挂架1:悬挂架1通过塔吊运送至指定楼层,并安装上支架16、下支架8、悬挂架1和第一钢丝绳14;S1. Install the suspension frame 1: the suspension frame 1 is transported to the designated floor by the tower crane, and the upper bracket 16, the lower bracket 8, the suspension frame 1 and the first wire rope 14 are installed;

S2、组装调节支架17:悬挂架1靠近楼层内部一侧的端部安装有调节支架17,调节支架17呈框架式结构,调节支架17上通过螺栓安装有提升机构2、收绳机构3、导绳机构4和电源主控制箱5;S2. Assembling the adjusting bracket 17: the end of the suspension frame 1 close to the inner side of the floor is equipped with an adjusting bracket 17. The adjusting bracket 17 is a frame structure. Rope mechanism 4 and power main control box 5;

S3、组装吊篮13:根据施工要求确定吊篮13尺寸,并组装,在吊篮13上安装提升机、安全锁和电源分控制箱;S3. Assemble the hanging basket 13: determine the size of the hanging basket 13 according to the construction requirements, and assemble it, and install the hoist, safety lock and power control box on the hanging basket 13;

S4、安装伸缩架:在地面组装好,通过螺栓与吊篮13固定,并安装液压装置,最后连接第二钢丝绳9。S4. Install the telescopic frame: assemble it on the ground, fix it with the hanging basket 13 through bolts, install the hydraulic device, and finally connect the second wire rope 9 .

其中本申请对于悬挂架1的安装采用以下方法:Wherein the application adopts the following methods for the installation of suspension frame 1:

1、设备运抵施工现场后,将支架、钢丝绳和配重等用施工电梯或塔吊分别运到所安装的楼层,将篮体部分搬运至相应位置的地面;1. After the equipment arrives at the construction site, use the construction elevator or tower crane to transport the bracket, wire rope and counterweight to the floor where it is installed, and move the basket body to the ground at the corresponding position;

2、将插杆插入三角形的前支架内,根据墙体(或其它障碍物)的高度调整插杆的高度,用螺栓固定。将插杆插入后支架套管内,插杆的高度与前支架高度等高,用螺栓固定,前、后支架完成安装;2. Insert the insertion rod into the triangular front bracket, adjust the height of the insertion rod according to the height of the wall (or other obstacles), and fix it with bolts. Insert the insertion rod into the sleeve of the rear bracket, the height of the insertion rod is equal to the height of the front bracket, and fix it with bolts, and the installation of the front and rear brackets is completed;

3、将前梁、后梁分别装入前、后支架的插杆内,用中梁连接,前、后座间距离在场地的允许下,尽量调整至最大距离。将上支柱安装在前支架的插杆上;3. Install the front beam and the rear beam into the inserting rods of the front and rear brackets respectively, and connect them with the center beam. The distance between the front and rear seats should be adjusted to the maximum distance as far as the site allows. Install the upper pillar on the insertion rod of the front bracket;

4、安装加强钢丝绳,调节螺旋扣的螺杆,使加强钢丝绳绷紧,使前梁略微上翘3-5厘米,产生预应力,提高前梁刚度。再将工作钢丝绳、安全钢丝绳分别固定在前梁的悬挂架1上,在安全钢丝绳适当处安装上限位装置7;4. Install the reinforced steel wire rope, adjust the screw rod of the turnbuckle to tighten the reinforced steel wire rope, and make the front beam slightly upturned by 3-5 cm to generate prestress and increase the rigidity of the front beam. Fix the working wire rope and the safety wire rope on the suspension frame 1 of the front beam respectively, and install the upper limit device 7 at the appropriate place of the safety wire rope;

5、在悬挂架1后端放置足够数量的配重块6,并捆绑牢固。5. Place a sufficient number of counterweights 6 at the rear end of the suspension frame 1 and tie them firmly.

同时,在施工后,本申请的伸展式吊篮装置可以按照以下顺序进行拆除:At the same time, after construction, the extension type hanging basket device of the present application can be dismantled in the following order:

1、开动提升机构2,使吊篮13下降至地面或屋顶平台上并拆解;1. Start the lifting mechanism 2 to lower the hanging basket 13 to the ground or the roof platform and disassemble it;

2、拆除伸缩架装置;2. Remove the telescopic frame device;

3、拆除提升机构2、收绳机构3和导绳机构4;3. Remove the lifting mechanism 2, the rope receiving mechanism 3 and the rope guiding mechanism 4;

4、拆除悬挂架1;4. Remove the suspension frame 1;

5、将构配件通过室内施工电梯运输到地面。5. Transport the components to the ground through the indoor construction elevator.

本发明集施工作业用吊篮13、液压装置11及配套的安全保护系统为一体,可用于屋面四周带有较大悬挑挑檐、连廊、连桥,整体立面造型独特、进出凸凹不平,整体呈直线型、弧形、正V型或正W型等向楼外倾斜的高层建筑立面幕墙特别是悬挑挑檐底部吊顶幕墙施工。解决了具有以上特殊造型的楼体幕墙施工技术难题,克服了搭设脚手架经济上不合理、用普通吊篮又难以施工的局限性。本发明伸展式吊篮的重复利用率高,节省了成本,机械性能好,大大提升了特殊型体幕墙施工工效,保证了高空施工安全。The invention integrates the hanging basket 13 for construction work, the hydraulic device 11 and the supporting safety protection system, and can be used for roofs with large cantilevered eaves, corridors and bridges around the roof. The overall facade has a unique shape and is uneven in and out. , The overall shape is straight, arc, positive V or positive W, etc. The facade curtain wall of the high-rise building is inclined to the outside of the building, especially the construction of the ceiling curtain wall at the bottom of the cantilevered eaves. It solves the technical problems in the construction of the curtain wall of the building with the above special shapes, and overcomes the limitations of unreasonable economics and difficult construction with ordinary hanging baskets. The stretching hanging basket of the present invention has a high reutilization rate, saves costs, has good mechanical performance, greatly improves the construction efficiency of the special-shaped curtain wall, and ensures the safety of high-altitude construction.

上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。The above description is only an overview of the technical solutions of the present invention. In order to understand the technical means of the present invention more clearly and implement them according to the contents of the description, the preferred embodiments of the present invention and accompanying drawings are described in detail below.

以上所述仅是本发明的优选实施方式,并不用于限制本发明,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, and is not intended to limit the present invention. It should be pointed out that for those of ordinary skill in the art, some improvements can be made without departing from the technical principle of the present invention. and modifications, these improvements and modifications should also be considered as the protection scope of the present invention.

Claims (7)

1. a kind of extended position nacelle device, including crossbearer is in the hanger bracket (1) on floor, it is characterised in that the hanger bracket (1) Lower section is provided with lower carriage (8), and the hanger bracket (1) is fixed on floor by lower carriage (8), and the hanger bracket (1) is close to building The internal one end of layer is provided with adjusting bracket (17), be provided with the adjusting bracket (17) hoisting mechanism (2), rope reeling mechanism (3), Conductor rope mechanism (4) and main power control case (5), the first steel wire rope (14), first steel wire are installed on the hanger bracket (1) Rope (14) one end is connected with hoisting mechanism (2) and rope reeling mechanism (3), and the other end connects with hanger bracket (1) away from one end inside floor Connect, upper bracket (16) be installed above the hanger bracket (1), upper bracket (16) lower end is fixed with hanger bracket (1), upper end with First steel wire rope (14) is flexibly connected;
The hanger bracket (1) is connected with expansion bracket away from one end inside floor by the second steel wire rope (9), and the expansion bracket includes First expansion bracket (10) and the second expansion bracket (15), described first expansion bracket (10) one end are fixed with hanging basket (13), and described first Expansion bracket (10) is provided with first connecting portion (18), second steel wire rope (9) and first connecting portion away from hanging basket (13) side (18) connecting, described second expansion bracket (15) one end and the first expansion bracket (10) are articulated with first connecting portion (18), and described second Second connecting portion (19) is provided with expansion bracket (15), hydraulic means (11), the hydraulic means are provided with the expansion bracket (11) cylinder rod is flexibly connected with end of the first expansion bracket (10) away from hanging basket (13) one end, the cylinder of the hydraulic means (11) Body is flexibly connected with second connecting portion (19);
First steel wire rope (14) is connected with the second steel wire rope (9), and first steel wire rope (14) passes through hoisting mechanism (2) Hanging basket (13) is driven to move up or down with rope reeling mechanism (3).
2. a kind of extended position nacelle device according to claim 1, it is characterised in that the expansion bracket passes through hydraulic means (11) deploy or close, the hanging basket (13) is displaced in the horizontal direction in by expansion bracket;
When expansion bracket deploys, first expansion bracket (10) is suspended from the second steel wire rope (9) perpendicular to the second steel wire rope (9), level Lower section, the cylinder rod of the hydraulic means (11) are taken in cylinder body;
When expansion bracket closes, the cylinder rod of the hydraulic means (11) is stretched out, first expansion bracket (10) and the second expansion bracket (15) it is mutually close.
3. a kind of extended position nacelle device according to claim 1, it is characterised in that the upper bracket (16) and the first steel Cord (14) junction is provided with anti-hypervelocity safety lock.
4. a kind of extended position nacelle device according to claim 1, it is characterised in that set on second expansion bracket (15) It is equipped with counter weight device.
5. a kind of extended position nacelle device according to claim 1, it is characterised in that set on the adjusting bracket (17) There is balancing weight (6).
6. a kind of extended position nacelle device according to claim 1, it is characterised in that be provided with the hanger bracket (1) Stopping means (7).
7. a kind of extended position nacelle device according to claim 1, it is characterised in that the hoisting mechanism (2), rope drawing machine Structure (3), conductor rope mechanism (4) and main power control case (5) are installed in adjusting bracket (17) by bolt, the main power control Case (5) is installed on close to floor interior side.
CN201610251467.2A 2016-04-21 2016-04-21 A kind of extended position nacelle device Active CN105776092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610251467.2A CN105776092B (en) 2016-04-21 2016-04-21 A kind of extended position nacelle device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610251467.2A CN105776092B (en) 2016-04-21 2016-04-21 A kind of extended position nacelle device

Publications (2)

Publication Number Publication Date
CN105776092A CN105776092A (en) 2016-07-20
CN105776092B true CN105776092B (en) 2017-12-29

Family

ID=56397197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610251467.2A Active CN105776092B (en) 2016-04-21 2016-04-21 A kind of extended position nacelle device

Country Status (1)

Country Link
CN (1) CN105776092B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106618365B (en) * 2017-01-25 2022-01-04 百事特设备租赁(上海)股份有限公司 Telescopic lifting appliance mechanism of window cleaning machine
CN106812301A (en) * 2017-02-24 2017-06-09 中国建筑第八工程局有限公司 A kind of mounting structure and installation method of built on stilts hanging basket
CN107060308B (en) * 2017-03-17 2022-11-04 南通理工学院 Outside-window operation rack
CN116065802B (en) * 2023-03-08 2026-01-13 中交浚浦建筑科技(上海)有限公司 Hanging basket construction device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3787057B2 (en) * 2000-07-28 2006-06-21 株式会社アイチコーポレーション Safety device for work vehicle
CN201416264Y (en) * 2009-06-16 2010-03-03 武汉一冶建筑安装工程有限责任公司 Overhead construction stabilizing device
CN103058090A (en) * 2013-01-11 2013-04-24 江苏申锡建筑机械有限公司 Multifunctional lifting device
CN103225389A (en) * 2013-04-12 2013-07-31 山东电力建设第二工程公司 Device for mould hoisting machine of concrete cylinder wall construction top lifting platform
CN204778472U (en) * 2015-07-04 2015-11-18 杭州华泽医药科技有限公司 Construct small -size loop wheel machine
CN204873690U (en) * 2015-07-30 2015-12-16 国网山东省电力公司淄博供电公司 Pole is with hoist and mount ware
CN105197845A (en) * 2015-09-19 2015-12-30 山东德建集团有限公司 Lifting hanging type hanging basket roof cornice construction device and use method
CN205133081U (en) * 2015-11-18 2016-04-06 郭岩涛 Novel hanging flower basket system
CN205134968U (en) * 2015-10-23 2016-04-06 百事特设备租赁(上海)股份有限公司 Novel shroud ring formula linking bridge

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3787057B2 (en) * 2000-07-28 2006-06-21 株式会社アイチコーポレーション Safety device for work vehicle
CN201416264Y (en) * 2009-06-16 2010-03-03 武汉一冶建筑安装工程有限责任公司 Overhead construction stabilizing device
CN103058090A (en) * 2013-01-11 2013-04-24 江苏申锡建筑机械有限公司 Multifunctional lifting device
CN103225389A (en) * 2013-04-12 2013-07-31 山东电力建设第二工程公司 Device for mould hoisting machine of concrete cylinder wall construction top lifting platform
CN204778472U (en) * 2015-07-04 2015-11-18 杭州华泽医药科技有限公司 Construct small -size loop wheel machine
CN204873690U (en) * 2015-07-30 2015-12-16 国网山东省电力公司淄博供电公司 Pole is with hoist and mount ware
CN105197845A (en) * 2015-09-19 2015-12-30 山东德建集团有限公司 Lifting hanging type hanging basket roof cornice construction device and use method
CN205134968U (en) * 2015-10-23 2016-04-06 百事特设备租赁(上海)股份有限公司 Novel shroud ring formula linking bridge
CN205133081U (en) * 2015-11-18 2016-04-06 郭岩涛 Novel hanging flower basket system

Also Published As

Publication number Publication date
CN105776092A (en) 2016-07-20

Similar Documents

Publication Publication Date Title
CN106958346B (en) Intelligent attached lifting scaffold equipment for curved surface super high-rise building and construction method
CN105888230B (en) A kind of lowering or hoisting gear and its construction method for building curtain wall construction
CN111395730B (en) A curtain wall construction system and method suitable for high-rise buildings with special-shaped giant columns
CN105776092B (en) A kind of extended position nacelle device
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN103806645B (en) Light intelligent hydraulic climbing formwork device with good wind-resistant and fireproof performances
CN201826516U (en) Novel attached lifting scaffold
CN205688774U (en) A kind of electric bridge scaffold
CN111305063A (en) Construction method of self-adaptive gradient movable type bridge maintenance hanging basket
CN107575032A (en) A kind of bolt-ball net frame roofing installation method
CN209145256U (en) Prefabricated building special climbing frame
CN211736326U (en) Fabricated outer wall climbing frame for building construction
CN110453836B (en) Inclined glass curtain wall installation system and installation method
CN210713752U (en) High-altitude operation construction hanging basket capable of moving in three-dimensional space
CN115807532A (en) Device for attaching suspension bracket and construction method
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN206625529U (en) A kind of way curved surface builds exterior trim surface construction hanging basket
CN114876176A (en) Adjustable long cantilever combined hanging basket and application thereof
CN210857952U (en) Novel attached lifting scaffold
CN201330506Y (en) Spreader climbing mechanism
CN211172563U (en) Inclined glass curtain wall mounting system
CN220667006U (en) Construction device for simultaneously installing steel-structured elevator shaft and elevator equipment
CN209741677U (en) A assembled work platform for high mound construction
CN204252013U (en) Across pier self-propelling device
CN220376298U (en) Hanging basket lifting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant